CN211135222U - Install in mould adjustment mechanism of steel pipe production line - Google Patents

Install in mould adjustment mechanism of steel pipe production line Download PDF

Info

Publication number
CN211135222U
CN211135222U CN201921992788.3U CN201921992788U CN211135222U CN 211135222 U CN211135222 U CN 211135222U CN 201921992788 U CN201921992788 U CN 201921992788U CN 211135222 U CN211135222 U CN 211135222U
Authority
CN
China
Prior art keywords
adjusting block
upper die
mould
die adjusting
production line
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201921992788.3U
Other languages
Chinese (zh)
Inventor
孙伟
李志成
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Chongqing Jiafeng Pipe Industry Co ltd
Original Assignee
Chongqing Jiafeng Pipe Industry Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Chongqing Jiafeng Pipe Industry Co ltd filed Critical Chongqing Jiafeng Pipe Industry Co ltd
Priority to CN201921992788.3U priority Critical patent/CN211135222U/en
Application granted granted Critical
Publication of CN211135222U publication Critical patent/CN211135222U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Mounting, Exchange, And Manufacturing Of Dies (AREA)

Abstract

The utility model discloses a die adjusting mechanism installed on a steel pipe production line, which comprises a bottom plate, two installing frames fixed on the upper end of the bottom plate in parallel, an upper die adjusting block installed at the two ends of an upper die, and a lower die adjusting block installed at the two ends of a lower die; the lower die adjusting block is fixed on the bottom plate and positioned below the upper die adjusting block, and a spring is arranged between the lower die adjusting block and the upper die adjusting block; the utility model relates to a rationally, simple structure, convenient to use installs in the regulation of steel pipe production line to the mould, realizes the adjustment of mould in the finished piece interval of bed die on the reasonable design, mould regulating block and lower mould regulating block, and wherein the lower mould regulating block is fixed, and goes up the mould regulating block and remove to can realize that mould and bed die interval are adjustable, with the processing of adaptation multiple thickness raw and other materials.

Description

Install in mould adjustment mechanism of steel pipe production line
Technical Field
The utility model relates to an adjustment mechanism specifically says to an install in mould adjustment mechanism of steel pipe production line.
Background
Steel pipes are steel with a hollow cross section whose length is much greater than the diameter or circumference. The steel pipe is divided into round, square, rectangular and special-shaped steel pipes according to the cross section shape, carbon structural steel pipes, low alloy structural steel pipes, alloy steel pipes and composite steel pipes according to the material quality, steel pipes for conveying pipelines, engineering structures, thermal equipment, petrochemical industry, machine manufacturing, geological drilling, high pressure equipment and the like according to the application, and the steel pipe is divided into a seamless steel pipe and a welded steel pipe according to the production process, wherein the seamless steel pipe is divided into hot rolling and cold rolling (drawing), and the welded steel pipe is divided into a straight seam welded steel pipe and a spiral seam welded steel pipe.
Steel pipes are not only used for transporting fluids and powdery solids, exchanging heat energy, manufacturing mechanical parts and containers, but also are economical steels. The steel pipe is used for manufacturing the building structure net rack, the supporting column and the mechanical support, so that the weight can be reduced, the metal can be saved by 20-40%, and the industrialized mechanized construction can be realized. The steel pipe is used for manufacturing the highway bridge, so that steel can be saved, the construction is simplified, the area of a coating protective layer can be greatly reduced, and the investment and the maintenance cost are saved.
The steel pipe is formed by a steel belt through a die set, the die set is more critical in the processing process, the distance between an upper die and a lower die in the traditional forming device is inconvenient to adjust, and when raw materials with different thicknesses are processed, a plurality of parts are replaced, and the operation is complex.
SUMMERY OF THE UTILITY MODEL
Therefore, in order to overcome the above disadvantages, the utility model provides a die adjusting mechanism which is reasonable in design, simple in structure and convenient to use, is installed on a steel pipe production line, realizes the adjustment of the distance between the upper die and the lower die, reasonably designs an upper die adjusting block and a lower die adjusting block, wherein the lower die adjusting block is fixed, and the upper die adjusting block moves, thereby realizing the adjustment of the distance between the upper die and the lower die to adapt to the processing of various thickness raw materials;
the utility model is realized in such a way that a mould adjusting mechanism arranged on a steel pipe production line is constructed, which comprises a bottom plate, two mounting frames fixed on the upper end of the bottom plate in parallel, an upper mould adjusting block arranged at the two ends of the upper mould, and a lower mould adjusting block arranged at the two ends of the lower mould;
wherein the lower die adjusting block is fixed on the bottom plate and is positioned below the upper die adjusting block,
the upper die adjusting block is adjustable in position in the mounting frame, a limiting screw for limiting the upper die is arranged at the upper end of the upper die adjusting block, the limiting screw penetrates through a top plate fixed at the upper end of the mounting frame and is fixed at the position of the top plate through a nut, the top plate is fixedly mounted at the upper end of the mounting frame through a screw, and a mounting hole with internal threads and matched with the screw is formed in the top plate;
and a spring is arranged between the lower die adjusting block and the upper die adjusting block.
Preferably, the guide strip for guiding the upper die adjusting block is fixedly mounted on the inner side of the mounting frame through a bolt.
Preferably, two springs which are parallel are arranged between the lower die adjusting block and the upper die adjusting block.
Preferably, two spring mounting grooves are respectively formed in the lower end face of the upper die adjusting block and the upper end face of the lower die adjusting block.
Preferably, the two sides of the bottom plate are provided with lugs, the lugs are provided with mounting holes, and screws are mounted in the mounting holes, so that the bottom plate and the external workbench are fixed.
The utility model discloses following beneficial effect has:
the utility model has reasonable design, simple structure and convenient use, is arranged on the die adjusting mechanism of the steel pipe production line, realizes the adjustment of the distance between the upper die and the lower die, reasonably designs the upper die adjusting block and the lower die adjusting block, wherein the lower die adjusting block is fixed, and the upper die adjusting block moves, thereby realizing the adjustment of the distance between the upper die and the lower die to adapt to the processing of various thickness raw materials;
the upper end of an upper die adjusting block for adjusting the upper die is provided with a limiting screw rod, the limiting screw rod penetrates through a top plate fixed at the upper end of the mounting frame, the position of the screw rod on the top plate is fixed through a nut, when the limiting screw rod is adjusted, the limiting screw rod is rotated, the depth of the rotating screw rod inserted into the top plate is controlled, the rotating screw rod abuts against the upper die adjusting block, the upper die is limited, the distance between the upper die and the lower die is adjusted, and raw materials can be better processed conveniently;
simultaneously reasonable at the inboard design gib block of installing frame for go up the mould regulating block and lead to through the gib block when removing, guarantee to remove steadily, and reasonable last mould regulating block sets up the spring with the lower mould regulating block between, thereby make and keep the clearance between last mould and the bed die, so that the passing through of raw and other materials.
Drawings
Fig. 1 is a perspective view of a first mold set of the present invention;
fig. 2 is a front view of a first die set of the present invention;
fig. 3 is a side view of a first die set of the present invention;
fig. 4 is a cross-sectional view a-a of fig. 2.
Detailed Description
The present invention will be described in detail with reference to fig. 1 to 4, and the technical solutions in the embodiments of the present invention will be clearly and completely described, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
As shown in FIGS. 1-4, the present invention provides a mold adjusting mechanism installed on a steel pipe production line, which comprises a bottom plate 12, two mounting frames 1 fixed on the upper end of the bottom plate in parallel, an upper mold adjusting block 3 installed at two ends of an upper mold 11, and a lower mold adjusting block 2 installed at two ends of a lower mold 10
Wherein the lower die adjusting block is fixed on the bottom plate 12 and is positioned below the upper die adjusting block,
the upper die adjusting block 3 is adjustable in position in the mounting frame, a limiting screw 5 for limiting the upper die is arranged at the upper end of the upper die, the limiting screw penetrates through a top plate 4 fixed at the upper end of the mounting frame and fixes the position of the screw on the top plate through a nut 6, the top plate is fixedly mounted at the upper end of the mounting frame through a screw, and a mounting hole with internal threads and matched with the screw is formed in the top plate;
and a spring 14 is arranged between the lower die adjusting block and the upper die adjusting block.
In this embodiment, a guide strip 15 for guiding the upper die adjusting block is fixedly installed on the inner side of the mounting frame 1 through a bolt.
In this embodiment, two springs 14 are disposed between the lower and upper die adjustment blocks in parallel.
In this embodiment, go up mould regulating block lower extreme face and lower mould regulating block up end and be provided with two spring mounting grooves respectively.
In the present embodiment, the bottom plate 12 is provided with a boss at both sides thereof, and a mounting hole is provided in the boss, and a screw is mounted in the mounting hole, so that the bottom plate is fixed to the circumscribed table.
In this embodiment, the middle of the upper mold is provided with an upper rotating shaft 8 through a key, the upper mold adjusting blocks are arranged at two ends of the upper rotating shaft, and the upper rotating shaft is arranged on the upper mold adjusting blocks through a bearing 9;
a lower rotating shaft is arranged in the middle of the lower die through a key, and lower die adjusting blocks are arranged at two ends of the lower rotating shaft, wherein the lower die adjusting blocks are fixed on the bottom plate 12 and positioned below the upper die adjusting blocks, and the lower rotating shaft is arranged on the lower die adjusting blocks through bearings;
the utility model discloses the concrete implementation is as follows:
the utility model relates to a mould adjustment mechanism installed on a steel pipe production line, which realizes the adjustment of the distance between the upper mould and the lower mould, during the operation, the distance between the upper mould and the lower mould is adjusted according to the thickness of the raw material, and during the adjustment, a limit screw is rotated to control the depth of the rotary screw inserted into a top plate, so that the upper mould adjusting block is supported through the limit screw, the limit of the upper mould is realized, and the distance between the upper mould and the lower mould is adjusted, so that the raw material can be better processed; wherein go up the mould regulating block and lead through the gib block when removing to reasonable last mould regulating block and lower mould regulating block set up the spring between, thereby make and keep the clearance between last mould and the bed die, so that the passing through of raw and other materials.
The previous description of the disclosed embodiments is provided to enable any person skilled in the art to make or use the present invention. Various modifications to these embodiments will be readily apparent to those skilled in the art, and the generic principles defined herein may be applied to other embodiments without departing from the spirit or scope of the invention. Thus, the present invention is not intended to be limited to the embodiments shown herein but is to be accorded the widest scope consistent with the principles and novel features disclosed herein.

Claims (5)

1. The utility model provides an install in mould adjustment mechanism of steel pipe production line which characterized in that: comprises a bottom plate (12), two mounting frames (1) fixed on the upper end of the bottom plate in parallel, an upper die adjusting block (3) arranged at the two ends of an upper die (11), and a lower die adjusting block (2) arranged at the two ends of a lower die (10)
Wherein the lower die adjusting block is fixed on the bottom plate (12) and is positioned below the upper die adjusting block,
the upper die adjusting block (3) is adjustable in position in the mounting frame, a limiting screw (5) for limiting an upper die is arranged at the upper end of the upper die, the limiting screw penetrates through a top plate (4) fixed at the upper end of the mounting frame and is fixed at the position of the top plate through a nut (6), the top plate is fixedly mounted at the upper end of the mounting frame through a screw, and a mounting hole which is provided with internal threads and matched with the screw is formed in the top plate;
and a spring (14) is arranged between the lower die adjusting block and the upper die adjusting block.
2. The mold adjusting mechanism installed on a steel tube production line according to claim 1, wherein: the inboard of installing frame (1) is through bolt fixed mounting for last mould regulating block direction gib block (15).
3. The mold adjusting mechanism installed on a steel tube production line according to claim 1, wherein: two springs (14) which are parallel are arranged between the lower die adjusting block and the upper die adjusting block.
4. The mold adjusting mechanism installed on the steel tube production line according to claim 3, wherein: and the lower end surface of the upper die adjusting block and the upper end surface of the lower die adjusting block are respectively provided with two spring mounting grooves.
5. The mold adjusting mechanism installed on a steel tube production line according to claim 1, wherein: both sides of the bottom plate (12) are provided with a convex lug, and the convex lug is provided with a mounting hole.
CN201921992788.3U 2019-11-18 2019-11-18 Install in mould adjustment mechanism of steel pipe production line Active CN211135222U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201921992788.3U CN211135222U (en) 2019-11-18 2019-11-18 Install in mould adjustment mechanism of steel pipe production line

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201921992788.3U CN211135222U (en) 2019-11-18 2019-11-18 Install in mould adjustment mechanism of steel pipe production line

Publications (1)

Publication Number Publication Date
CN211135222U true CN211135222U (en) 2020-07-31

Family

ID=71745282

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201921992788.3U Active CN211135222U (en) 2019-11-18 2019-11-18 Install in mould adjustment mechanism of steel pipe production line

Country Status (1)

Country Link
CN (1) CN211135222U (en)

Similar Documents

Publication Publication Date Title
CN109352066B (en) Aluminum profile cutting and transferring mechanism
CN209319621U (en) A kind of tubular object extruding clamping device
CN101219449A (en) Semi-automatic production method of integrally arcuate stainless steel round blank crystallizer water jacket
CN201366550Y (en) Clamping device
CN110918708A (en) Manual elbow pipe forming device
CN211135222U (en) Install in mould adjustment mechanism of steel pipe production line
CN202129649U (en) Anti-clamping deformation machining clamp for large-caliber elbow
CN209773131U (en) novel roller type straightening machine
CN213034102U (en) Fixing device for flange machining
CN210647920U (en) Spiral pipe bending machine device
CN2871051Y (en) Fast manual circular winder
US3269162A (en) Spiral pipe machine
CN214685908U (en) Steel pipe production equipment
CN213916455U (en) Feeding structure for cutting corrugated pipe
CN210059361U (en) Metal draws in succession self-adaptation regulation draw-off gear
CN212397733U (en) Thin-wall steel pipe production forming machine
CN210995925U (en) Adjustable die of bending machine
CN209683225U (en) A kind of adjustable electric motor-car saddle pipe rolling word device
CN207547347U (en) Steel pipe spiral groove rolling device
CN216574975U (en) Aluminum product trimmer
CN213317280U (en) Auxiliary supporting device for corrugated pipe production setting
CN214442137U (en) Bender is used in aluminum product processing
CN216632149U (en) Steel bending machine
CN205220058U (en) Aluminium alloy gilding press
CN205995991U (en) A kind of bicycle frame tube clicker press machine

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CP01 Change in the name or title of a patent holder
CP01 Change in the name or title of a patent holder

Address after: 402260 Aston expert building, No. 8 Chuangye Road, Shuangfu Town, Jiangjin District, Chongqing

Patentee after: Chongqing Jiafeng Pipe Industry Co.,Ltd.

Address before: 402260 Aston expert building, No. 8 Chuangye Road, Shuangfu Town, Jiangjin District, Chongqing

Patentee before: CHONGQING JIAFENG PIPE INDUSTRY Co.,Ltd.