CN211200408U - Rain and sewage pipeline groove supporting construction - Google Patents

Rain and sewage pipeline groove supporting construction Download PDF

Info

Publication number
CN211200408U
CN211200408U CN201922209725.2U CN201922209725U CN211200408U CN 211200408 U CN211200408 U CN 211200408U CN 201922209725 U CN201922209725 U CN 201922209725U CN 211200408 U CN211200408 U CN 211200408U
Authority
CN
China
Prior art keywords
spread groove
groove
mounting
supporting construction
extension plate
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201922209725.2U
Other languages
Chinese (zh)
Inventor
刘斌
张璐
陆建伟
许晓琴
伍星星
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shenzhen Special Zone Construction Engineering Energy Construction Group Co.,Ltd.
Original Assignee
Shenzhen Tianjian Pingshan Construction Engineering Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shenzhen Tianjian Pingshan Construction Engineering Co ltd filed Critical Shenzhen Tianjian Pingshan Construction Engineering Co ltd
Priority to CN201922209725.2U priority Critical patent/CN211200408U/en
Application granted granted Critical
Publication of CN211200408U publication Critical patent/CN211200408U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Sewage (AREA)

Abstract

The utility model discloses a rain and sewage pipeline slot supporting construction, including a backplate, the upper end surface of a backplate is dug empty and has been offered and bear the ladder groove, the internally mounted who bears the ladder groove has the extension plate, one side surface of a backplate runs through and installs positioning mechanism, the spread groove is all installed to one side surface of a backplate and one side surface of extension plate, one side of spread groove is installed and is born the backup pad, one side of bearing the backup pad is installed the installation piece, and the installation piece is located the inside of spread groove, be provided with installation mechanism between installation piece and the spread groove. A rain and sewage pipeline slot supporting construction, can be applicable to the slot of the different degree of depth, and can be convenient for assemble.

Description

Rain and sewage pipeline groove supporting construction
Technical Field
The utility model relates to a construction field, in particular to dirty pipeline slot supporting construction of rain.
Background
When people install the rain and sewage pipeline, a pipeline groove is usually dug out firstly, and meanwhile, in order to prevent the dug pipeline groove from collapsing, a rain and sewage pipeline groove supporting structure is usually placed in the pipeline groove, so that soil slopes on two sides of the pipeline groove are blocked by the rain and sewage pipeline groove supporting structure; the existing rain and sewage pipeline groove supporting structure has certain defects when in use, cannot be suitable for grooves of different depths, is inconvenient to assemble, brings certain adverse effects to actual use, and provides a rain and sewage pipeline groove supporting structure for the purpose.
SUMMERY OF THE UTILITY MODEL
A primary object of the utility model is to provide a rain and sewage pipeline slot supporting construction can effectively solve the problem in the background art.
In order to achieve the above purpose, the utility model adopts the following technical scheme:
the utility model provides a rain sewage pipeline slot supporting construction, includes a backplate, the upper end surface of a backplate is dug empty and has been offered and bear the ladder groove, the internally mounted who bears the ladder groove has the extension plate, one side surface of a backplate runs through and installs positioning mechanism, the spread groove is all installed with one side surface of extension plate to one side surface of a backplate, one side of spread groove is installed and is born the backup pad, bear one side of backup pad and install the installation piece, and the installation piece is located the inside of spread groove, be provided with installation mechanism between installation piece and the spread groove.
Preferably, the outer surface of one side of the bearing support plate is fixedly connected with the outer surface of one side of the connecting groove through the mounting block, a welding rod is arranged between the connecting groove and the extension plate, and the outer surface of one side of the connecting groove is fixedly connected with the outer surface of one side of the extension plate through the welding rod.
By adopting the technical scheme, the welding rod has the function of welding the connecting groove and the extension plate together, the bearing support plate has the function of connecting and fixing the support, and the connecting groove has the function of connecting.
Preferably, the positioning mechanism comprises a positioning screw hole formed in the outer surface of one side of the supporting plate, a positioning stud is screwed in the positioning screw hole, the outer surface of one side of the positioning stud is attached to the outer surface of one side of the extension plate, and a rotating disc is mounted on the other side of the positioning stud.
Through adopting above-mentioned technical scheme, the locating stud plays fixed effect, and the rolling disc plays and controls pivoted effect, and the extension plate plays and blocks the effect of adjusting.
Preferably, the outer surface of the mounting block is fixedly connected with the inner side outer surface of the connecting groove through a mounting mechanism, and the outer surface of the mounting block is attached to the inner side outer surface of the connecting groove.
Through adopting above-mentioned technical scheme, the installation piece plays the effect of installation concatenation.
Preferably, the mounting mechanism comprises mounting holes formed in the outer surface of the front end of the connecting groove and the outer surface of the front end of the mounting block, a limiting magnetic ring is embedded in the bottom surface of the inside of each mounting hole, a mounting column is mounted inside each mounting hole, and the mounting columns are adsorbed to the limiting magnetic rings.
Through adopting above-mentioned technical scheme, spacing magnetic ring plays the effect of fixed mounting post, and the erection column plays fixed mounting's effect.
Preferably, a soldering lug is arranged between the mounting block and the bearing support plate, and the outer surface of one side of the mounting block is fixedly connected with the outer surface of one side of the bearing support plate through the soldering lug.
By adopting the technical scheme, the soldering lug plays a role in welding the mounting block and the bearing support plate together.
Compared with the prior art, the utility model discloses following beneficial effect has: because the installation mechanism is arranged, the bearing support plate can be placed on the connecting groove on the support plate and the connecting groove on the extension plate, the installation block on the bearing support plate is positioned in the connecting groove, the installation column is placed in the connecting groove on the connecting groove and the installation hole on the installation block, the installation column and the limiting magnetic ring are adsorbed simultaneously, and the installation column is fixed in the installation hole, make its installation piece can fix in the spread groove, be about to bear the backup pad and fix and accomplish on the backup pad and assemble on the extension plate, and then realize its benefit of being convenient for assemble, the effect of use is better for traditional mode.
Drawings
Fig. 1 is a schematic view of the overall structure of a rainwater and sewage pipeline groove supporting structure of the utility model;
fig. 2 is a cross-sectional view of a positioning mechanism of a rainwater and sewage pipeline groove supporting structure of the utility model;
fig. 3 is a cross-sectional view of the mounting mechanism of the rain and sewage pipeline groove supporting structure of the present invention;
fig. 4 is the utility model relates to a rain sewage pipeline groove supporting construction's spread groove's schematic diagram.
In the figure: 1. supporting the guard plate; 2. an extension plate; 3. a positioning mechanism; 31. positioning the screw hole; 32. positioning the stud; 33. rotating the disc; 4. connecting grooves; 5. a bearing support plate; 6. an installation mechanism; 61. mounting holes; 62. a limiting magnetic ring; 63. mounting a column; 7. mounting blocks; 8. a bearing stepped groove.
Detailed Description
In order to make the technical means, creation features, achievement purposes and functions of the present invention easy to understand, the present invention is further described below with reference to the following embodiments.
As shown in fig. 1-4, a rain and sewage pipeline groove supporting structure, including a protection plate 1, the upper end surface of a protection plate 1 is hollowed and is provided with a bearing stepped groove 8, the internally mounted bearing stepped groove 8 has an extension plate 2, one side surface of a protection plate 1 is provided with a positioning mechanism 3 in a penetrating manner, a connecting groove 4 is respectively arranged on one side surface of a protection plate 1 and one side surface of the extension plate 2, a bearing support plate 5 is arranged on one side of the connecting groove 4, a mounting block 7 is arranged on one side of the bearing support plate 5, the mounting block 7 is located inside the connecting groove 4, and a mounting mechanism 6 is arranged between the mounting block 7 and the connecting groove 4.
Bear one side surface of backup pad 5 and pass through one side fixed surface connection of installation piece 7 and spread groove 4, set up the welding rod between spread groove 4 and the extension plate 2, one side surface of spread groove 4 passes through the welding rod and is connected with one side fixed surface of extension plate 2, and the welding rod plays the effect of welding spread groove 4 and extension plate 2 together, bears backup pad 5 and plays the effect of connecting fixed stay, and spread groove 4 plays the effect of connecting.
The positioning mechanism 3 comprises a positioning screw hole 31 arranged on the outer surface of one side of the supporting plate 1, a positioning stud 32 is screwed in the positioning screw hole 31, the outer surface of one side of the positioning stud 32 is attached to the outer surface of one side of the extension plate 2, a rotating disc 33 is arranged on the other side of the positioning stud 32, the positioning stud 32 plays a role in fixing, the rotating disc 33 plays a role in holding and rotating, and the extension plate 2 plays a role in blocking and adjusting.
The outer surface of the mounting block 7 is fixedly connected with the inner side outer surface of the connecting groove 4 through the mounting mechanism 6, the outer surface of the mounting block 7 is attached to the inner side outer surface of the connecting groove 4, and the mounting block 7 plays a role in mounting and splicing.
The mounting mechanism 6 comprises a mounting hole 61 formed in the outer surface of the front end of the connecting groove 4 and the outer surface of the front end of the mounting block 7, a limiting magnetic ring 62 is embedded in the bottom surface of the inside of the mounting hole 61, a mounting column 63 is mounted inside the mounting hole 61, the mounting column 63 is adsorbed with the limiting magnetic ring 62, the limiting magnetic ring 62 plays a role in fixing the mounting column 63, and the mounting column 63 plays a role in fixed mounting.
A soldering lug is arranged between the mounting block 7 and the bearing support plate 5, the outer surface of one side of the mounting block 7 is fixedly connected with the outer surface of one side of the bearing support plate 5 through the soldering lug, and the soldering lug plays a role in welding the mounting block 7 and the bearing support plate 5 together.
It should be noted that the utility model relates to a rain and sewage pipeline groove supporting structure, when in use, a user places a bearing support plate 5 on a connecting groove 4 on a supporting plate 1 and a connecting groove 4 on an extension plate 2, and a mounting block 7 on the bearing support plate 5 is positioned inside the connecting groove 4, then the user places a mounting column 63 in a mounting hole 61 on the connecting groove 4 and a mounting hole 61 on the mounting block 7, and the mounting column 63 and a limiting magnetic ring 62 are adsorbed to fix the mounting column 63 in the mounting hole 61, so that the mounting block 7 can be fixed in the connecting groove 4, that is, the bearing support plate 5 is fixed on the supporting plate 1 and the extension plate 2, then the user pulls the extension plate 2 according to the depth of the pipeline groove, so that the extension plate 2 can be pulled out from the inside of the supporting plate 1, and the height between the extension plate 2 and the supporting plate 1 can reach the height suitable for the pipeline groove, the user rotates the positioning stud 32 in the positioning screw hole 31 afterwards, makes its positioning stud 32 can contact with extension plate 2, fixes extension plate 2 after will removing, and the user will assemble the dirty pipeline groove supporting construction after accomplishing afterwards and place in the pipeline slot, makes it support the slight slope on pipeline slot both sides through backplate 1 and extension plate 2, avoids its slight slope phenomenon of collapsing to appear, and is comparatively practical.
The basic principles and the main features of the invention and the advantages of the invention have been shown and described above. It will be understood by those skilled in the art that the present invention is not limited to the above embodiments, and that the foregoing embodiments and descriptions are provided only to illustrate the principles of the present invention without departing from the spirit and scope of the present invention. The scope of the invention is defined by the appended claims and equivalents thereof.

Claims (6)

1. The utility model provides a rain and sewage pipeline slot supporting construction, includes a backplate (1), its characterized in that: the utility model discloses a ladder fixing device, including a supporting plate (1), a supporting plate (7), a mounting block (7), the upper end surface of a supporting plate (1) is hollowed out and has been offered and bear ladder groove (8), the internally mounted who bears ladder groove (8) has extension plate (2), one side surface of a supporting plate (1) runs through and installs positioning mechanism (3), one side surface of a supporting plate (1) with spread groove (4) is all installed to one side surface of extension plate (2), one side of spread groove (4) is installed and is born backup pad (5), just mounting block (7) are located the inside of spread groove (4), mounting block (7) with be provided with between spread groove (4) installation mechanism (6).
2. A storm sewer gutter supporting construction in accordance with claim 1, characterised in that: the outer surface of one side of bearing backup pad (5) passes through installation piece (7) with the outer fixed surface of one side of spread groove (4) is connected, spread groove (4) with set up the welding rod between extension plate (2), the outer surface of one side of spread groove (4) pass through the welding rod with the outer fixed surface of one side of extension plate (2) is connected.
3. A storm sewer gutter supporting construction in accordance with claim 1, characterised in that: positioning mechanism (3) are including seting up location screw (31) of one side surface of backplate (1), the inside of location screw (31) is screwed there is positioning stud (32), just one side surface of positioning stud (32) with one side surface of extension plate (2) is laminated mutually, rolling disc (33) are installed to the opposite side of positioning stud (32).
4. A storm sewer gutter supporting construction in accordance with claim 1, characterised in that: the surface of installation piece (7) passes through installation mechanism (6) with the inboard surface fixed connection of spread groove (4), the surface of installation piece (7) with the inboard surface of spread groove (4) is laminated mutually.
5. A storm sewer gutter supporting construction in accordance with claim 1, characterised in that: the mounting mechanism (6) comprises mounting holes (61) formed in the outer surface of the front end of the connecting groove (4) and the outer surface of the front end of the mounting block (7), limiting magnetic rings (62) are embedded in the inner bottom surfaces of the mounting holes (61), mounting columns (63) are mounted in the mounting holes (61), and the mounting columns (63) are adsorbed with the limiting magnetic rings (62).
6. A storm sewer gutter supporting construction in accordance with claim 1, characterised in that: a soldering lug is arranged between the mounting block (7) and the bearing support plate (5), and the outer surface of one side of the mounting block (7) is fixedly connected with the outer surface of one side of the bearing support plate (5) through the soldering lug.
CN201922209725.2U 2019-12-11 2019-12-11 Rain and sewage pipeline groove supporting construction Active CN211200408U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201922209725.2U CN211200408U (en) 2019-12-11 2019-12-11 Rain and sewage pipeline groove supporting construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201922209725.2U CN211200408U (en) 2019-12-11 2019-12-11 Rain and sewage pipeline groove supporting construction

Publications (1)

Publication Number Publication Date
CN211200408U true CN211200408U (en) 2020-08-07

Family

ID=71851090

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201922209725.2U Active CN211200408U (en) 2019-12-11 2019-12-11 Rain and sewage pipeline groove supporting construction

Country Status (1)

Country Link
CN (1) CN211200408U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114592521A (en) * 2021-11-10 2022-06-07 鸿厦建设有限公司 Building construction foundation pit enclosure structure

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114592521A (en) * 2021-11-10 2022-06-07 鸿厦建设有限公司 Building construction foundation pit enclosure structure

Similar Documents

Publication Publication Date Title
CN211200408U (en) Rain and sewage pipeline groove supporting construction
CN208251113U (en) A kind of anti-collapse device of building foundation pit
CN203878887U (en) Automatic sewage removal device for roof drain pipe
CN209837036U (en) Steel construction assembled supporting construction
CN113897974B (en) Enclosing purlin internally-hung intercepting ditch and installation method
CN210597338U (en) Foundation pit slope stability maintaining device
CN211900004U (en) Convenient to use's house is isolated column for building engineering
KR200489323Y1 (en) Water stop device
CN218466542U (en) Square foundation ditch edge strutting arrangement
CN110924441A (en) Inspection well anti-falling device
CN210342212U (en) Sludge cleaning device for urban underground pipeline
CN211472587U (en) Assembled anti-falling plate supporting structure
CN213118325U (en) Highway construction strutting arrangement
CN205591641U (en) Novel enclosure bears down on one
CN210890405U (en) Pipeline strutting arrangement for municipal works
CN214994503U (en) Floor drain for construction industry
CN216447749U (en) On-site measuring device for territorial space planning
CN215563150U (en) Improved structure of municipal works underground pipeline
CN211058809U (en) Convenient railway tunnel construction that removes and install fast uses concrete pipe piece
CN214579287U (en) Building water supply and drainage pipeline lays and uses bearing structure based on BIM technique
CN220268665U (en) Municipal administration water supply and drainage pipeline strutting arrangement
CN217634223U (en) Pipeline protection casing for hydraulic engineering
CN104018625A (en) Automatic sewage clearing device for roof drain pipe
CN210508231U (en) Outdoor crystal plastic floor mounting structure
CN218130437U (en) Swimming pool filter element with metal layer

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CP03 Change of name, title or address

Address after: 518000, 2007 Pingshan Avenue, Liulian Community, Pingshan Street, Pingshan District, Shenzhen City, Guangdong Province, China Innovation Plaza A1201-A1206

Patentee after: Shenzhen Special Zone Construction Engineering Energy Construction Group Co.,Ltd.

Country or region after: China

Address before: No. a1201-a1206, block a, innovation Plaza, 2007 Pingshan Avenue, Malian street, Pingshan District, Shenzhen, Guangdong 518000

Patentee before: SHENZHEN TIANJIAN PINGSHAN CONSTRUCTION ENGINEERING Co.,Ltd.

Country or region before: China