CN211117995U - A water conservancy pipeline supports connection structure for hydraulic engineering - Google Patents

A water conservancy pipeline supports connection structure for hydraulic engineering Download PDF

Info

Publication number
CN211117995U
CN211117995U CN201921890431.4U CN201921890431U CN211117995U CN 211117995 U CN211117995 U CN 211117995U CN 201921890431 U CN201921890431 U CN 201921890431U CN 211117995 U CN211117995 U CN 211117995U
Authority
CN
China
Prior art keywords
clamping
fixedly connected
connection structure
water conservancy
fixing
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201921890431.4U
Other languages
Chinese (zh)
Inventor
李树章
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201921890431.4U priority Critical patent/CN211117995U/en
Application granted granted Critical
Publication of CN211117995U publication Critical patent/CN211117995U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

The utility model discloses a water conservancy pipeline supports connection structure for hydraulic engineering, including base and fixed column, the last fixed surface of base is connected with the fixed column, the inner wall swing joint of fixed column has the pillar, the first clamp ring of last fixed surface of pillar, the one end of first clamp ring has rotatable second clamp ring through hinge swing joint, the equal fixedly connected with cardboard in surface of first clamp ring and second clamp ring. This a water conservancy pipeline supports connection structure for hydraulic engineering, through the fixed column, cooperation setting between pillar and the fixing bolt, can be through the pillar in the inside different positions of fixed column, and then adjust the device's high position, the high difference of the water conservancy pipeline that is convenient for support as required adjusts the device, through first clamp ring, the second clamp ring, cardboard and the cooperation setting between the chucking bolt, can fix the position of water conservancy pipeline, avoid it to take place to rock.

Description

A water conservancy pipeline supports connection structure for hydraulic engineering
Technical Field
The utility model relates to a pipeline bearing structure technical field specifically is a water conservancy pipeline supports connection structure for hydraulic engineering.
Background
Hydraulic engineering is an engineering built for controlling and allocating surface water and underground water in the nature to achieve the purposes of removing harm and benefiting, water is a valuable resource essential for human production and life, but the naturally existing state of the water does not completely meet the requirements of human beings, and only by building the hydraulic engineering, water flow can be controlled to prevent flood disasters and adjust and distribute water quantity to meet the requirements of people life and production on water resources.
The water conservancy pipeline supports is in order to consolidate and support the water pipe, generally all be the segmentation construction in large-scale hydraulic engineering, then the set gathers, improvement work efficiency that this kind of construction method can be great, current carry out the device that supports to water conservancy pipeline, the existence is fixed insecure to water conservancy pipeline, and strutting arrangement can't adjust its high position that supports according to actual demand, and is not strong to the linkage between per two strutting arrangement, easily leads to strutting arrangement's position change.
SUMMERY OF THE UTILITY MODEL
Technical problem to be solved
Not enough to prior art, the utility model provides a water conservancy pipeline supports connection structure for hydraulic engineering has solved the problem that proposes in the above-mentioned background art.
(II) technical scheme
In order to achieve the above purpose, the utility model discloses a following technical scheme realizes: the utility model provides a water conservancy pipeline supports connection structure for hydraulic engineering, includes base and fixed column, the last fixed surface of base is connected with the fixed column, the inner wall swing joint of fixed column has the pillar, the last fixed surface of pillar is connected with first clamp ring, the one end of first clamp ring has rotatable second clamp ring through hinge swing joint, the equal fixedly connected with cardboard in surface of first clamp ring and second clamp ring, the surperficial threaded connection of cardboard has the chucking bolt, the surperficial threaded connection of fixed column has fixing bolt, the fixed cylinder of fixed surface of base is connected with, the quantity of fixed cylinder is four, two of them the inner wall threaded connection of fixed cylinder has the card post.
Optionally, the front surface of the base is fixedly connected with a fixing block.
Optionally, the back of the base is provided with a clamping hole.
Optionally, a clamping block is movably connected inside the fixing block.
Optionally, the bottom of the clamping block is fixedly connected with a spring, and one end, far away from the clamping block, of the spring is fixedly connected with the fixing block.
Optionally, one side of the fixture block is fixedly connected with a connecting sheet, and the upper surface of the connecting sheet is fixedly connected with a pressing column.
(III) advantageous effects
The utility model provides a water conservancy pipeline supports connection structure for hydraulic engineering possesses following beneficial effect:
1. this a water conservancy pipeline supports connection structure for hydraulic engineering, through the fixed column, cooperation setting between pillar and the fixing bolt, can be through the pillar in the inside different positions of fixed column, and then adjust the device's high position, the high difference of the water conservancy pipeline that is convenient for support as required adjusts the device, through first clamp ring, the second clamp ring, cardboard and the cooperation setting between the chucking bolt, can fix the position of water conservancy pipeline, avoid it to take place to rock.
2. This a water conservancy pipeline supports connection structure for hydraulic engineering sets up through the cooperation between card post and the solid fixed cylinder, can carry out the joint through the card post with another the device's solid fixed cylinder to make the device can a plurality of concatenations, set up through the cooperation between fixed block, card hole and the fixture block, can strengthen the connectivity between per two the device, make it difficult not hard up and fracture.
Drawings
FIG. 1 is a schematic structural view of the present invention;
FIG. 2 is a schematic view of the base structure of the present invention;
FIG. 3 is a schematic view of the structure of the fixture block of the present invention;
fig. 4 is an enlarged schematic structural view of a portion a in fig. 1 according to the present invention.
In the figure: 1. a base; 2. fixing a column; 3. a pillar; 4. a first clamp ring; 5. a second clamp ring; 6. clamping a plate; 7. clamping the bolt; 8. fixing the bolt; 9. a fixed cylinder; 10. clamping the column; 11. a fixed block; 12. a clamping hole; 13. a clamping block; 14. a spring; 15. connecting sheets; 16. the column is pressed.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments.
Referring to fig. 1 to 4, the present invention provides a technical solution: a water conservancy pipeline supporting and connecting structure for water conservancy engineering comprises a base 1 and a fixed column 2, wherein the upper surface of the base 1 is fixedly connected with the fixed column 2, and the inner wall of the fixed column 2 is movably connected with a supporting column 3;
in order to fix the position of the water conservancy pipeline, a first clamping ring 4 is fixedly connected to the upper surface of a strut 3, one end of the first clamping ring 4 is movably connected with a rotatable second clamping ring 5 through a hinge, clamping plates 6 are fixedly connected to the surfaces of the first clamping ring 4 and the second clamping ring 5, clamping bolts 7 are in threaded connection with the surfaces of the clamping plates 6, and the position of the water conservancy pipeline can be fixed and prevented from shaking through the matching arrangement among the first clamping ring 4, the second clamping ring 5, the clamping plates 6 and the clamping bolts 7;
in order to adjust the height position of the device, a fixing bolt 8 is connected to the surface of a fixing column 2 in a threaded manner, the fixing column 2, the support column 3 and the fixing bolt 8 are arranged in a matched manner, the height position of the device can be adjusted through different positions of the support column 3 in the fixing column 2, and the device can be conveniently adjusted according to different heights of water conservancy pipelines which are supported as required;
in order to strengthen the connectivity between per two the device, consequently at the positive fixedly connected with fixed block 11 of base 1, card hole 12 has been seted up at base 1's the back, the inside swing joint of fixed block 11 has fixture block 13, through fixed block 11, cooperation setting between card hole 12 and the fixture block 13, can strengthen the connectivity between per two the device, make it difficult not hard up and fracture, the bottom fixedly connected with spring 14 of fixture block 13, one end and the fixed block 11 fixed connection of fixture block 13 are kept away from to spring 14, one side fixedly connected with connection piece 15 of fixture block 13, the last fixed surface of connection piece 15 is connected with presses compression leg 16.
To sum up, the water conservancy pipeline supporting and connecting structure for the water conservancy project fixes a water conservancy pipeline through a first clamping ring 4 and a second clamping ring 5 when in use, supports the water conservancy pipeline through the mutual connection of a plurality of the devices, can adjust the height position of the device through different positions of a strut 3 in the fixed column 2 through the matching arrangement among the fixed column 2, the strut 3 and a fixing bolt 8, is convenient for adjusting the device according to the height difference of the water conservancy pipeline which is supported as required, can fix the position of the water conservancy pipeline through the matching arrangement among the first clamping ring 4, the second clamping ring 5, a clamping plate 6 and a clamping bolt 7 to avoid the shaking of the device, can be clamped with a fixing cylinder 9 of another device through the clamping column 10 through the matching arrangement between the clamping column 10 and the fixing cylinder 9, thereby enabling the device to splice a plurality of devices, through the cooperation setting between fixed block 11, card hole 12 and fixture block 13, can strengthen the connectivity between per two this device, make it difficult not hard up and fracture.
The above, only be the concrete implementation of the preferred embodiment of the present invention, but the protection scope of the present invention is not limited thereto, and any person skilled in the art is in the technical scope of the present invention, according to the technical solution of the present invention and the utility model, the concept of which is equivalent to replace or change, should be covered within the protection scope of the present invention.

Claims (6)

1. The utility model provides a water conservancy pipeline supports connection structure for hydraulic engineering, includes base (1) and fixed column (2), its characterized in that: the fixing device is characterized in that the upper surface of the base (1) is fixedly connected with fixing columns (2), the inner walls of the fixing columns (2) are movably connected with pillars (3), the upper surface of each pillar (3) is fixedly connected with a first clamping ring (4), one end of each first clamping ring (4) is movably connected with a rotatable second clamping ring (5) through a hinge, the surfaces of the first clamping rings (4) and the second clamping rings (5) are fixedly connected with clamping plates (6), the surface of each clamping plate (6) is in threaded connection with a clamping bolt (7), the surface of each fixing column (2) is in threaded connection with a fixing bolt (8), the surfaces of the base (1) are fixedly connected with fixing cylinders (9), the number of the fixing cylinders (9) is four, and the inner walls of the fixing cylinders (9) are in threaded connection with clamping columns (10).
2. A hydraulic pipe support connection structure for hydraulic engineering according to claim 1, wherein: the front surface of the base (1) is fixedly connected with a fixing block (11).
3. A hydraulic pipe support connection structure for hydraulic engineering according to claim 1, wherein: the back of the base (1) is provided with a clamping hole (12).
4. A hydraulic pipe support connection structure for hydraulic engineering according to claim 2, wherein: the inside swing joint of fixed block (11) has fixture block (13).
5. A hydraulic pipe support connection structure for hydraulic engineering according to claim 4, wherein: the bottom of the clamping block (13) is fixedly connected with a spring (14), and one end, far away from the clamping block (13), of the spring (14) is fixedly connected with the fixing block (11).
6. A hydraulic pipe support connection structure for hydraulic engineering according to claim 4, wherein: one side of the clamping block (13) is fixedly connected with a connecting piece (15), and the upper surface of the connecting piece (15) is fixedly connected with a pressing column (16).
CN201921890431.4U 2019-11-05 2019-11-05 A water conservancy pipeline supports connection structure for hydraulic engineering Expired - Fee Related CN211117995U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201921890431.4U CN211117995U (en) 2019-11-05 2019-11-05 A water conservancy pipeline supports connection structure for hydraulic engineering

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201921890431.4U CN211117995U (en) 2019-11-05 2019-11-05 A water conservancy pipeline supports connection structure for hydraulic engineering

Publications (1)

Publication Number Publication Date
CN211117995U true CN211117995U (en) 2020-07-28

Family

ID=71701364

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201921890431.4U Expired - Fee Related CN211117995U (en) 2019-11-05 2019-11-05 A water conservancy pipeline supports connection structure for hydraulic engineering

Country Status (1)

Country Link
CN (1) CN211117995U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114688364A (en) * 2022-04-25 2022-07-01 龚子强 A hydraulic pipeline supports connection structure for hydraulic engineering construction management

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114688364A (en) * 2022-04-25 2022-07-01 龚子强 A hydraulic pipeline supports connection structure for hydraulic engineering construction management

Similar Documents

Publication Publication Date Title
CN204954392U (en) Construction pipe cutting and fixing device
CN107477259A (en) A kind of water conservancy construction pipeline fixing device
CN103470026B (en) Basement external wall single-face framework erecting system and construction method
CN211117995U (en) A water conservancy pipeline supports connection structure for hydraulic engineering
CN207121928U (en) A kind of new prefabricated assembled piping lane
CN203961021U (en) A kind of prefabricated panel and precast beam rapid installing connection structure
CN204212408U (en) A kind of hole to be provided filling-up hole template
CN206237081U (en) A kind of self-supporting cable tunnel frame with telescopic joint
CN204608597U (en) A kind of damping tension and compression pot rubber bearing
CN214302188U (en) Assembled node structure
CN210530900U (en) Hydraulic support supporting equipment for coal mining
CN206957226U (en) A kind of model sheetinstallat workbench
CN211456236U (en) Power distribution cabinet synchronous locking structure for power engineering
CN206918393U (en) A kind of municipal pipeline mat piece
CN205476444U (en) Light -duty support post based on low level jacking die carrier system
CN217460634U (en) Reverse construction structure of super-high steep slope
CN206174259U (en) Be used for plasterboard suspended ceiling fossil fragments mounting
CN217813409U (en) Wellhead structure repaired by early-strength concrete
CN210066655U (en) Concrete formwork is used in construction of water conservancy water and electricity dam
CN216478218U (en) Polyurethane composite material frame structure
CN216520003U (en) Hydraulic pipeline strutting arrangement for hydraulic engineering
CN220353491U (en) Support frame for high-rise building
CN212772197U (en) Novel waterwall structure for hydraulic engineering
CN211665936U (en) Steel structure column
CN213809200U (en) Suspended pipeline supporting device

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20200728

Termination date: 20201105

CF01 Termination of patent right due to non-payment of annual fee