CN211178461U - Building engineering management measuring device - Google Patents

Building engineering management measuring device Download PDF

Info

Publication number
CN211178461U
CN211178461U CN201922275032.3U CN201922275032U CN211178461U CN 211178461 U CN211178461 U CN 211178461U CN 201922275032 U CN201922275032 U CN 201922275032U CN 211178461 U CN211178461 U CN 211178461U
Authority
CN
China
Prior art keywords
connecting plate
fixed
follower
plate
seted
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201922275032.3U
Other languages
Chinese (zh)
Inventor
贯士朋
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201922275032.3U priority Critical patent/CN211178461U/en
Application granted granted Critical
Publication of CN211178461U publication Critical patent/CN211178461U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Testing Of Devices, Machine Parts, Or Other Structures Thereof (AREA)

Abstract

The utility model discloses a building engineering management measuring device, including examining test table, it installs first connecting plate to examine test table top fixed surface, the inside fixed mounting that runs through of first connecting plate middle-end has the primary importance, the primary importance inside wall runs through fixed mounting and has the follower lever. The utility model discloses because there is first connecting plate examining test table top surface mounting, and install the second connecting plate at follower rod top surface, and then can rotate the motor and drive gear and rotate, and then be connected with drive gear through the follower gear, and then drive follower rod and second connecting plate and rotate, make the install bin rotate, and then make the sensor of installing in the install bin inside carry out the position and rotate, and then the convenient to use person is according to the position of using the inside sensor of the required position quick adjustment install bin that detects, guarantee the accuracy and the speed that detect, and is comparatively practical, and is suitable for extensively promoting and using.

Description

Building engineering management measuring device
Technical Field
The utility model is suitable for a building engineering auxiliary device field, in particular to building engineering management measuring device.
Background
Currently, a measuring device is a combination of a measuring instrument and an auxiliary device for measuring. Some auxiliary devices or tools for measurement are also often included in the conventional measuring tool, and a construction engineering management measuring device is required during the construction of the building.
However, the construction engineering management measuring device used today still has some disadvantages: 1. when the building construction is detected by using the building engineering management measuring device, a large number of different sensors are needed to detect the building, but the sizes of the different sensors are different, so that more detection devices need to be carried about, and the quality of use and detection is influenced; 2. when detecting, need the user to detect the position of position change sensor according to different prisons, operation process is very loaded down with trivial details. Therefore, a construction engineering management measuring device is provided.
SUMMERY OF THE UTILITY MODEL
A primary object of the present invention is to provide a building engineering management measuring device, which can effectively solve the problems in the background art.
In order to achieve the above purpose, the utility model adopts the following technical scheme:
a building engineering management measuring device comprises a detection table, wherein a first connecting plate is fixedly installed on the surface of the top end of the detection table, a first bearing is fixedly installed inside the middle end of the first connecting plate in a penetrating mode, a follower rod is fixedly installed on the inner side wall of the first bearing in a penetrating mode, a follower gear is installed on the surface of the top end of the follower rod in an embedded mode, a rotating motor is fixedly installed on the surface of the top end of the right side of the first connecting plate, a transmission gear is installed on the surface of the top end of the rotating motor in an embedded mode, the left side of the transmission gear is meshed with the right side of the follower gear, a second connecting plate is fixedly installed on the surface;
detect a bottom fixed surface and install the connecting rod, connecting rod bottom surface runs through fixed mounting at the fixed plate, fixed screw has been seted up to fixed plate middle-end inside, first internal thread has been seted up to fixed screw inside wall, first external screw thread has been seted up to connecting rod bottom lateral wall, first external screw thread and first internal thread looks adaptation, it has control panel to detect a left side bottom fixed surface.
Preferably, the centre gripping screw, every have all been seted up to the install bin middle-end left and right sides inside centre gripping screw inside wall all runs through movable mounting and has the centre gripping bolt, every centre gripping bolt top surface all runs through fixed mounting inside the arc grip block middle-end through the second bearing, every second external screw thread has all been seted up to centre gripping bolt middle-end lateral wall, every the second internal thread has all been seted up to centre gripping screw inside wall, second external screw thread and second internal thread looks adaptation.
Preferably, connecting rod bottom surface equidistance is connected, every with the one end stationary phase of pivot the other end of pivot all is connected, every with bracing piece top fixed surface the equal fixed mounting in bracing piece bottom surface has the backup pad, the pivot is symmetrical triangle-shaped array distribution on the fixed plate surface.
Preferably, the detection table, the first connecting plate, the follower rod, the second connecting plate, the connecting rod, the fixing plate, the support rod, the support plate and the arc-shaped clamping plate are all made of stainless steel materials.
Preferably, the input end of the control panel is electrically connected with an external power supply through a power transmission line, and the output end of the control panel is electrically connected with the input end of the rotating motor.
Compared with the prior art, the utility model discloses following beneficial effect has:
1. the utility model discloses a building engineering management measuring device, because there is first connecting plate examining test table top surface mounting, and install the follower rod through first bearing in first connecting plate is inside, and install the second connecting plate on the follower rod top surface, and then can rotate the motor and drive gear and rotate, and then be connected with drive gear through the follower gear, and then drive follower rod and second connecting plate and rotate, make the install bin rotate, and then make the sensor of installing in the install bin inside carry out the position rotation, and then the convenient to use person adjusts the position of the inside sensor of install bin according to the position that uses required detection fast, guarantee the accuracy and the speed that detect.
2. The utility model discloses a building engineering management measuring device, owing to seted up the centre gripping screw inside the install bin to install holding bolt through second internal thread and second external screw thread looks adaptation inside the centre gripping screw, and install the arc grip block through the second bearing on the holding bolt top, can drive the position of adjusting the grip block through rotating holding bolt, and then make the sensor surface of different size and size can be hugged closely on the grip block surface, and then increase the suitability of this device.
3. The utility model discloses a building engineering management measuring device owing to install the connecting rod in examining test table bottom to install the connecting rod inside the fixed plate through first internal thread and first external screw thread looks adaptation, and then can be quick dismantle the fixed plate from the connecting rod surface, and then subsequent transportation of being convenient for, and install the bracing piece through the pivot in the three apex angle department of fixed plate, can support whole device through three bracing piece, guarantee the stability of whole device.
Drawings
Fig. 1 is an overall front view sectional structure diagram of the construction engineering management measuring device of the present invention;
FIG. 2 is a schematic view of a side view cross-sectional structure of an installation box of the construction engineering management measuring device of the present invention;
fig. 3 is the utility model discloses building engineering management measuring device's fixed plate looks up the structure sketch map.
Reference numerals: the detection device comprises a detection table 1, a first connecting plate 2, a first bearing 3, a follower rod 4, a follower gear 5, a rotating motor 6, a transmission gear 7, a second connecting plate 8, a connecting rod 9, a fixing plate 10, a fixing screw hole 11, a rotating shaft 12, a supporting rod 13, a supporting plate 14, a first external thread 15, a first internal thread 16, an installation box 17, a clamping screw hole 18, a clamping bolt 19, a second bearing 20, an arc-shaped clamping plate 21, a second internal thread 22, a second external thread 23 and a control panel 24.
Detailed Description
In order to make the technical means, creation features, achievement purposes and functions of the present invention easy to understand, the present invention is further described below with reference to the following embodiments.
In the description of the present invention, it is to be understood that the terms "upper", "lower", "front", "rear", "left", "right", "top", "bottom", "inner", "outer", and the like indicate orientations or positional relationships based on the orientations or positional relationships shown in the drawings, and are only for convenience of description and simplicity of description, and do not indicate or imply that the device or element being referred to must have a particular orientation, be constructed and operated in a particular orientation, and therefore, should not be construed as limiting the present invention.
In the description of the present invention, it should be noted that, unless explicitly stated or limited otherwise, the terms "mounted," "connected" and "disposed" are to be interpreted broadly, and may be, for example, fixedly connected, disposed, detachably connected, disposed, or integrally connected and disposed; the utility model discloses in provide only supply the reference with the model of electrical apparatus. For those skilled in the art, different types of electrical appliances with the same function can be replaced according to actual use conditions, and for those skilled in the art, the specific meaning of the above terms in the present invention can be understood in specific situations.
As shown in fig. 1-3, a construction engineering management measuring device includes a detection table 1, a first connecting plate 2 is fixedly installed on a top surface of the detection table 1, a first bearing 3 is fixedly installed inside a middle end of the first connecting plate 2 in a penetrating manner, a follower rod 4 is fixedly installed on an inner side wall of the first bearing 3 in a penetrating manner, a follower gear 5 is installed on a top surface of the follower rod 4 in an embedded manner, a rotating motor 6 is fixedly installed on a top surface of a right side of the first connecting plate 2, a transmission gear 7 is installed on a top surface of the rotating motor 6 in an embedded manner, a left side of the transmission gear 7 is meshed with a right side of the follower gear 5, a second connecting plate 8 is fixedly installed on a top surface of the follower rod 4, and an installation box 17 is fixedly;
detect 1 bottom middle part fixed surface of platform and install connecting rod 9, the bottom surface of connecting rod 9 runs through fixed mounting at fixed plate 10, fixed screw 11 has been seted up to fixed plate 10 middle-end inside, first internal thread 16 has been seted up to fixed screw 11 inside wall, first external screw thread 15 has been seted up to connecting rod 9 bottom lateral wall, first external screw thread 15 and first internal thread 16 looks adaptation, it has control panel 24 to detect 1 left side bottom fixed surface of platform.
As shown in fig. 1 and 2, in this embodiment, because there is the first connecting plate 2 at the surface of the top end of the detection table 1, and the follower rod 4 is installed inside the first connecting plate 2 through the first bearing 3, and the second connecting plate 8 is installed on the top end surface of the follower rod 4, and then the motor 6 can be rotated to drive the transmission gear 7 to rotate, and then be connected with the transmission gear 7 through the follower gear 5, and then drive the follower rod 4 and the second connecting plate 8 to rotate, so that the installation box 17 rotates, and further make the sensor installed inside the installation box 17 rotate in position, and further the user of convenience can adjust the position of the sensor inside the installation box 17 according to the position required to be detected by the user, and the accuracy and the speed of detection are ensured.
Wherein, centre gripping screw 18 has all been seted up to the inside centre gripping screw 18, every of having all run through movable mounting and have clamping bolt 19, every clamping bolt 19 top surface all runs through fixed mounting inside arc grip block 21 middle-end through second bearing 20, every clamping bolt 19 middle-end lateral wall has all seted up second external screw thread 23, every second internal thread 22 has all been seted up to the 18 inside walls of centre gripping screw, second external screw thread 22 and second internal thread 23 looks adaptation.
As shown in fig. 1, in this embodiment, because the clamping screw hole 18 is provided inside the mounting box 17, and the clamping bolt 19 is installed inside the clamping screw hole 18 through the second internal thread 22 and the second external thread 23 in a matching manner, and the arc-shaped clamping plate 21 is installed on the top end of the clamping bolt 19 through the second bearing 20, the position of the arc-shaped clamping plate 21 can be adjusted by rotating the clamping bolt 19, so that the surfaces of the sensors with different sizes can be tightly attached to the surface of the arc-shaped clamping plate 21, and the applicability of the device is further improved.
Wherein, connecting rod 9 bottom surface equidistance is connected, every with the one end fixed phase of pivot 12 the other end of pivot 12 all is connected, every with 13 top fixed surface of bracing piece 13 the equal fixed mounting in bracing piece 13 bottom surface has backup pad 14, pivot 12 is symmetrical triangle-shaped array distribution on the surface of fixed plate 10.
As shown in fig. 2 and 3, in this embodiment, because connecting rod 9 is installed at the bottom end of detection table 1, and install connecting rod 9 inside fixed plate 10 through first internal thread 16 and first external thread 15 looks adaptation, and then can be quick dismantle fixed plate 10 from connecting rod 9 surface, and then subsequent transportation of being convenient for, and install bracing piece 13 through pivot 12 in the three apex angle department of fixed plate 10, can support whole device through three bracing piece 13, guarantee the stability of whole device.
The detection table 1, the first connecting plate 2, the follower rod 4, the second connecting plate 8, the connecting rod 9, the fixing plate 10, the support rod 13, the support plate 14 and the arc-shaped clamping plate 21 are all made of stainless steel materials.
In the embodiment, as shown in fig. 1, the stainless steel has good rust resistance, so that parts can be prevented from rusting and being damaged under long-term rain wash.
The input end of the control panel 24 is electrically connected with an external power supply through a power transmission line, and the output end of the control panel 24 is electrically connected with the input end of the rotating motor 6.
In this embodiment, as shown in fig. 1, the control panel 24 controls the rotating motor 6, so that the control difficulty can be reduced.
It should be noted that the utility model relates to a building engineering management measuring device, including detecting platform 1, first connecting plate 2, first bearing 3, follower rod 4, follower gear 5, rotating motor 6, drive gear 7, second connecting plate 8, connecting rod 9, fixed plate 10, fixed screw 11, pivot 12, bracing piece 13, backup pad 14, first external screw 15, first internal thread 16, install bin 17, centre gripping screw 18, centre gripping bolt 19, second bearing 20, arc grip block 21, second internal thread 22, second external screw 23, control panel 24, the part is general standard component or the part that this neighborhood technical staff knows, its structure and principle all can be known or can be known through conventional experimental method for this technical staff through the technical manual, in operation, rotate fixed plate 10, install connecting rod 9 to the inside of fixed plate 10, the supporting rod 13 is rotated to stably install the whole device on the ground, the clamping bolt 19 is rotated to enable the surface of the arc-shaped clamping plate 21 to be tightly attached to the surface of a sensor to be used, the whole sensor is installed in the installation box 17, the rotating motor 6 is turned on through the control panel 24 to enable the position of the installation box 17 to rotate, compared with the traditional auxiliary device for building engineering, the device is characterized in that the first connecting plate 2 is installed on the top end surface of the detection platform 1, the follower rod 4 is installed in the first connecting plate 2 through the first bearing 3, the second connecting plate 8 is installed on the top end surface of the follower rod 4, the rotating motor 6 can further drive the transmission gear 7 to rotate, the follower rod 4 and the second connecting plate 8 are further driven to rotate, the installation box 17 is rotated, and the sensor installed in the installation box 17 is further rotated in position, and then the user of being convenient for is according to the position quick adjustment installation box 17 inside sensor's that needs the measuring position, guarantees the accuracy and the speed that detect.
The basic principles and the main features of the invention and the advantages of the invention have been shown and described above. It will be understood by those skilled in the art that the present invention is not limited to the above embodiments, and that the foregoing embodiments and descriptions are provided only to illustrate the principles of the present invention without departing from the spirit and scope of the present invention. The scope of the invention is defined by the appended claims and equivalents thereof.

Claims (5)

1. The utility model provides a building engineering management measuring device, is including examining test table (1), its characterized in that: a first connecting plate (2) is fixedly installed on the surface of the top end of the detection table (1), a first bearing (3) is fixedly installed inside the middle end of the first connecting plate (2) in a penetrating mode, a follower rod (4) is fixedly installed on the inner side wall of the first bearing (3) in a penetrating mode, a follower gear (5) is installed on the surface of the top end of the follower rod (4) in a penetrating mode, a rotating motor (6) is fixedly installed on the surface of the top end of the right side of the first connecting plate (2), a transmission gear (7) is installed on the surface of the top end of the rotating motor (6) in a penetrating mode, the left side of the transmission gear (7) is meshed with the right side of the follower gear (5), a second connecting plate (8) is fixedly installed on the surface of the top end;
detect platform (1) bottom middle part fixed surface and install connecting rod (9), fixed mounting is run through at fixed plate (10) on connecting rod (9) bottom surface, fixed screw (11) have been seted up to fixed plate (10) middle-end inside, first internal thread (16) have been seted up to fixed screw (11) inside wall, first external screw thread (15) have been seted up to connecting rod (9) bottom lateral wall, first external screw thread (15) and first internal thread (16) looks adaptation, it has control panel (24) to detect platform (1) left side bottom fixed surface.
2. The construction engineering management measurement device according to claim 1, wherein: centre gripping screw (18), every have all been seted up to install bin (17) middle-end left and right sides inside centre gripping screw (18) inside wall all runs through movable mounting and has centre gripping bolt (19), every centre gripping bolt (19) top surface all runs through fixed mounting inside arc grip block (21) middle-end through second bearing (20), every second external screw thread (23), every have all been seted up to centre gripping bolt (19) middle-end lateral wall second internal thread (22) have all been seted up to centre gripping screw (18) inside wall, second external screw thread (23) and second internal thread (22) looks adaptation.
3. The construction engineering management measurement device according to claim 1, wherein: connecting rod (9) bottom surface equidistance is connected, every with the one end stationary phase of pivot (12) the other end of pivot (12) all is connected, every with bracing piece (13) top fixed surface bracing piece (13) bottom surface equal fixed mounting has backup pad (14), pivot (12) are symmetrical triangle-shaped array distribution on fixed plate (10) surface.
4. The construction engineering management measurement device according to claim 3, wherein: the detection table (1), the first connecting plate (2), the follower rod (4), the second connecting plate (8), the connecting rod (9), the fixing plate (10), the supporting rod (13), the supporting plate (14) and the arc-shaped clamping plate (21) are all made of stainless steel.
5. The construction engineering management measurement device according to claim 1, wherein: the input end of the control panel (24) is electrically connected with an external power supply through a power transmission line, and the output end of the control panel (24) is electrically connected with the input end of the rotating motor (6).
CN201922275032.3U 2019-12-18 2019-12-18 Building engineering management measuring device Expired - Fee Related CN211178461U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201922275032.3U CN211178461U (en) 2019-12-18 2019-12-18 Building engineering management measuring device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201922275032.3U CN211178461U (en) 2019-12-18 2019-12-18 Building engineering management measuring device

Publications (1)

Publication Number Publication Date
CN211178461U true CN211178461U (en) 2020-08-04

Family

ID=71802645

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201922275032.3U Expired - Fee Related CN211178461U (en) 2019-12-18 2019-12-18 Building engineering management measuring device

Country Status (1)

Country Link
CN (1) CN211178461U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111830666A (en) * 2020-09-01 2020-10-27 中建交通建设集团有限公司 Device for controlling single prism to rotate and construction method thereof

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111830666A (en) * 2020-09-01 2020-10-27 中建交通建设集团有限公司 Device for controlling single prism to rotate and construction method thereof

Similar Documents

Publication Publication Date Title
CN211178461U (en) Building engineering management measuring device
CN214407238U (en) Thread detection device
CN219391344U (en) Radial torsion testing machine for joint bearing
CN209046113U (en) Insulating bar
CN203848824U (en) Mounting adjusting mechanism for tilt angle sensor of transmission tower
CN208416826U (en) A kind of cable tray device for wind generator
CN210346943U (en) Synchronous temperature measuring device based on additive manufacturing
CN211426372U (en) Ultrasonic flaw detector mainboard assembly jig
CN209994330U (en) Angle-adjustable solar panel mechanism
CN210570680U (en) Positioning device for surveying and mapping
CN212029034U (en) Strutting arrangement for mine survey
CN210742485U (en) Electric power engineering instrument sampling detection device
CN214749964U (en) Transient electromagnetic method-based auxiliary device for detecting defects of coated equipment
CN210890880U (en) Portable tripod for engineering measuring instrument
CN213794511U (en) Water conservancy pipeline cutting device
CN214669122U (en) Automatic detection device for response characteristics of environmental parameters of fluorescent probe
CN211013087U (en) Adjustable plane optical pole environment detector
CN218895196U (en) Pitching angle adjusting mechanism of warning radar
CN219623585U (en) Monitor support bracket with stable butt joint structure
CN217384360U (en) Automatic ultrasonic flow sensor auxiliary assembly of calibration
CN220852639U (en) Multifunctional high-purity single-hole oxidation rod
CN214372449U (en) Analytical equipment is used in hydrogeology research convenient to operation
CN219867154U (en) Base is connected to controller with fixture
CN211004382U (en) Jacking hydraulic device
CN208140088U (en) A kind of novel building settlement measuring device

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20200804

Termination date: 20201218