CN211175648U - Concrete transportation pipeline protection foundation structure - Google Patents
Concrete transportation pipeline protection foundation structure Download PDFInfo
- Publication number
- CN211175648U CN211175648U CN201920752130.9U CN201920752130U CN211175648U CN 211175648 U CN211175648 U CN 211175648U CN 201920752130 U CN201920752130 U CN 201920752130U CN 211175648 U CN211175648 U CN 211175648U
- Authority
- CN
- China
- Prior art keywords
- fixedly connected
- ring
- concrete
- linking arm
- transportation pipeline
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Landscapes
- Supports For Pipes And Cables (AREA)
Abstract
The utility model discloses a concrete transportation pipeline protection infrastructure among the concrete transportation pipeline bearing structure technical field, including filling up the platform, horizon bar and vertical pole etc, hold the handle, insert the locking piece in the collar, wherein one of them fixture block and second fixture block are inserted respectively in the upside and the downside of spacer bar, make down lock seat and last locking head fixed connection from this, the ring that half lower go-between and first go-between are constituteed jointly plays the supporting role to concrete transportation pipeline, extract the locking piece, lift up the tapered end and make down lock seat and last locking head separation, go up the linking arm simultaneously and rotate on the linking arm down, half lower go-between is separable with the junction of first go-between, the convenience is dismantled concrete transportation pipeline.
Description
Technical Field
The utility model relates to a concrete transportation pipeline bearing structure technical field, concrete field is a concrete transportation pipeline protection foundation structure.
Background
The concrete conveying pipeline is often used together with a concrete conveying pump for conveying concrete, the concrete conveying pump is used for continuously conveying the concrete along the concrete conveying pipeline and is used for large-scale concrete projects such as house construction, bridge construction and tunnel construction, the concrete conveying pump is continuously updated along with the concrete conveying pump, the concrete conveying pump is from a stirring barrel, a towing pump and a vehicle-mounted pump to a concrete pump truck, the functions of the concrete pump truck are gradually improved, the concrete pump truck is used in various engineering buildings, but the use of the concrete pump truck is limited in certain narrow construction areas due to the limitation of the height of an arm support and the safety of supporting legs, in this case, the towing pump or the vehicle-mounted pump can be used only by matching with the concrete conveying pipeline, a horizontal concrete conveying pipeline needs to be supported and fixed by a supporting and fixing device at certain intervals so as to be convenient for assembling and disassembling and eliminating pipe blockage, and the supporting and fixing device of the existing concrete conveying pipeline is inconvenient to disassemble, a concrete transportation pipeline protection foundation structure is provided for the purpose.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a concrete transportation pipeline protection foundation structure to solve the problem that proposes in the above-mentioned background art.
In order to achieve the above object, the utility model provides a following technical scheme: a concrete transportation pipeline protection foundation structure comprises a plurality of pad platforms, wherein the pad platforms are formed by pouring reinforced concrete, the upper end faces of the pad platforms are fixedly connected with a concrete transportation pipeline fixing frame, the concrete transportation pipeline fixing frame comprises a connecting plate, the connecting plate is fixedly connected with the upper end faces of the pad platforms, the upper end faces of the connecting plate are integrally formed with a connecting seat, the upper end faces of the connecting seat are fixedly connected with a lower connecting ring, the upper end of the lower connecting ring is provided with an upper connecting ring matched with the lower connecting ring, the side wall of the lower connecting ring is symmetrically and fixedly connected with lower connecting arms, one ends of the upper connecting arms are fixedly connected with the side wall of the upper connecting ring, the other ends of the upper connecting arms are positioned between the two lower connecting arms, the upper connecting arms are rotatably connected with the lower connecting arms, the lower connecting arms and the side wall of the upper connecting arms are respectively and fixedly connected with lower locking seats and upper locking heads, the upper end face of the lower lock base is fixedly connected with an insert ring, the insert ring is fixedly connected with a spacer rod, an insertion hole is formed in the upper lock head, the insert ring penetrates through the insertion hole, and a locking block is clamped on the insert ring.
Preferably, the reinforcing steel bars inside the cushion table are composed of a plurality of frames, each frame comprises two horizontal rods, and a plurality of vertical rods are integrally formed between the two horizontal rods.
Preferably, bolts are arranged at four corners of the connecting plate, and the connecting plate is fixedly connected with the upper end face of the cushion table through the bolts.
Preferably, the upper end surface of the connecting seat is in a concave arc shape.
Preferably, the upper connecting arm and the lower connecting arm are provided with connecting columns in a penetrating mode, two ends of each connecting column are fixedly connected with limiting pieces respectively, and the two limiting pieces are in close contact with the two lower connecting arms respectively.
Preferably, the locking block includes the connecting block, the first fixture block of one end fixedly connected with and the second fixture block of connecting block, the other end fixedly connected with handle of connecting block.
Compared with the prior art, the beneficial effects of the utility model are that: the utility model provides a concrete transportation pipeline protection infrastructure, hold the handle, insert the locking piece in the collar, wherein one of them fixture block and second fixture block are inserted respectively in the upside and the downside of spacer bar, make lower lock seat and the fixed connection of last connector ring from this, the ring that half lower connector ring and first connector ring are constituteed jointly plays the supporting role to concrete transportation pipeline, extract the locking piece, lift up the tapered end and make down lock seat and the separation of last connector ring, it rotates on the lower linking arm to go up the linking arm simultaneously, the junction of half lower connector ring and first connector ring is separable, the convenience is dismantled concrete transportation pipeline.
The reinforcing steel bars in the cushion table are composed of a plurality of frames, each frame comprises two horizontal rods, a plurality of vertical rods are integrally formed between the two horizontal rods, and the frames play a role in reinforcing the whole cushion table;
bolts are arranged at the four corners of the connecting plate, and the connecting plate is fixedly connected with the upper end surface of the cushion table through the bolts, so that the concrete conveying pipeline fixing frame is stably fixed on the upper end surface of the cushion table;
the upper end surface of the connecting seat is in a concave arc shape, the connecting seat is fixedly connected with the lower half connecting ring, the upper end surface of the connecting seat is in a concave arc shape and can be completely attached to the lower side wall of the lower half connecting ring, the connecting area is large, and the connection is firm.
Go up and run through jointly on linking arm and the lower linking arm and be equipped with the spliced pole, the both ends difference fixedly connected with of spliced pole is spacing piece, two spacing pieces respectively with two linking arms in close contact with down, spacing piece is spacing with the position of going up linking arm and linking arm down, goes up the linking arm and can rotate on the linking arm down under the exogenic action.
Drawings
FIG. 1 is a front view of the main structure of the present invention when the locking block is not inserted;
FIG. 2 is a front sectional view of a reinforcement frame consisting of horizontal rods and vertical rods in the cushion table of the present invention;
FIG. 3 is a left side sectional view of a reinforcement frame consisting of horizontal rods and vertical rods in the cushion table of the present invention;
FIG. 4 is a top view of the upper connecting ring, the upper lock head and the insertion hole of the present invention;
FIG. 5 is a top sectional view of the lower connecting arm, the upper connecting arm, the connecting post and the spacing piece of the present invention;
fig. 6 is a left side view of the locking block of the present invention;
fig. 7 is a front view of the first and second clamping blocks of the present invention.
In the figure: 1-cushion table, 2-horizontal rod, 3-vertical rod, 401-connecting plate, 402-connecting seat, 403-lower half connecting ring, 404-upper half connecting ring, 405-lower connecting arm, 406-upper connecting arm, 407-connecting column, 408-lower locking seat, 409-upper locking head, 410-inserting ring, 411-spacer rod, 412-inserting hole, 413-locking block, 4131-connecting block, 4132-first fixture block, 4133-second fixture block, 4134-handle and 414-limiting piece.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
The description of the directions (up, down, left, right, front, and back) is made with reference to the structure shown in fig. 1 of the drawings attached to the specification, but the practical direction of the present invention is not limited thereto.
Referring to fig. 1-7, the present invention provides a technical solution: a concrete transportation pipeline protection foundation structure comprises a plurality of pad platforms 1, wherein the pad platforms are formed by pouring reinforced concrete, the upper end faces of the pad platforms are fixedly connected with a concrete transportation pipeline fixing frame, the pad platforms are used for protecting the foundation and play a bearing role on the concrete transportation pipeline fixing frame, the concrete transportation pipeline fixing frame comprises a connecting plate 401, the connecting plate is fixedly connected with the upper end faces of the pad platforms, the concrete transportation pipeline fixing frame is fixedly fixed on the upper end faces of the pad platforms, the upper end faces of the connecting plate are integrally formed with a connecting seat 402, the upper end faces of the connecting seat are fixedly connected with a lower connecting ring 403, the connecting seat is used for connecting the lower connecting ring, the upper end of the lower connecting ring is provided with an upper connecting ring 404 matched with the lower connecting ring for use, and the side walls of the lower connecting ring are symmetrically and fixedly connected with lower connecting arms 405, the side wall of the upper half connecting ring is fixedly connected with one end of an upper connecting arm 406, the other end of the upper connecting arm is positioned between two lower connecting arms, the upper connecting arm is rotatably connected with the lower connecting arms, the upper connecting arm can rotate on the lower connecting arms under the action of external force, the side walls of the lower connecting arm and the upper connecting arm are respectively and fixedly connected with a lower lock seat 408 and an upper lock head 409, the upper end surface of the lower lock seat is fixedly connected with an insert ring 410, the insert ring is fixedly connected with a spacer bar 411, the upper lock head is provided with a jack 412, the insert ring penetrates through the jack, a locking block 413 is clamped on the insert ring, the handle is held by hand, the locking block is inserted into the insert ring, wherein one clamping block and the second clamping block are respectively inserted on the upper side and the lower side of the spacer bar, so that the lower lock seat is fixedly connected with the upper lock head, the locking block is pulled out, the lower lock seat is separated from the upper lock head, and the joint of the lower half connecting ring and the upper half connecting ring is separable.
Particularly, the inside reinforcing bar of pad platform comprises a plurality of frames, the frame includes two horizon bars 2, two integrated into one piece has a plurality of vertical poles 3 between the horizon bar, the frame is right it wholly plays the reinforcing effect to fill up the platform.
Particularly, the four corners department of connecting plate is provided with the bolt, the connecting plate with the up end of pad platform passes through bolt fixed connection, and what make concrete transportation pipeline mount firm is fixed in pad bench up end.
Particularly, the upper end surface of the connecting seat is in a concave arc shape, the connecting seat is fixedly connected with the lower half connecting ring, the upper end surface of the connecting seat is in a concave arc shape and can be completely attached to the lower side wall of the lower half connecting ring, the connecting area is large, and the connection is firm.
Particularly, go up the linking arm with run through jointly on the linking arm down and be equipped with spliced pole 407, the both ends difference fixedly connected with of spliced pole is spacing piece 414, two spacing piece respectively with two linking arm in close contact with down, spacing piece will go up the linking arm with the position of linking arm carries on spacingly down, it can under the exogenic action to go up the linking arm rotate on the linking arm down.
Specifically, the locking block comprises a connecting block 4131, one end of which is fixedly connected with a first clamping block 4132 and a second clamping block 4133, the other end of the connecting block is fixedly connected with a handle 4134, the connecting block is used for connecting the first clamping block, the second clamping block and the handle, the handle is held by hand, the locking block is inserted into the inserting ring, wherein one of the clamping blocks and the second clamping block are respectively inserted at the upper side and the lower side of the spacer bar, so that the lower lock seat is fixedly connected with the upper lock head, the circular ring formed by the lower half connecting ring and the upper half connecting ring has a supporting function on the concrete transportation pipeline, the locking block is pulled out, the lower lock seat is separated from the upper lock head, and the joint of the lower half connecting ring and the upper half connecting ring is separated, so that the structure is convenient for disassembling the concrete conveying pipeline.
The working principle is as follows: handle is held to the hand, insert the locking block and insert in the go-between, wherein one of them fixture block and second fixture block are inserted respectively in the upside and the downside of spacer bar, make from this down lock seat and last lock head fixed connection, the ring that half go-between and first go-between are constituteed jointly plays the supporting role to concrete transportation pipeline, extract the locking block, lift up the tapered end and make down lock seat and the separation of last lock head, it rotates on the linking arm down to go up the linking arm simultaneously, the junction of half go-between and first go-between is separable down, the convenience is dismantled concrete transportation pipeline.
The utility model discloses the standard part that uses all can purchase from the market, and dysmorphism piece all can be customized according to the description with the record of drawing of description, and the concrete connection mode of each part all adopts conventional means such as ripe bolt, rivet, welding among the prior art, and machinery, part and setting are equipped with and all adopt prior art, and conventional model is including circuit connection adopts conventional connection mode among the prior art, and the detail is not repeated here.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the invention, the scope of which is defined in the appended claims and their equivalents.
Claims (6)
1. The utility model provides a concrete transportation pipeline protection foundation structure, includes a plurality of pad platforms (1), its characterized in that: the concrete cushion is characterized in that the cushion table (1) is formed by pouring reinforced concrete, the upper end face of the cushion table (1) is fixedly connected with a concrete conveying pipeline fixing frame, the concrete conveying pipeline fixing frame comprises a connecting plate (401), the connecting plate (401) is fixedly connected with the upper end face of the cushion table (1), the upper end face of the connecting plate (401) is integrally formed with a connecting seat (402), the upper end face of the connecting seat (402) is fixedly connected with a lower connecting half ring (403), the upper end of the lower connecting half ring (403) is provided with an upper connecting half ring (404) matched with the lower connecting half ring (403) for use, the side wall of the lower connecting ring (403) is symmetrically and fixedly connected with lower connecting arms (405), the side wall of the upper connecting ring (404) is fixedly connected with one end of an upper connecting arm (406), and the other end of the upper connecting arm (406) is positioned between the lower connecting arms, and go up linking arm (406) with linking arm (405) rotate to be connected down, lower linking arm (405) with on the lateral wall of last linking arm (406) respectively fixedly connected with down lock seat (408) and last lock (409), the up end fixedly connected with of lock seat (408) down inserts ring (410), insert fixedly connected with spacer bar (411) on ring (410), last jack (412) have been seted up on lock (409), insert ring (410) run through in jack (412), the joint has locking piece (413) on inserting ring (410).
2. A concrete transport pipeline protection infrastructure according to claim 1, characterized in that: the inside reinforcing bar of pad platform (1) comprises a plurality of frames, the frame includes two horizon bars (2), two integrated into one piece has a plurality of vertical poles (3) between horizon bar (2).
3. A concrete transport pipeline protection infrastructure according to claim 1, characterized in that: bolts are arranged at four corners of the connecting plate (401), and the connecting plate (401) is fixedly connected with the upper end face of the cushion table (1) through the bolts.
4. A concrete transport pipeline protection infrastructure according to claim 1, characterized in that: the upper end surface of the connecting seat (402) is in a concave arc shape.
5. A concrete transport pipeline protection infrastructure according to claim 1, characterized in that: go up linking arm (406) with run through jointly on linking arm (405) and be equipped with spliced pole (407), the both ends of spliced pole (407) are spacing piece (414) of fixedly connected with respectively, two spacing piece (414) respectively with two linking arm (405) in close contact with down.
6. A concrete transport pipeline protection infrastructure according to claim 1, characterized in that: the locking block (413) comprises a connecting block (4131), one end of the connecting block (4131) is fixedly connected with a first clamping block (4132) and a second clamping block (4133), and the other end of the connecting block (4131) is fixedly connected with a handle (4134).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201920752130.9U CN211175648U (en) | 2019-05-23 | 2019-05-23 | Concrete transportation pipeline protection foundation structure |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201920752130.9U CN211175648U (en) | 2019-05-23 | 2019-05-23 | Concrete transportation pipeline protection foundation structure |
Publications (1)
Publication Number | Publication Date |
---|---|
CN211175648U true CN211175648U (en) | 2020-08-04 |
Family
ID=71806178
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201920752130.9U Active CN211175648U (en) | 2019-05-23 | 2019-05-23 | Concrete transportation pipeline protection foundation structure |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN211175648U (en) |
-
2019
- 2019-05-23 CN CN201920752130.9U patent/CN211175648U/en active Active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN205711776U (en) | A kind of supporting bracket of bridge construction | |
CN215563350U (en) | Steel structure beam column reinforced connection node | |
CN211175648U (en) | Concrete transportation pipeline protection foundation structure | |
CN203514808U (en) | Wall formwork supporting composite structure | |
CN101210455A (en) | Assembly jig for detachable steel structure construction | |
CN210659407U (en) | Tool type protective shed for machining of reinforcing steel bars | |
CN210342692U (en) | Single-point embedded part inclined strut device of aluminum alloy template system | |
CN212803276U (en) | Supporting structure of shield interval tunnel | |
CN213296881U (en) | Steel structure upright post for assembly type building | |
CN204212263U (en) | A kind of building frame with high-stability bean column node | |
CN211873868U (en) | Strengthen cloth pole that side direction is firm | |
CN212000638U (en) | Overhead cover beam type steel supporting structure | |
CN210887997U (en) | Building scaffold with adjustable height | |
CN202767482U (en) | Weld-free highly supported framework scaffolding with disc columns | |
CN215761730U (en) | Adjustable tunnel supporting structure | |
CN213774127U (en) | Steel bar connecting device for building engineering | |
CN217054263U (en) | Draw scaffold frame of encorbelmenting to one side | |
CN213329977U (en) | Scaffold frame bearing structure encorbelments | |
CN210827839U (en) | Double-circulation garage fixed upright post structure device | |
CN204212274U (en) | A kind of building frame construction | |
CN220953358U (en) | High-strength prestressed concrete pipe pile | |
CN214834646U (en) | Scaffold frame bottom reinforced structure | |
CN215368635U (en) | Reinforced upper and lower hanging points | |
CN214941660U (en) | Prefabricated stand skeleton | |
CN217352162U (en) | Supporting structure for bridge construction |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |