CN211115992U - Gold mine shaft lateral wall supporting device - Google Patents

Gold mine shaft lateral wall supporting device Download PDF

Info

Publication number
CN211115992U
CN211115992U CN201921299376.1U CN201921299376U CN211115992U CN 211115992 U CN211115992 U CN 211115992U CN 201921299376 U CN201921299376 U CN 201921299376U CN 211115992 U CN211115992 U CN 211115992U
Authority
CN
China
Prior art keywords
shaft
fixed plate
gold mine
bolt
plate
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201921299376.1U
Other languages
Chinese (zh)
Inventor
张旭鹏
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201921299376.1U priority Critical patent/CN211115992U/en
Application granted granted Critical
Publication of CN211115992U publication Critical patent/CN211115992U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

The utility model discloses a gold mine shaft lateral wall supporting device, including the shaft, the inside fixed plate that all is provided with all around of shaft, be provided with the backup pad between the fixed plate, the supporting shoe has all been welded to the both sides of backup pad, the inside threaded connection of supporting shoe has first bolt, the surperficial cover of first bolt is equipped with the hydraulic stem. The utility model discloses a shaft, the fixed plate, the backup pad, the supporting shoe, first bolt, the hydraulic stem, the bearing plate, through-hole and protection architecture's setting, make gold mine shaft lateral wall supporting device have fixed effectual, can adjust and can carry out the advantage of reconnaissance to the shaft periphery to strutting the scope, promote the factor of safety of shaft, and make the shaft of different diameters of supporting device can be fitted, it is poor to have solved current gold mine shaft lateral wall supporting device fixed effect simultaneously, can not adjust and can't carry out the problem of reconnaissance to the shaft periphery to strutting the scope.

Description

Gold mine shaft lateral wall supporting device
Technical Field
The utility model relates to a gold mine exploitation technical field specifically is a gold mine shaft lateral wall supporting device.
Background
After the primary gold deposit is exposed out of the earth surface, the gold-containing ore vein or gold-containing mother rock is gradually broken into rock debris, gold particles and the like due to mechanical and chemical weathering effects, and then, under the carrying effect and the sorting effect of external force, minerals (such as gold particles) with high specific gravity are deposited at the places of hillsides, river beds and lake coast to form certain enrichment.
When the gold mine is mined, the mine opening is open-air and underground, when the underground mine opening enters, the mine opening needs to pass through a vertical shaft, the effect of the vertical shaft is very important, so the mine opening needs to be protected and supported, the existing gold mine vertical shaft side wall supporting device is simple in structure, only a fixing plate is installed on the side wall, the effect is not large, the supporting device cannot adjust the supporting range and only can be suitable for the vertical shaft with the same diameter, other gold mines possibly exist at the periphery of the vertical shaft due to the fact that the position of the vertical shaft is located above the gold mine, and the existing supporting device cannot accommodate workers to carry out exploration on the periphery of the vertical shaft.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a gold mine shaft lateral wall supporting device possesses fixed effectual, can adjust and can carry out the advantage of reconnaissance to the shaft periphery to strutting the scope, solved current gold mine shaft lateral wall supporting device fixed effect poor, can not adjust and can't carry out the problem of reconnaissance to the shaft periphery to strutting the scope.
In order to achieve the above object, the utility model provides a following technical scheme: the utility model provides a gold mine shaft lateral wall supporting device, includes the shaft, the inside fixed plate that all is provided with all around of shaft, be provided with the backup pad between the fixed plate, the supporting shoe has all been welded to the both sides of backup pad, the inside threaded connection of supporting shoe has first bolt, the surface cover of first bolt is equipped with the hydraulic stem, the output of hydraulic stem passes through the loose axle and articulates with the surface of fixed plate, the back welding of fixed plate has the bearing plate, the through-hole has been seted up to the inside of fixed plate, the surface mounting of fixed plate has protection architecture.
Preferably, the inner threads of the fixing plate are connected with a plurality of second bolts, and the threaded ends of the second bolts are in threaded connection with the inner wall of the shaft.
Preferably, the fixed plate is an arc-shaped plate and is made of a stainless steel plate.
Preferably, the front and the back of the supporting plate are both in threaded connection with a third bolt, and the threaded end of the third bolt is in threaded connection with the inner wall of the vertical shaft.
Preferably, the protection architecture includes the connecting block, the surface welding of one side and the fixed plate of connecting block, there is the safety belt opposite side of connecting block through loose axle swing joint, the safety belt can be connected fixedly with mining personnel.
Preferably, the number of the support plates is four, the number of the hydraulic rods is eight, and the hydraulic rods are symmetrically installed with the support plates as centers.
Preferably, the fixed plate, the supporting plate, the hydraulic rod and the bearing plate are symmetrically arranged at the same center of a circle of the vertical shaft.
Preferably, the output end of the hydraulic rod is hinged to the two ends of the fixing plate, and the support block can fix the angle of the hydraulic rod through a second bolt.
Compared with the prior art, the beneficial effects of the utility model are as follows:
1. the utility model discloses a shaft, the fixed plate, the backup pad, the supporting shoe, first bolt, the hydraulic stem, the bearing plate, through-hole and protection architecture's setting, make gold mine shaft lateral wall supporting device have fixed effectual, can adjust and can carry out the advantage of reconnaissance to the shaft periphery to strutting the scope, promote the factor of safety of shaft, and make the shaft of different diameters of supporting device can be fitted, it is poor to have solved current gold mine shaft lateral wall supporting device fixed effect simultaneously, can not adjust and can't carry out the problem of reconnaissance to the shaft periphery to strutting the scope.
2. The utility model discloses a screw thread fixation can be carried out with fixed plate and shaft to the use of second bolt, strengthens the stability of fixed plate, and its arc shape can be better with the inner wall laminating of shaft, through the use of third bolt, can strengthen the stability of backup pad, better supports the hydraulic stem, uses through the cooperation of connecting block and insurance area, can carry out the safety constraint to the staff, prevents that it from falling from the bearing plate.
Drawings
FIG. 1 is a schematic structural view of the present invention;
FIG. 2 is an enlarged view of a portion A of FIG. 1;
FIG. 3 is a sectional view of the structure of the present invention;
fig. 4 is a partially enlarged view of the point B in fig. 3 according to the present invention.
In the figure: the device comprises a vertical shaft 1, a fixing plate 2, a supporting plate 3, a supporting block 4, a first bolt 5, a hydraulic rod 6, a bearing plate 7, a through hole 8, a protection structure 9, a connecting block 91, a safety belt 92, a second bolt 10 and a third bolt 11.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
Referring to fig. 1-4, a gold mine shaft side wall supporting device comprises a shaft 1, fixing plates 2 are arranged around the inside of the shaft 1, supporting plates 3 are arranged between the fixing plates 2, supporting blocks 4 are welded on two sides of each supporting plate 3, first bolts 5 are connected with the inside of each supporting block 4 through threads, hydraulic rods 6 are sleeved on the surfaces of the first bolts 5, the output ends of the hydraulic rods 6 are hinged with the surfaces of the fixing plates 2 through movable shafts, bearing plates 7 are welded on the back surfaces of the fixing plates 2, through holes 8 are formed in the fixing plates 2, protective structures 9 are arranged on the surfaces of the fixing plates 2, second bolts 10 are connected with the inside of the fixing plates 2 through threads, the number of the second bolts 10 is multiple, the threaded ends of the second bolts 10 are connected with the inner wall of the shaft 1 through threads, the fixing plates 2 are arc-shaped plates, and the fixing plates 2 are, the front and the back of the supporting plate 3 are both in threaded connection with a third bolt 11, the threaded end of the third bolt 11 is in threaded connection with the inner wall of the shaft 1, the protection structure 9 comprises a connecting block 91, one side of the connecting block 91 is welded with the surface of the fixed plate 2, the other side of the connecting block 91 is movably connected with a safety belt 92 through a movable shaft, the safety belt 92 can be connected and fixed with mining personnel, the number of the supporting plates 3 is four, the number of the hydraulic rods 6 is eight, the hydraulic rods 6 are symmetrically installed by taking the supporting plate 3 as a center, the fixed plate 2, the supporting plate 3, the hydraulic rods 6 and the bearing plate 7 are symmetrically installed by taking the same center of the shaft 1, the output ends of the hydraulic rods 6 are hinged with the two ends of the fixed plate 2, the supporting block 4 can fix the hydraulic rods 6 at an angle through a second bolt 10, and the fixed plate 2 and the shaft 1, the stability of the fixing plate 2 is enhanced, the arc-shaped fixing plate can be better attached to the inner wall of the vertical shaft 1, the stability of the supporting plate 3 can be enhanced by using the third bolt 11, the hydraulic rod 6 can be better supported, workers can be safely restrained by matching the connecting block 91 with the safety belt 92 to prevent the workers from falling off the bearing plate 7, and the safety factor of the vertical shaft is improved, the supporting device can be matched with vertical shafts with different diameters by virtue of the advantages that the gold mine vertical shaft side wall supporting device has a good fixing effect, the supporting range can be adjusted and the periphery of the vertical shaft can be surveyed by arranging the vertical shaft 1, the fixing plate 2, the supporting plate 3, the supporting block 4, the first bolt 5, the hydraulic rod 6, the bearing plate 7, the through hole 8 and the protective structure 9, and meanwhile the problem that the existing gold mine vertical shaft side wall supporting device is poor in fixing effect is solved, The supporting range can not be adjusted and the periphery of the shaft can not be investigated.
During the use, pass through second bolt 10 with 1 threaded fixation of shaft with fixed plate 2, fix backup pad 3 through third bolt 11 afterwards, loosen second bolt 10 afterwards, support and the extension angle to hydraulic stem 6 are adjusted, make its directional fixed plate 2 and shaft 1's junction, second bolt 10 is screwed afterwards, and start hydraulic stem 6, adjust hydraulic stem 6's extension distance according to shaft 1's diameter, push fixed plate 2, make fixed plate 2 more stable, when the staff need carry out the reconnaissance to shaft 1's periphery, the staff stands on bearing plate 7, and be connected safety belt 92 with the safety equipment on one's body, the staff stretches into from through-hole 8 with the exploration equipment afterwards, reconnaissance to shaft 1 peripheral region.
In summary, the following steps: this gold mine shaft lateral wall supporting device uses through the cooperation of shaft 1, fixed plate 2, backup pad 3, supporting shoe 4, first bolt 5, hydraulic stem 6, bearing plate 7, through-hole 8 and protective structure 9, has solved current gold mine shaft lateral wall supporting device fixed effect poor, can not adjust the supporting scope and can't carry out the problem of reconnaissance to the shaft periphery.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the invention, the scope of which is defined in the appended claims and their equivalents.

Claims (8)

1. The utility model provides a gold mine shaft lateral wall supporting device, includes shaft (1), its characterized in that: shaft (1) inside all is provided with fixed plate (2) all around, be provided with backup pad (3) between fixed plate (2), supporting shoe (4) have all been welded to the both sides of backup pad (3), the inside threaded connection of supporting shoe (4) has first bolt (5), the surface cover of first bolt (5) is equipped with hydraulic stem (6), the output of hydraulic stem (6) is articulated through the surface of loose axle with fixed plate (2), the back welding of fixed plate (2) has bearing plate (7), through-hole (8) have been seted up to the inside of fixed plate (2), the surface mounting of fixed plate (2) has protection architecture (9).
2. The gold mine shaft side wall support device according to claim 1, wherein: the inner thread of the fixing plate (2) is connected with a plurality of second bolts (10), the number of the second bolts (10) is a plurality, and the thread ends of the second bolts (10) are in threaded connection with the inner wall of the vertical shaft (1).
3. The gold mine shaft side wall support device according to claim 1, wherein: the shape of fixed plate (2) is the arc, the material of fixed plate (2) is stainless steel plate.
4. The gold mine shaft side wall support device according to claim 1, wherein: the front and the back of the supporting plate (3) are in threaded connection with a third bolt (11), and the threaded end of the third bolt (11) is in threaded connection with the inner wall of the vertical shaft (1).
5. The gold mine shaft side wall support device according to claim 1, wherein: protection architecture (9) are including connecting block (91), the surface welding of one side and fixed plate (2) of connecting block (91), there is safety belt (92) on the opposite side of connecting block (91) through loose axle swing joint, safety belt (92) can be connected fixedly with mining personnel.
6. The gold mine shaft side wall support device according to claim 1, wherein: the number of the supporting plates (3) is four, the number of the hydraulic rods (6) is eight, and the hydraulic rods (6) are symmetrically installed by taking the supporting plates (3) as centers.
7. The gold mine shaft side wall support device according to claim 1, wherein: the fixed plate (2), the supporting plate (3), the hydraulic rod (6) and the bearing plate (7) are symmetrically arranged at the same center of a circle of the vertical shaft (1).
8. The gold mine shaft side wall support device according to claim 1, wherein: the output end of the hydraulic rod (6) is hinged to the two ends of the fixing plate (2), and the supporting block (4) can fix the angle of the hydraulic rod (6) through a second bolt (10).
CN201921299376.1U 2019-08-12 2019-08-12 Gold mine shaft lateral wall supporting device Expired - Fee Related CN211115992U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201921299376.1U CN211115992U (en) 2019-08-12 2019-08-12 Gold mine shaft lateral wall supporting device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201921299376.1U CN211115992U (en) 2019-08-12 2019-08-12 Gold mine shaft lateral wall supporting device

Publications (1)

Publication Number Publication Date
CN211115992U true CN211115992U (en) 2020-07-28

Family

ID=71690139

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201921299376.1U Expired - Fee Related CN211115992U (en) 2019-08-12 2019-08-12 Gold mine shaft lateral wall supporting device

Country Status (1)

Country Link
CN (1) CN211115992U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113250713A (en) * 2021-05-25 2021-08-13 中建八局第一建设有限公司 Push type splicing working well supporting device

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113250713A (en) * 2021-05-25 2021-08-13 中建八局第一建设有限公司 Push type splicing working well supporting device

Similar Documents

Publication Publication Date Title
CN201155331Y (en) Head-on safe protection shield for tunnel development
CN211115992U (en) Gold mine shaft lateral wall supporting device
CN112709241A (en) Anti unsettled dangerous rock mass of formula of splitting protection retaining structure
CN215801718U (en) Protective net for mine
CN207497207U (en) A kind of device of Mine haul
CN207538854U (en) A kind of coal mine miner's safety device
CN211081916U (en) Colliery support that security performance is good
CN111964953A (en) Sampling analysis and storage equipment for deep-field mineral resource exploration and exploitation
CN208266907U (en) A kind of goaf roly-poly type base apparatus
CN206737933U (en) A kind of tunnel diagonal brace device
CN211448718U (en) Mining is with preventing support equipment that sinks
CN211006686U (en) Deep foundation pit supporting structure
CN209163509U (en) Protective device is used in a kind of construction of building foundation pit
CN111721175B (en) Mine blasting rubble protector
CN213775419U (en) Supporting device for coal mine tunneling
CN217735517U (en) Frame construction for coal mine tunnel construction
CN206554956U (en) A kind of anti-down fixing device of individual hydraulic prop
CN207228783U (en) A kind of safety-type building guardrail easy to use
CN217652695U (en) Mud sputtering device is prevented in percussion drill construction
CN217001905U (en) Supporting device for coal mine safety production
CN214660250U (en) Portable spiral pillar structure
CN103526774A (en) Detachable landslide preventing protection shed
CN216043794U (en) Underground support for coal mine excavation
CN216582127U (en) Adjustable civil engineering pipe fitting rack
CN213063009U (en) Civil engineering safety scaffold

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20200728

Termination date: 20210812

CF01 Termination of patent right due to non-payment of annual fee