CN211189584U - Industrial waste gas treatment box - Google Patents

Industrial waste gas treatment box Download PDF

Info

Publication number
CN211189584U
CN211189584U CN201921618611.7U CN201921618611U CN211189584U CN 211189584 U CN211189584 U CN 211189584U CN 201921618611 U CN201921618611 U CN 201921618611U CN 211189584 U CN211189584 U CN 211189584U
Authority
CN
China
Prior art keywords
waste gas
fixedly connected
hole
box
industrial waste
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201921618611.7U
Other languages
Chinese (zh)
Inventor
陈强
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Weilin Environmental Protection Technology Dalian Co ltd
Original Assignee
Nan'an Xingbai Decoration Engineering Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Nan'an Xingbai Decoration Engineering Co ltd filed Critical Nan'an Xingbai Decoration Engineering Co ltd
Priority to CN201921618611.7U priority Critical patent/CN211189584U/en
Application granted granted Critical
Publication of CN211189584U publication Critical patent/CN211189584U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Treating Waste Gases (AREA)

Abstract

The utility model belongs to the exhaust-gas treatment field, especially, industrial waste gas handles case, when using to current processing case, because the structure is too single to lead to the not good problem of treatment effect to waste gas, the scheme as follows now proposes, and it includes the box, bolt fixedly connected with driving motor is passed through to one side of box, and the welding has the drive shaft on driving motor's the output shaft, has all seted up the spacing groove on the both sides inner wall of box, and sliding mounting has the limiting plate in the spacing groove, and one side welding that two limiting plates are close to each other has same filter plate, and the top welding of limiting plate has the spring, and the top of spring welds on the top inner wall of spacing groove, and the fixed cover in the outside of drive shaft is equipped with two cams, and the cam contacts with the bottom of filter. The utility model discloses the practicality is good, and effectual improvement is to exhaust purification's efficiency to the effectual of purification satisfies people's needs.

