CN211126789U - Cable erecting device for building electromechanical installation - Google Patents

Cable erecting device for building electromechanical installation Download PDF

Info

Publication number
CN211126789U
CN211126789U CN201921939314.2U CN201921939314U CN211126789U CN 211126789 U CN211126789 U CN 211126789U CN 201921939314 U CN201921939314 U CN 201921939314U CN 211126789 U CN211126789 U CN 211126789U
Authority
CN
China
Prior art keywords
fixed
cutting
frame
fixing
lift platform
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201921939314.2U
Other languages
Chinese (zh)
Inventor
张建军
霍晓芳
孙成坤
张聪荣
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201921939314.2U priority Critical patent/CN211126789U/en
Application granted granted Critical
Publication of CN211126789U publication Critical patent/CN211126789U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The utility model discloses a cable erection device for building machine electricity installation, including fixed plate, lift platform, conveyor and strutting arrangement, lift platform is installed at the top of fixed plate, lift platform's bottom and the fixed welding of fixed plate, two sets of fixing device and guide bar about lift platform central line symmetry are installed at lift platform's top, and are two sets of be equipped with cutting device between the fixing device, the bottom of cutting device, fixing device and guide bar all with lift platform's top fixed welding, conveyor is installed to one side that lift platform was kept away from at the top of fixed plate, conveyor's bottom and lift platform's top fixed welding, four strutting arrangement that are the distribution of rectangle array are installed to the outside of fixed plate. This cable handing equipment is used in building electromechanical installation can make things convenient for height-adjusting, can fix the cable and cut as required simultaneously, and especially adapted building electromechanical installation is used.

Description

Cable erecting device for building electromechanical installation
Technical Field
The utility model belongs to the technical field of the cable erection, concretely relates to cable erection device is used in building electromechanical installation.
Background
A cable is a conductor made of one or more conductors insulated from each other and an outer insulating sheath that carries power or information from one location to another. Typically a rope-like cable made up of several or groups of conductors (at least two in each group) twisted together, with the conductors of each group being insulated from one another and often twisted around a center, and surrounded by a highly insulating covering. The cable has the characteristics of internal electrification and external insulation. The cable includes a control cable, a computer cable, a signal cable, and the like. They are composed of single or multi-strand wires and insulating layers, and are used for connecting circuits, electric appliances and the like. The wire and cable industry is the second industry in China next to the automobile industry, and both the product variety satisfaction rate and the domestic market share rate exceed 90%. The total output value of the electric wire and the electric cable in China exceeds the United states worldwide, and the electric wire and the electric cable become the first country for producing the electric wire and the electric cable in the world. Along with the high-speed development of the China wire and cable industry, the number of newly added enterprises is continuously increased, and the overall technical level of the industry is greatly improved. The existing cable erection device cannot be adjusted in height according to actual conditions, and meanwhile, in the process of erecting the cable, the cable cannot be well fixed, so that the erection efficiency is influenced.
Therefore, in order to meet the current situation, the design and production of a cable erection device for building electromechanical installation are urgently needed to meet the actual use requirement.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a cable erection device is used in building electromechanical installation to solve the problem that proposes among the above-mentioned background art.
In order to achieve the above object, the utility model provides a following technical scheme: a cable erecting device for building electromechanical installation comprises a fixed plate, a lifting platform, a conveying device and a supporting device, wherein the lifting platform is installed at the top of the fixed plate, the bottom of the lifting platform is fixedly welded with the fixed plate, two groups of fixing devices and guide rods which are symmetrical about the center line of the lifting platform are installed at the top of the lifting platform, a cutting device is arranged between the two groups of fixing devices, the bottoms of the cutting device, the fixing devices and the guide rods are fixedly welded with the top of the lifting platform, the cutting device, the fixing devices and the guide rods are positioned on the same horizontal plane, the conveying device is installed on one side, away from the lifting platform, of the top of the fixed plate, the guide rods are arranged between the conveying device and the lifting platform, the bottoms of the guide rods and the conveying device are fixedly welded with the top of the lifting platform, and guide wheels are installed on the three groups, four groups of supporting devices which are distributed in a rectangular array are arranged on the outer side of the fixing plate.
Preferably, the fixing device comprises a fixing frame, two fixing clamping plates and a fixing shaft, two groups of fixing clamping plates which are symmetrical about the center line of the fixing frame are arranged inside the fixing frame, a hollow column and a fixing column are respectively fixedly welded on one side of the two groups of fixing clamping plates, one end of the fixing column, which is far away from the fixing clamping plate, is fixedly welded with the inner wall of the fixing frame, the hollow column penetrates through the inner wall of the fixing frame, a circular limiting plate is fixedly welded at one end of the hollow column penetrating through the inner wall of the fixing frame, a compression spring and a resistance spring are respectively arranged between the two sides of the limiting plate and the fixing frame, the cavity part of the hollow column is in threaded connection with a fixed shaft, one end of the fixed shaft, which is far away from the hollow column, penetrates through the fixed frame, the fixed shaft penetrates through the fixed welding of one end of the fixed frame and is provided with a fixed valve, the fixed shaft is fixedly welded with the inner ring of the bearing seat, and one side, far away from the fixed valve, of the bearing seat is fixedly welded with the fixed frame.
Preferably, cutting device is including cutting frame, cutting splint and cutting air pump, the fixed welding in the inside bottom of cutting frame has the cutting post, the one end and the fixed welding of cutting splint that the cutting frame was kept away from to the cutting post, the cutting knife is installed to one side that the cutting post was kept away from to the inside of cutting frame, the fixed welding in output of cutting knife and cutting air pump, the bottom of cutting air pump and the fixed welding in top of cutting frame, the equal fixed welding in bottom of cutting frame and fixed frame has the spliced pole, the spliced pole is kept away from the one end of cutting frame and fixed frame and all is welded with lift platform's top is fixed.
Preferably, strutting arrangement includes back shaft, support column, backup pad and universal wheel, one side and the fixed plate fixed weld of backup pad, the fixed welding in center of backup pad has the bearing frame, the inner circle and the back shaft fixed weld of bearing frame, the both ends of back shaft respectively with governing valve and the fixed welding of support column, the fixed welding in bottom of support column has the universal wheel that has brake function.
Preferably, the conveying device comprises a conveying shaft, two groups of fixing seats and a handle, wherein bearing seats are fixedly welded on the upper half parts of the two groups of fixing seats, inner rings of the two groups of bearing seats are fixedly welded with the two ends of the conveying shaft, one end of the conveying shaft penetrates through the bearing seats, and one end of the conveying shaft penetrating through the bearing seats is fixedly welded with the handle.
The utility model discloses a technological effect and advantage: according to the cable erection device for building electromechanical installation, the support shaft is driven to rotate through the rotary adjusting valve, the distance between the support column and the support plate is adjusted, so that the distance between the fixed plate and the ground is adjusted, and the height of the cable erection device body is adjusted according to actual conditions; the conveying shaft is rotated by rotating the handle, the guide wheel is used for guiding and conveying, and meanwhile, the lifting of the lifting platform is adjusted according to actual conditions, so that the cable wound on the conveying shaft can be conveniently conveyed to a required position, and the cable is convenient to move; when the in-process of erectting needs to fix the cable, rotate the standing valve, it rotates to drive the fixed axle, and through fixed axle and well hollow post threaded connection, make the fixed axle promote well hollow post, thereby adjust the distance between two sets of solid fixed splint, thereby make the cable of arranging in between two sets of solid fixed splint can fix, can reduce rocking when the cable is fixed effectively through compression spring and the damping spring that sets up, thereby make the cable fix steadily between two sets of solid fixed splint, through the drive of cutting air pump, make the cutting knife will cut the cable fixed by two sets of fixing device on the splint and can cut as required, this cable handing equipment for building machinery installation, can make things convenient for height-adjusting, simultaneously can be as required fixed cable and cutting, especially adapted building machinery installation usefulness.
Drawings
Fig. 1 is a front view of the present invention;
fig. 2 is a cross-sectional view of the fixing device of the present invention;
fig. 3 is a side view of the cutting device of the present invention;
fig. 4 is a schematic structural diagram of the supporting device of the present invention.
In the figure: the device comprises a fixing plate 1, a lifting platform 2, a conveying device 3, a supporting device 4, a fixing device 5, a guide rod 6, a cutting device 7, a fixing frame 8, a fixing clamp plate 9, a fixing shaft 10, a hollow column 11, a fixing column 12, a limiting plate 13, a compression spring 14, a resistance spring 15, a fixing valve 16, a cutting frame 17, a cutting clamp plate 18, a cutting air pump 19, a cutting column 20, a cutting knife 21, a supporting shaft 22, a supporting column 23, a supporting plate 24, a universal wheel 25, a regulating valve 26, a conveying shaft 27, a fixing seat 28, a handle 29, a guide wheel 30 and a connecting column 31.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
Unless defined otherwise, all references to up, down, left, right, front, back, inner and outer directions herein are to be interpreted as referring to up, down, left, right, front, back, inner and outer directions in the drawings to which the invention is applied, and all references are hereby incorporated herein by reference.
The utility model provides a cable erection device for building electromechanical installation as shown in figures 1-4, which comprises a fixed plate 1, a lifting platform 2, a conveying device 3 and a supporting device 4, wherein the lifting platform 2 is installed at the top of the fixed plate 1, the lifting platform 2 is selected as a double-fork type lifting platform produced by Anhui Dingsheng Automation science and technology Limited company, the bottom of the lifting platform 2 is fixedly welded with the fixed plate 1, two groups of fixing devices 5 and guide rods 6 which are symmetrical about the central line of the lifting platform 2 are installed at the top of the lifting platform 2, a cutting device 7 is arranged between the two groups of fixing devices 5, the bottoms of the cutting device 7, the fixing devices 5 and the guide rods 6 are fixedly welded with the top of the lifting platform 2, the cutting device 7, the fixing devices 5 and the guide rods 6 are positioned on the same horizontal plane, the conveying device 3 is installed at one side of the top of the fixed plate 1, which is far away from, be equipped with guide bar 6 between conveyor 3 and lift platform 2, guide bar 6 and conveyor 3's bottom all with lift platform 2's top fixed weld, three groups all install leading wheel 30 on the guide bar, four groups of strutting arrangement 4 that are the rectangular array and distribute are installed in the outside of fixed plate 1.
Specifically, the fixing device 5 comprises a fixing frame 8, a fixing clamp plate 9 and a fixing shaft 10, wherein two groups of fixing clamp plates 9 symmetrical about the center line of the fixing frame 8 are arranged inside the fixing frame 8, one sides of the two groups of fixing clamp plates 9 are respectively fixedly welded with a hollow column 11 and a fixing column 12, one end, far away from the fixing clamp plate 9, of the fixing column 12 is fixedly welded with the inner wall of the fixing frame 8, the hollow column 11 penetrates through the inner wall of the fixing frame 8, one end, penetrating through the inner wall of the fixing frame 8, of the hollow column 11 is fixedly welded with a circular limiting plate 13, a compression spring 14 and a resistance spring 15 are respectively installed between the two sides of the limiting plate 13 and the fixing frame 8, a cavity part of the hollow column 11 is in threaded connection with the fixing shaft 10, one end, far away from the hollow column 11, of the, the fixed axle 10 is fixed with the inner circle of bearing frame and is welded, one side that the fixed valve 16 was kept away from to the bearing frame is fixed with fixed frame 8 and is welded, when the in-process of erectting need be fixed with the cable, rotate fixed valve 16, drive fixed axle 10 and rotate, make fixed axle 10 promote cavity post 11, thereby adjust the distance between two sets of solid fixed splint 9, thereby the cable of arranging in between two sets of solid fixed splint 9 can be fixed, rock when can reduce the cable to fix effectively through compression spring 14 and the damping spring 15 that sets up, thereby make the cable can fix between two sets of solid fixed splint 9 steadily.
Specifically, the cutting device 7 comprises a cutting frame 17, a cutting clamp plate 18 and a cutting air pump 19, the bottom inside the cutting frame 17 is fixedly welded with a cutting column 20, one end of the cutting column 20, far away from the cutting frame 17, is fixedly welded with the cutting clamp plate 18, grooves matched with cables are formed in the cutting clamp plate 18 and the fixing clamp plate 9, a cutting knife 21 is installed on one side, far away from the cutting column 20, inside the cutting frame 17, the cutting knife 21 is fixedly welded with the output end of the cutting air pump 19, the cutting air pump 19 is selected from hurricane 0.12-8 belt type air compressors, the bottom of the cutting air pump 19 is fixedly welded with the top end of the cutting frame 17, connecting columns 31 are fixedly welded at the bottoms of the cutting frame 17 and the fixing frame 8, one ends, far away from the cutting frame 17 and the fixing frame 8, of the connecting columns 31 are fixedly welded with the top end of, the cable fixed by the two groups of fixing devices 5 on the cutting clamp plate 18 can be cut as required by the cutting knife 21 under the driving of the cutting air pump 19.
Specifically, strutting arrangement 4 includes back shaft 22, support column 23, backup pad 24 and universal wheel 25, one side and the fixed welding of fixed plate 1 of backup pad 24, the fixed welding in center of backup pad 24 has the bearing frame, the inner circle and the back shaft 22 fixed welding of bearing frame, the both ends of back shaft 22 respectively with governing valve 26 and the fixed welding of support column 23, the fixed welding in bottom of support column 23 has the universal wheel 25 that has brake function, through rotary regulating valve 26, drives back shaft 22 rotatory, adjusts the distance between support column 23 and the backup pad 24 to adjust the distance between fixed plate 1 and the ground, thereby adjust the height of cable erection device body according to actual conditions.
Specifically, conveyor 3 is including carrying axle 27, two sets of fixing base 28 and handle 29, and is two sets of the equal fixed welding in first half of fixing base 28 has the bearing frame, and the inner circle of two sets of bearing frames all with carry the both ends fixed welding of axle 27, carry the one end of axle 27 and run through the bearing frame, carry the one end that axle 27 runs through the bearing frame and handle 29 fixed welding, rotatory handle 29 makes and carries axle 27 and rotate to carry through leading wheel 30 and lead the transport, make the cable of winding on carrying axle 27 can conveniently carry the position that needs, make the removal cable more convenient.
Specifically, the cable erection device for building electromechanical installation moves and fixes a cable erection device body through a universal wheel 25, a rotary adjusting valve 26 drives a support shaft 22 to rotate, adjusts the distance between a support column 23 and a support plate 24, thereby adjusting the distance between a fixed plate 1 and the ground, thereby adjusting the height of the cable erection device body according to actual conditions, a conveying shaft 27 rotates through a rotary handle 29, and is guided and conveyed through a guide wheel 30, and simultaneously, the lifting of a lifting platform 2 is adjusted according to actual conditions, so that cables wound on the conveying shaft 27 can be conveniently conveyed to a required position, thereby facilitating the movement of the cables, when the cables need to be fixed in the erection process, a fixed valve 16 is rotated to drive a fixed shaft 10 to rotate, so that the fixed shaft 10 pushes a hollow column 11, thereby adjusting the distance between two groups of fixed clamping plates 9, thereby the cable of arranging in between two sets of solid fixed splint 9 can be fixed, rock when can reduce the cable fixed effectively through compression spring 14 and the damping spring 15 that sets up to make the cable can fix steadily between two sets of solid fixed splint 9, and through the drive of cutting air pump 19, make the cutting knife 21 can cut as required by the fixed cable of two sets of fixing device 5 on will cutting splint 18.
Finally, it should be noted that: although the present invention has been described in detail with reference to the foregoing embodiments, it will be apparent to those skilled in the art that modifications and variations can be made in the embodiments or in part of the technical features of the embodiments without departing from the spirit and the scope of the invention.

Claims (5)

1. The utility model provides a cable erection device for building electromechanical installation, includes fixed plate (1), lift platform (2), conveyor (3) and strutting arrangement (4), its characterized in that: lift platform (2) is installed at the top of fixed plate (1), the bottom and fixed welding of fixed plate (1) of lift platform (2), two sets of fixing device (5) and guide bar (6) about lift platform (2) central line symmetry are installed at the top of lift platform (2), and are two sets of be equipped with cutting device (7) between fixing device (5), the bottom of cutting device (7), fixing device (5) and guide bar (6) all with the top fixed welding of lift platform (2), cutting device (7), fixing device (5) and guide bar (6) are in on same horizontal plane, conveyor (3) are installed to one side of lift platform (2) is kept away from at the top of fixed plate (1), be equipped with guide bar (6) between conveyor (3) and lift platform (2), guide bar (6) and the bottom of conveyor (3) all weld with the top fixed welding of lift platform (2) and weld And the three groups of guide rods are provided with guide wheels (30), and the outer side of the fixed plate (1) is provided with four groups of supporting devices (4) distributed in a rectangular array.
2. The cable erection device for building electromechanical installation of claim 1, wherein: the fixing device (5) comprises a fixing frame (8), a fixing clamp plate (9) and a fixing shaft (10), wherein two sets of fixing clamp plates (9) which are symmetrical about a center line of the fixing frame (8) are arranged inside the fixing frame (8), one sides of the fixing clamp plates (9) are fixedly welded with a hollow column (11) and a fixing column (12) respectively, one end of the fixing clamp plate (9) far away from the fixing column (12) is fixedly welded with the inner wall of the fixing frame (8), the hollow column (11) penetrates through the inner wall of the fixing frame (8), one end of the hollow column (11) penetrates through the inner wall of the fixing frame (8) is fixedly welded with a circular limiting plate (13), a compression spring (14) and a resistance spring (15) are respectively installed between the two sides of the limiting plate (13) and the fixing frame (8), and a cavity part of the hollow column (11), fixed frame (8) is run through to the one end that cavity post (11) was kept away from in fixed axle (10), the fixed welding of the one end that fixed axle (10) run through fixed frame (8) has solid fixed valve (16), fixed axle (10) and the inner circle fixed weld of bearing frame, one side and fixed frame (8) fixed weld that solid fixed valve (16) were kept away from to the bearing frame.
3. The cable erection device for building electromechanical installation of claim 1, wherein: cutting device (7) are including cutting frame (17), cutting splint (18) and cutting air pump (19), the fixed welding in bottom of cutting frame (17) inside has cutting post (20), the one end and the fixed welding of cutting splint (18) of cutting frame (17) are kept away from to cutting post (20), cutting knife (21) are installed to one side of cutting post (20) is kept away from to the inside of cutting frame (17), cutting knife (21) and the fixed welding of the output of cutting air pump (19), the bottom of cutting air pump (19) and the fixed welding in top of cutting frame (17), the equal fixed welding in bottom of cutting frame (17) and fixed frame (8) has spliced pole (31), the one end that cutting frame (17) and fixed frame (8) were kept away from in spliced pole (31) all with the fixed welding in top of lift platform (2).
4. The cable erection device for building electromechanical installation of claim 1, wherein: strutting arrangement (4) are including back shaft (22), support column (23), backup pad (24) and universal wheel (25), one side and fixed plate (1) fixed weld of backup pad (24), the fixed welding in center of backup pad (24) has the bearing frame, the inner circle and the back shaft (22) fixed weld of bearing frame, the both ends of back shaft (22) respectively with governing valve (26) and support column (23) fixed weld, the fixed welding in bottom of support column (23) has universal wheel (25) that have brake function.
5. The cable erection device for building electromechanical installation of claim 1, wherein: conveyor (3) are including carrying axle (27), two sets of fixing base (28) and handle (29), and are two sets of the equal fixed welding in first half of fixing base (28) has the bearing frame, and the inner circle of two sets of bearing frames all with the both ends fixed welding who carries axle (27), carry the one end of axle (27) and run through the bearing frame, carry the one end that axle (27) run through the bearing frame and handle (29) fixed welding.
CN201921939314.2U 2019-11-12 2019-11-12 Cable erecting device for building electromechanical installation Expired - Fee Related CN211126789U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201921939314.2U CN211126789U (en) 2019-11-12 2019-11-12 Cable erecting device for building electromechanical installation

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201921939314.2U CN211126789U (en) 2019-11-12 2019-11-12 Cable erecting device for building electromechanical installation

Publications (1)

Publication Number Publication Date
CN211126789U true CN211126789U (en) 2020-07-28

Family

ID=71703343

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201921939314.2U Expired - Fee Related CN211126789U (en) 2019-11-12 2019-11-12 Cable erecting device for building electromechanical installation

Country Status (1)

Country Link
CN (1) CN211126789U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111952888A (en) * 2020-08-12 2020-11-17 吴振亮 Cable erection supporting device for electromechanical installation

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111952888A (en) * 2020-08-12 2020-11-17 吴振亮 Cable erection supporting device for electromechanical installation

Similar Documents

Publication Publication Date Title
CN211126789U (en) Cable erecting device for building electromechanical installation
CN109830915B (en) A parcel robot for overhead cable
CN103440930B (en) The unwrapping wire strand body of cable cabling machine
CN114629046A (en) Moving platform for installing spacer pre-twisted wire of power transmission line
CN210162939U (en) Galvanized steel strand is with high-efficient bundling device
CN211218473U (en) Steel wire mesh framework polyethylene composite pipe steel wire mesh winding machine
CN112850326A (en) Smart power grids circuit is laid and is walked line pay-off
CN214505145U (en) Steel-cored aluminum strand processing is with drive mechanism of stranding device
CN110247100A (en) Battery core anode and the encapsulated system of cathode
CN203456177U (en) Paying-off twister of cable forming machine
CN207490294U (en) Numerical control cable maker
CN215497483U (en) Wiring ware is used in distribution installation
CN214479050U (en) Cutting device for wire and cable processing
CN210214376U (en) Wire and cable coiling mechanism convenient to remove
CN211366544U (en) Suspension and retraction guide device for heavy cables
CN213613840U (en) Cutting device for production and processing of electric wires and cables
CN206796252U (en) A kind of excavation machine
CN216608695U (en) Clamping tool for cable processing
CN111776850A (en) Parallel prestressed wire winding process
CN101783553B (en) Split type stator coil winding method and winding mold device
CN206164315U (en) Biax winding device
CN211967643U (en) Cutting equipment for composite material cable
CN218783343U (en) Make things convenient for butt joint device for cable manufacture of centre gripping
CN218747249U (en) Clamping device is used in processing of motor coil group
CN217148166U (en) Coal-winning machine cable fixing device

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20200728

Termination date: 20201112

CF01 Termination of patent right due to non-payment of annual fee