CN211203361U - Railway storage material monitoring and managing device - Google Patents

Railway storage material monitoring and managing device Download PDF

Info

Publication number
CN211203361U
CN211203361U CN201921811602.XU CN201921811602U CN211203361U CN 211203361 U CN211203361 U CN 211203361U CN 201921811602 U CN201921811602 U CN 201921811602U CN 211203361 U CN211203361 U CN 211203361U
Authority
CN
China
Prior art keywords
installation box
gear
motor
wall
storage material
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201921811602.XU
Other languages
Chinese (zh)
Inventor
杨励钦
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201921811602.XU priority Critical patent/CN211203361U/en
Application granted granted Critical
Publication of CN211203361U publication Critical patent/CN211203361U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

The utility model discloses a railway storage material control management device belongs to monitoring device technical field. A railway storage material monitoring and managing device comprises an installation box lifting platform and a monitor, wherein a first sealing ring is connected in the installation box, a first motor is connected in the installation box, a first partition plate is connected in the installation box, the output end of the first motor is connected with a first gear, the top of the first partition plate is connected with a rotating shaft, the rotating shaft is rotatably connected with a second gear, the first gear is meshed with the second gear, the top of the second gear is connected with a screw rod, a nut sleeve is connected in the lifting platform and meshed with the screw rod, the top of the second partition plate is connected in the lifting platform and connected with a second motor, a second through hole is formed in the top of the lifting platform, the output of the second motor is connected with a rotary table, and the monitor is fixedly connected to the rotary table; the utility model discloses use the outside of totally closed box separation to float and sink, not only can freely adjust monitoring area but also effectively promote the life of internals.

Description

Railway storage material monitoring and managing device
Technical Field
The utility model relates to a monitoring device technical field especially relates to a railway storage material control management device.
Background
The storage refers to a general term of storing, keeping and warehouse-related storage activities of materials through a warehouse, which is generated along with the generation of material storage and is developed along with the development of productivity, the storage is one of important links of commodity circulation and is also an important pillar of logistics activities, when the storage material management is carried out, a real-time monitoring device is needed to monitor the materials, especially in a railway storage place, as the freight train transports more materials, a large number of personnel cannot be equipped for patrol, and the arrangement of the monitoring device becomes a great importance.
In the prior art, after the monitoring device is installed, the monitoring device is influenced by an installation environment, the dead angle range is large after the monitoring device is fixed, the monitoring effect is seriously influenced, and the service life of the monitoring device is also influenced due to large floating dust in railway transportation; therefore, a railway storage material monitoring and managing device with a protection function and capable of being observed in a multi-angle and high-definition mode is needed.
SUMMERY OF THE UTILITY MODEL
The utility model aims at solving the defects in the prior art and providing a railway storage material monitoring and managing device.
In order to achieve the above purpose, the utility model adopts the following technical scheme:
a railway storage material monitoring and management device comprises an installation box lifting platform and a monitor, wherein the lifting platform is connected in an installation box in a sliding manner, a first sealing ring is connected to the inner wall of the top of the installation box, a first motor is connected to the inner wall of the bottom of the installation box, a first partition plate is connected in the installation box, the output end of the first motor penetrates through the first partition plate and extends to the top, a first gear is connected to the top of the first partition plate, a rotating shaft is connected to the top of the first partition plate, a second gear is connected to the rotating shaft in a rotating manner, the first gear is meshed with the second gear, a lead screw is connected to the top of the second gear, a nut sleeve is connected in the lifting platform and is meshed with the lead screw, a second motor is connected to the top of the second partition plate in the lifting platform, a second through hole is formed in the top of the lifting platform, the output end of the second motor penetrates through the second through hole to extend to the top to be connected with a rotary table, and the monitor is fixedly connected to the rotary table.
Preferably, the first partition plate is provided with a first through hole, and the output end of the first motor penetrates through the first through hole.
Preferably, the installation box is internally connected with a guide rail, the outer wall of the lifting platform is provided with a sliding groove, and the guide rail is connected with the sliding groove in a sliding manner.
Preferably, the inner wall of the installation box is connected with a limiting block, and the bottom wall of the lifting platform is abutted to the limiting block.
Preferably, a first groove is formed in the inner wall of the top of the installation box, the first sealing ring is connected in the first groove, and the outer wall of the first sealing ring is attached to the outer wall of the lifting table;
a second groove is formed in the second through hole, the second sealing ring is connected in the second groove, and the outer wall of the second sealing ring is attached to the outer wall of the output end of the second motor.
Preferably, the first sealing ring and the second sealing ring are both made of nitrile rubber.
Preferably, the bottom of the installation box is connected with a fixing plate, and the fixing plate is provided with an installation hole.
Compared with the prior art, the utility model provides a railway storage material control management device possesses following beneficial effect:
1. the railway storage material monitoring and management device can realize the monitoring of the lifting and rotating of the monitor at multiple angles by fixing the installation box in the area to be monitored, specifically, an expansion bolt and the like are used for penetrating through the installation hole to fix the fixed plate, when the monitoring area needs to be adjusted up and down, the first motor is started to drive the first gear to rotate, and then the second gear meshed with the first gear rotates on the rotating shaft, at the moment, the screw rod fixedly connected with the second gear rotates to push the nut sleeve meshed with the nut sleeve upwards or downwards, at the position, the nut sleeve and the screw rod are matched with opposite threads, so that when the two second gears reversely rotate, the two nut sleeves can simultaneously ascend or descend, the two nut sleeves simultaneously ascend or descend to greatly improve the lifting synchronism of the lifting platform, and the lifting platform is more stable, when the lifting platform drives the monitor to ascend and descend to adjust the position, inside first sealing washer of first groove connection can effectively prevent outside dust to get into the install bin, and then promote the life of inside engagement part by a wide margin, when needs carry out turned angle, the just reversal of direct control second motor can, the second motor drives the carousel and rotates, thereby adjust the observation angle of watch-dog, convenient and fast, here, the second sealing washer of second recess internal connection can make closely laminating between output shaft and the second through-hole of second motor, prevent that the dust that floats from getting into, make install bin and elevating platform inside sealed completely, promote the life of internals greatly.
Drawings
Fig. 1 is a schematic structural diagram of a railway storage material monitoring and managing device provided by the present invention;
fig. 2 is a schematic structural diagram of a railway storage material monitoring and managing device provided by the present invention;
fig. 3 is a schematic structural view of an installation box of a railway storage material monitoring and managing device provided by the utility model;
fig. 4 is the utility model provides a structural schematic diagram of a railway storage material monitoring management device elevating platform.
In the figure: 1. installing a box; 101. a fixing plate; 1011. mounting holes; 102. a guide rail; 103. a first separator; 1031. a first through hole; 1032. a rotating shaft; 1033. a limiting block; 104. a first groove; 1041. a first seal ring; 2. a lifting platform; 201. a nut sleeve; 202. a chute; 203. a second separator; 204. a second through hole; 2041. a second groove; 2042. a second seal ring; 3. a first motor; 301. a first gear; 302. a second gear; 303. a screw rod; 4. a second motor; 401. a turntable; 5. and a monitor.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments.
In the description of the present invention, it is to be understood that the terms "upper", "lower", "front", "rear", "left", "right", "top", "bottom", "inner", "outer", and the like indicate orientations or positional relationships based on the orientations or positional relationships shown in the drawings, and are only for convenience of description and simplicity of description, and do not indicate or imply that the device or element being referred to must have a particular orientation, be constructed and operated in a particular orientation, and therefore, should not be construed as limiting the present invention.
Example (b):
referring to fig. 1-4, a railway storage material monitoring and management device comprises an installation box 1, an elevating platform 2 and a monitor 5, wherein the elevating platform 2 is slidably connected in the installation box 1, the top inner wall of the installation box 1 is connected with a first sealing ring 1041, the bottom inner wall of the installation box 1 is connected with a first motor 3, the installation box 1 is connected with a first partition plate 103, the output end of the first motor 3 penetrates through the first partition plate 103 and extends to the top to be connected with a first gear 301, the top of the first partition plate 103 is connected with a rotating shaft 1032, the rotating shaft 1032 is rotatably connected with a second gear 302, the first gear 301 is meshed with the second gear 302, the top of the second gear 302 is connected with a screw rod 303, the elevating platform 2 is connected with a nut sleeve 201, the nut sleeve 201 is meshed with the screw rod 303, the elevating platform 2 is connected with a second motor 4 at the top of a second partition plate 203, the elevating platform, the second sealing ring 2042 is connected in the second through hole 204, the output end of the second motor 4 penetrates through the second through hole 204 and extends to the top to be connected with a rotary table 401, and the monitor 5 is fixedly connected to the rotary table 401.
The first partition 103 has a first through hole 1031, and the output end of the first motor 3 passes through the first through hole 1031.
Guide rail 102 is connected in installation case 1, and elevating platform 2 outer wall has seted up spout 202, and guide rail 102 and spout 202 slide linkage.
The inner wall of the installation box 1 is connected with a limiting block 1033, and the bottom wall of the lifting platform 2 is abutted to the limiting block 1033.
A first groove 104 is formed in the inner wall of the top of the installation box 1, a first sealing ring 1041 is connected in the first groove 104, and the outer wall of the first sealing ring 1041 is attached to the outer wall of the lifting platform 2;
a second groove 2041 is formed in the second through hole 204, the second sealing ring 2042 is connected in the second groove 2041, and the outer wall of the second sealing ring 2042 is attached to the outer wall of the output end of the second motor 4.
The first seal ring 1041 and the second seal ring 2042 are both made of nitrile rubber.
The bottom of the installation box 1 is connected with a fixing plate 101, and the fixing plate 101 is provided with an installation hole 1011.
The working principle is as follows: in the utility model, the installation box 1 is fixed in the area to be monitored, so as to realize the monitoring of the monitor 5 at multiple angles of elevation and rotation, specifically, an expansion bolt is used to pass through the installation hole 1011 to fix the fixing plate 101, when the monitoring area needs to be adjusted up and down, the first motor 3 is started to drive the first gear 301 to rotate, and further the second gear 302 engaged with the first gear is rotated on the rotating shaft 1032, at the moment, the screw rod 303 fixedly connected with the second gear 302 rotates to push or shrink the nut sleeve 201 engaged with the first gear upwards, here, the nut sleeve 201 and the screw rod 303 are opposite threads matched, thereby ensuring that when the two second gears 302 rotate oppositely, the two nut sleeves 201 can ascend or descend simultaneously, the two nut sleeves 201 ascend or descend simultaneously to greatly improve the elevation synchronism of the lifting platform 2, and the lifting platform 2 drives the monitor 5 to ascend and descend to adjust the position, connect first sealing washer 1041 at first recess 104 and can effectively prevent outside dust to get into install bin 1 inside, and then promote inside engagement parts's life by a wide margin, when needs carry out turned angle, direct control second motor 4 just reverse can, second motor 4 drives carousel 401 and rotates, thereby adjust watch-dog 5's observation angle, high convenience and fast, here, second sealing washer 2042 of second recess 2041 internal connection can make and closely laminate between second motor 4's output shaft and the second through-hole 204, prevent that the floating dust from getting into, make install bin 1 and 2 inside complete sealings of elevating platform, promote internals's life greatly.
The above, only be the concrete implementation of the preferred embodiment of the present invention, but the protection scope of the present invention is not limited thereto, and any person skilled in the art is in the technical scope of the present invention, according to the technical solution of the present invention and the utility model, the concept of which is equivalent to replace or change, should be covered within the protection scope of the present invention.

Claims (7)

1. The railway storage material monitoring and managing device comprises an installation box (1), an elevating platform (2) and a monitor (5), wherein the elevating platform (2) is connected in the installation box (1) in a sliding manner, and is characterized in that a first sealing ring (1041) is connected to the inner wall of the top of the installation box (1), a first motor (3) is connected to the inner wall of the bottom of the installation box (1), a first partition plate (103) is connected in the installation box (1), the output end of the first motor (3) penetrates through the first partition plate (103) and extends to the top to be connected with a first gear (301), the top of the first partition plate (103) is connected with a rotating shaft (1032), a second gear (302) is rotatably connected on the rotating shaft (1032), the first gear (301) is meshed with the second gear (302), the top of the second gear (302) is connected with a screw rod (303), a nut sleeve (201) is connected in the elevating platform (2), nut cover (201) and lead screw (303) mesh mutually, elevating platform (2) in-connection has second baffle (203) top to be connected with second motor (4), second through-hole (204) have been seted up at elevating platform (2) top, second through-hole (204) in-connection has second sealing washer (2042), the output of second motor (4) runs through second through-hole (204) and extends to the top and be connected with carousel (401), watch-dog (5) fixed connection is on carousel (401).
2. The railway storage material monitoring and managing device as claimed in claim 1, wherein the first partition (103) is provided with a first through hole (1031), and the output end of the first motor (3) penetrates through the first through hole (1031).
3. The railway storage material monitoring and managing device as claimed in claim 1, wherein a guide rail (102) is connected in the installation box (1), a sliding groove (202) is formed in the outer wall of the lifting platform (2), and the guide rail (102) is connected with the sliding groove (202) in a sliding manner.
4. The railway storage material monitoring and managing device as claimed in claim 3, wherein a limiting block (1033) is connected to the inner wall of the installation box (1), and the bottom wall of the lifting platform (2) abuts against the limiting block (1033).
5. The railway storage material monitoring and managing device as claimed in claim 1, wherein a first groove (104) is formed in the inner wall of the top of the installation box (1), the first sealing ring (1041) is connected in the first groove (104), and the outer wall of the first sealing ring (1041) is attached to the outer wall of the lifting platform (2);
second recess (2041) have been seted up in second through-hole (204), second sealing washer (2042) are connected in second recess (2041), just the outer wall of second sealing washer (2042) is laminated with the output outer wall of second motor (4) mutually.
6. The railway storage material monitoring and managing device as claimed in claim 1, wherein the first sealing ring (1041) and the second sealing ring (2042) are made of nitrile rubber.
7. The railway storage material monitoring and managing device as claimed in claim 1, wherein a fixing plate (101) is connected to the bottom of the installation box (1), and a mounting hole (1011) is formed in the fixing plate (101).
CN201921811602.XU 2019-10-26 2019-10-26 Railway storage material monitoring and managing device Expired - Fee Related CN211203361U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201921811602.XU CN211203361U (en) 2019-10-26 2019-10-26 Railway storage material monitoring and managing device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201921811602.XU CN211203361U (en) 2019-10-26 2019-10-26 Railway storage material monitoring and managing device

Publications (1)

Publication Number Publication Date
CN211203361U true CN211203361U (en) 2020-08-07

Family

ID=71879515

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201921811602.XU Expired - Fee Related CN211203361U (en) 2019-10-26 2019-10-26 Railway storage material monitoring and managing device

Country Status (1)

Country Link
CN (1) CN211203361U (en)

Similar Documents

Publication Publication Date Title
CN202792753U (en) Ice stirring and breaking driving device
CN211203361U (en) Railway storage material monitoring and managing device
CN208670228U (en) A kind of headstock gear of manual bevel gear engagement and screw nut driving
CN214543213U (en) Energy-saving switch board
CN215042553U (en) Mobile detection car of construction supervision
CN211038446U (en) Intelligent prison door
CN212107132U (en) Screw rod and nut valve speed reducer
CN212305861U (en) Outdoor information communication cabinet
CN114426148A (en) A fresh-keeping storage device for rice processing
CN210539844U (en) Classified storage rack for files for business administration
CN210074159U (en) Novel 4G antenna
CN208581036U (en) Rail traffic junction box
CN210739325U (en) Stable reduction gearbox for wind power generation
CN215808262U (en) Intelligent building comprehensive illumination monitoring system
CN203079227U (en) Spiral conveyor convenient to maintain
CN213871734U (en) Building water utilization engineering management device
CN216038572U (en) Single-station cap screwing and pressing device
CN211287196U (en) Buried automatic door transmission mechanism
CN213539304U (en) Fixing device for container prefabricated house
CN203442113U (en) Sealing lock
CN216699133U (en) Switch cabinet convenient to overhaul
CN201285711Y (en) Manual operating mechanism for electric switch equipment
CN213732022U (en) Motorcycle helmet processingequipment
CN116929856B (en) Sampling robot and method for monitoring pollution of urban sewage to inland water quality
CN215405875U (en) Hydraulic engineering flood prevention composite module fixing device

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20200807

Termination date: 20211026