Description

Industrial waste gas treatment box
Technical Field
The utility model relates to a waste gas treatment technical field especially relates to an industrial waste gas handles case.
Background
Industrial waste gas is a generic term for various pollutant-containing gases discharged into the air during the combustion and production processes of fuels in the factory area of an enterprise. These exhaust gases are: carbon dioxide, carbon disulfide, hydrogen sulfide, fluorides, nitrogen oxides, chlorine, hydrogen chloride, carbon monoxide, lead mercury (mist) sulfate, beryllium compounds, smoke dust and productive dust, which are discharged into the atmosphere and pollute the air.
The treatment case can be used when handling industrial waste gas in the market, but current treatment case is when using because the structure is too single to lead to the treatment effect to waste gas not good.
Disclosure of Invention
The utility model aims at solving the problem that the treatment box in the prior art is used because the structure is too single, thereby leading to the poor defect of the treatment effect of waste gas and providing an industrial waste gas treatment box.
In order to achieve the above purpose, the utility model adopts the following technical scheme:
an industrial waste gas treatment box comprises a box body, wherein one side of the box body is fixedly connected with a driving motor through a bolt, a driving shaft is welded on an output shaft of the driving motor, limiting grooves are respectively formed in the inner walls of the two sides of the box body, limiting plates are arranged in the limiting grooves in a sliding mode, one side, close to each other, of each of the two limiting plates is welded with the same filter plate, a spring is welded at the top of each limiting plate, the top end of each spring is welded on the inner wall of the top of each limiting groove, two cams are fixedly sleeved on the outer side of the driving shaft and are in contact with the bottoms of the filter plates, a water containing tank is welded on the other side of the box body, a water pump is fixedly connected onto the inner wall of the bottom of the water containing tank through a bolt, the bottom fixedly connected with drum of connecting pipe, four shower nozzles of bottom fixedly connected with of drum, the fixed cover in the outside of connecting pipe is equipped with first gear, the traction groove has been seted up at the top of fixed plate, the traction shaft is installed to the traction groove internal rotation, the fixed cover in the outside of traction shaft is equipped with the second gear, first gear meshes with the second gear mutually, the fixed cover in the outside of drive shaft is equipped with first bevel gear, the top welding of traction shaft has the second bevel gear, first bevel gear meshes with the second bevel gear mutually.
Preferably, the inner walls of the two sides of the box body are respectively provided with a driving groove and a driving hole, and the driving shaft is rotatably arranged in the driving groove and the driving hole.
Preferably, the top of the water containing tank is fixedly connected with a water inlet funnel, so that water can be conveniently added.
Preferably, a first hole is formed in one side of the box body, an air inlet pipe is fixedly connected in the first hole, a second hole is formed in the top of the box body, and an air outlet pipe is fixedly connected in the second hole.
Preferably, the bottom of box has seted up the third hole, fixedly connected with drain pipe in the third hole, is provided with the valve on the drain pipe, conveniently discharges the water.
Preferably, the two sides of the bottom of the box body are welded with supporting pieces.
The utility model discloses in, an industrial waste gas handles case, waste gas enters into in the box through the intake pipe, start water pump and driving motor, the clear water of water pump in with containing water box passes through the shower nozzle blowout, the drive shaft drives first bevel gear and rotates, the second bevel gear drives and pulls the axle and rotate, it drives the second gear and rotates to pull the axle, the connecting pipe drives the shower nozzle through the drum and rotates, the shower nozzle carries out comprehensive spraying to the waste gas in the entering box, purify waste gas for the first time, then the rethread filter carries out the second time purification to waste gas, and the drive shaft drives the cam and rotates, the cam drives the filter plate and removes, the filter plate drives the limiting plate and removes, make the filter plate remove at vertical round trip, shake off the impurity on the filter plate, the efficiency of.
The utility model discloses the practicality is good, and effectual improvement is to exhaust purification's efficiency to the effectual of purification satisfies people's needs.
Drawings
FIG. 1 is a schematic structural view of an industrial waste gas treatment tank according to the present invention;
FIG. 2 is a schematic structural view of part A of an industrial waste gas treatment tank according to the present invention;
fig. 3 is a schematic structural diagram of a part B of the industrial waste gas treatment tank provided by the present invention.
In the figure: 1. a box body; 2. a drive motor; 3. a drive shaft; 4. filtering the plate; 5. a limiting plate; 6. a spring; 7. a cam; 8. a water containing tank; 9. a water pump; 10. a water pipe; 11. a fixing plate; 12. a connecting pipe; 13. a cylinder; 14. a spray head; 15. a first gear; 16. a traction shaft; 17. a second gear; 18. a first bevel gear; 19. a second bevel gear.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments.
Referring to fig. 1-3, an industrial waste gas treatment tank comprises a tank body 1, a driving motor 2 is fixedly connected to one side of the tank body 1 through bolts, a driving shaft 3 is welded to an output shaft of the driving motor 2, limiting grooves are formed in inner walls of two sides of the tank body 1, limiting plates 5 are slidably mounted in the limiting grooves, the same filter plate 4 is welded to one side, close to each other, of the two limiting plates 5, a spring 6 is welded to the top of each limiting plate 5, the top end of the spring 6 is welded to the inner wall of the top of each limiting groove, two cams 7 are fixedly sleeved on the outer side of the driving shaft 3, the cams 7 are in contact with the bottoms of the filter plates 4, a water containing tank 8 is welded to the other side of the tank body 1, a water pump 9 is fixedly connected to the inner wall of the bottom of the water containing tank 8 through bolts, the connecting pipe 12 is rotatably mounted in the connecting hole, the connecting pipe 12 is rotatably sleeved on the outer side of the water pipe 10 in a sealing manner, a cylinder 13 is fixedly connected to the bottom end of the connecting pipe 12, four spray heads 14 are fixedly connected to the bottom end of the cylinder 13, a first gear 15 is fixedly sleeved on the outer side of the connecting pipe 12, a traction groove is formed in the top of the fixing plate 11, a traction shaft 16 is rotatably mounted in the traction groove, a second gear 17 is fixedly sleeved on the outer side of the traction shaft 16, the first gear 15 is meshed with the second gear 17, a first bevel gear 18 is fixedly sleeved on the outer side of the driving shaft 3, a second bevel gear 19 is welded at the top end of the traction shaft 16.
In this embodiment, the inner walls of the two sides of the box body 1 are respectively provided with a driving groove and a driving hole, and the driving shaft 3 is rotatably installed in the driving groove and the driving hole.
In this embodiment, the top of water containing tank 8 is fixedly connected with the water inlet funnel, conveniently adds water.
In this embodiment, a first hole has been seted up to one side of box 1, the first downthehole fixedly connected with intake pipe, and a second hole has been seted up at the top of box 1, the downthehole fixedly connected with outlet duct of second.
In this embodiment, the third hole has been seted up to the bottom of box 1, fixedly connected with drain pipe in the third hole, is provided with the valve on the drain pipe, conveniently discharges the water.
In this embodiment, the support members are welded to both sides of the bottom of the box body 1.
In the utility model, when in use, the waste gas enters the box body 1 through the air inlet pipe, the water pump 9 and the driving motor 2 are started, the water pump 9 and the driving motor 2 are controlled by the control switch, the water pump 9 and the driving motor 2 are powered by the commercial power, the water pump 9 sprays the clean water in the water containing tank 8 through the spray head 14, the output shaft of the driving motor 2 drives the driving shaft 3 to rotate, the driving shaft 3 drives the first bevel gear 18 to rotate, the first bevel gear 18 drives the second bevel gear 19 to rotate, the second bevel gear 19 drives the traction shaft 16 to rotate, the traction shaft 16 drives the second gear 17 to rotate, the second gear 17 drives the first gear 15 to rotate, the first gear 15 drives the connecting pipe 12 to rotate, the connecting pipe 12 drives the spray head 14 to rotate through the cylinder 13, the spray head 14 sprays the waste gas entering the box body 1 comprehensively, purify waste gas for the first time, then rethread filter 4 purifies waste gas for the second time to drive shaft 3 drives cam 7 and rotates, and cam 7 extrusion filter plate 4 drives filter plate 4 and removes, and filter plate 4 drives limiting plate 5 and removes, and limiting plate 5 extrudees spring 6, makes filter plate 4 remove at vertical round trip, shakes off the impurity on the filter plate 4, improves the efficiency of purification, then opens the valve, the processing of draining.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the invention, the scope of which is defined in the appended claims and their equivalents.

Claims (6)

1. The utility model provides an industrial waste gas handles case, which comprises a box body (1), a serial communication port, bolt fixedly connected with driving motor (2) is passed through to one side of box (1), the welding has drive shaft (3) on the output shaft of driving motor (2), the spacing groove has all been seted up on the both sides inner wall of box (1), sliding mounting has limiting plate (5) in the spacing groove, one side welding that two limiting plate (5) are close to each other has same filter plate (4), the top welding of limiting plate (5) has spring (6), the top of spring (6) welds on the top inner wall of spacing groove, the outside fixed cover of drive shaft (3) is equipped with two cams (7), cam (7) and the bottom of filter plate (4) contact, the opposite side welding of box (1) has flourishing water tank (8), through bolt fixedly connected with water pump (9) on the bottom inner wall, a water pipe (10) is fixedly connected at a water outlet of the water pump (9), a fixing plate (11) is welded in the box body (1), a connecting hole is formed in the top of the fixing plate (11), a connecting pipe (12) is rotatably installed in the connecting hole, the connecting pipe (12) is rotatably sealed and sleeved on the outer side of the water pipe (10), a cylinder (13) is fixedly connected at the bottom end of the connecting pipe (12), four spray heads (14) are fixedly connected at the bottom end of the cylinder (13), a first gear (15) is fixedly sleeved on the outer side of the connecting pipe (12), a traction groove is formed in the top of the fixing plate (11), a traction shaft (16) is rotatably installed in the traction groove, a second gear (17) is fixedly sleeved on the outer side of the traction shaft (16), the first gear (15) is meshed with the second gear (17), a first bevel gear (18) is fixedly sleeved on the outer side of the, the first bevel gear (18) is engaged with the second bevel gear (19).
2. The industrial waste gas treatment tank according to claim 1, wherein the inner walls of the two sides of the tank body (1) are respectively provided with a driving groove and a driving hole, and the driving shaft (3) is rotatably arranged in the driving groove and the driving hole.
3. An industrial waste gas treatment tank according to claim 1, characterized in that a water inlet funnel is fixedly connected to the top of the water containing tank (8).
4. The industrial waste gas treatment box according to claim 1, wherein a first hole is formed in one side of the box body (1), an air inlet pipe is fixedly connected in the first hole, a second hole is formed in the top of the box body (1), and an air outlet pipe is fixedly connected in the second hole.
5. The industrial waste gas treatment tank is characterized in that a third hole is formed in the bottom of the tank body (1), a liquid outlet pipe is fixedly connected into the third hole, and a valve is arranged on the liquid outlet pipe.
6. An industrial waste gas treatment tank according to claim 1, characterized in that supports are welded to both sides of the bottom of the tank body (1).
CN201921618611.7U 2019-09-26 2019-09-26 Industrial waste gas treatment box Active CN211189584U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201921618611.7U CN211189584U (en) 2019-09-26 2019-09-26 Industrial waste gas treatment box

