CN211113622U - Side slope protection anchor rod drilling construction platform - Google Patents
Side slope protection anchor rod drilling construction platform Download PDFInfo
- Publication number
- CN211113622U CN211113622U CN201921825568.1U CN201921825568U CN211113622U CN 211113622 U CN211113622 U CN 211113622U CN 201921825568 U CN201921825568 U CN 201921825568U CN 211113622 U CN211113622 U CN 211113622U
- Authority
- CN
- China
- Prior art keywords
- anchor rod
- motor
- construction
- wire rope
- slope protection
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Landscapes
- Pit Excavations, Shoring, Fill Or Stabilisation Of Slopes (AREA)
Abstract
A side slope protection anchor rod drilling construction platform comprises an anchoring rod, a steel wire rope, a construction fence, a motor and a winch; the anchor rod is fixed in the side slope wall body, motor fixed mounting in construction fence top, fixed mounting has on the motor spindle the capstan winch, wire rope one end with anchor rod fixed connection, the other end twine in capstan winch and end are fixed in the middle of the capstan winch, be equipped with on the construction fence and be used for control the motor opens and stops and the switch of just reversing, through the just reverse control of motor wire rope receive and releases. The utility model provides a fixed and loose working site for the drilling work of the side slope protection anchor rod, the fixity is higher, and the construction error is not easy to cause; the operation of the construction platform of the utility model is simpler and faster, and the action cost of constructors is greatly reduced; the operation of staff is more convenient simple, and more stable, and is more secure to constructor's security.
Description
Technical Field
The utility model relates to an engineering construction field especially relates to a side slope protection stock drilling construction platform.
Background
A common method for slope protection construction platforms is a slope scaffold construction platform. The existing slope protection construction platform is common, scaffolds need to be set according to slope rate, and scaffold setting calculation needs to be carried out before construction. The installation need be made a round trip to dismantle, wastes time and energy and takes the material. The scaffold has poor stability and the anchor rod hole is easy to deviate. There are many limiting factors in the process of mobile setting and the like.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a side slope protection stock drilling construction platform to solve the aforementioned problem that exists among the prior art.
In order to realize the purpose, the utility model discloses a technical scheme as follows:
a side slope protection anchor rod drilling construction platform comprises an anchoring rod, a steel wire rope, a construction fence, a motor and a winch; the anchor rod is fixed in the side slope wall body, motor fixed mounting in construction fence top, fixed mounting has on the motor spindle the capstan winch, wire rope one end with anchor rod fixed connection, the other end twine in capstan winch and end are fixed in the middle of the capstan winch, be equipped with on the construction fence and be used for control the motor opens and stops and the switch of just reversing, through the just reverse control of motor wire rope receive and releases.
Preferably, the construction fence comprises bearing steel bars, a guard rail and a bottom plate; the bottom of construction fence is the criss-cross of welding together the bearing reinforcing bar, the protection railing is fixed in around the bearing reinforcing bar, the bottom plate lay in the reinforcing bar top of weighing.
Preferably, the construction fence is fixedly provided with arc-shaped steel at the joint of the bottom and the side face of one side of the side slope.
Preferably, the wire rope, the motor, the winch, and the switch are in a one-to-one controlled relationship.
Preferably, the number of the steel wire ropes is 4 or more than 4.
Preferably, the steel wire rope is a phosphated coated steel wire rope.
The utility model has the advantages that: the utility model provides a fixed and loose working site for the drilling work of the side slope protection anchor rod through the arrangement of the construction fence, and the fixing property is higher, so that the construction error is not easy to cause; the operation of the construction platform of the utility model is simpler and faster, and the action cost of constructors is greatly reduced; the motor is adopted to control the movement of the construction platform, so that the operation of workers is more convenient and simpler, the operation is more stable, and the safety of the constructors is guaranteed.
Drawings
FIG. 1 is a schematic view of a side slope protection anchor rod drilling construction platform installation;
FIG. 2 is a top view of the installation of the slope protection anchor drilling construction platform;
in the figure: 1-anchor rod, 2-steel wire rope, 3-motor, 4-bearing steel bar, 5-guard rail, 6-bottom plate.
Detailed Description
In order to make the objects, technical solutions and advantages of the present invention more clearly understood, the present invention is further described in detail below with reference to the accompanying drawings. It should be understood that the detailed description and specific examples, while indicating the invention, are given by way of illustration only.
A slope protection anchor rod drilling construction platform is shown in installation schematic diagrams in figures 1 and 2 and comprises an anchor rod 1, a steel wire rope 2, a construction fence, a motor 3 and a winch; the anchoring rod 1 is fixed in a side slope wall body, the motor 3 is fixedly mounted at the top of the construction fence, the winch is fixedly mounted on a main shaft of the motor 3, one end of the steel wire rope 2 is fixedly connected with the anchoring rod 1, the other end of the steel wire rope is wound on the winch, the tail end of the steel wire rope is fixed in the middle of the winch, a switch for controlling the starting, stopping and forward and reverse rotation of the motor is arranged on the construction fence, and the winding and unwinding of the steel wire rope are controlled through the forward and reverse rotation of; thereby realizing the up-and-down movement of the construction fence
The construction fence comprises bearing steel bars 4, a protective railing 5 and a bottom plate 6; the bottom of the construction fence is provided with the bearing steel bars 4 welded together in a criss-cross mode, the bottom plate 6 is formed by assembling and building a wood bottom plate, the bottom plate 6 is paved above the bearing steel bars 4 and used for construction personnel to stand and place construction equipment, and the guard rails 5 are fixed around the bearing steel bars 4; arc-shaped smooth steel plates are arranged at the connecting positions of the bottom and the side face of one side of the construction fence adjacent to the side slope; the construction fence is suspended on the anchoring rod 1 through the steel wire rope 2, the steel wire rope 2 is connected to the top end of the construction fence, a motor 3 is respectively installed at the connecting position, and the length of the steel wire rope 2 is driven by the motor 3; the switch comprises a forward start, a reverse start and a stop; the motor 3 is controlled by the switch, when the switch is started, the motor 3 can be controlled to drive the steel wire rope 2 to move up and down, when the specified position of construction is reached, the switch is stopped, the construction fence can be fixed, and constructors can start construction.
Examples
In this embodiment, the diameter of the anchor rod 1 is set to be 25cm, the steel wire rope 2 of a phosphate coating is selected as the steel wire rope 2, the power of the motor 3 is 2kw, the diameter of the bearing steel bar 4 is set to be 25cm, the laying area of the bottom plate 6 is consistent with the criss-cross area of the bearing steel bar 4 and is set to be 1.5m by 1.5m, and the height of the guard rail 5 is 1.2 m; the number of the steel wire ropes 2 is 4, and the steel wire ropes are connected to four corner positions of the protective fence. Placing the side slope protection anchor rod drilling equipment on the construction fence, and opening the remote control to enable the construction fence to move; when the remote control is closed when the construction position is reached, the construction fence stops, and constructors can work.
Through adopting the utility model discloses an above-mentioned technical scheme has obtained following profitable effect:
the utility model provides a fixed and loose working site for the drilling work of the side slope protection anchor rod through the arrangement of the construction fence, and the fixing property is higher, so that the construction error is not easy to cause; the operation of the construction platform of the utility model is simpler and faster, and the action cost of constructors is greatly reduced; the motor is adopted to control the movement of the construction platform, so that the operation of workers is more convenient and simpler, the operation is more stable, and the safety of the constructors is guaranteed.
The foregoing is only a preferred embodiment of the present invention, and it should be noted that, for those skilled in the art, a plurality of improvements and decorations can be made without departing from the principle of the present invention, and these improvements and decorations should also be viewed as the protection scope of the present invention.
Claims (6)
1. A side slope protection anchor rod drilling construction platform is characterized by comprising an anchor rod, a steel wire rope, a construction fence, a motor and a winch; the anchor rod is fixed in the side slope wall body, motor fixed mounting in construction fence top, fixed mounting has on the motor spindle the capstan winch, wire rope one end with anchor rod fixed connection, the other end twine in capstan winch and end are fixed in the middle of the capstan winch, be equipped with on the construction fence and be used for control the motor opens and stops and the switch of just reversing, through the just reverse control of motor wire rope receive and releases.
2. The slope protection anchor rod drilling construction platform according to claim 1, wherein the construction bars comprise bearing steel bars, protection railings and bottom plates; the bottom of construction fence is the criss-cross of welding together the bearing reinforcing bar, the protection railing is fixed in around the bearing reinforcing bar, the bottom plate is laid in bearing reinforcing bar top.
3. The slope protection anchor rod drilling construction platform of claim 2, wherein the construction fence is fixedly provided with smooth arc-shaped steel at the joint of the bottom and the side surface of one side adjacent to the slope.
4. The slope protection anchor drilling construction platform of claim 1, wherein the wire rope, the motor, the winch, and the switch are in a one-to-one controlled relationship.
5. The slope protection anchor rod drilling construction platform according to claim 1, wherein the number of the steel wire ropes is 4 or more than 4.
6. The slope protection anchor rod drilling construction platform of claim 1, wherein the steel wire rope is a phosphated coated steel wire rope.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201921825568.1U CN211113622U (en) | 2019-10-28 | 2019-10-28 | Side slope protection anchor rod drilling construction platform |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201921825568.1U CN211113622U (en) | 2019-10-28 | 2019-10-28 | Side slope protection anchor rod drilling construction platform |
Publications (1)
Publication Number | Publication Date |
---|---|
CN211113622U true CN211113622U (en) | 2020-07-28 |
Family
ID=71703190
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201921825568.1U Active CN211113622U (en) | 2019-10-28 | 2019-10-28 | Side slope protection anchor rod drilling construction platform |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN211113622U (en) |
-
2019
- 2019-10-28 CN CN201921825568.1U patent/CN211113622U/en active Active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN108104475B (en) | Self-crawling type floor inner concrete cloth equipment and its construction method | |
CN111648628B (en) | Construction method for upper cover building of subway parking garage | |
CN102502378A (en) | Climbing elevator for building construction | |
CN109989348A (en) | Cantilever formwork for concrete construction and construction method thereof | |
CN111395184A (en) | System and method for constructing high pier with gradually-changed section by using electric bridge type scaffold platform | |
CN211113622U (en) | Side slope protection anchor rod drilling construction platform | |
CN113216587B (en) | High-rise building outer wall construction operation platform fixing structure and construction method thereof | |
KR100966596B1 (en) | Gang Form Auto-Climbing Apparatus | |
CN201172921Y (en) | Slideway on oblique roof and pulley system | |
CN102677907A (en) | Method for manually installing steel beam at top of silo | |
CN111648256A (en) | Pier body reinforcing construction method | |
CN111576832A (en) | Construction system and construction method of cantilever multi-bent | |
CN106193621A (en) | Fabricated construction superimposed sheet string hangs construction method | |
CN110616902A (en) | Installation and construction method for metal cored color steel plate of thermal power plant | |
CN207728007U (en) | Shear wall exterior wall curing means | |
CN214570326U (en) | Curtain wall unit plate rail hoisting and hard protection integrated device | |
CN211341900U (en) | Movable trolley for maintaining and reinforcing cornice of existing building | |
CN215978520U (en) | Feeding and discharging platform for building | |
CN211998356U (en) | Construction elevator capable of crossing outer frame and climbing frame | |
CN212984579U (en) | Integrated device for super high-rise rail crane, hanging basket platform and hard protection | |
CN216971832U (en) | Steel wire rope hoist crane | |
CN214885358U (en) | A operation platform structure for super high-rise building outer wall construction | |
CN214272867U (en) | Racket type soft platform for lighting roof installation | |
CN216471954U (en) | Liftable support for construction engineering construction | |
CN214834571U (en) | Scaffold device with material lifting function |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |