CN211107472U - Pipeline clamp holder - Google Patents
Pipeline clamp holder Download PDFInfo
- Publication number
- CN211107472U CN211107472U CN201921636318.3U CN201921636318U CN211107472U CN 211107472 U CN211107472 U CN 211107472U CN 201921636318 U CN201921636318 U CN 201921636318U CN 211107472 U CN211107472 U CN 211107472U
- Authority
- CN
- China
- Prior art keywords
- clamping plate
- pipeline
- grip block
- plate
- upper clamping
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Landscapes
- Supports For Pipes And Cables (AREA)
Abstract
The utility model discloses a pipeline clamp holder, which relates to the field of pipeline clamping, and comprises a vertical plate and a clamping plate, wherein the clamping plate is divided into an upper clamping plate and a lower clamping plate, the lower clamping plate is fixed on the vertical plate, the upper clamping plate is connected with the lower clamping plate through a screw rod, the screw rod position at the upper end of the upper clamping plate is provided with a nut, the bottom surface of the vertical plate is provided with a roller, after one end of a pipeline is placed on the lower clamping plate, the upper clamping plate extends into the pipeline, the nut is screwed down, so that the upper clamping plate is matched with the lower clamping plate to clamp the lower side of the pipe wall of the pipeline, the other pipeline clamp holder is fixed at the other end of the pipeline by using the same method, after two pipeline clamps are fixed at two ends of the pipeline to be carried, two workers push the pipeline clamps at the two ends of the pipeline and ensure the rolling, the upper clamping plate has no force for clamping the pipeline, and the pipeline clamping devices at two ends are respectively taken out, so that the pipeline can be installed.
Description
Technical Field
The utility model relates to a pipeline centre gripping field, in particular to pipeline holder.
Background
In the existing construction site, after a vehicle for transporting medium and large pipelines unloads the medium and large pipelines on a construction site, site workers need to move the medium and large pipelines to the positions to be installed, mechanical arms such as cranes are generally adopted for certain large pipelines, the use of the cranes for the medium pipelines wastes resources, manual carrying is generally adopted, but the manual carrying is heavy, so that the manual carrying wastes manpower, personnel can be injured in the carrying process, and a tool suitable for carrying the medium pipelines on the construction site is urgently needed.
At the present stage, on the construction site, the crane is used for middle-sized pipelines, so that resources are wasted, manual carrying is adopted due to the fact that the pipelines are heavy, manpower is wasted, personnel can be injured possibly in the carrying process, and a tool suitable for carrying the middle-sized pipelines on the construction site is urgently needed.
Disclosure of Invention
The utility model aims to provide a: the utility model provides a pipeline holder has solved at present stage on the construction site, uses the extravagant resource of loop wheel machine to medium-sized pipeline, adopts artifical transport because the pipeline is heavier, not only extravagant manpower to still can cause personnel's injury in handling, the urgent problem that needs a kind of instrument that can be applicable to the job site transport of medium-sized pipeline now.
The utility model adopts the technical scheme as follows:
The utility model provides a pipeline holder, includes riser, grip block, the grip block divide into grip block and lower grip block, the grip block is fixed on the riser down, goes up the grip block and passes through the screw rod with lower grip block and connect, and the screw rod position of going up the grip block upper end is provided with a nut, the bottom surface of riser is provided with the gyro wheel.
The pipeline can be directly carried by adopting the pipeline clamp holder, and the concrete method is that the lower clamping plate is used for placing the pipeline to be carried, after one end of the pipeline is placed on the lower clamping plate, the upper clamping plate extends into the pipeline, the nut is screwed down to ensure that the upper clamping plate is matched with the lower clamping plate to clamp the lower side of the pipe wall of the pipeline, the other end of the pipeline is also fixed with another pipeline clamp by the same method, after the two pipeline clamps are fixed at the two ends of the pipeline to be carried, two workers push the pipeline clamp at the two ends of the pipeline and ensure the rolling direction of the roller, the pipeline clamp can be smoothly carried to the position needing to be installed, then unscrew the nut, go up the grip block and just not have the power of pressing from both sides tight pipeline, take out the pipeline holder at both ends respectively, just can begin to install the pipeline, practice thrift the manpower, and avoided personnel to collide with or the pipeline from the injury hidden danger of hand landing in the transport.
Furthermore, a supporting plate in the vertical direction is arranged above the upper clamping plate and below the lower clamping plate, and the supporting plate connected with the lower part of the lower clamping plate is fixed on the vertical plate.
The backup pad cooperates grip block and lower grip block, forms a "T" font structure, and as is known to all, "T" font structure has stability, can better support the pipeline, and the grip block produces deformation about not making.
Furthermore, the lower end of the screw is fixed on the top surface of the lower clamping plate and penetrates through the upper clamping plate.
The screw rod lower extreme is fixed to lower grip block top surface, and does not use the screw rod to pass grip block down and the position of the lower extreme screw rod of grip block sets up the nut under, can be when save material, makes the fixed knot who follows grip block and screw rod construct more firmly.
Further, the clamping plate is arranged to be an arc-shaped plate, and concave surfaces of the upper clamping plate and the lower clamping plate are upward.
Set up the grip block into the arc, be the annular structure for using the pipeline more, though can not adapt to the wall pitch arc of various specification pipelines, but also can have the arc of better adaptation pipeline wall than the plane board, more firm when making the grip block centre gripping pipeline from top to bottom.
Furthermore, the riser position that the intermediate position of going up the grip block corresponds is provided with the guide rail groove, the face that goes up the grip block and press close to the riser has the structure of cooperation guide rail groove.
The guide rail groove prevents the upper clamping plate from being far away from the vertical plate when moving up and down, and can limit the displacement of the upper clamping plate in the horizontal direction on the aspect of keeping the upper clamping plate moving up and down.
Further, a handle is arranged on the back surface of the vertical plate, on which the clamping plate is not installed.
When carrying the pipeline, can hold the handle, promote the pipeline holder, and then drive the pipeline and remove, make building site constructor's use more convenient.
To sum up, owing to adopted above-mentioned technical scheme, the beneficial effects of the utility model are that:
1. The utility model relates to a pipeline clamp holder, which provides a pipeline clamp holder for workers to use and carry pipelines, and solves the problem that manpower is wasted due to heavier pipelines when manual carrying is adopted on a construction site at the present stage;
2. The utility model relates to a pipeline holder provides a pipeline holder supplies the workman to use the pipeline, has solved present stage on the constructor, during artifical pipeline carrying, can cause personnel injured's problem in handling.
Drawings
The invention will now be described, by way of example, with reference to the accompanying drawings, in which:
Fig. 1 is a front view of the present invention;
Fig. 2 is a right side view of the present invention;
FIG. 3 is a structural view of a guide rail groove of the present invention;
In the figure, 1-vertical plate, 2-clamping plate, 3-screw rod, 4-nut, 5-supporting plate, 101-roller, 102-guide rail groove, 103-handle, 201-upper clamping plate and 202-lower clamping plate.
Detailed Description
All of the features disclosed in this specification, or all of the steps in any method or process so disclosed, may be combined in any combination, except combinations of features and/or steps that are mutually exclusive.
It is noted that relational terms such as "first" and "second," and the like, may be used solely to distinguish one entity or action from another entity or action without necessarily requiring or implying any actual such relationship or order between such entities or actions. Also, the terms "comprises," "comprising," or any other variation thereof, are intended to cover a non-exclusive inclusion, such that a process, method, article, or apparatus that comprises a list of elements does not include only those elements but may include other elements not expressly listed or inherent to such process, method, article, or apparatus. Without further limitation, an element defined by the phrase "comprising an … …" does not exclude the presence of other identical elements in a process, method, article, or apparatus that comprises the element.
The present invention will be described in detail with reference to fig. 1 and 2 to 3.
Example 1
The utility model provides a pipeline holder, as fig. 1, fig. 2, fig. 3, includes riser 1, grip block 2 divide into grip block 201 and lower grip block 202, grip block 202 fixes on riser 1 down, goes up grip block 201 and passes through screw 3 with lower grip block 202 and connect, and the screw 3 position of going up the grip block 201 upper end is provided with a nut 4, the bottom surface of riser 1 is provided with gyro wheel 101.
The utility model discloses a theory of operation does: the pipeline is directly conveyed by adopting the pipeline clamp holder, the pipeline to be conveyed is placed by using the lower clamping plate 202, one end of the pipeline is placed on the lower clamping plate 202, the upper clamping plate 201 extends into the pipeline, the nut 4 is screwed down, the upper clamping plate 201 is matched with the lower clamping plate 202 to clamp the lower side of the pipe wall of the pipeline, the other pipeline clamp holder is fixed at the other end of the pipeline by using the same method, after the two pipeline clamp holders are fixed at the two ends of the pipeline to be conveyed, the two workers push the pipeline clamp holders at the two ends of the pipeline and ensure the rolling direction of the roller 101, the pipeline to be installed can be smoothly conveyed, then the nut is unscrewed, the force for clamping the pipeline is not applied to the upper clamping plate 201, the pipeline clamp holders at the two ends are respectively taken out, and.
Example 2
The utility model provides a pipeline holder, as fig. 1, fig. 2, fig. 3, includes riser 1, grip block 2 divide into grip block 201 and lower grip block 202, grip block 202 fixes on riser 1 down, goes up grip block 201 and passes through screw 3 with lower grip block 202 and connect, and the screw 3 position of going up the grip block 201 upper end is provided with a nut 4, the bottom surface of riser 1 is provided with gyro wheel 101.
The upper portion of the upper clamping plate 201 and the lower portion of the lower clamping plate 202 are both provided with a supporting plate 5 in the vertical direction, and the supporting plate 5 connected with the lower portion of the lower clamping plate 202 is fixed on the vertical plate 1.
The support plate 5 cooperates with the upper clamping plate 201 and the lower clamping plate 202 to form a "T" shaped structure, which is known to have stability and to better support the pipe without deformation of the upper and lower clamping plates.
Example 3
The utility model provides a pipeline holder, as fig. 1, fig. 2, fig. 3, includes riser 1, grip block 2 divide into grip block 201 and lower grip block 202, grip block 202 fixes on riser 1 down, goes up grip block 201 and passes through screw 3 with lower grip block 202 and connect, and the screw 3 position of going up the grip block 201 upper end is provided with a nut 4, the bottom surface of riser 1 is provided with gyro wheel 101.
The lower end of the screw rod 3 is fixed on the top surface of the lower clamping plate 202 and penetrates through the upper clamping plate 201.
The lower end of the screw 3 is fixed on the top surface of the lower clamping plate 202, and the screw 3 is not used to penetrate through the lower clamping plate 202 and a nut is arranged at the position of the screw 3 at the lower end of the lower clamping plate 202, so that the fixing structure of the lower clamping plate 202 and the screw 3 can be more stable while saving materials.
Example 4
This embodiment is a further supplement to embodiment 1, and as shown in fig. 3, the clamping plate 2 is configured as an arc-shaped plate, and the concave surfaces of the upper clamping plate 201 and the lower clamping plate 202 are both upward.
Set up grip block 2 to the arc, be the annular structure for using the pipeline more, though can not adapt to the wall pitch arc of various specification pipelines, but also can have the arc of better adaptation pipeline wall than the plane board, more firm when making the grip block centre gripping pipeline from top to bottom.
Example 5
The utility model provides a pipeline holder, as fig. 1, fig. 2, fig. 3, includes riser 1, grip block 2 divide into grip block 201 and lower grip block 202, grip block 202 fixes on riser 1 down, goes up grip block 201 and passes through screw 3 with lower grip block 202 and connect, and the screw 3 position of going up the grip block 201 upper end is provided with a nut 4, the bottom surface of riser 1 is provided with gyro wheel 101.
A guide rail groove 102 is formed in the position, corresponding to the middle position of the upper clamping plate 201, of the vertical plate 1, and a structure matched with the guide rail groove 102 is formed in the surface, close to the vertical plate 1, of the upper clamping plate 201.
The rail groove 102 prevents the upper clamping plate 201 from being separated from the vertical plate 1 even when the upper clamping plate 201 moves up and down, and can restrict the horizontal displacement of the upper clamping plate 201 in terms of keeping the upper clamping plate 201 moving up and down.
Example 6
This embodiment is a further addition to embodiment 1, in which the riser 1 is provided with a handle 103 on the back side thereof to which the clamping plate is not attached.
When carrying the pipeline, can hold handle 103 by hand, promote the pipeline holder, and then drive the pipeline and remove, make building site constructor's use more convenient.
The above description is only for the preferred embodiment of the present invention, but the protection scope of the present invention is not limited thereto, and any person skilled in the art can be covered within the protection scope of the present invention without the changes or substitutions conceived by the inventive work within the technical scope disclosed by the present invention. Therefore, the protection scope of the present invention should be subject to the protection scope defined by the claims.
Claims (6)
1. The utility model provides a pipeline holder, includes riser (1), grip block (2), its characterized in that: the clamping plate (2) is divided into an upper clamping plate (201) and a lower clamping plate (202), the lower clamping plate (202) is fixed on the vertical plate (1), the upper clamping plate (201) is connected with the lower clamping plate (202) through a screw (3), a nut (4) is arranged at the position of the screw (3) at the upper end of the upper clamping plate (201), and the roller (101) is arranged on the bottom surface of the vertical plate (1).
2. A pipe clamp according to claim 1, wherein: the upper portion of the upper clamping plate (201) and the lower portion of the lower clamping plate (202) are provided with a supporting plate (5) in the vertical direction, and the supporting plate (5) connected with the lower portion of the lower clamping plate (202) is fixed on the vertical plate (1).
3. A pipe clamp according to claim 1, wherein: the lower end of the screw rod (3) is fixed on the top surface of the lower clamping plate (202) and penetrates through the upper clamping plate (201).
4. A pipe clamp according to claim 1, wherein: the clamping plate (2) is arranged to be an arc-shaped plate, and concave surfaces of the upper clamping plate (201) and the lower clamping plate (202) are upward.
5. A pipe clamp according to claim 1, wherein: go up riser (1) position that the intermediate position of grip block (201) corresponds and be provided with guide rail groove (102), the face that goes up grip block (201) and press close to riser (1) has the structure of cooperation guide rail groove (102).
6. A pipe clamp according to claim 1, wherein: and a handle (103) is arranged on the back surface of the vertical plate (1) without the clamping plate.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201921636318.3U CN211107472U (en) | 2019-09-29 | 2019-09-29 | Pipeline clamp holder |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201921636318.3U CN211107472U (en) | 2019-09-29 | 2019-09-29 | Pipeline clamp holder |
Publications (1)
Publication Number | Publication Date |
---|---|
CN211107472U true CN211107472U (en) | 2020-07-28 |
Family
ID=71718159
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201921636318.3U Active CN211107472U (en) | 2019-09-29 | 2019-09-29 | Pipeline clamp holder |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN211107472U (en) |
-
2019
- 2019-09-29 CN CN201921636318.3U patent/CN211107472U/en active Active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN205799023U (en) | A kind of bullhead mechanical gripping means | |
CN209307863U (en) | A kind of steel structure bridge installation segmentation line style adjustment and integral bridge descending device | |
CN211107472U (en) | Pipeline clamp holder | |
CN207259974U (en) | A kind of hand-held mode transfer instrument of Railway Bridges And Piers model sheetinstallat | |
CN206942160U (en) | Steel bar truss floor support plate lifting device | |
CN217921178U (en) | Tower crane counterfort connecting device for building | |
CN211076887U (en) | Pipeline clamping tool for urban construction | |
CN202657229U (en) | Rigid support device for shipbuilding | |
CN216140029U (en) | Safe carrying and using device for building paint bucket | |
CN110695139A (en) | Steel constructs web arc correcting unit | |
CN206351317U (en) | A kind of efficient energy-saving digital-control wearing plate built-up welder | |
CN211589099U (en) | Welding fixture for manufacturing high-end equipment | |
CN211976533U (en) | Anti-toppling device for high-pressure gas cylinder | |
CN211059474U (en) | Building engineering construction pipeline connecting device | |
CN209396010U (en) | The new type scaffold that full angle uses during a kind of shipbuilding | |
CN206839476U (en) | Leveling fixture on pipeline enternal pipe mouth butt-jointing | |
CN209739922U (en) | Portable steel pipe handling device | |
CN202467173U (en) | Steel support applied in steel-structure floor | |
CN205530703U (en) | It can dismantlement type anchor bolt to encorbelment shaped steel | |
CN202270875U (en) | Working table of numerically controlled fast forming machine of metal panels | |
CN104952773B (en) | A kind of semiconductor deposition equipment cavity docking calculation | |
CN209956029U (en) | Light asphalt barrel transfer tool | |
CN215556287U (en) | Transport cable pit bears down on one device | |
CN217412940U (en) | Climb a guide rail weldment work platform | |
CN205111299U (en) | Unsteady anchor clamps of processing round steel post |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |