CN211114208U - Wall structure for green building - Google Patents

Wall structure for green building Download PDF

Info

Publication number
CN211114208U
CN211114208U CN201921215336.4U CN201921215336U CN211114208U CN 211114208 U CN211114208 U CN 211114208U CN 201921215336 U CN201921215336 U CN 201921215336U CN 211114208 U CN211114208 U CN 211114208U
Authority
CN
China
Prior art keywords
plate
fixing
protection
light
wall structure
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201921215336.4U
Other languages
Chinese (zh)
Inventor
余学玲
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Yingtou Construction Development Co ltd
Original Assignee
Shanghai Yingtou Construction Development Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Yingtou Construction Development Co ltd filed Critical Shanghai Yingtou Construction Development Co ltd
Priority to CN201921215336.4U priority Critical patent/CN211114208U/en
Application granted granted Critical
Publication of CN211114208U publication Critical patent/CN211114208U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Finishing Walls (AREA)

Abstract

The utility model discloses a wall structure for green building relates to green building technical field. The multifunctional electric heating plate comprises a body, the body comprises a function plate device and a fixing device, the function plate device comprises two light steel frames, a first protection plate, a second protection plate, a third protection plate and a screw rod, and the opposite surfaces of the light steel frames are respectively in lap joint with the front surface and the back surface of a fixing plate. This wall structure for green building, through establishing fixing device, light steelframe and function board device, fill the concrete material with light steelframe and fixed back of steel column to the inside in concrete cavity again, the loaded down with trivial details problem of wall brick filling process has been solved to conventional green building, the device intensity after the concrete is filled is high and simple structure has made things convenient for staff's use, cooperation function board device makes indoor environment safe, environmental protection and comfortable, and the wall body recycle rate after demolising is high, the device's practicality has been improved.

Description

Wall structure for green building
Technical Field
The utility model relates to a green building technical field specifically is a wall structure for green building.
Background
The green building indicates in the life cycle of building, furthest resources are saved, including energy-conservation, festival ground, water conservation, material saving etc. environmental protection and pollution abatement, for people provide healthy, comfortable and efficient usage space, with the building of nature harmonious intergrowth, most green buildings adopt steel structural framework mostly, fill the wall body between the steel construction, but current wall body still has following not enoughly:
in the prior art, most of conventional green buildings are filled with wall bricks, the tedious process of filling the wall bricks consumes more manpower and working hours, functional plates are additionally arranged at the back to cause the wall to become thick, the resource recycling rate of the wall during dismantling is low, and the purposes of energy conservation, environmental protection, high efficiency and sustainability of the green buildings are not met.
SUMMERY OF THE UTILITY MODEL
Technical problem to be solved
Not enough to prior art, the utility model provides a wall structure for green building possesses the advantage that labour saving and time saving and resource recovery rate are high, has solved the problem that wastes time and energy and resource recovery rate are low.
(II) technical scheme
For the purpose that realizes above-mentioned labour saving and time saving and resource recovery rate are high, the utility model provides a following technical scheme: a wall structure for a green building comprises a body, wherein the body comprises a function board device and a fixing device, the function board device comprises two light steel frames, a first protection plate, a second protection plate, a third protection plate and a screw rod, opposite surfaces of the two light steel frames are respectively overlapped with the front surface and the back surface of a fixing plate, a space formed by the opposite surfaces of the two light steel frames is a concrete cavity, first fixing holes are formed in the right side surface of the light steel frame and the inside of the fixing plate, fixing grooves are formed in the light steel frames, and the first fixing holes and the inside of the fixing grooves are both sleeved with the surfaces of the screw rods;
the fixing device comprises a steel column and a fixing seat, wherein convex blocks are fixedly mounted on four surfaces of the steel column, the upper surface of the steel column is fixedly connected with the lower surface of the fixing seat, second fixing holes are formed in the surfaces of the fixing seat and the convex blocks, the specifications of the convex blocks are matched with the internal specifications of the light steel frame, the second fixing holes are matched with the specifications of the first fixing holes, and one end, far away from the steel column, of the convex block is in lap joint with the internal portion of the light steel frame.
As a preferred technical scheme of the utility model, the right flank of first guard plate and the left surface fixed connection of light steelframe, the left surface fixed mounting of first guard plate has waterproof coating, waterproof coating is the acrylic acid coating, the left surface of second guard plate and the right flank fixed connection of light steelframe, the right flank of second guard plate and the left surface fixed connection of third guard plate.
As an optimized technical scheme of the utility model, first guard plate is the ceramic heat insulating board, the second guard plate is the mineral wool acoustic celotex board, the third guard plate is the magnesium oxychloride PLASTIC LAMINATED.
As an optimized technical scheme of the utility model, the protection chamber has been seted up to the inside of third prevention backplate, the inside activity in protection chamber is provided with the dry powder.
As an optimal technical scheme of the utility model, the screw thread with screw rod surface looks adaptation is all seted up to the inside of first fixed orifices, fixed slot and second fixed orifices.
(III) advantageous effects
Compared with the prior art, the utility model provides a wall structure for green building possesses following beneficial effect:
1. this wall structure for green building, through establishing fixing device, light steelframe and function board device, fill the concrete material with light steelframe and fixed back of steel column to the inside in concrete cavity again, the loaded down with trivial details problem of wall brick filling process has been solved to conventional green building, the device intensity after the concrete is filled is high and simple structure has made things convenient for staff's use, cooperation function board device makes indoor environment safe, environmental protection and comfortable, and the wall body recycle rate after demolising is high, the device's practicality has been improved.
2. This wall structure for green building through setting up fixed plate, screw rod and protection chamber, and the fixed plate passes through the screw rod and makes the intensity whole improvement after muddy earth fills between two first light steel framves, and the dry powder cooperation third protection board that the protection intracavity was filled makes the device's fire behavior improve, has improved the barrier propterty of whole steel construction, accords with the purpose of green building, has made things convenient for user's use.
Drawings
Fig. 1 is a schematic structural view of the present invention;
FIG. 2 is a sectional view of the functional board structure of the present invention;
FIG. 3 is a schematic view of the fixing structure of the present invention
Fig. 4 is a sectional view of a first light steel frame of the present invention.
In the figure: 1. a body; 2. a function board device; 21. a light steel frame; 211. a first fixing hole; 212. fixing grooves; 213. a screw; 22. a first guard plate; 23. a water-resistant coating; 24. a fixing plate; 25. a second guard plate; 26. a third protection plate; 261. a protective cavity; 262. dry powder; 27. a concrete cavity; 3. a fixing device; 31. a steel column; 32. a bump; 33. a fixed seat; 34. and a second fixing hole.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
Referring to fig. 1-4, the utility model discloses a wall structure for green building, including body 1, body 1 includes function board device 2 and fixing device 3, function board device 2 includes two light steelframe 21, first guard plate 22, second guard plate 25, third guard plate 26 and screw rod 213, the opposite face of two light steelframe 21 respectively with the front and the back overlap joint of fixed plate 24, the space that the opposite face of two light steelframe 21 formed is concrete cavity 27, the right flank of light steelframe 21 and the inside of fixed plate 24 all are equipped with first fixed orifices 211, fixed slot 212 has been seted up to the inside of light steelframe 21, the inside of first fixed orifices 211 and fixed slot 212 all cup joints with the surface of screw rod 213;
the fixing device 3 comprises a steel column 31 and a fixing seat 33, wherein four surfaces of the steel column 31 are fixedly provided with a lug 32, the upper surface of the steel column 31 is fixedly connected with the lower surface of the fixing seat 33, the surfaces of the fixing seat 33 and the lug 32 are respectively provided with a second fixing hole 34, the specification of the lug 32 is matched with the internal specification of the light steel frame 21, the second fixing hole 34 is matched with the specification of the first fixing hole 211, one end of the lug 32, far away from the steel column 31, is overlapped with the internal part of the light steel frame 21, and the fixing device 3, the light steel frame 21 and the function plate device 2 are arranged to fix the light steel frame 21 and the steel column 31 and then fill concrete materials into the concrete cavity 27, so that the problem that the wall brick filling process is complicated in the conventional green building is solved, the strength of the device after concrete filling is high, the structure is simple, and the use of workers is convenient, the cooperation function board device 2 makes indoor environment safety, environmental protection and comfortable, and the wall body recycle rate after demolising is high, has improved the device's practicality.
Specifically, the right side of first guard plate 22 and the left surface fixed connection of light steelframe 21, the left surface fixed mounting of first guard plate 22 has water proof coating 23, the left surface of second guard plate 25 and the right surface fixed connection of light steelframe 21, the right surface of second guard plate 25 and the left surface fixed connection of third guard plate 26.
In this embodiment, the concrete cavity 27 formed between the two keel frames is filled with concrete, and after the concrete layer is solidified, the air gun can be used for fixing the first protection plate 22 and the second protection plate 25 with the concrete layer, so that the fixity of the first protection plate 22 and the second protection plate 25 is improved.
Specifically, the first protection plate 22 is a ceramic thermal insulation plate, the second protection plate 25 is a mineral wool thermal insulation plate, the third protection plate 26 is a magnesium oxychloride fireproof plate, and the waterproof coating 23 is an acrylic coating.
In this embodiment, acrylic acid waterproof coating 23 can be fine isolated with outside rainwater or heat with ceramic heat insulating board, increases indoor travelling comfort, and the mineral wool acoustic celotex board can be isolated with outside sound, prevents to influence the user, and the magnesium oxychloride PLASTIC LAMINATED plays the fire prevention effect to whole steel construction when probably taking place the conflagration, reduces the steel construction and receives thermal injury.
Specifically, a protection cavity 261 is formed in the third protection plate 26, and dry powder 262 is movably arranged in the protection cavity 261.
In this embodiment, through the inside dry powder 262 that sets up of third prevention backplate 26, can play the effect of putting out when flame burning third prevention backplate 26, reduce the speed of flame burning, cooperation third prevention backplate 26 makes holistic fire behavior greatly increased, has made things convenient for user's use.
Specifically, the first fixing hole 211, the fixing groove 212 and the second fixing hole 34 are all provided with threads matched with the surface of the screw rod 213.
In this embodiment, the specification looks adaptation of lug 32 and light steelframe 21, the specification looks adaptation of second fixed orifices 34 and first fixed orifices 211 for threaded rod threaded connection first fixed orifices 211, second fixed orifices 34 and fixed slot 212, make light steelframe 21 and steel column 31 obtain fixed make overall structure installation convenient, and screw 213 makes the outside of screw 213 not more than the outside of first fixed orifices 211 when rotatory to the inside of fixed slot 212, make whole aesthetic property increase.
The utility model discloses a theory of operation and use flow: when the device is used, the light steel frame 21 and the convex block 32 are combined, the first fixing hole 211, the second fixing hole 34 and the fixing groove 212 are sequentially in threaded connection through the screw rod 213, the fixing plate 24 is fixed between the two light steel frames 21 through the screw rod 213, the first protection plate 22 and the second protection plate 25 are fixedly bonded with two sides of the light steel frame 21, concrete is filled into the concrete cavity 27, after the concrete is solidified, the first protection plate 22 and the second protection plate 25 are fixed with the concrete layer through the air guns, the waterproof coating 23 is coated on the surface of the first protection plate 22, the third protection plate 26 and the second protection plate 25 are fixed through the air guns, the light steel frame 21 is H-shaped, the light steel frame 21 can be continuously installed on the steel column 31 as required to fill a wall, and the operation of the device is completed through the above steps.
To sum up, this wall structure for green building through establishing fixing device 3, light steelframe 21 and function board device 2, to the inside filling concrete material in concrete cavity 27 again after fixing light steelframe 21 and steel column 31, the loaded down with trivial details problem of conventional green building adoption wall brick filling process has been solved, the intensity after the device is filled through the concrete is high and simple structure has made things convenient for staff's use, cooperation function board device 2 makes indoor environment safety, environmental protection and comfortable, and the wall body recycle rate after demolising is high, the device's practicality has been improved.
It should be noted that, in this document, terms such as "comprises," "comprising," or any other variation thereof, are intended to cover a non-exclusive inclusion, such that a process, method, article, or apparatus that comprises a list of elements does not include only those elements but may include other elements not expressly listed or inherent to such process, method, article, or apparatus. Without further limitation, an element defined by the phrase "comprising an … …" does not exclude the presence of other identical elements in a process, method, article, or apparatus that comprises the element.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the invention, the scope of which is defined in the appended claims and their equivalents.

Claims (5)

1. The utility model provides a green wall structure for building, includes body (1), its characterized in that: the body (1) comprises a function board device (2) and a fixing device (3), the function board device (2) comprises two light steel frames (21), a first protection plate (22), a second protection plate (25), a third protection plate (26) and a screw rod (213), opposite surfaces of the two light steel frames (21) are respectively in lap joint with the front surface and the back surface of a fixing plate (24), a space formed by the opposite surfaces of the two light steel frames (21) is a concrete cavity (27), the right side surface of the light steel frame (21) and the inside of the fixing plate (24) are both provided with first fixing holes (211), fixing grooves (212) are formed in the light steel frame (21), and the first fixing holes (211) and the inside of the fixing grooves (212) are both in socket joint with the surfaces of the screw rod (213);
the fixing device (3) comprises a steel column (31) and a fixing seat (33), wherein convex blocks (32) are fixedly mounted on four surfaces of the steel column (31), the upper surface of the steel column (31) is fixedly connected with the lower surface of the fixing seat (33), second fixing holes (34) are formed in the surfaces of the fixing seat (33) and the convex blocks (32), the specifications of the convex blocks (32) are matched with the internal specifications of the light steel frame (21), the second fixing holes (34) are matched with the specifications of the first fixing holes (211), and one end, far away from the steel column (31), of each convex block (32) is in lap joint with the internal portion of the light steel frame (21).
2. The wall structure for green buildings according to claim 1, wherein: the right flank of first guard plate (22) and the left flank fixed connection of light steelframe (21), the left flank fixed mounting of first guard plate (22) has waterproof coating (23), waterproof coating (23) are acrylic coating, the left flank of second guard plate (25) and the right flank fixed connection of light steelframe (21), the right flank of second guard plate (25) and the left flank fixed connection of third guard plate (26).
3. The wall structure for green buildings according to claim 1, wherein: the first protection plate (22) is a ceramic insulation plate, the second protection plate (25) is a mineral wool insulation plate, and the third protection plate (26) is a magnesium oxychloride fireproof plate.
4. The wall structure for green buildings according to claim 1, wherein: a protection cavity (261) is formed in the third protection plate (26), and dry powder (262) is movably arranged in the protection cavity (261).
5. The wall structure for green buildings according to claim 1, wherein: and threads matched with the surface of the screw rod (213) are formed in the first fixing hole (211), the fixing groove (212) and the second fixing hole (34).
CN201921215336.4U 2019-07-30 2019-07-30 Wall structure for green building Expired - Fee Related CN211114208U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201921215336.4U CN211114208U (en) 2019-07-30 2019-07-30 Wall structure for green building

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201921215336.4U CN211114208U (en) 2019-07-30 2019-07-30 Wall structure for green building

Publications (1)

Publication Number Publication Date
CN211114208U true CN211114208U (en) 2020-07-28

Family

ID=71694833

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201921215336.4U Expired - Fee Related CN211114208U (en) 2019-07-30 2019-07-30 Wall structure for green building

Country Status (1)

Country Link
CN (1) CN211114208U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112695917A (en) * 2020-12-23 2021-04-23 湖北正浩建设集团有限公司 Shear wall structure of steel-concrete structure building and construction method thereof

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112695917A (en) * 2020-12-23 2021-04-23 湖北正浩建设集团有限公司 Shear wall structure of steel-concrete structure building and construction method thereof
CN112695917B (en) * 2020-12-23 2022-04-19 湖北正浩建设集团有限公司 Shear wall structure of steel-concrete structure building and construction method thereof

Similar Documents

Publication Publication Date Title
CN106760348A (en) A kind of insulation and decoration acoustic wall board and its construction method of installation
CN101851994A (en) Inorganic sandwich composite external thermal insulation system
CN101131002A (en) Mould-locking assembled water-proof heat-insulating slab and construction method thereof
CN211114208U (en) Wall structure for green building
CN206681280U (en) A kind of solar panels roof structure
CN203977596U (en) A kind of rock-wool heat insulation plate of composite multi-layer structure
CN204401814U (en) Light polyurethane heat preservation and decoration of outer wall system
CN205663143U (en) Compound incubation outer wall -in -place mould
CN206957099U (en) A kind of insulation and decoration acoustic wall board
CN104631740A (en) Preparation method for multifunctional colored fireproof and heat-preservation decorative plate
CN202644826U (en) Hollow internal model steel screen and cement anti-seismic interior wall of insulation wall
CN204919881U (en) Whole wall of assembly spouting lightweight concrete
CN201406789Y (en) Light insulation outer wall board
CN207419739U (en) A kind of New compound heated board
CN200975050Y (en) Multifunctional energy-saving building blocks
CN202202445U (en) Energy-saving and heat-insulation external wall body
CN205153413U (en) Assembled external wall insulation decorates integration unit
CN201850662U (en) Composite type external temperature preservation system of outer wall
CN211447311U (en) Prefabricated wallboard of prefabricated house
CN210597765U (en) Composite heat-insulation fireproof external formwork external thermal insulation system
CN209891625U (en) External wall heat preservation structure
CN202064561U (en) Rock wool composite plate integrating heat preservation function with decoration function for outer walls
CN106592793A (en) Production method employing A-grade fire-prevention heat-insulation material to form heat-insulation layer system
CN211817052U (en) Heat-preservation fireproof outer wall structure
CN201106248Y (en) Exterior wall assembled suspending board being suitable for frame construction and steel construction

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20200728

Termination date: 20210730

CF01 Termination of patent right due to non-payment of annual fee