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201921618611.7U CN211189584U (en) 2019-09-26 2019-09-26 Industrial waste gas treatment box

Publications (1)

Publication Number Publication Date
CN211189584U true CN211189584U (en) 2020-08-07

Family

ID=71878936

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201921618611.7U Active CN211189584U (en) 2019-09-26 2019-09-26 Industrial waste gas treatment box

Country Status (1)

Country Link
CN (1) CN211189584U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111962189A (en) * 2020-08-19 2020-11-20 黄山市信达丝线有限公司 Twistless doubling machine that possesses stranded doubling function
CN113877395A (en) * 2021-10-28 2022-01-04 盐城工学院 Ceramic filter tube denitration and desulfurization dust remover
CN115557654A (en) * 2021-07-02 2023-01-03 无锡金鹏环保科技有限公司 Heavy metal sludge purification treatment device and method

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111962189A (en) * 2020-08-19 2020-11-20 黄山市信达丝线有限公司 Twistless doubling machine that possesses stranded doubling function
CN115557654A (en) * 2021-07-02 2023-01-03 无锡金鹏环保科技有限公司 Heavy metal sludge purification treatment device and method
CN113877395A (en) * 2021-10-28 2022-01-04 盐城工学院 Ceramic filter tube denitration and desulfurization dust remover

Similar Documents

Publication Publication Date Title
CN211189584U (en) Industrial waste gas treatment box
CN216171304U (en) Novel environment-friendly industrial waste gas purifies device
CN212309294U (en) High-efficient chemical industry tail gas's processing apparatus
CN214233491U (en) A clarification plant sprays for waste gas
CN213360215U (en) Three-way catalytic converter for treating automobile exhaust
CN210145798U (en) Purifier for treating various acid-containing waste gases
CN210030805U (en) Quenching oil tank flue gas collection device
CN215027334U (en) Industrial waste gas removes miscellaneous spray set that uses
CN218047145U (en) Industrial waste gas treatment mechanism with good environmental protection performance
CN208320324U (en) A kind of waste gas purification apparatus easy to remove
CN212915145U (en) High-efficient environmental protection industrial waste gas treatment device
CN213668669U (en) Purifying tower for efficient treatment of chemical waste gas
CN211069571U (en) Zinc cigarette processing apparatus
CN214019960U (en) Purification device for reducing harmful exhaust emission for plastic products
CN212673245U (en) Waste gas catalytic oxidation device
CN209155510U (en) A kind of industrial waste-gas purifier
CN216878677U (en) Industrial waste gas treatment device
CN114247283A (en) High-efficient purifier of nitrogenous sulphur industrial waste gas
CN213790683U (en) Industrial waste gas purification device
CN217449504U (en) A industrial waste gas preprocessing device for environmental protection
CN216572197U (en) Novel combined desulfurization dust-removing equipment
CN212188461U (en) Active carbon filters formula exhaust-gas purification scrubbing tower
CN213253710U (en) Industrial waste gas purification device
CN218590143U (en) Remove peculiar smell scrubbing tower
CN219083143U (en) Flue gas purifying chimney

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20221216

Address after: No. 20-3, Xingcheng Street, Chunman Community, Chengzitan Street, Pulandian District, Dalian City, Liaoning Province, 116000

Patentee after: WEILIN ENVIRONMENTAL PROTECTION TECHNOLOGY (DALIAN) Co.,Ltd.

Address before: Room 607, Liucheng New Building, Nan'an City, Quanzhou City, Fujian Province

Patentee before: NAN'AN XINGBAI DECORATION ENGINEERING Co.,Ltd.