CN211164521U - Precast beam mould - Google Patents

Precast beam mould Download PDF

Info

Publication number
CN211164521U
CN211164521U CN201921310684.XU CN201921310684U CN211164521U CN 211164521 U CN211164521 U CN 211164521U CN 201921310684 U CN201921310684 U CN 201921310684U CN 211164521 U CN211164521 U CN 211164521U
Authority
CN
China
Prior art keywords
precast beam
mould
key groove
mold
end panel
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201921310684.XU
Other languages
Chinese (zh)
Inventor
陈斌立
李津
李良鹏
周铭文
于斌
郭浩
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Ningbo Chenxu Building Technology Co ltd
Original Assignee
Ningbo Chenxu Building Technology Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Ningbo Chenxu Building Technology Co ltd filed Critical Ningbo Chenxu Building Technology Co ltd
Priority to CN201921310684.XU priority Critical patent/CN211164521U/en
Application granted granted Critical
Publication of CN211164521U publication Critical patent/CN211164521U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

The utility model discloses a precast beam mould, which comprises a body, the body includes first end mould, second end mould and a plurality of side form, a plurality of side form setting still is equipped with fixed drawing of patterns, installation hoisting point and frock support between first end mould and second end mould, is located a plurality of side form, the installation hoisting point sets up at frock support side, fixed drawing of patterns sets up in side form one side, and covers through the frock support and connect fixedly, and its equipment is nimble, can effectual realization recycle, avoids the material extravagant to the prefabrication cost of effectual reduction precast beam & post has satisfied green construction requirement simultaneously.

Description

Precast beam mould
Technical Field
The utility model relates to a precast beam mould.
Background
At present, the national is pushed to assemble buildings and develop industrialized building modes, so a large number of prefabricated wallboard technologies are promoted, and the existing construction method mainly adopts the steps of adopting wood molds, steel molds and aluminum films to cast concrete in situ, and forming prefabricated beams and columns after demolding after certain curing time. The existing method has the following defects:
1. the existing mold can only be used for a single-size beam and column in a single project, once a certain project structural part is prefabricated, the special mold cannot be reused and can only be discarded or reprocessed, so that a large amount of template materials are wasted during prefabrication of a component, and the cost of the prefabricated component is increased.
2. The existing prefabricated beam and column die is single in size and fixed, assembly of various size requirements cannot be met, a large number of operators are needed in the beam and column prefabricating process, and labor investment is increased.
3. The existing construction method needs to cut and splice the template on the construction site, and the noise and dust cause serious pollution to the environment and do not meet the green construction requirement.
With the development of the times, the new technology comes out endlessly, the requirements of supervision departments and owners on construction quality, cost, technology and the like are higher and higher, and the complex, rigid and rough and laggard technical method is difficult to meet the new construction requirements of modernization, refinement and flexibility and is gradually eliminated.
Disclosure of Invention
The utility model aims to solve the technical problem that a prefabricated superimposed sheet mould is provided, its equipment is nimble, can effectual realization recycle, avoids the material extravagant to the prefabricated cost of effectual reduction precast beam & post has satisfied green construction requirement simultaneously.
The utility model provides a technical scheme that above-mentioned technical problem adopted does: the utility model provides a precast beam mould, includes the body, the body includes first end mould, second end mould and a plurality of side form, a plurality of side form setting still is equipped with fixed drawing of patterns, installation hoisting point and frock support between first end mould and second end mould, is located a plurality of side form, the installation hoisting point sets up at frock support side, fixed drawing of patterns sets up in side form one side, and covers through the frock support and connect fixedly.
Furthermore, the first end die and the second end die are spliced up and down.
Further, first end mould includes first upper end panel and first terminal surface board, the side mould is through first upper end panel and first terminal surface board fixed connection that mutually supports.
Further, the second end mould comprises a second upper end panel and a second lower end panel, and the side moulds are mutually matched and fixedly connected through the second upper end panel and the second lower end panel.
And the first end die, the second end die and the plurality of side dies are connected, limited and fixed through the precast beam key grooves.
Further, precast beam keyway includes first keyway, second keyway and third keyway, all be equipped with first keyway on first end mould and the second end mould, second keyway and third keyway all set up on the side mould, and wherein, the one end and the first keyway of second keyway are connected.
Further, still be equipped with the protection frock board on the side form edge, the protection frock board is located frock support below, and fixes through the frock support.
Compared with the prior art, the utility model has the advantages of:
the utility model provides a precast beam mould, its equipment is nimble, can effectual realization recycle, avoids the material extravagant to the prefabrication cost of effectual reduction precast beam & post has satisfied green construction requirement simultaneously.
Drawings
Fig. 1 is a schematic view of an overall structure of a precast beam mold according to an embodiment.
Fig. 2 is a schematic structural view of a first end mold of the precast beam mold according to the embodiment.
Fig. 3 is a schematic structural view of a first end mold of the precast beam mold according to the embodiment.
The corresponding names of the components in the figure are as follows: the structure comprises a body 1, a first end die 2, a second end die 3, a side die 4, a fixed demoulding 5, an installation hoisting point 6, a tool support 7, a first upper end panel 8, a first lower end panel 9, a second upper end panel 10, a second lower end panel 11, a precast beam key groove 12, a first key groove 13, a second key groove 14, a third key groove 15 and a protection tool plate 16.
Detailed Description
The present invention will be described in further detail with reference to the following embodiments.
Examples
As shown in fig. 1-3, the technical solution adopted by the present invention to solve the above technical problems is: a precast beam mould comprises a body 1, wherein the body 1 comprises a first end mould 2, a second end mould 3 and a plurality of side moulds 4, the plurality of side moulds 4 are arranged between the first end mould 2 and the second end mould 3, a fixed demoulding 5, an installation hoisting point 6 and a tool support 7 are further arranged on the plurality of side moulds 4, the installation hoisting point 6 is arranged on the side edge of the tool support 7, the fixed demoulding 5 is arranged on one side of the side mould 4 and is fixedly connected with the tool support 7 in a covering manner, the first end mould 2 and the second end mould 3 are formed by splicing from top to bottom, the first end mould 2 comprises a first upper end panel 8 and a first lower end panel 9, the side moulds 4 are fixedly connected with each other in a matching manner through the first upper end panel 8 and the first lower end panel 9, the second end mould 3 comprises a second upper end panel 10 and a second lower end panel 11, the side moulds 4 are fixedly connected with each other in a matching manner through the second upper end panel 10 and the second lower end panel 11, still include precast beam keyway 12, connect spacing fixedly through precast beam keyway 12 between first end mould 2, second end mould 3 and a plurality of side mould 4 three, precast beam keyway 12 includes first keyway 13, second keyway 14 and third keyway 15, all be equipped with first keyway 13 on first end mould 2 and the second end mould 3, second keyway 14 and third keyway 15 all set up on side mould 4, and wherein, the one end and the first keyway 13 of second keyway 14 are connected, 4 edges of side mould still are equipped with protection frock board 16, protection frock board 16 is located frock support 7 below, and fixes through frock support 7.
The precast beam mould that this embodiment provided, its equipment is nimble, can effectual realization recycle, avoids the material extravagant to the prefabrication cost of effectual reduction precast beam & post has satisfied green construction requirement simultaneously.
Specifically, the first end die 2 and the second end die 3 are assembled up and down, so that the up-down, left-right and left sizes of the ribs and the thickness of the protective layer can be effectively fixed; the side die 4 adopts an integral type for the side die 4 with the length less than five meters, and the side die 4 with the length more than five meters adopts a modular splicing type matched die so as to be convenient for die assembly and die disassembly, simultaneously enhance the rigidity and the strength of the die and improve the service cycle of the die; the side die 4 is also provided with a fixed demoulding 5, a mounting lifting point 6 and a tool support 7, wherein the tool support 7 is movably connected with the side die 4 through bolts, and the lifting point can be flexibly fixed according to the size of a component; the first key groove 13, the second key groove 14 and the third key groove 15 are arranged on the side die 4, and can be flexibly configured according to the size of the precast beam and the column key groove, so that the characteristic that a plurality of components can be used as one set of die at the same time is realized; the protective tooling plate 16 is positioned below the tooling support 7, so that the thickness of the precast beam stirrup protective layer is ensured, and the precast beam stirrup protective layer can be flexibly fixed according to the size of the precast beam stirrup.
The foregoing is only a preferred embodiment of the present invention, and it should be noted that, for those skilled in the art, a plurality of improvements and decorations can be made without departing from the technical principle of the present invention, and these improvements and decorations should also be regarded as the protection scope of the present invention.

Claims (7)

1. The utility model provides a precast beam mould, a serial communication port, which comprises a body, the body includes first end mould, second end mould and a plurality of side form, a plurality of side form setting still is equipped with fixed drawing of patterns, installation hoisting point and frock support between first end mould and second end mould, is located a plurality of side form, the installation hoisting point sets up at frock support side, fixed drawing of patterns sets up in side form one side, and covers through the frock support and connect fixedly.
2. The precast beam mold of claim 1, wherein the first end mold and the second end mold are assembled up and down.
3. A precast beam mould according to claim 2, wherein the first end mould comprises a first upper end panel and a first lower end panel, and the side moulds are fixedly connected with each other through the first upper end panel and the first lower end panel.
4. A precast beam mould according to claim 2, wherein the second end form comprises a second upper end panel and a second lower end panel, and the side forms are fixedly connected with each other by the second upper end panel and the second lower end panel.
5. The precast beam mold according to claim 1, further comprising a precast beam key groove, wherein the first end mold, the second end mold and the plurality of side molds are connected, limited and fixed by the precast beam key groove.
6. The precast beam mold according to claim 5, wherein the precast beam key groove comprises a first key groove, a second key groove and a third key groove, the first key groove is formed on each of the first and second end molds, the second key groove and the third key groove are formed on each of the side molds, and one end of the second key groove is connected with the first key groove.
7. The precast beam mold according to claim 1, wherein a protective tooling plate is further arranged on the side mold edges, is located below the tooling support and is fixed through the tooling support.
CN201921310684.XU 2019-08-14 2019-08-14 Precast beam mould Active CN211164521U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201921310684.XU CN211164521U (en) 2019-08-14 2019-08-14 Precast beam mould

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201921310684.XU CN211164521U (en) 2019-08-14 2019-08-14 Precast beam mould

Publications (1)

Publication Number Publication Date
CN211164521U true CN211164521U (en) 2020-08-04

Family

ID=71792871

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201921310684.XU Active CN211164521U (en) 2019-08-14 2019-08-14 Precast beam mould

Country Status (1)

Country Link
CN (1) CN211164521U (en)

Similar Documents

Publication Publication Date Title
CN205668316U (en) A kind of composite assembly precast concrete plate mould of simple in construction
CN109252662B (en) One-step forming construction method for vertical shaft bridge frame through cast-in-place concrete floor
CN111070380A (en) Combined prefabricated shear wall mold assembly and using method thereof
CN211164521U (en) Precast beam mould
CN111702942A (en) Railway bridge deck auxiliary structure integral prefabrication production line and production process thereof
CN214110810U (en) Mould for prefabricating laminated slab
CN109208799B (en) Construction method for early formwork removal in structure hole of waffle slab
CN215212325U (en) Structure for positioning reinforcing steel bar on plate surface and controlling thickness of floor slab
CN114347229A (en) Vertical forging die for prefabricated wallboard of fabricated building and production process
CN214871425U (en) Concrete prefabricated part mould with three-dimensional positioning slurry leakage prevention plate
CN211941382U (en) Prefabricated staircase combination steel mould
CN208323723U (en) A kind of pin-connected panel prefabricated panel mold
CN217915899U (en) Superimposed sheet mould convenient to installation
CN112523243A (en) Caisson template
CN219650179U (en) Precast concrete sheet mould structure
CN219686020U (en) Wall column barrel pressing die
CN110666942A (en) Manufacturing method of novel prefabricated concrete stair mold
CN219569566U (en) Cast-in-situ stair closed template system
CN216127448U (en) Prefabricated coincide floor mould
CN209792531U (en) Simple and easy full sample wood pattern
CN217777279U (en) Prefabricated coincide board mould of modularization assembly type structure
CN210820086U (en) Modular window mould of prefabricated wallboard window
CN113954216B (en) Steel die-aluminum die building process for bridge prefabricated part
CN210233406U (en) Steel-wood combined structure die for prefabricated wallboard component
CN217751920U (en) Concrete prefabricated part mould

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant