CN211132806U - Fire water tank construction equipment - Google Patents

Fire water tank construction equipment Download PDF

Info

Publication number
CN211132806U
CN211132806U CN201922122799.2U CN201922122799U CN211132806U CN 211132806 U CN211132806 U CN 211132806U CN 201922122799 U CN201922122799 U CN 201922122799U CN 211132806 U CN211132806 U CN 211132806U
Authority
CN
China
Prior art keywords
water
water level
box
box body
pipe
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201922122799.2U
Other languages
Chinese (zh)
Inventor
董艳
褚楠楠
李波
李进营
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Weifang Ping'an Fire Protection Engineering Co ltd
Original Assignee
Weifang Ping'an Fire Protection Engineering Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Weifang Ping'an Fire Protection Engineering Co ltd filed Critical Weifang Ping'an Fire Protection Engineering Co ltd
Priority to CN201922122799.2U priority Critical patent/CN211132806U/en
Application granted granted Critical
Publication of CN211132806U publication Critical patent/CN211132806U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Loading And Unloading Of Fuel Tanks Or Ships (AREA)

Abstract

The utility model discloses a fire water tank construction equipment, including box, overflow pipeline and raceway, both sides all are provided with a set of base about the bottom of box, and the up end left part of box is provided with overflow pipeline and raceway to the right pipe end of overflow pipeline stretches into the internal setting of box, and the right-hand member head of overflow pipeline installs the ball-cock assembly, and the right side of ball-cock assembly is through the iron wire system and have the floater. This fire water tank construction equipment, overall structure sets up rationally, it is main to be connected with overflow pipeline and raceway in the up end right part of box, the inlet tube, hydraulic pressure water level control valve and raceway constitute toward the internal conduit of box together, the inlet tube, hydraulic pressure water level control valve and overflow pipeline constitute toward the outer backflow pipeline of box together, with the liquid level that keeps in the box can not be higher than the highest water level, so that the water level in the control box is between minimum water level and highest water level, convenience simple to use.

Description

Fire water tank construction equipment
Technical Field
The utility model relates to a fire water tank technical field specifically is a fire water tank construction equipment.
Background
The fire water tank is a fire-fighting facility, provide the fire-fighting facility at water source for the fire brigade in the rescue activity of putting out a fire, divide into circulation fire water tank and non-circulation fire water tank two types according to the usage, it is good to have a water quality, it is clean pollution-free, high strength, advantages such as light in weight, it is a fixed water tank on the floor building under the more circumstances, and it has water to irritate in the water tank, the use of conveniently putting out a fire, but the inside water level of prior art's water tank height can not see, the incasement water level height can not cross lowly and also can not be too high, the water yield is low and can not use, the too much water yield can influence the.
In order to solve the defects and the deficiencies of the fire-fighting water tank, the technology of improving the fire-fighting water tank is urgently needed, an overflow pipeline and a water pipe are mainly connected to the right part of the upper end face of a tank body, a water inlet pipe, a hydraulic water level control valve and the water pipe form the water pipe in the tank body together, the water inlet pipe, the hydraulic water level control valve and the overflow pipeline form a return pipeline outside the tank body together, the liquid level in the tank body is kept not higher than the highest water level, the water level in the tank body is conveniently controlled between the lowest water level and the highest water level, the use is simple and convenient, and the fire-fighting water tank construction device is provided.
SUMMERY OF THE UTILITY MODEL
The utility model provides a technical problem lie in overcoming the inside water level height of water tank of prior art and can not see, and the incasement water level height can not cross lowly and also can not be too high, and the water yield is low not enough to use, and the too much bearing capacity that can influence the box of water yield, safe defect inadequately provides a fire water tank construction equipment. The utility model provides a fire water tank construction equipment has and is mainly connected with overflow pipeline and raceway in the up end right part of box, and inlet tube, hydraulic pressure water level control valve and raceway constitute towards the interior conduit of box together, and inlet tube, hydraulic pressure water level control valve and overflow pipeline constitute towards the outer backflow pipeline of box together to the liquid level that keeps in the box can not be higher than the highest water level, so that the water level in the control box is between minimum water level and highest water level, characteristics such as simple to use convenience.
In order to achieve the above object, the utility model provides a following technical scheme: a fire water tank construction device comprises a tank body, an overflow pipeline and a water delivery pipe, wherein a group of bases are arranged on the left side and the right side of the bottom of the tank body, the overflow pipeline and the water delivery pipe are arranged on the left portion of the upper end face of the tank body, the right pipe end of the overflow pipeline extends into the tank body, a ball float valve is mounted at the right end of the overflow pipeline, a floating ball is tied on the right side of the ball float valve through an iron wire, the right pipe end of the water delivery pipe extends into the tank body, and an energy dissipation cylinder is mounted at the right end of the water delivery pipe;
the mid-mounting of overflow pipeline has the stop valve, and the left end of overflow pipeline connects on hydraulic pressure water level control valve to the left end of raceway is connected on hydraulic pressure water level control valve, and the left part of hydraulic pressure water level control valve is connected with the inlet tube simultaneously, and installs the gate valve on the inlet tube.
Preferably, the center of the upper end face of the box body is provided with a twist cover, the twist cover is twisted with a maintenance opening, and the maintenance opening and the twist cover can be detachably arranged.
Preferably, the front side surface of the bottom of the box body is provided with a sewage draining outlet, the lower part of the right side surface of the box body is provided with a water outlet pipe, and the sewage draining outlet and the water outlet pipe are both provided with electromagnetic control valves.
Preferably, the inner wall of the box body is sequentially provided with a lowest water level inductor, a highest water level inductor and an overflow water level inductor from bottom to top, and the floating ball is suspended on the water level indicated by the highest water level inductor.
Preferably, the size of the box body is set to be 4m × 2m × 2m, the thickness of the box body is set to be 3cm, and the box body of the box body is made of stainless steel.
Preferably, the water flow direction among the water inlet pipe, the hydraulic water level control valve and the water delivery pipe is from outside to inside the box body, and the water flow direction among the water inlet pipe, the overflow pipeline and the ball float valve is from inside to outside the box body.
Compared with the prior art, the beneficial effects of the utility model are that:
1. the right part of the upper end face of the box body is mainly connected with an overflow pipeline and a water delivery pipe, the water inlet pipe, the hydraulic water level control valve and the water delivery pipe form a water delivery pipe going into the box body together, and the water inlet pipe, the hydraulic water level control valve and the overflow pipeline form a return pipeline going out of the box body together, so that the liquid level in the box body is kept not higher than the highest water level, the water level in the box body is controlled between the lowest water level and the highest water level, and the use is simple and convenient;
2. meanwhile, the right end of the water conveying pipe is provided with the energy dissipation cylinder, the energy dissipation cylinder is helpful for reducing the impact force of water flow, the fierce water flow in the box body is avoided, the impact is reduced, the right end of the overflow pipeline is provided with the ball float valve and the floating ball, the ball float valve is opened or closed through the floating ball floating on the liquid level in the box body, and the switch is convenient.
Drawings
FIG. 1 is a schematic front view of the structure of the present invention;
FIG. 2 is a right-side view of the structure of the present invention;
fig. 3 is a schematic view of the internal structure of the present invention.
Reference numbers in the figures: 1. a sewage draining outlet; 2. a base; 3. a water outlet pipe; 4. a minimum water level sensor; 5. a maximum water level sensor; 6. an overflow level sensor; 7. a box body; 8. a maintenance port; 9. twisting the cover; 10. a floating ball; 11. a float valve; 12. an overflow conduit; 13. a stop valve; 14. an energy dissipation cylinder; 15. a water delivery pipe; 16. a hydraulic water level control valve; 17. a gate valve; 18. and (4) a water inlet pipe.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
Referring to fig. 1-3, the utility model provides a fire water tank construction equipment, including box 7, overflow pipeline 12 and raceway 15, both sides are provided with a set of base 2 about the bottom of box 7, and the upper end left part of box 7 is provided with overflow pipeline 12 and raceway 15, and the right pipe end of overflow pipeline 12 stretches into the box 7 and sets up, and the right end of overflow pipeline 12 installs ball float valve 11, and there is floater 10 in the right side direction of ball float valve 11 through the wire system, and the right pipe end of raceway 15 stretches into the box 7 and sets up, the upper end center of box 7 is provided with twist cover 9, and twist on twist cover 9 has maintenance mouth 8, and but between maintenance mouth 8 and twist cover 9 split setting, the bottom front side of box 7 is provided with drain 1, and the right side lower part of box 7 is provided with outlet pipe 3, and all install the drain 1 and outlet pipe 3, the inner wall of box 7 has been provided with minimum water level induction gauge 4 from the bottom in proper order, maximum water level induction gauge 5 and induction gauge 6, and the upper end of overflow pipe 15 connects to the left pipe of the raceway 15, and overflow pipe 15, the left pipe 15 and overflow pipe 15 are connected with the electromagnetic control valve, the water level induction valve, the water pipe 15, the water control valve is connected to the water pipe 15, the water control valve is connected to the water pipe 15, the water control valve from the water pipe 4, the water control valve is connected to the water control valve from the water pipe 15, the water control valve is connected with the water control valve from the water control valve of the water pipe 4.
As shown in fig. 1-3, the overall structure of the apparatus is shown, and an overflow pipe 12 and a water pipe 15 are connected to the right portion of the upper end surface of the tank 7, a water inlet pipe 18, a hydraulic water level control valve 16 and the water pipe 15 together form a water pipe to the inside of the tank 7, and the water inlet pipe 18, the hydraulic water level control valve 16 and the overflow pipe 12 together form a return pipe to the outside of the tank 7, so as to keep the liquid level in the tank 7 not higher than the highest water level, so as to control the water level in the tank 7 between the lowest water level and the highest water level, and the apparatus is simple and convenient to use;
meanwhile, the right end of the water pipe 15 is provided with the energy dissipation cylinder 14, the energy dissipation cylinder 14 is helpful for reducing the impact force of water flow, the fierce water flow in the box body 7 is avoided, the impact is reduced, the right end of the overflow pipeline 12 is provided with the ball float valve 11 and the ball float 10, the ball float valve 11 is opened or closed through the floating height of the ball float 10 on the liquid level in the box body 7, and the switch is convenient.
The working principle is as follows: when the fire water tank construction device is used, the device carries out water delivery work into the tank body 7 through the water inlet pipe 18, the hydraulic water level control valve 16 and the water delivery pipe 15, the lowest water level inductor 4, the highest water level inductor 5 and the overflow water level inductor 6 are sequentially arranged in the tank body 7 from bottom to top, the lowest water level in the tank body 7 can not be lower than the liquid level of the lowest water level inductor 4, the highest water level can not be higher than the liquid level of the highest water level inductor 5, the floating ball 10 is suspended on the liquid level through the floating ball 10, when the floating position of the floating ball 10 is lower than the liquid level of the highest water level inductor 5, the floating ball 10 can not drive the switch on the floating ball valve 11 to be opened, when the liquid level of the sewage discharge port 1 is higher than the liquid level of the highest water level inductor 5, the water level can become the overflow water level inductor 6, the floating ball 10 can float and can open the switch of the floating ball valve 11, so that the water, simultaneously, the water outlet pipe 3 arranged on the lower portion of the right side face of the box body 7 can convey water to the outside, the sewage discharge port 1 on the front side face of the bottom of the box body 7 is convenient to discharge sewage, the maintenance port 8 on the twisting cover 9 on the upper end face of the box body 7 is convenient to twist open, and the box body 7 is convenient to clean or maintain for checking and using.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the invention, the scope of which is defined in the appended claims and their equivalents.

Claims (6)

1. The utility model provides a fire water tank construction equipment, includes box (7), overflow pipe (12) and raceway (15), its characterized in that: the left side and the right side of the bottom of the box body (7) are respectively provided with a group of bases (2), the left part of the upper end face of the box body (7) is provided with an overflow pipeline (12) and a water delivery pipe (15), the right pipe end of the overflow pipeline (12) extends into the box body (7) and is provided with a ball float valve (11), the right side of the ball float valve (11) is provided with a ball float (10) through an iron wire system, the right pipe end of the water delivery pipe (15) extends into the box body (7) and is provided with an energy dissipation cylinder (14), and the right end of the water delivery pipe (15) is provided with an energy dissipation cylinder (14);
the middle part of overflow pipeline (12) is installed stop valve (13), and the left end of overflow pipeline (12) is connected on hydraulic pressure water level control valve (16) to the left end of raceway (15) is connected on hydraulic pressure water level control valve (16), and the left part of hydraulic pressure water level control valve (16) is connected with inlet tube (18) simultaneously, and installs gate valve (17) on inlet tube (18).
2. A fire water tank construction equipment according to claim 1, characterized in that: the upper end face center of box (7) is provided with twist lid (9), and twist on lid (9) and twist and have maintenance mouth (8) to but split setting between maintenance mouth (8) and twist lid (9).
3. A fire water tank construction equipment according to claim 1, characterized in that: the sewage draining device is characterized in that a sewage draining outlet (1) is formed in the front side face of the bottom of the box body (7), a water outlet pipe (3) is arranged on the lower portion of the right side face of the box body (7), and electromagnetic control valves are mounted on the sewage draining outlet (1) and the water outlet pipe (3).
4. A fire water tank construction equipment according to claim 1, characterized in that: the inner wall of the box body (7) is sequentially provided with a lowest water level inductor (4), a highest water level inductor (5) and an overflow water level inductor (6) from bottom to top, and the floating ball (10) is suspended on the water level indicated by the highest water level inductor (5).
5. A fire water tank construction device as claimed in claim 1, wherein the size of the tank body (7) is set to 4m × 2m × 2m, the thickness of the tank body (7) is set to 3cm, and the tank body (7) is made of stainless steel.
6. A fire water tank construction equipment according to claim 1, characterized in that: the water flow direction among the water inlet pipe (18), the hydraulic water level control valve (16) and the water delivery pipe (15) is from the outside to the inside of the box body (7), and the water flow direction among the water inlet pipe (18), the overflow pipeline (12) and the ball float valve (11) is from the inside to the outside of the box body (7).
CN201922122799.2U 2019-12-02 2019-12-02 Fire water tank construction equipment Active CN211132806U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201922122799.2U CN211132806U (en) 2019-12-02 2019-12-02 Fire water tank construction equipment

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201922122799.2U CN211132806U (en) 2019-12-02 2019-12-02 Fire water tank construction equipment

Publications (1)

Publication Number Publication Date
CN211132806U true CN211132806U (en) 2020-07-31

Family

ID=71748577

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201922122799.2U Active CN211132806U (en) 2019-12-02 2019-12-02 Fire water tank construction equipment

Country Status (1)

Country Link
CN (1) CN211132806U (en)

Similar Documents

Publication Publication Date Title
CN211132806U (en) Fire water tank construction equipment
CN208395909U (en) Cellular-type water supply tank
CN107902204A (en) A kind of bucket of the easy draining of self-cleaning
CN107720045A (en) A kind of rubbish hangs the sealing structure of grab bucket manhole
CN107044587A (en) The water lute drainer of anti-leak
CN206988822U (en) The water lute drainer of anti-leak
CN208668385U (en) Tail water cooler device convenient to overhaul
CN109881740A (en) A kind of combined type automatically cleaning water supply device of negative pressure intelligence control compensation
CN206081756U (en) Novel high -efficient water pitcher that divides
CN206089108U (en) Ultraviolet ray disinfection water tank
CN208828041U (en) Petrochemical industry deck floor drain
CN210874443U (en) Vertical anti-reverse air suction water separator
CN208830408U (en) A kind of stainless steel water tank overflow pipe energy saver
CN202925598U (en) Silence type pipeline non-negative pressure water supply device
CN207063048U (en) A kind of water tank of high-rise building with the function of automatic adding water
CN208088445U (en) A kind of public toilet cistern
CN206941718U (en) Sanitary sewage after-treatment utilizes device
CN221645914U (en) Structure of buried pump station
CN207295964U (en) A kind of horizontal prefabricated pumping plant of integration
CN205475452U (en) Dedicated automatic water supplying device of water utilities trade
CN207497404U (en) A kind of rubbish hangs the sealing structure of grab bucket manhole
CN209468811U (en) Preposition oil removal integrated pump station
CN218440929U (en) External water tank water inlet control device
CN211447107U (en) Water return device of aluminum ingot cooling tank
CN218687749U (en) Liquid level self-control kiln gas washing tower

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant