CN211209201U - MPP pipe convenient to double-barrelled centre gripping - Google Patents

MPP pipe convenient to double-barrelled centre gripping Download PDF

Info

Publication number
CN211209201U
CN211209201U CN202020262309.9U CN202020262309U CN211209201U CN 211209201 U CN211209201 U CN 211209201U CN 202020262309 U CN202020262309 U CN 202020262309U CN 211209201 U CN211209201 U CN 211209201U
Authority
CN
China
Prior art keywords
pipe
pillow
mpp
pipe pillow
splicing
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202020262309.9U
Other languages
Chinese (zh)
Inventor
陈叶祥
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hangzhou Jintai Plastic Industry Co ltd
Original Assignee
Hangzhou Jintai Plastic Industry Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hangzhou Jintai Plastic Industry Co ltd filed Critical Hangzhou Jintai Plastic Industry Co ltd
Priority to CN202020262309.9U priority Critical patent/CN211209201U/en
Application granted granted Critical
Publication of CN211209201U publication Critical patent/CN211209201U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Supports For Pipes And Cables (AREA)

Abstract

The utility model discloses a MPP pipe convenient to double-barrelled centre gripping, manage body and second pipe pillow including MPP, MPP pipe body outer wall bottom is provided with first pipe pillow, second pipe pillow sets up in MPP pipe body outer wall top, the standing groove has all been seted up with second pipe pillow inside to first pipe pillow, the spread groove has been seted up at first pipe pillow top both ends, first concatenation groove has been seted up with second pipe pillow side to first pipe pillow, second pipe pillow top is provided with second concatenation fixture block, first concatenation fixture block all is provided with the fixture block with second concatenation fixture block both sides. This first pipe pillow of MPP pipe, second pipe pillow convenient to double-barrelled centre gripping are managed this body centre gripping with MPP and are managed the standing groove of pillow, second inside in first pipe pillow, second, and can transversely or vertically splice between the first pipe pillow of multiunit, the second pipe pillow, should be provided with and do benefit to and prepare the first pipe pillow, the second pipe pillow of corresponding quantity according to the quantity of the actual required MPP pipe body to be favorable to avoiding the wasting of resources.

Description

MPP pipe convenient to double-barrelled centre gripping
Technical Field
The utility model relates to a MPP manages technical field, specifically is a MPP pipe convenient to double-barrelled centre gripping.
Background
The MPP pipe is also called MPP power cable protection pipe, adopts modified polypropylene as main raw material, has the characteristics of high temperature resistance and external pressure resistance, is suitable for high-voltage transmission line cable duct pipes below 10KV, and is generally uniformly and neatly arranged after penetrating through a pipe pillow when the MPP pipe is installed.
The utility model discloses a pipe pillow is convenient for double-barrelled centre gripping MPP pipe, and the MPP pipe that current MPP pipe needs the pipe pillow to assist when installing to be arranged, and the MPP pipe quantity that nevertheless the pipe pillow can be fixed is limited, and this restriction often can cause unnecessary MPP pipe to install or have the vacancy on the pipe pillow, causes the wasting of resources, to above-mentioned condition, we have released a MPP pipe of being convenient for double-barrelled centre gripping.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a MPP pipe convenient to double-barrelled centre gripping to it needs the pipe pillow to assist to arrange to put forward general MPP pipe when installing in solving above-mentioned background art, however the MPP pipe quantity that the pipe pillow can be fixed is limited, and this restriction often can cause unnecessary MPP pipe can't install or the pipe has the vacancy on the pillow, causes the problem of wasting of resources.
In order to achieve the above object, the utility model provides a following technical scheme: the utility model provides a MPP pipe convenient to double-barrelled centre gripping, includes MPP pipe body and second pipe pillow, MPP pipe body outer wall bottom is provided with first pipe pillow, second pipe pillow sets up in MPP pipe body outer wall top, the standing groove has all been seted up with second pipe pillow inside to first pipe pillow, and the inside protection pad that is provided with of standing groove, the spread groove has been seted up at first pipe pillow top both ends, and the inside card strip that runs through of spread groove, first pipe pillow has been seted up with second pipe pillow side, and first pipe pillow is provided with first concatenation fixture block with second pipe pillow another side, first pipe pillow bottom is provided with the second concatenation groove, second pipe pillow top is provided with second concatenation fixture block, the draw-in groove has all been seted up with second concatenation inslot portion to first concatenation groove, first concatenation fixture block all is provided with the fixture block with second concatenation fixture block both sides.
Preferably, the MPP pipe body constitutes the structure that surrounds entirely through first pipe pillow, second pipe pillow, and the upper surface of first pipe pillow is laminated mutually with the lower surface of second pipe pillow.
Preferably, the standing groove is the arc structure, and MPP pipe body passes through to constitute clamping structure between protection pad, standing groove and first pipe pillow, the second pipe pillow.
Preferably, first pipe pillow constitutes the block structure through blocking between strip, spread groove and the second pipe pillow, and is the integrated structure of moulding plastics between card strip and the second pipe pillow.
Preferably, the inner opening structure size of the first splicing groove is matched with the inner opening structure size of the second splicing groove, and the central axes of the first splicing groove and the second splicing groove are perpendicular to the central axis of the MPP pipe body.
Preferably, the outer opening structure size of the second splicing fixture block is matched with the outer opening structure size of the first splicing fixture block, and the central axes of the second splicing fixture block and the first splicing fixture block are perpendicular to the central axis of the MPP pipe body.
Preferably, the first pipe pillow and the second pipe pillow form a splicing structure through the clamping groove and the clamping block, and the structural size of an inner opening of the clamping groove is matched with the structural size of an outer opening of the clamping block.
Compared with the prior art, the beneficial effects of the utility model are that: this MPP pipe convenient to double-barrelled centre gripping is managed body centre gripping in the inside standing groove of first pipe pillow, second pipe pillow through first pipe pillow, second pipe pillow, and can transversely or vertically splice between the first pipe pillow of multiunit, second pipe pillow, should be provided with and do benefit to the first pipe pillow, the second pipe pillow of corresponding quantity of quantity preparation according to the quantity of the actual required MPP pipe body to be favorable to avoiding the wasting of resources.
This MPP pipe second pipe pillow bottom card convenient to double-barrelled centre gripping can accomplish the equipment in the spread groove of first pipe pillow, and MPP pipe body is held in the standing groove this moment, and this equipment operation mode is easily understood, makes things convenient for the staff operation, and first pipe pillow, second pipe pillow are plastic goods, through mould injection production, make things convenient for the producer to produce when being favorable to reduction in production cost.
This MPP pipe standing groove convenient to double-barrelled centre gripping is inside to be provided with the protection pad, and the protection pad has high toughness, corrosion resistance and non-skid property for the rubber pad, is favorable to improving the centre gripping dynamics of first pipe pillow, second pipe pillow to MPP pipe body, prevents that MPP pipe body from taking place to rock or the landing.
Drawings
FIG. 1 is a schematic front view of the present invention;
FIG. 2 is a front view of the first tube pillow of the present invention;
FIG. 3 is a schematic top view of a second tube pillow of the present invention;
FIG. 4 is an enlarged schematic view of the structure at A in FIG. 2 according to the present invention;
fig. 5 is an enlarged schematic view of the structure at B in fig. 2 according to the present invention.
In the figure: 1. an MPP pipe body; 2. a first tube pillow; 3. a second tube pillow; 4. a placement groove; 5. A protective pad; 6. connecting grooves; 7. clamping the strip; 8. a first splice groove; 9. a first splicing fixture block; 10. a second splice groove; 11. a second splicing fixture block; 12. a card slot; 13. and (7) clamping blocks.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
Referring to fig. 1-5, the present invention provides a technical solution: an MPP pipe convenient for double-pipe clamping comprises an MPP pipe body 1 and a second pipe pillow 3, wherein a first pipe pillow 2 is arranged at the bottom of the outer wall of the MPP pipe body 1, the second pipe pillow 3 is arranged at the top of the outer wall of the MPP pipe body 1, the MPP pipe body 1 forms a full-enclosure structure through the first pipe pillow 2 and the second pipe pillow 3, the upper surface of the first pipe pillow 2 is attached to the lower surface of the second pipe pillow 3, the first pipe pillow 2 and the second pipe pillow 3 wrap the outer wall of the MPP pipe body 1 to prevent the MPP pipe body 1 from falling off from the first pipe pillow 2 and the second pipe pillow 3, and the upper surface of the first pipe pillow 2 is attached to the lower surface of the second pipe pillow 3 to improve the firmness of connection between the first pipe pillow 2 and the second pipe pillow 3;
placing grooves 4 are formed in the first pipe pillow 2 and the second pipe pillow 3, a protective pad 5 is arranged in each placing groove 4, each placing groove 4 is of an arc-shaped structure, the MPP pipe body 1 forms a clamping structure with the first pipe pillow 2 and the second pipe pillow 3 through the protective pad 5, each placing groove 4 is of an arc-shaped structure and is matched with the outer opening structure of the MPP pipe body 1, the MPP pipe body 1 penetrates through each placing groove 4 at the moment, the protective pads 5 are arranged in each placing groove 4, each protective pad 5 is a rubber pad and has high toughness, corrosion resistance and skid resistance, the clamping force of the first pipe pillow 2 and the second pipe pillow 3 on the MPP pipe body 1 is favorably improved, and the MPP pipe body 1 is prevented from shaking or sliding;
the MPP pipe body 1 is clamped in the placing groove 4 at the moment, the assembling operation mode is simple and easy to understand, the operation of workers is convenient, and the injection molding integrated structure is formed between the clamping strip 7 and the second pipe pillow 3, so that convenience is brought to production of manufacturers;
a first splicing groove 8 is arranged on one side surface of the first pipe pillow 2 and the second pipe pillow 3, a first splicing fixture block 9 is arranged on the other side surface of the first pipe pillow 2 and the second pipe pillow 3, a second splicing groove 10 is arranged at the bottom of the first pipe pillow 2, the inner opening structure size of the first splicing groove 8 is matched with that of the second splicing groove 10, the axle wires of the first splicing groove 8 and the second splicing groove 10 are mutually vertical to the axle wire of the MPP pipe body 1,
the top of the second pipe pillow 3 is provided with a second splicing fixture block 11, the structural size of an outer opening of the second splicing fixture block 11 is matched with that of an outer opening of the first splicing fixture block 9, the second splicing fixture block 11 and the central axis of the first splicing fixture block 9 are perpendicular to that of the MPP pipe body 1, the first splicing groove 8 and the first splicing fixture block 9 are formed by assembling the first pipe pillow 2 and the second pipe pillow 3, the first splicing fixture block 11 and the central axis of the first splicing fixture block 9 are respectively distributed on two sides of the first pipe pillow 2 and the second pipe pillow 3, the first splicing fixture block 9 of one group of first pipe pillow 2 and the second pipe pillow 3 is inserted into the first splicing groove 8 of the other group of first pipe pillow 2 and the second pipe pillow 3 to realize transverse splicing of a plurality of groups of first pipe pillows 2 and second pipe pillows 3, and the second splicing fixture block 11 is inserted into the second splicing groove 10 to realize longitudinal splicing of the plurality of groups of first pipe pillows 2 and second pipe pillows 3, and the first pipe pillows 2 and the second pipe pillows 3 are favorable for preparing the corresponding number of first pipe bodies, The second pipe pillow 3 is beneficial to avoiding resource waste, the central axis of the first splicing fixture block 9 is perpendicular to the central axis of the MPP pipe body 1, the central axes of the first splicing groove 8 and the second splicing groove 10 are perpendicular to the central axis of the MPP pipe body 1, and the arrangement is beneficial to orderly arrangement of the MPP pipe bodies 1 and prevents the MPP pipe bodies 1 from being inclined;
the first splicing groove 8 and the second splicing groove 10 are both internally provided with a clamping groove 12, the first splicing fixture block 9 and the second splicing fixture block 11 are both provided with a fixture block 13 at both sides, the first pipe pillow 2 and the second pipe pillow 3 form a splicing structure through the clamping groove 12 and the fixture block 13, and the inner opening structure size of the clamping groove 12 is matched with the outer opening structure size of the clamping block 13, when the first splicing clamping block 9 is inserted into the first splicing groove 8, the clamping blocks 13 at the two sides of the first splicing clamping block 9 are clamped into the clamping grooves 12 in the first splicing groove 8 along the same force, the arrangement is favorable for preventing the first splicing fixture block 9 from falling off from the inside of the first splicing groove 8, is favorable for improving the stability of the splicing of the plurality of groups of the first pipe sleepers 2 and the second pipe sleepers 3, and the structural size of the inner opening of the clamping groove 12 is matched with the structural size of the outer opening of the clamping block 13, so that the clamping block 13 and the first splicing clamping block 9 can be prevented from shaking in the first splicing groove 8.
The working principle is as follows: when the MPP pipe convenient for double-pipe clamping is used, firstly, an MPP pipe body 1 is placed in a placing groove 4 at the top of a first pipe pillow 2, then a clamping strip 7 at the bottom of a second pipe pillow 3 is clamped into a connecting groove 6 of the first pipe pillow 2 to complete assembling, at the moment, the surface of the MPP pipe body 1 is wrapped by the second pipe pillow 3 and the first pipe pillow 2, a protective pad 5 is arranged inside the placing groove 4, the protective pad 5 is a rubber pad with high toughness, corrosion resistance and skid resistance, the clamping force of the first pipe pillow 2 and the second pipe pillow 3 on the MPP pipe body 1 is favorably improved, the MPP pipe body 1 is prevented from shaking or slipping, then a first splicing groove 8 and a first splicing clamping block 9 are formed by assembling the first pipe pillow 2 and the second pipe pillow 3 and are respectively distributed on two sides of the first pipe pillow 2 and the second pipe pillow 3, and a group of first pipe pillow 2 and a group of second pipe pillow 3 are inserted into another group of first pipe pillow 2, The transverse splicing of a plurality of groups of first pipe sleepers 2 and second pipe sleepers 3 can be realized in the first splicing groove 8 of the second pipe sleeper 3, and similarly, the longitudinal splicing of a plurality of groups of first pipe sleepers 2 and second pipe sleepers 3 can be realized when the second splicing fixture block 11 is inserted into the second splicing groove 10, the arrangement is favorable for preparing the first pipe sleepers 2 and second pipe sleepers 3 with corresponding numbers according to the number of the MPP pipe bodies 1 required actually, so that resource waste is avoided, and then, because the central axis of the first splicing fixture block 9 is vertical to the central axis of the MPP pipe bodies 1, the central axes of the first splicing groove 8 and the second splicing groove 10 are vertical to the central axis of the MPP pipe bodies 1, the arrangement is favorable for orderly arranging a plurality of MPP pipe bodies 1 to prevent the MPP pipe bodies 1 from skewing, and finally when the first splicing fixture block 9 is inserted into the first splicing groove 8 or the second splicing fixture block 11 is inserted into the second splicing groove 10, in the draw-in groove 12 of first splice groove 8 inside is gone into to the fixture block 13 homeotropic card of first splice fixture block 9 both sides, should be provided with and do benefit to and prevent that first splice fixture block 9 from taking place to drop from first splice groove 8 is inside, be favorable to improving the steadiness when the first tub of pillow 2 of multiunit, the concatenation of second tub of pillow 3, and the outer mouthful of structural dimension of interior mouthful structural dimension of draw-in groove 12 and fixture block 13 is identical can prevent that fixture block 13, first splice fixture block 9 from taking place to rock in first splice groove 8 is inside.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the invention, the scope of which is defined in the appended claims and their equivalents.

Claims (7)

1. The utility model provides a MPP pipe convenient to double-barrelled centre gripping, includes MPP pipe body (1) and second pipe pillow (3), its characterized in that: the MPP pipe comprises a MPP pipe body (1), wherein a first pipe pillow (2) is arranged at the bottom of the outer wall of the MPP pipe body (1), a second pipe pillow (3) is arranged at the top of the outer wall of the MPP pipe body (1), a placing groove (4) is formed in the first pipe pillow (2) and the second pipe pillow (3), a protective pad (5) is arranged in the placing groove (4), connecting grooves (6) are formed in two ends of the top of the first pipe pillow (2), a clamping strip (7) penetrates through the inside of the connecting groove (6), a first splicing groove (8) is formed in one side face of the first pipe pillow (2) and the second pipe pillow (3), a first splicing clamping block (9) is arranged on the other side face of the first pipe pillow (2) and the second pipe pillow (3), a second splicing groove (10) is formed in the bottom of the first pipe pillow (2), a second splicing clamping block (11) is arranged at the top of the second pipe pillow (3), and a second splicing groove (12) is formed in the first splicing groove (8) and the, and clamping blocks (13) are arranged on both sides of the first splicing clamping block (9) and the second splicing clamping block (11).
2. The MPP tube to facilitate double tube clamping of claim 1, wherein: MPP pipe body (1) constitute through first pipe pillow (2), second pipe pillow (3) and enclose the structure entirely, and the upper surface of first pipe pillow (2) is laminated mutually with the lower surface of second pipe pillow (3).
3. The MPP tube to facilitate double tube clamping of claim 1, wherein: standing groove (4) are the arc structure, and MPP pipe body (1) constitutes clamping structure through protecting between pad (5), standing groove (4) and first pipe pillow (2), second pipe pillow (3).
4. The MPP tube to facilitate double tube clamping of claim 1, wherein: first pipe pillow (2) constitute the block structure through blocking between strip (7), spread groove (6) and second pipe pillow (3), and be the integrated structure of moulding plastics between card strip (7) and second pipe pillow (3).
5. The MPP tube to facilitate double tube clamping of claim 1, wherein: the inner opening structure size of the first splicing groove (8) is matched with that of the second splicing groove (10), and the central axes of the first splicing groove (8) and the second splicing groove (10) are perpendicular to the central axis of the MPP pipe body (1).
6. The MPP tube to facilitate double tube clamping of claim 1, wherein: the outer opening structure size of the second splicing fixture block (11) is matched with the outer opening structure size of the first splicing fixture block (9), and the central axis of the second splicing fixture block (11) and the central axis of the first splicing fixture block (9) are perpendicular to the central axis of the MPP pipe body (1).
7. The MPP tube to facilitate double tube clamping of claim 1, wherein: the first pipe pillow (2) and the second pipe pillow (3) form a splicing structure through the clamping groove (12) and the clamping block (13), and the structural size of an inner opening of the clamping groove (12) is matched with that of an outer opening of the clamping block (13).
CN202020262309.9U 2020-03-06 2020-03-06 MPP pipe convenient to double-barrelled centre gripping Active CN211209201U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202020262309.9U CN211209201U (en) 2020-03-06 2020-03-06 MPP pipe convenient to double-barrelled centre gripping

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202020262309.9U CN211209201U (en) 2020-03-06 2020-03-06 MPP pipe convenient to double-barrelled centre gripping

Publications (1)

Publication Number Publication Date
CN211209201U true CN211209201U (en) 2020-08-07

Family

ID=71856357

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202020262309.9U Active CN211209201U (en) 2020-03-06 2020-03-06 MPP pipe convenient to double-barrelled centre gripping

Country Status (1)

Country Link
CN (1) CN211209201U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113278221A (en) * 2021-06-04 2021-08-20 安徽玉发塑业有限公司 Impact-resistant heat-resistant flame-retardant MPP pipe and preparation method thereof

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113278221A (en) * 2021-06-04 2021-08-20 安徽玉发塑业有限公司 Impact-resistant heat-resistant flame-retardant MPP pipe and preparation method thereof

Similar Documents

Publication Publication Date Title
CN211209201U (en) MPP pipe convenient to double-barrelled centre gripping
CN202888735U (en) Cable bunching machine
CN201518396U (en) Tool for replacing strain insulator string in 220 KV circuit with charged line
CN201813110U (en) Special clamp for drawing cable machine
CN205064191U (en) Wind generating set cable fixing device
CN212515160U (en) Communication optical cable
CN106655047A (en) Spool type insulator street sign indicating number
CN211017285U (en) Laminate polymer battery restraint tray
CN211404091U (en) Flat cable for elevator
CN214849228U (en) New forms of energy combination concatenation formula pencil connection structure
CN206850383U (en) Spool insulator street code
CN211371618U (en) Laying and connecting structure of high-density polyethylene solid-wall water supply engineering pipe
CN209896275U (en) Insulating thermal shrinkage rubber sleeve
CN211266307U (en) Cable fixing clamp for electrical engineering
CN209946492U (en) General optical divider installation device
CN207282173U (en) A kind of new type mining cable
CN220556671U (en) Quick detach formula power tube pillow
CN214956095U (en) Tensile and compressive power cable
CN211377447U (en) Compound insulating type PE electric power pipe of multiple protection
CN217639676U (en) Storage device for eight types of jumper wires
CN216612349U (en) Hook-shaped rubber band for binding electric wire
CN218768858U (en) Super liquid cooling cable that fills soon
CN214411662U (en) Practical PVC power cord of anti-drop
CN208384195U (en) A kind of communication cable fixed appliance
CN203759330U (en) Multi-row jumper fiber protecting sleeve

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant