CN211110436U - Water conservancy construction pipe laying pay-off - Google Patents
Water conservancy construction pipe laying pay-off Download PDFInfo
- Publication number
- CN211110436U CN211110436U CN201922283649.XU CN201922283649U CN211110436U CN 211110436 U CN211110436 U CN 211110436U CN 201922283649 U CN201922283649 U CN 201922283649U CN 211110436 U CN211110436 U CN 211110436U
- Authority
- CN
- China
- Prior art keywords
- fixed mounting
- fixedly connected
- water conservancy
- bottom plate
- pipe laying
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 title claims abstract description 30
- 238000010276 construction Methods 0.000 title claims abstract description 25
- 235000017166 Bambusa arundinacea Nutrition 0.000 claims description 4
- 235000017491 Bambusa tulda Nutrition 0.000 claims description 4
- 241001330002 Bambuseae Species 0.000 claims description 4
- 235000015334 Phyllostachys viridis Nutrition 0.000 claims description 4
- 239000011425 bamboo Substances 0.000 claims description 4
- 230000001681 protective effect Effects 0.000 claims description 4
- 230000009467 reduction Effects 0.000 claims description 3
- 239000003638 chemical reducing agent Substances 0.000 description 6
- 230000006835 compression Effects 0.000 description 3
- 238000007906 compression Methods 0.000 description 3
- 230000035939 shock Effects 0.000 description 3
- 238000004804 winding Methods 0.000 description 3
- 230000000694 effects Effects 0.000 description 2
- 230000009471 action Effects 0.000 description 1
- 230000009286 beneficial effect Effects 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
- 238000001125 extrusion Methods 0.000 description 1
- 230000002349 favourable effect Effects 0.000 description 1
- 238000004519 manufacturing process Methods 0.000 description 1
- 238000000034 method Methods 0.000 description 1
- 230000008569 process Effects 0.000 description 1
- 239000000126 substance Substances 0.000 description 1
- 239000002352 surface water Substances 0.000 description 1
Images
Landscapes
- Laying Of Electric Cables Or Lines Outside (AREA)
Abstract
The utility model discloses a water conservancy construction pipe laying pay-off, comprising a base plate, the equal fixed mounting in bottom plate lower extreme four corners has the universal wheel, the anterior fixed mounting in bottom plate upper end has positioner, the equal fixed mounting in bottom plate upper end left part and upper end right part has the riser, two fixed mounting has wire device between the opposite face lower part of riser, and wire device's left end and right-hand member all control run through the riser, two the equal fixed mounting in opposite face upper portion of riser has the quarter butt, two the common fixedly connected with support column of the opposite face of quarter butt, the surface of support column has cup jointed the bobbin, two the equal fixed mounting in riser upper end has the connecting rod, two common fixedly connected with decelerator between the opposite face of connecting rod. A water conservancy construction pipe laying pay-off, through setting up decelerator and positioner, make whole device more practical and durable, the device simple structure is firm, the practicality is strong.
Description
Technical Field
The utility model relates to a water conservancy construction field, in particular to water conservancy construction pipe laying pay-off.
Background
Hydraulic engineering is an engineering built for controlling and allocating surface water and underground water in nature to achieve the purposes of removing harmful substances and benefiting. Also known as water engineering. Through building hydraulic engineering, can control rivers, prevent flood disasters to the regulation and the distribution of water yield, in order to satisfy people's life and production to the needs of water resource, in the water conservancy work progress, often need carry out the unwrapping wire to the buried pipe and pull, in order to make things convenient for laying of pipeline.
The prior patent (publication number: CN 209210056U) discloses a water conservancy construction pipe laying pay-off, including the base, the top surface fixed mounting of base has the box, the right-hand member fixed mounting of base top surface has the board of placing, the top surface fixed mounting who places the board has driving motor, driving motor's output shaft fixedly connected with first runner, the outside and the left and right sides face activity of box of first runner cup joint, the left surface activity of box has cup jointed the second runner that is located first runner top, make whole device more stable also can control the unwrapping wire speed, the utility model discloses the people finds at least following problem does not obtain solving among the prior art: 1. the water conservancy construction pipe laying pay-off device is not provided with a positioning device with more accurate positioning, and the position of pay-off cannot be accurately controlled during pay-off; 2. when the water conservancy construction pipe burying pay-off device finishes paying off, the first rotating wheel can only be stopped by controlling the driving motor, the pay-off cannot be immediately finished, redundant wires are required to be wound from a new position, and the whole device is easily damaged when the driving motor is controlled to stop suddenly; 3. the flexibility when this water conservancy construction pipe laying pay-off removes is not high.
SUMMERY OF THE UTILITY MODEL
A primary object of the utility model is to provide a water conservancy construction pipe laying pay-off can effectively solve the problem in the background art.
In order to achieve the above object, the utility model provides a following technical scheme:
the utility model provides a water conservancy construction pipe laying pay-off, includes the bottom plate, the equal fixed mounting in bottom plate lower extreme four corners has the universal wheel, the anterior fixed mounting in bottom plate upper end has positioner, the equal fixed mounting in bottom plate upper end left part and upper end right part has the riser, two fixed mounting has wire device between the opposite face lower part of riser, and wire device's left end and right-hand member all control and run through the riser, two the equal fixed mounting in opposite face upper portion of riser has the quarter butt, two the common fixedly connected with support column of the opposite face of quarter butt, the surface of support column has cup jointed the bobbin, two the equal fixed mounting in riser upper end has the connecting rod, two common fixedly connected with decelerator between the opposite face of connecting rod.
Preferably, decelerator includes the fixed plate, open threaded hole on the fixed plate, the fixed plate has met the threaded rod through the threaded hole soon, threaded rod upper end fixedly connected with dwang, threaded rod lower extreme fixedly connected with spring box, two depression bars of spring box lower extreme fixedly connected with, two the common fixedly connected with speed reducing disk of depression bar lower extreme, speed reducing disk lower extreme fixed mounting has the rubber pad, decelerator passes through fixed plate fixed mounting between the opposite face of two connecting rods.
Preferably, the wire device includes a protection section of thick bamboo, fixed mounting has the motor in the protection section of thick bamboo, protection section of thick bamboo upper end fixed mounting has L type pole, L type pole right-hand member fixed mounting has the screw thread to detain, the output fixedly connected with wire roller of motor, the fixed surface of wire roller installs the one deck friction pad, the wire device passes through wire roller fixed mounting between the opposite face lower part of two risers.
Preferably, positioner includes the diaphragm, open the diaphragm upper end has the shifting chute, sliding connection has two movable blocks in the shifting chute, the equal fixed mounting in movable block upper end has the dead lever, two fixed mounting has the extension rod and the equal fixed mounting of two dead lever front ends has the screw between the opposite face of dead lever, open the extension rod front end has a plurality of locating holes, positioner passes through diaphragm fixed mounting at bottom plate upper end front portion.
Preferably, the two fixing rods are inserted into the positioning holes through screws and fixedly connected with the extension rod, the two fixing rods are bilaterally symmetrical, and the length of the transverse plate is the same as that of the bottom plate.
Preferably, the protection cylinder is fixedly installed at the lower ends of the left ends of the vertical plates at the left part of the upper end of the bottom plate through thread buckles, the lower parts of the left ends of the two vertical plates are respectively provided with a rotating hole which is used for the wire guide roller to rotate and is penetrated left and right, and the left and right end surfaces of the wire guide roller are respectively flush with the back-to-face surfaces of the two vertical plates.
Compared with the prior art, the utility model discloses following beneficial effect has:
1. in the utility model, the speed reducer is arranged on the whole device, wherein the rubber pad below the speed reducer can stop the rotation of the bobbin immediately by increasing the friction force, so that the whole device can accurately control the length of the paying-off wire, and under the action of the spring box, the whole device can not be damaged due to severe shaking caused by sudden stop, thereby prolonging the service life and improving the practicability of the whole device;
2. through set up positioner and wire device on whole device, under the cooperation of dead lever and extension rod among wire roller and positioner, gap when can enough reducing the wire of fixing a position also can improve whole device's unwrapping wire efficiency, can make the line carry out accurate placing, and location structure among the positioner can slide in the shifting chute, improved the flexibility of the device when the unwrapping wire, and the universal wheel then can make the device have more the flexibility when removing.
Drawings
Fig. 1 is a schematic view of the overall structure of a water conservancy construction pipe laying and paying-off device of the utility model;
fig. 2 is a schematic view of the overall structure of the speed reducer of the water conservancy construction pipe laying and paying-off device of the utility model;
fig. 3 is a schematic view of the overall structure of a wire guiding device of the water conservancy construction pipe laying and paying-off device of the utility model;
fig. 4 is the utility model relates to a water conservancy construction pipe laying pay-off's positioner's overall structure schematic diagram.
In the figure, the device comprises a base plate 1, a speed reducer 2, a wire guide device 3, a positioning device 4, a universal wheel 5, a winding reel 6, a winding reel 7, a short rod 8, a connecting rod 9, a vertical plate 10, a supporting column 21, a fixing plate 22, a rotating rod 23, a threaded rod 24, a spring box 25, a speed reducing disc 26, a rubber pad 27, a pressure rod 28, a threaded hole 31, an L-shaped rod 32, a protective cylinder 33, a motor 34, a wire guide roller 35, a friction pad 37, a threaded fastener 41, a transverse plate 42, a moving block 43, a positioning hole 44, a screw 45, an extension rod 46, a fixing rod 47 and a moving groove.
Detailed Description
In order to make the technical means, creation features, achievement purposes and functions of the present invention easy to understand, the present invention is further described below with reference to the following embodiments.
In the description of the present invention, it should be noted that the terms "upper", "lower", "inner", "outer", "front end", "rear end", "both ends", "one end", "the other end" and the like indicate orientations or positional relationships based on the orientations or positional relationships shown in the drawings, and are only for convenience of description and simplification of description, but do not indicate or imply that the device or element to which the reference is made must have a specific orientation, be constructed in a specific orientation, and be operated, and thus, should not be construed as limiting the present invention. Furthermore, the terms "first" and "second" are used for descriptive purposes only and are not to be construed as indicating or implying relative importance.
In the description of the present invention, it is to be noted that, unless otherwise explicitly specified or limited, the terms "mounted," "disposed," "connected," and the like are to be construed broadly, and for example, "connected" may be either fixedly connected or detachably connected, or integrally connected; can be mechanically or electrically connected; they may be connected directly or indirectly through intervening media, or they may be interconnected between two elements. The specific meaning of the above terms in the present invention can be understood in specific cases to those skilled in the art.
As shown in fig. 1-4, a water conservancy construction pipe laying pay-off, comprising a base plate 1, the equal fixed mounting in 1 lower extreme four corners of bottom plate has universal wheel 5, the anterior fixed mounting in 1 upper end of bottom plate has positioner 4, the equal fixed mounting in 1 upper end left part of bottom plate and the upper end right part has riser 9, fixed mounting has wire device 3 between the opposite face lower part of two riser 9, and wire device 3's left end and right-hand member are all controlled and run through riser 9, the equal fixed mounting in opposite face upper portion of two riser 9 has quarter butt 7, the common fixedly connected with support column 10 of the opposite face of two quarter butt 7, bobbin 6 has been cup jointed to the surface of support column 10, the equal fixed mounting in two riser 9 upper ends has connecting rod 8, common fixedly connected with decelerator 2 between the opposite face.
The speed reducer 2 comprises a fixing plate 21, a threaded hole 28 is formed in the upper end of the fixing plate 21, a threaded rod 23 is screwed on the fixing plate 21 through the threaded hole 28, a rotating rod 22 is fixedly connected to the upper end of the threaded rod 23, a spring box 24 is fixedly connected to the lower end of the threaded rod 23, two compression rods 27 are fixedly connected to the lower end of the spring box 24, the spring box 24 can absorb shock and remove shock of a vibrating bobbin 6 under the extrusion of the compression rods 27 to avoid damage of the vibrating bobbin 6, a speed reducing disc 25 is fixedly connected to the lower ends of the two compression rods 27, a rubber pad 26 is fixedly mounted at the lower end of the speed reducing disc 25, the speed reducer 2 is fixedly mounted between opposite faces of two connecting rods 8 through the fixing plate 21, the wire guiding device 3 comprises a protecting cylinder 32, a motor 33 is fixedly mounted in the protecting cylinder 32, L-shaped rods 31 are fixedly mounted at the upper end of the protecting cylinder 32, a thread buckle 37 is fixedly mounted at the right end of the L-hand end of the rod 31, a wire guiding roller 34 is fixedly connected to the output end of the motor 33, a friction pad 35 is fixedly mounted on the outer surface of the wire guiding roller 34, the friction pad 35 can improve the efficiency of the whole device by increasing the friction force of the guiding device, the guiding device 3 is fixedly mounted between the guiding device, the guiding device 3 is fixedly mounted on the guiding device, the guiding device.
It should be noted that, the utility model relates to a water conservancy construction pipe laying and paying off device, in the using process, firstly, the whole device is moved to the region needing paying off through the universal wheel 5 at the lower end of the bottom plate 1, then the cable is wound on the outer surface of the winding drum 6, the lower end of the cable is put on the wire guiding roller 34 in the wire guiding device 3, then the cable passes through the gap between the fixed rod 46, the extending rod 45 and the moving block 42 in the positioning device 4, then the extending rod 45 is extended and retracted in the fixed rod 46 according to the width of the cable, after the work of reducing the gap is completed, the screw 44 is inserted into the corresponding positioning hole 43 on the extending rod 45, the fixed rod 46 and the extending rod 45 are fixed, the direction of paying off the cable can be adjusted through the sliding block 42 in the moving groove 47, after the adjustment is completed, the motor 33 in the wire guiding device 3 is started, make wire roller 34 begin to rotate the wire, frictional force between wire and the wire roller 34 can be increased to the friction pad 35 on wire roller 34 surface, after accomplishing the unwrapping wire, dwang 22 through rotating speed reduction device 2 makes threaded rod 23 spin downwards in screw hole 28, thereby make rubber pad 26 and bobbin 6 contact and make its stall, and spring box 24 can cushion the shock attenuation to the bobbin 6 of shake, make whole device more durable, whole device simple structure is firm, therefore, the clothes hanger is strong in practicability, be favorable to the use in water conservancy construction pipe laying unwrapping wire work.
The basic principles and the main features of the invention and the advantages of the invention have been shown and described above. It will be understood by those skilled in the art that the present invention is not limited to the above embodiments, and that the foregoing embodiments and descriptions are provided only to illustrate the principles of the present invention without departing from the spirit and scope of the present invention. The scope of the invention is defined by the appended claims and equivalents thereof.
Claims (6)
1. The utility model provides a water conservancy construction pipe laying pay-off, includes bottom plate (1), its characterized in that: four corners of the lower end of the bottom plate (1) are fixedly provided with universal wheels (5), the front part of the upper end of the bottom plate (1) is fixedly provided with a positioning device (4), the left part and the right part of the upper end of the bottom plate (1) are both fixedly provided with vertical plates (9), a wire device (3) is fixedly arranged between the lower parts of the opposite surfaces of the two vertical plates (9), the left end and the right end of the wire guiding device (3) penetrate through the vertical plates (9) left and right, short rods (7) are fixedly mounted on the upper portions of opposite surfaces of the two vertical plates (9), supporting columns (10) are fixedly connected to the opposite surfaces of the two short rods (7) together, the surface of support column (10) has cup jointed bobbin (6), two the equal fixed mounting in riser (9) upper end has connecting rod (8), two common fixedly connected with decelerator (2) between the opposite face of connecting rod (8).
2. The water conservancy construction pipe laying and paying-off device according to claim 1, characterized in that: decelerator (2) are including fixed plate (21), open in fixed plate (21) upper end has screw hole (28), fixed plate (21) have screwed threaded rod (23) through screw hole (28), threaded rod (23) upper end fixedly connected with dwang (22), threaded rod (23) lower extreme fixedly connected with spring box (24), two depression bars (27), two of spring box (24) lower extreme fixedly connected with speed reduction disk (25) of the common fixedly connected with of depression bar (27) lower extreme, speed reduction disk (25) lower extreme fixed mounting has rubber pad (26), decelerator (2) are through fixed plate (21) fixed mounting between the opposite face of two connecting rods (8).
3. The water conservancy construction pipe laying and paying-off device according to claim 1, characterized in that the wire guiding device (3) comprises a protective cylinder (32), a motor (33) is fixedly installed in the protective cylinder (32), an L-type rod (31) is fixedly installed at the upper end of the protective cylinder (32), a threaded buckle (37) is fixedly installed at the right end of the L-type rod (31), a wire guiding roller (34) is fixedly connected to the output end of the motor (33), a friction pad (35) is fixedly installed on the outer surface of the wire guiding roller (34), and the wire guiding device (3) is fixedly installed between the lower parts of the opposite surfaces of the two vertical plates (9) through the wire guiding roller (34).
4. The water conservancy construction pipe laying and paying-off device according to claim 1, characterized in that: positioner (4) include diaphragm (41), open diaphragm (41) upper end has shifting chute (47), sliding connection has two movable blocks (42) in shifting chute (47), equal fixed mounting has dead lever (46) in movable block (42) upper end, two fixed mounting has extension rod (45) and the equal fixed mounting of two dead lever (46) front end has screw (44) between the opposite face of dead lever (46), extension rod (45) front end is opened has a plurality of locating holes (43), positioner (4) are anterior in bottom plate (1) upper end through diaphragm (41) fixed mounting.
5. The water conservancy construction pipe laying and paying off device according to claim 4, wherein: the two fixing rods (46) are fixedly connected with the extension rod (45) through screws (44) inserted into the positioning holes (43), the two fixing rods (46) are bilaterally symmetrical, and the length of the transverse plate (41) is the same as that of the bottom plate (1).
6. The water conservancy construction pipe laying and paying off device according to claim 3, wherein: a protection section of thick bamboo (32) are detained (37) through the screw thread and are fixedly mounted at the left end lower extreme of riser (9) of bottom plate (1) upper end left part, two riser (9) left end lower part all opens and supplies wire roller (34) rotatory and control the rotatory hole that link up, the terminal surface is parallel and level with the back to face of two risers (9) respectively about wire roller (34).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201922283649.XU CN211110436U (en) | 2019-12-18 | 2019-12-18 | Water conservancy construction pipe laying pay-off |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201922283649.XU CN211110436U (en) | 2019-12-18 | 2019-12-18 | Water conservancy construction pipe laying pay-off |
Publications (1)
Publication Number | Publication Date |
---|---|
CN211110436U true CN211110436U (en) | 2020-07-28 |
Family
ID=71705524
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201922283649.XU Expired - Fee Related CN211110436U (en) | 2019-12-18 | 2019-12-18 | Water conservancy construction pipe laying pay-off |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN211110436U (en) |
-
2019
- 2019-12-18 CN CN201922283649.XU patent/CN211110436U/en not_active Expired - Fee Related
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN108736379B (en) | Electric power construction leading truck | |
CN210490280U (en) | Cable tensioning device for laying power distribution network | |
CN211110436U (en) | Water conservancy construction pipe laying pay-off | |
CN113602906A (en) | A wire abrasionproof decreases device for transmission line non-tension unwrapping wire | |
CN215478797U (en) | Cable laying is with taut structure of unwrapping wire | |
CN111252616A (en) | Water conservancy construction pipe laying pay-off | |
CN212863801U (en) | Hoisting accessory of hollow case component of concrete is exclusively used in | |
CN219779634U (en) | Vertical cable laying device | |
CN114843940A (en) | Laying device for communication line of subway station | |
CN211480756U (en) | Positioning and arranging device for laying power line | |
CN213717476U (en) | Draw gear for cable laying | |
CN211619626U (en) | Unwrapping wire cable guide pulley device | |
CN209637224U (en) | A kind of assembled wall | |
CN210517607U (en) | Power system cable laying auxiliary assembly | |
CN219287037U (en) | Novel turntable for cable laying | |
CN212639487U (en) | Cable winding device for electric power capable of avoiding cable falling | |
CN112886479A (en) | Cable drag and drop equipment with cable protection function applied to building construction | |
CN211958577U (en) | Unwrapping wire equipment that construction used | |
CN210482042U (en) | Control device for paving guide lines on asphalt surface layer of bridge floor | |
CN219950039U (en) | Simple and easy adjustable cable unreeling device | |
CN113353730B (en) | Power line traction device | |
CN212991894U (en) | Protection device for wire pipe in embedded construction of building electrical equipment installation | |
CN111058638B (en) | Splicing seam treatment process after construction of prefabricated building interlayer floor slab | |
CN212201367U (en) | Building engineering datum line pay-off | |
CN218407491U (en) | Strong-stress adjustable anti-pulling anchor rod |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20200728 |