CN211176027U - Geological detection equipment for building - Google Patents

Geological detection equipment for building Download PDF

Info

Publication number
CN211176027U
CN211176027U CN201922256909.4U CN201922256909U CN211176027U CN 211176027 U CN211176027 U CN 211176027U CN 201922256909 U CN201922256909 U CN 201922256909U CN 211176027 U CN211176027 U CN 211176027U
Authority
CN
China
Prior art keywords
cavity
device case
geological detection
fixture block
box
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201922256909.4U
Other languages
Chinese (zh)
Inventor
陈登科
史委宗
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Sichuan Yuanjian Construction Engineering Design Co ltd
Original Assignee
Sichuan Yuanjian Construction Engineering Design Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Sichuan Yuanjian Construction Engineering Design Co ltd filed Critical Sichuan Yuanjian Construction Engineering Design Co ltd
Priority to CN201922256909.4U priority Critical patent/CN211176027U/en
Application granted granted Critical
Publication of CN211176027U publication Critical patent/CN211176027U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

The utility model relates to a building field just discloses a geological detection equipment for building, including the device case, the inside of device case is provided with first cavity and second cavity, the internally mounted of second cavity has electric putter, and electric putter's output is connected with the fixture block, the inside of first cavity is provided with the multiunit mounting panel, and the figure of mounting panel is two sets of. This geological detection equipment for building can drive the fixture block through the electric putter who sets up and carry out the up-and-down motion, make the fixture block can insert in soil, and the outside of fixture block is provided with multiunit chi tooth, can fix in soil, first guard plate and second guard plate all are the arc structure simultaneously, two kinds of modes combine together, make the holistic stability of device case promote greatly, can enough prevent that the top of device case from receiving the damage that leads to the inside machine of device case when striking strongly, also can prevent toppling over of device case and influence the normal operating of machine simultaneously, excellent in use effect.

Description

Geological detection equipment for building
Technical Field
The utility model relates to a building field specifically is a building land used quality testing equipment.
Background
In the field of buildings, environmental geology detection is the basis of scientific environment management and environmental law enforcement and supervision and is essential basic work for environmental geology protection, and the core target of environmental geology detection is to provide data of the current situation and the change trend of environmental geology quality, judge the environmental geology quality, evaluate the current main environmental problems and provide services for environmental management.
In the testing process of environmental geology, need place the geological environment detecting instrument who uses the specialty and carry out work in the open air, because the outdoor working environmental condition is relatively poor, and detecting instrument exposes outside for a long time, it leads to the instrument vibrations to empty to easily receive external force factor when meeting with extreme weather, make detecting instrument can not normally carry out the testing job, influence the job schedule of environmental geology testing job, automatic detection can not be realized to current geological monitoring equipment simultaneously, lead to still needing the user to take equipment with the hand, the practicality of equipment has been influenced. Therefore, the building land quality detection device is designed.
SUMMERY OF THE UTILITY MODEL
The utility model provides a not enough to prior art, the utility model provides a building land used quality testing equipment has solved detecting instrument and has exposed outside for a long time, very easily receives external force factor when meeting with extreme weather and leads to the instrument vibrations to empty, makes detecting instrument can normally carry out the detection achievement, influences the problem of environment geology detection job progress.
In order to achieve the above purpose, the utility model adopts the technical scheme that:
the building land quality detection equipment comprises an equipment box, wherein a first cavity and a second cavity are arranged inside the equipment box, an electric push rod is arranged inside the second cavity, the output end of the electric push rod is connected with a clamping block, a plurality of groups of mounting plates are arranged inside the first cavity, the number of the mounting plates is two, the front surfaces of the two mounting plates are provided with electromagnetic slide rails, an electromagnetic slide block is connected inside the electromagnetic slide rail in a sliding manner, the front surface of the electromagnetic slide block is connected with a connecting plate, the bottom of the connecting plate is provided with a detector, a baffle is arranged inside the device box, and the top of the baffle is provided with a containing box, the top of the device box is provided with a handle, both sides of the inner wall of the device box are provided with fixed blocks, and the front surface of fixed block is provided with first guard plate, the bottom of first guard plate is provided with the second guard plate.
Furthermore, the fixture block runs through to the bottom of device case, and the outside of fixture block is provided with multiunit chi tooth.
Furthermore, the bottom of the device box is provided with a through hole, and the through hole is matched with the detector.
Furthermore, the bottom of containing box is provided with the installation piece, and the both sides switch-on of installation piece is connected with the gyro wheel through the round pin axle is articulated.
Furthermore, the top of the baffle is provided with a groove, and the groove is matched with the roller.
Furthermore, the first protection plate and the second protection plate are both arc-shaped net structures, and the first protection plate and the second protection plate are both made of aliphatic polyketone.
Furthermore, the front surface of device case is connected with first sealing door and second sealing door through hinge joint, and the front surface of first sealing door and second sealing door all is provided with the window.
The utility model has the advantages that:
1. the utility model discloses an electric putter through setting up can drive the fixture block and carry out the up-and-down motion for the fixture block can insert in soil, and the outside of fixture block is provided with multiunit chi tooth, can fix in soil, first guard plate and second guard plate all are the arc structure simultaneously, two kinds of modes combine together, make the holistic stability of device case promote greatly, can enough prevent that the top of device case from receiving the damage that leads to the inside machine of device case when strong striking, also can prevent empting of device case and influence the normal operating of machine simultaneously, the result of use is better.
2. The utility model discloses a can drive electromagnetic sliding block through the electromagnetism slide rail that sets up and reciprocate for electromagnetic sliding block can drive the connecting plate and reciprocate, and then makes the connecting plate drive the detector on the connecting plate and reciprocate, has avoided the trouble that the staff was taken, has made things convenient for the operation, and is simple convenient.
Drawings
Fig. 1 is a schematic view of the internal structure of the present invention;
FIG. 2 is a front view of the present invention;
fig. 3 is an enlarged view of the present invention a.
In the figure: 1. a device case; 2. a first cavity; 3. a second cavity; 4. an electric push rod; 5. a clamping block; 6. tooth measurement; 7. mounting a plate; 8. an electromagnetic slide rail; 9. an electromagnetic slider; 10. a connecting plate; 11. a detector; 12. a through hole; 13. a baffle plate; 14. a storage box; 15. mounting blocks; 16. a roller; 17. a groove; 18. a first guard plate; 19. a second guard plate; 20. a fixed block; 21. a handle; 22. a first sealing door; 23. a second sealing door; 24. and (4) a window.
Detailed Description
In order to make the objects, technical solutions and advantages of the embodiments of the present invention clearer, the embodiments of the present invention will be clearly and completely described below with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are some, but not all, embodiments of the present invention. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative efforts belong to the protection scope of the present invention.
Referring to FIGS. 1-3: a building geological detection device comprises a device box 1, a first cavity 2 and a second cavity 3 are arranged inside the device box 1, an electric push rod 4 is arranged inside the second cavity 3, the output end of the electric push rod 4 is connected with a clamping block 5, a plurality of groups of mounting plates 7 are arranged inside the first cavity 2, the number of the mounting plates 7 is two, electromagnetic slide rails 8 are arranged on the front surfaces of the two groups of mounting plates 7, an electromagnetic slide block 9 is connected inside the electromagnetic slide rails 8 in a sliding manner, a connecting plate 10 is connected on the front surface of the electromagnetic slide block 9, a detector 11 is arranged at the bottom of the connecting plate 10, a baffle 13 is arranged inside the device box 1, a containing box 14 is arranged at the top of the baffle 13, a handle 21 is arranged at the top of the device box 1, fixed blocks 20 are arranged on two sides of the inner wall of the device box 1, and a first protection, the bottom of the first shielding plate 18 is provided with a second shielding plate 19.
The utility model discloses an electric putter 4 that sets up can drive fixture block 5 and carry out the up-and-down motion, make fixture block 5 can insert in soil, and the outside of fixture block 5 is provided with multiunit chi tooth 6, can fix in soil, first guard plate 18 and second guard plate 19 all are the arc structure simultaneously, two kinds of modes combine together, make the holistic stability of device case 1 promote greatly, can enough prevent that the top of device case 1 from receiving the damage that leads to the inside machine of device case 1 when strong striking, also can prevent toppling over of device case 1 and influence the normal operating of machine simultaneously, the result of use is better.
Please refer to fig. 1, the fixture block 5 penetrates the bottom of the device case 1, and a plurality of sets of teeth 6 are disposed on the outer side of the fixture block 5.
This kind of quality detection equipment for building can fix in soil through the multiunit chi tooth 6 that sets up, can prevent toppling over of device case 1 and influence the normal operating of machine, and the result of use is better.
Referring to fig. 1, a through hole 12 is formed at the bottom of the device case 1, and the through hole 12 is matched with the detector 11.
This kind of quality detection equipment for building has made things convenient for detector 11 to run through to the outside of device case 1 through the through-hole 12 that sets up, has made things convenient for the operation.
Please refer to fig. 1, the bottom of the storage box 14 is provided with a mounting block 15, two sides of the mounting block 15 are hinged to rollers 16 through pins, the top of the baffle 13 is provided with a groove 17, and the groove 17 is matched with the rollers 16.
This kind of building land used quality testing equipment is through the recess 17 that sets up and the cooperation of gyro wheel 16 for containing box 14 can freely extract, conveniently places corresponding pen and paper or repair tools in containing box 14's inside.
Please refer to fig. 1, the first protection plate 18 and the second protection plate 19 are both arc-shaped net structures, and the first protection plate 18 and the second protection plate 19 are both made of aliphatic polyketone.
The aliphatic polyketone is an alternating copolymerization high polymer material of carbon monoxide and olefin, is the only engineering plastic with all main chains composed of carbon, has a high crystallinity and a firm crystalline structure, shows impact resistance, wear resistance, chemical resistance, fuel resistance and gas barrier property, and can play a good protection role.
Referring to fig. 2, the front surface of the device box 1 is hinged to a first sealing door 22 and a second sealing door 23, and the front surfaces of the first sealing door 22 and the second sealing door 23 are provided with windows 24.
This kind of building land used quality testing equipment can separate device case 1 through the first sealing door 22 and the second sealing door 23 that set up, and the convenient operation that divides the labour avoids the confusion, and window 24 can be convenient for people to watch the inside condition of device case 1 simultaneously.
To sum up, the utility model discloses when using, earlier remove device case 1 to suitable position, then the switch on, open electric putter 4, electric putter 4 drives fixture block 5 and carries out the downstream, make fixture block 5 can insert in the soil, and the outside of fixture block 5 is provided with multiunit chi tooth 6, can fix in soil, the universal wheel breaks away from with ground this moment, and device case 1 is apart from certain height on ground, then utilize the inside slip condition of P L C controller control electromagnetism slider 9 at electromagnetism slide rail 8, make electromagnetism slider 9 drive connecting plate 10 move down, and then make connecting plate 10 drive detector 11 on connecting plate 10 and carry out the downstream, then detector 11 passes the through-hole 12 of dress device case 1 bottom, detector 11 carries out corresponding survey (the concrete work flow of detector 11 can refer to patent number CN207123623U) to ground, when taking place the unnecessary situation, because first guard plate 18 and second guard plate 19 all are the arc structure, consequently, can prevent that device case 1's top from receiving the damage that leads to device case 1 internal machine when strong striking, the result in a better use effect.
The above embodiments are only used to illustrate the technical solution of the present invention, and not to limit it; although the present invention has been described in detail with reference to the foregoing embodiments, it should be understood by those skilled in the art that: the technical solutions described in the foregoing embodiments may still be modified, or some technical features may be equivalently replaced; such modifications and substitutions do not depart from the spirit and scope of the present invention in its corresponding aspects.

Claims (7)

1. The utility model provides a quality of building check out test set, includes device case (1), its characterized in that: the device comprises a device box (1), wherein a first cavity (2) and a second cavity (3) are arranged in the device box (1), an electric push rod (4) is arranged in the second cavity (3), the output end of the electric push rod (4) is connected with a clamping block (5), a plurality of groups of mounting plates (7) are arranged in the first cavity (2), the number of the mounting plates (7) is two, electromagnetic slide rails (8) are arranged on the front surfaces of the two groups of mounting plates (7), electromagnetic slide blocks (9) are connected in the electromagnetic slide rails (8) in a sliding manner, a connecting plate (10) is connected on the front surface of each electromagnetic slide block (9), a detector (11) is arranged at the bottom of the connecting plate (10), a baffle (13) is arranged in the device box (1), a containing box (14) is arranged at the top of the baffle (13), a handle (21) is arranged at the top of the device, both sides of device case (1) inner wall all are provided with fixed block (20), and the front surface of fixed block (20) is provided with first guard plate (18), the bottom of first guard plate (18) is provided with second guard plate (19).
2. The geological detection device for buildings according to claim 1, characterized in that: the fixture block (5) penetrates through the bottom of the device box (1), and a plurality of groups of ruler teeth (6) are arranged on the outer side of the fixture block (5).
3. The geological detection device for buildings according to claim 1, characterized in that: the bottom of the device box (1) is provided with a through hole (12), and the through hole (12) is matched with the detector (11).
4. The geological detection device for buildings according to claim 1, characterized in that: the bottom of the containing box (14) is provided with an installation block (15), and two sides of the installation block (15) are connected with rollers (16) through pin shafts in a hinged mode.
5. The geological detection device for buildings according to claim 4, characterized in that: the top of baffle (13) is provided with recess (17), and recess (17) and gyro wheel (16) cooperate.
6. The geological detection device for buildings according to claim 1, characterized in that: the first protection plate (18) and the second protection plate (19) are both arc-shaped net structures, and the first protection plate (18) and the second protection plate (19) are both made of aliphatic polyketone.
7. The geological detection device for buildings according to claim 1, characterized in that: the front surface of the device box (1) is hinged with a first sealing door (22) and a second sealing door (23) through hinges, and the front surfaces of the first sealing door (22) and the second sealing door (23) are provided with windows (24).
CN201922256909.4U 2019-12-16 2019-12-16 Geological detection equipment for building Expired - Fee Related CN211176027U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201922256909.4U CN211176027U (en) 2019-12-16 2019-12-16 Geological detection equipment for building

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201922256909.4U CN211176027U (en) 2019-12-16 2019-12-16 Geological detection equipment for building

Publications (1)

Publication Number Publication Date
CN211176027U true CN211176027U (en) 2020-08-04

Family

ID=71805547

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201922256909.4U Expired - Fee Related CN211176027U (en) 2019-12-16 2019-12-16 Geological detection equipment for building

Country Status (1)

Country Link
CN (1) CN211176027U (en)

Similar Documents

Publication Publication Date Title
CN211176027U (en) Geological detection equipment for building
CN111043941A (en) Flatness detection equipment for constructional engineering
CN214844121U (en) Civil engineering house detects appraisal and detects sampling mechanism with wall body soil property
CN209446544U (en) A kind of coal mine down-hole gas safety monitoring device
CN213898952U (en) Hole depth measuring device
CN112986030B (en) Mobile building structure detection robot
CN209655963U (en) A kind of engineering detecting testing apparatus for verticality
CN214446089U (en) Fire hammer for building engineering fire safety detection
CN111854695A (en) Wall gradient measuring device for building engineering
CN210014732U (en) Detection apparatus for PCB drilling sword footpath
CN216012214U (en) Quick checking ruler for building quality inspection and evaluation standard
CN217055020U (en) Drilling rig for geotechnical engineering investigation
CN214952262U (en) Ground layering sampling equipment for geological detection
CN214223896U (en) Measuring tool for building engineering management
CN206223122U (en) A kind of device for measuring part position angle agreement
CN215639418U (en) Be used for building engineering ramp angle detection device
CN218822041U (en) Crack measuring device
CN211205117U (en) Measuring scale for electric power engineering
CN218766562U (en) Wall painting quality detection device for supervision
CN214333603U (en) Floor tile gap detector for house construction engineering
CN211877469U (en) Municipal works quality testing sampling device
CN216977891U (en) Engineering field test major structure positioning tool
CN214657315U (en) Drilling bucket depth measuring device
CN213021561U (en) Vertical detection ruler for constructional engineering
CN219432922U (en) Mine vision information acquisition equipment

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20200804

Termination date: 20201216