CN211114553U - High-ductility cement exterior wall cladding - Google Patents

High-ductility cement exterior wall cladding Download PDF

Info

Publication number
CN211114553U
CN211114553U CN201921317847.7U CN201921317847U CN211114553U CN 211114553 U CN211114553 U CN 211114553U CN 201921317847 U CN201921317847 U CN 201921317847U CN 211114553 U CN211114553 U CN 211114553U
Authority
CN
China
Prior art keywords
groove
link plate
cladding
block
wall
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201921317847.7U
Other languages
Chinese (zh)
Inventor
张忠民
潘金龙
顾大伟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jiangsu Guanghao Architectural Technology Co ltd
Original Assignee
Jiangsu Guanghao Architectural Technology Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jiangsu Guanghao Architectural Technology Co ltd filed Critical Jiangsu Guanghao Architectural Technology Co ltd
Priority to CN201921317847.7U priority Critical patent/CN211114553U/en
Application granted granted Critical
Publication of CN211114553U publication Critical patent/CN211114553U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Load-Bearing And Curtain Walls (AREA)

Abstract

The utility model discloses a high ductility cement exterior wall cladding, including first link plate and second link plate, first link plate has seted up logical groove near one side middle part of second link plate, the spacing groove that is linked together with leading to the groove is seted up to the upper and lower lateral wall that leads to the groove, one side fixed mounting that the second link plate is close to first link plate has with groove phase-matched connecting block, the inside of connecting block is seted up flutedly, one side fixed mounting that the inside of recess is close to leading to the groove has the level to set up the horizontal pole, the outer wall sliding connection of horizontal pole has first fixed block, one side of first fixed block is rotated and is connected with first rotation pole. The utility model discloses a cooperation of gag lever post and spacing groove realizes first link plate and second link plate fixed connection and dismantlement, passes through threaded rod fixed mounting with first link plate and second link plate after the fixed connection on the outer wall, realizes that first link plate and second link plate are common and outer wall fixed mounting, and it is more convenient to install.

Description

High-ductility cement exterior wall cladding
Technical Field
The utility model relates to an exterior wall cladding technical field especially relates to a high ductility cement exterior wall cladding.
Background
Along with the rapid development of economy, people's standard of living improves gradually, and is also higher and higher to the requirement of living environment, and fixed mounting link plate on the cement outer wall of house not only can reach and decorate pleasing to the eye effect, can insulate against heat, keep warm and give sound insulation moreover, makes people live more comfortablely. Traditional exterior wall cladding is fashioned alone, can not connect and dismantle two link plates, when installing the link plate on the cement outer wall, need install every board alone, and the installation is more troublesome.
SUMMERY OF THE UTILITY MODEL
The utility model aims at solving the problem in the background art and providing a high-ductility cement exterior wall cladding.
In order to achieve the above purpose, the utility model adopts the following technical scheme:
a high-ductility cement exterior wall cladding comprises a first cladding and a second cladding, wherein a through groove is formed in the middle of one side of the first cladding, which is close to the second cladding, the upper side wall and the lower side wall of the through groove are provided with limit grooves communicated with the through groove, a connecting block matched with the through groove is fixedly installed on one side of the second cladding, which is close to the first cladding, a groove is formed in the connecting block, a horizontal transverse rod is fixedly installed on one side of the inside of the groove, which is close to the through groove, the outer wall of the transverse rod is slidably connected with a first fixing block, a first rotating rod is rotatably connected to one side of the first fixing block, a second rotating rod is rotatably connected to the other side of the first fixing block, one end of each first rotating rod, which is far away from the first fixing block, is rotatably connected with the limit rod vertically extending to the outer side of, the vertical fixed movable rod that is equipped with to extend to the connecting block outside of inserting in the second fixed block, fixed mounting has expanding spring between the lower extreme of movable rod and the interior diapire of recess, lateral wall is equallyd divide about the opposite one end of first link plate and second link plate and has seted up through-hole and screw hole respectively, is located same vertical line the through-hole is linked together with the screw hole, every screw hole female connection has the threaded rod.
Preferably, the number of the through holes and the threaded holes on the first hanging plate and the second hanging plate is two.
Preferably, two the opposite one end of gag lever post all sets to the arc, the carriage release lever is located the outside one end fixedly connected with pulling block of connecting block, expanding spring's deformation volume is less than the length of crossbeam.
Compared with the prior art, the high-ductility cement exterior wall cladding has the advantages that:
1. the first hanging plate is provided with a through groove and a limiting groove, the second hanging plate is provided with a connecting block, a limiting rod, a first fixing block, a first rotating rod, a second fixing block, a second rotating rod, a moving rod and a telescopic spring, the connecting block is inserted into the through groove, and the first hanging plate and the second hanging plate are fixedly connected and detached through the matching of the limiting rod and the limiting groove;
2. the through holes, the threaded holes and the threaded grooves are arranged, the through holes in the first hanging plate and the second hanging plate which are fixedly connected are sleeved on the sleeve on the outer wall, the threaded rod is rotated to enable the threaded rod to be in threaded connection with the sleeve, the first hanging plate and the second hanging plate are fixedly installed on the outer wall, and installation is more convenient;
to sum up, the utility model discloses a cooperation of gag lever post and spacing groove realizes first link plate and second link plate fixed connection and dismantlement, passes through threaded rod fixed mounting with first link plate and second link plate after the fixed connection on the outer wall, realizes that first link plate and second link plate are common with outer wall fixed mounting, and it is more convenient to install.
Drawings
FIG. 1 is a schematic structural view of a high-ductility cement exterior wall cladding provided by the present invention;
FIG. 2 is an enlarged view of portion A of FIG. 1;
FIG. 3 is a bottom view of the first hanging plate of the high-ductility cement exterior wall hanging plate provided by the utility model;
fig. 4 is a bottom view of the second hanging plate in the high-ductility cement exterior wall hanging plate provided by the utility model.
In the figure: 1 first link plate, 2 second link plates, 3 logical grooves, 4 spacing grooves, 5 connecting blocks, 6 recesses, 7 horizontal poles, 8 first fixed blocks, 9 first dwang, 10 second dwang, 11 gag lever post, 12 second fixed blocks, 13 carriage release levers, 14 expanding spring, 15 through-holes, 16 screw holes, 17 pulling block, 18 threaded rods.
Detailed Description
The technical solution in the embodiments of the present invention will be clearly and completely described below with reference to the accompanying drawings in the embodiments of the present invention.
Referring to fig. 1-4, a high-ductility cement exterior wall cladding, comprising a first cladding 1 and a second cladding 2, wherein a through groove 3 is provided at the middle part of one side of the first cladding 1 close to the second cladding 2, specifically, the length, width and height of the through groove 3 are less than those of the first cladding 1, a limiting groove 4 communicated with the through groove 3 is provided at the upper and lower side walls of the through groove 3, a connecting block 5 matched with the through groove 3 is fixedly installed at one side of the second cladding 2 close to the first cladding 1, specifically, the length, width and height of the connecting block 5 are less than those of the second cladding 2, a groove 6 is provided inside the connecting block 5, a horizontal bar 7 is fixedly installed at one side of the inside of the groove 6 close to the through groove 3, specifically, the length of the bar 7 is less than that of the groove 6, a first fixing block 8 is slidably connected to the outer wall of the bar 7, first fixed block 8 moves about the direction that sets up along horizontal pole 7 under the exogenic action, one side of first fixed block 8 is rotated and is connected with first dwang 9, the opposite side of first fixed block 8 is rotated and is connected with second dwang 10, every first dwang 9 is kept away from the one end of first fixed block 8 and is rotated and be connected with the gag lever post 11 in the vertical extension to the connecting block 5 outside, it is further, the arc all is set to two gag lever posts 11 opposite one end, when connecting block 5 inserts logical groove 3, the one end that the 11 arc of gag lever post set up and the inside wall contact removal that leads to groove 3, it is more smooth and easy to guarantee the contact removal, move about first fixed block 8, it rotates to drive first dwang 9, first dwang 9 rotates and drives gag lever post 11 and reciprocates, realize gag lever post.
One end of the second rotating rod 10 far away from the first fixed block 8 is rotatably connected with a second fixed block 12, a moving rod 13 extending to the outside of the connecting block 5 is vertically and fixedly inserted in the second fixed block 12, one end of the moving rod 13, which is positioned at the outside of the connecting block 5, is fixedly connected with a pulling block 17, external force acts on the pulling block 17 to drive the moving rod 13 to move up and down, a telescopic spring 14 is fixedly installed between the lower end of the moving rod 13 and the inner bottom wall of the groove 6, specifically, in an initial state, the telescopic spring 14 is in a contraction state, at the moment, the opposite ends of the two limiting rods 11 are furthest far away, the pulling block 17 is pulled upwards, the pulling block 17 drives the moving rod 13 to move upwards, the moving rod 13 moves upwards to drive the second fixed block 12 to move upwards together with the moving rod 13, the second fixed block 12 moves upwards to drive the second rotating rod 10 to rotate, one end of the second rotating rod 10 far away from, further, the deformation amount of the extension spring 14 is smaller than the length of the cross bar 7, so as to limit the first fixing block 8, and ensure that the first fixing block 8 always slides left and right on the outer wall of the cross bar 7 under the action of external force, the first fixing block 8 cannot be separated from the cross bar 7, the first fixing block 8 moves right to drive the two first rotating rods 9 to rotate in opposite directions, the first rotating rod 9 rotates in opposite directions to drive the two limiting rods 11 to move in opposite directions, at the moment, the two limiting rods 11 approach each other, one side of the connecting block 5, which is close to the through groove 3, is inserted into the through groove 3, at the moment, the pulling block 17 is released, under the action of the elastic force of the extension spring 14, the moving rod 13 and the second fixing block 12 move downward to drive the second rotating rod 10 to rotate, the second rotating rod 10 rotates to drive the first fixing block 8 to move left, the first fixing block 8 moves, first rotation pole 9 rotates and drives two gag lever post 11 and remove towards opposite direction, the one end that two gag lever post 11 arcs set up is contradicted with the inside wall that leads to groove 3, continue to promote connecting block 5 and remove to leading to the inslot 3, when gag lever post 11 and spacing groove 4 are located same vertical line, gag lever post 11 gets into the spacing groove 4, realize the fixed connection of first link plate 1 and second link plate 2, when needs are dismantled first link plate 1 and second link plate 2, upwards stimulate pull block 17, and then drive gag lever post 11 and deviate from spacing groove 4, take connecting block 5 out from leading to groove 3, realize the dismantlement of first link plate 1 and second link plate 2.
The upper side wall and the lower side wall of one end of the first hanging plate 1 opposite to the second hanging plate 2 are respectively provided with a through hole 15 and a threaded hole 16, the number of the through holes 15 and the threaded holes 16 on the first hanging plate 1 and the second hanging plate 2 is two, the through holes 15 and the threaded holes 16 positioned on the same vertical line are communicated, each threaded hole 16 is internally threaded with a threaded rod 18, specifically, the length of the threaded rod 18 is greater than the depth of the threaded hole 16, the sleeve matched with the through hole 15 is pre-buried on the cement outer wall, a thread groove is formed in the inner side wall of each sleeve, the through holes 15 in the first hanging plate 1 and the second hanging plate 2 are sleeved on the pre-buried sleeve on the cement outer wall, the threaded rod 18 is rotated, one end, close to the through hole 15, of the threaded rod 18 is rotated to enter the sleeve, the threaded rod 18 is further rotated, the threaded rod 18 is rotated in the sleeve to be connected with the sleeve threads in a rotating mode, and the first hanging plate 1 and the second hanging plate 2 are fixedly connected with the cement outer wall.
Further, unless otherwise specifically stated or limited, the above-described fixed connection is to be understood in a broad sense, and may be, for example, welded, glued, or integrally formed as is conventional in the art.
Now, the operation principle of the present invention is explained as follows:
one side of a connecting block 5 fixedly connected with a second hanging plate 2 is inserted into a through groove 3, a pulling block 17 is pulled upwards, the pulling block 17 drives a moving rod 13 and a second fixing block 12 to move upwards together, at the moment, a telescopic spring 14 is in an expansion state, the second fixing block 12 moves upwards to drive a second rotating rod 10 to rotate, a first fixing block 8 is driven to move right, a first rotating rod 9 is driven to move oppositely, two limiting rods 11 are driven to move oppositely, the connecting block 5 is continuously pushed to move towards the through groove 3, the pulling block 17 is released, the moving rod 13 and the second fixing block 12 are driven to move downwards under the elastic force of the telescopic spring 14, two limiting rods 11 are further driven to move towards opposite directions, so that the limiting rods 11 enter a limiting groove 4 to fixedly connect the first hanging plate 1 and the second hanging plate 2, through holes 15 of the first hanging plate 1 and the second hanging plate 2 are sleeved on sleeves on a cement exterior wall, and rotating the threaded rod 18 to enable the threaded rod 18 to rotate to enter the sleeve and be in threaded connection with the sleeve, so that the first hanging plate 1 and the second hanging plate 2 are fixedly installed on the cement outer wall.

Claims (3)

1. The high-ductility cement exterior wall cladding comprises a first cladding (1) and a second cladding (2), and is characterized in that a through groove (3) is formed in the middle of one side of the first cladding (1) close to the second cladding (2), a limiting groove (4) communicated with the through groove (3) is formed in the upper side wall and the lower side wall of the through groove (3), a connecting block (5) matched with the through groove (3) is fixedly mounted on one side of the second cladding (2) close to the first cladding (1), a groove (6) is formed in the connecting block (5), a horizontal cross rod (7) is horizontally arranged on one side of the groove (6) close to the through groove (3), a first fixing block (8) is slidably connected to the outer wall of the cross rod (7), a first rotating rod (9) is rotatably connected to one side of the first fixing block (8), a second rotating rod (10) is rotatably connected to the other side of the first fixing block (8), every the one end rotation that first fixed block (8) were kept away from in first dwang (9) is connected with vertical gag lever post (11) that extends to the connecting block (5) outside, the one end rotation that first fixed block (8) were kept away from in second dwang (10) connects second fixed block (12), vertical fixed inserting is equipped with carriage release lever (13) that extends to connecting block (5) outside in second fixed block (12), fixed mounting has expanding spring (14) between the lower extreme of carriage release lever (13) and the interior diapire of recess (6), through-hole (15) and screw hole (16) have been seted up respectively to the lateral wall about first link plate (1) and the opposite one end of second link plate (2), is located same vertical line through-hole (15) and screw hole (16) are linked together, every screw hole (16) threaded rod (18) female connection.
2. A high-ductility cement exterior wall cladding panel according to claim 1, wherein the number of the through holes (15) and the threaded holes (16) on the first cladding panel (1) and the second cladding panel (2) are two.
3. The high-ductility cement exterior wall cladding panel according to claim 2, wherein the opposite ends of the two limiting rods (11) are both arranged in an arc shape, one end of the movable rod (13) positioned outside the connecting block (5) is fixedly connected with a pulling block (17), and the deformation amount of the expansion spring (14) is smaller than the length of the cross rod (7).
CN201921317847.7U 2019-08-14 2019-08-14 High-ductility cement exterior wall cladding Expired - Fee Related CN211114553U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201921317847.7U CN211114553U (en) 2019-08-14 2019-08-14 High-ductility cement exterior wall cladding

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201921317847.7U CN211114553U (en) 2019-08-14 2019-08-14 High-ductility cement exterior wall cladding

Publications (1)

Publication Number Publication Date
CN211114553U true CN211114553U (en) 2020-07-28

Family

ID=71693085

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201921317847.7U Expired - Fee Related CN211114553U (en) 2019-08-14 2019-08-14 High-ductility cement exterior wall cladding

Country Status (1)

Country Link
CN (1) CN211114553U (en)

Similar Documents

Publication Publication Date Title
CN210273368U (en) Easy-to-assemble and disassemble bridge structure for cable erection
CN213544257U (en) Recycled concrete strength detection device
CN211114553U (en) High-ductility cement exterior wall cladding
CN214531297U (en) Heat-insulation wallboard building house
CN210858235U (en) Safety device for construction
CN112227737A (en) Wallboard fixing bracket with splicing structure for constructional engineering
CN111884144A (en) High-stability spliced cable bridge
CN207144265U (en) A kind of curtain wall
CN215269137U (en) Electrical control cabinet with adjustable component mounting height
CN110424659A (en) A kind of high ductility cement exterior wall cladding
CN211472990U (en) Building curtain wall mounting structure
CN108930410B (en) Tap system for concrete pouring and concrete pouring tap process
CN114227909B (en) Precast beam formula thin wardrobe door apparatus for producing convenient to form removal
CN217362932U (en) Detachable magnetic control soft start cabinet
CN220434148U (en) Plastering machine for building decoration
CN221441551U (en) Prefabricated ribbed large-burial-depth PC board moulding bed
CN211118638U (en) Fixed telescoping device of TV set display screen
CN116220297A (en) Decorative wallboard capable of being spliced
CN221609167U (en) Building wall
CN217169715U (en) Blow molding device for plastic pipe production
CN114753533B (en) Large-area anti-toppling curtain wall board capable of performing preliminary positioning
CN216197042U (en) Concrete electric pole with bird repelling function for power engineering
CN221500489U (en) Super high-rise assembled self-climbing track type vertical material conveying platform
CN211083304U (en) Electric power angle steel tower equipment box mounting base
CN221589981U (en) Assembled heat preservation wall body

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20200728

CF01 Termination of patent right due to non-payment of annual fee