CN211181582U - Construction progress contrast display device for project management - Google Patents

Construction progress contrast display device for project management Download PDF

Info

Publication number
CN211181582U
CN211181582U CN202020347980.3U CN202020347980U CN211181582U CN 211181582 U CN211181582 U CN 211181582U CN 202020347980 U CN202020347980 U CN 202020347980U CN 211181582 U CN211181582 U CN 211181582U
Authority
CN
China
Prior art keywords
rectangular frame
construction progress
display device
project management
fixedly connected
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202020347980.3U
Other languages
Chinese (zh)
Inventor
胡新华
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN202020347980.3U priority Critical patent/CN211181582U/en
Application granted granted Critical
Publication of CN211181582U publication Critical patent/CN211181582U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

The utility model discloses a project management is with construction progress contrast display device, including rectangular frame, the transparent clipboard of viscose fixedly connected with is passed through to one side of rectangular frame, the inboard top of rectangular frame and the equal fixedly connected with in bottom attract the strip to attract one side of strip and one side of transparent clipboard to contact, the utility model relates to a display device technical field. This construction progress contrast display device for project management, through loading plan drawing in rectangular frame and transparent clipboard, can directly be located the below of the corresponding prediction construction progress of plan drawing on transparent clipboard and draw out actual construction progress crosswalk picture through marker pen mark, thereby form the contrast, be convenient for know and observe, need not direct mark or change on plan drawing, can use repeatedly after cleaning, device simple structure, the preparation is convenient for save time, it is not fragile, simple and easy durable, whole quality is light, and has very good practicality.

Description

Construction progress contrast display device for project management
Technical Field
The utility model relates to a display device technical field specifically is a construction progress contrast display device for project management.
Background
In the construction process of building, we often will need to compare the estimated time spent and the specific time spent of each project, just so be unlikely to cause interference among each task in the project, in the construction progress contrast process, we often can use the crosswalk picture record comparison method, to the information of looking up actual progress collection in the project construction, directly mark in the crosswalk line of original plan together with the crosswalk line side by side after the arrangement, carry out the comparison directly perceived, thereby demonstrate the construction progress more obviously.
Patent publication No. CN209199466U discloses a construction progress comparison and display device for project management, which comprises a bottom plate, the side wall of the bottom plate is fixedly provided with a frame, the front side wall of the bottom plate is provided with a surface line, the front side wall of the bottom plate is provided with a chute, the inner side wall of the chute is connected with a left slide block and a right slide block in a sliding way, the construction progress can be better displayed and compared through the estimated construction days and the actual completion represented by the connecting line between the left sliding block and the right sliding block, make the constructor better when observing, also with every day of need in the construction, the actual construction day of day has carried out abundant show, has reached the effect that makes things convenient for the constructor to know the construction progress, and its device structure is comparatively complicated, and the spare part is many, and actual production assembly operation is troublesome, and the connecting wire is fragile, and it is inconvenient to maintain.
SUMMERY OF THE UTILITY MODEL
Not enough to prior art, the utility model provides a project management is with construction progress contrast display device has solved the problem that proposes in the above-mentioned background art.
In order to achieve the above purpose, the utility model discloses a following technical scheme realizes: the utility model provides a project management is with construction progress contrast display device, includes rectangular frame, the transparent clipboard of viscose fixedly connected with is passed through to one side of rectangular frame, the inboard top of rectangular frame and the equal fixedly connected with in bottom attract the strip to one side that attracts the strip contacts with one side of transparent clipboard, transparent clipboard is close to one side that attracts the strip and is located two and attracts and be provided with the plan drawing between one side that the strip is relative, two it is provided with the riser to attract the strip to keep away from between one side of transparent clipboard, one side fixedly connected with extrusion silver that the riser is close to transparent clipboard to the fixed slot has all been seted up, two to the top and the bottom that the riser is close to extrusion silver one side the equal fixedly connected with magnet in inside of.
Preferably, the handle is fixedly connected to the middle of the top of the rectangular frame, and the width of the rectangular frame is not more than 3 cm.
Preferably, the transparent writing board is made of acrylic board or white glass, and the length and width of the transparent writing board are equal to those of the rectangular frame.
Preferably, the attraction bar is made of an iron material, and both ends of the attraction bar are in contact with the inner side of the rectangular frame.
Preferably, the sum of the widths of the attraction strip and the vertical plate is equal to the width of the rectangular frame, and at least two vertical plates are arranged.
Advantageous effects
The utility model provides a project management is with construction progress contrast display device. Compared with the prior art, the method has the following beneficial effects:
this construction progress contrast display device for project management, through loading plan drawing in rectangular frame and transparent clipboard, can directly be located the below of the corresponding prediction construction progress of plan drawing on transparent clipboard and draw out actual construction progress crosswalk picture through marker pen mark, thereby form the contrast, be convenient for know and observe, need not direct mark or change on plan drawing, can use repeatedly after cleaning, device simple structure, the preparation is convenient for save time, it is not fragile, simple and easy durable, whole quality is light, and has very good practicality.
Drawings
FIG. 1 is a front view of the structure of the present invention;
FIG. 2 is a side view of the internal structure of the present invention;
FIG. 3 is a schematic view of the present invention;
fig. 4 is a schematic view of the vertical plate and the fixing groove structure of the present invention.
In the figure: 1-rectangular frame, 2-transparent writing board, 3-attraction strip, 4-planning drawing, 5-vertical board, 6-extruded cotton sliver, 7-fixed groove, 8-magnet and 9-handle.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
Referring to fig. 1-4, the present invention provides a technical solution: a construction progress comparison display device for project management comprises a rectangular frame 1, a handle 9 is fixedly connected to the middle of the top of the rectangular frame 1, the handle 9 is convenient for the device to be hung and displayed or carried by hands, the width of the rectangular frame 1 is not more than 3cm, a transparent writing board 2 is fixedly connected to one side of the rectangular frame 1 through adhesive, the transparent writing board 2 is made of acrylic boards or white glass, the length and the width of the transparent writing board 2 are equal to those of the rectangular frame 1, suction strips 3 are fixedly connected to the top and the bottom of the inner side of the rectangular frame 1, the suction strips 3 are made of iron materials, two ends of the suction strips 3 are in contact with the inner side of the rectangular frame 1, one sides of the suction strips 3 are in contact with one side of the transparent writing board 2, a planning drawing 4 is arranged between one sides, close to one side of the suction strips 3, and opposite to the two suction strips 3, of the transparent writing board, plan drawing 4 uses the predicted construction progress of crosswalk drawing record, be provided with riser 5 between one side that transparent clipboard 2 was kept away from to two attraction strips 3, the sum of the width of attraction strip 3 and riser 5 equals the width of rectangular frame 1, and riser 5 is provided with two at least, one side fixedly connected with extrusion silver 6 that riser 5 is close to transparent clipboard 2, extrude fixed laminating at transparent clipboard 2 side surface with plan drawing 4 through extrusion silver 6, and fixed slot 7 has all been seted up to top and the bottom that riser 5 is close to extrusion silver 6 one side, the equal fixedly connected with magnet 8 in inside of two fixed slot 7, the content that does not make detailed description in this specification all belongs to the well-known prior art of technical staff in the field simultaneously.
During the use, openly aim at transparent clipboard 2 with plan drawing 4 and spread to utilize extrusion silver 6 to fix plan drawing 4 through installation riser 5, the magnet 8 at riser 5 both ends realizes fixedly with attracting 3 inter attraction, can hang the device through handle 9 and demonstrate, does actual construction progress mark through the cross path picture of marker pen on transparent clipboard 2 surface correspondence plan drawing 4, can conveniently accomplish the contrast show fast.
It is noted that, herein, relational terms such as first and second, and the like may be used solely to distinguish one entity or action from another entity or action without necessarily requiring or implying any actual such relationship or order between such entities or actions. Also, the terms "comprises," "comprising," or any other variation thereof, are intended to cover a non-exclusive inclusion, such that a process, method, article, or apparatus that comprises a list of elements does not include only those elements but may include other elements not expressly listed or inherent to such process, method, article, or apparatus.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the invention, the scope of which is defined in the appended claims and their equivalents.

Claims (5)

1. The utility model provides a construction progress contrast display device for project management, includes rectangular frame (1), its characterized in that: one side of the rectangular frame (1) is fixedly connected with a transparent writing board (2) through viscose glue, the top and the bottom of the inner side of the rectangular frame (1) are both fixedly connected with an attraction strip (3), and one side of the attraction strip (3) is contacted with one side of the transparent writing board (2), a planning drawing (4) is arranged on one side of the transparent writing board (2) close to the attraction strips (3) and between the two opposite sides of the attraction strips (3), a vertical plate (5) is arranged between the two sides of the attraction strips (3) far away from the transparent writing board (2), one side of the vertical plate (5) close to the transparent writing plate (2) is fixedly connected with an extrusion cotton sliver (6), and fixed slots (7) are respectively formed in the top and the bottom of the vertical plate (5) close to one side of the extrusion cotton sliver (6), and two magnets (8) are fixedly connected in the fixed slots (7).
2. The construction progress comparison and display device for project management according to claim 1, wherein: the middle part of the top of the rectangular frame (1) is fixedly connected with a handle (9), and the width of the rectangular frame (1) is not more than 3 cm.
3. The construction progress comparison and display device for project management according to claim 1, wherein: the transparent writing board (2) is made of acrylic boards or white glass, and the length and the width of the transparent writing board (2) are equal to those of the rectangular frame (1).
4. The construction progress comparison and display device for project management according to claim 1, wherein: the attraction strip (3) is made of iron materials, and two ends of the attraction strip (3) are in contact with the inner side of the rectangular frame (1).
5. The construction progress comparison and display device for project management according to claim 1, wherein: the sum of the widths of the attraction strips (3) and the vertical plates (5) is equal to the width of the rectangular frame (1), and at least two vertical plates (5) are arranged.
CN202020347980.3U 2020-03-19 2020-03-19 Construction progress contrast display device for project management Expired - Fee Related CN211181582U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202020347980.3U CN211181582U (en) 2020-03-19 2020-03-19 Construction progress contrast display device for project management

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202020347980.3U CN211181582U (en) 2020-03-19 2020-03-19 Construction progress contrast display device for project management

Publications (1)

Publication Number Publication Date
CN211181582U true CN211181582U (en) 2020-08-04

Family

ID=71805154

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202020347980.3U Expired - Fee Related CN211181582U (en) 2020-03-19 2020-03-19 Construction progress contrast display device for project management

Country Status (1)

Country Link
CN (1) CN211181582U (en)

Similar Documents

Publication Publication Date Title
CN211181582U (en) Construction progress contrast display device for project management
CN208622361U (en) A kind of liquid crystal-spliced screen splicing apparatus
CN213277391U (en) Production progress data statistics device
CN208307283U (en) A kind of production of color steel tile is with being convenient for classifying device
CN206057748U (en) A kind of new narrow frame is without barricade backlight
CN209607093U (en) A kind of doorbell with card holder
CN206021786U (en) A kind of novel catering publicity board
CN212009763U (en) Novel finance POS machine hangs device
CN211294531U (en) Notice board
CN214046348U (en) Dampproofing advertisement show screen
CN210200012U (en) Magnetic geometric figure assembling teaching aid
CN218585589U (en) Advertisement sign for floor hanging connection type
CN205038944U (en) Novel health education information fence
CN211929004U (en) Novel adsorption type display board
CN204614359U (en) The displaying of machine room interior framework is listed
CN213150257U (en) Writing board for information consultation in school
CN218054712U (en) Simple positioning and marking device
CN210018103U (en) Multifunctional nurse chest card
CN210072637U (en) Code scanning recognizer based on quantum secret optical recognition module and convenient to clean
CN2710469Y (en) Insertion convenient photo frame
CN212995772U (en) Level ruler picture frame
CN220810357U (en) Storage display box
CN212938694U (en) Eink conference table label based on Bluetooth transmission
CN219534013U (en) Ordering price board
CN214123399U (en) Billboard convenient for replacing advertisement

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20200804

Termination date: 20210319