CN211086626U - Earthquake data acquisition station and system with intelligent controllable switch - Google Patents

Earthquake data acquisition station and system with intelligent controllable switch Download PDF

Info

Publication number
CN211086626U
CN211086626U CN201922081254.1U CN201922081254U CN211086626U CN 211086626 U CN211086626 U CN 211086626U CN 201922081254 U CN201922081254 U CN 201922081254U CN 211086626 U CN211086626 U CN 211086626U
Authority
CN
China
Prior art keywords
unit
data acquisition
switch control
switch
signal
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201922081254.1U
Other languages
Chinese (zh)
Inventor
冯京川
吴淮均
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shenzhen Mianyuan Intelligent Technology Co ltd
Original Assignee
Shenzhen Mianyuan Intelligent Technology Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shenzhen Mianyuan Intelligent Technology Co ltd filed Critical Shenzhen Mianyuan Intelligent Technology Co ltd
Priority to CN201922081254.1U priority Critical patent/CN211086626U/en
Application granted granted Critical
Publication of CN211086626U publication Critical patent/CN211086626U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Geophysics And Detection Of Objects (AREA)

Abstract

The utility model relates to an intelligence controllable switch's seismic data acquisition station, and collection system. The acquisition station comprises a closed shell, a power supply unit arranged in the closed shell and an earthquake detection acquisition unit powered by the power supply unit; the earthquake data acquisition station is characterized by also comprising a switch control unit and a switch induction unit which are arranged in the closed shell; the switch induction unit is electrically connected with the switch control unit and used for sensing and generating a switch control signal and transmitting the switch control signal to the switch control unit; the switch control unit is electrically connected with the switch induction unit, the earthquake detection and acquisition unit and the power supply unit and is used for controlling the power supply unit to supply power or stop supplying power to the earthquake detection and acquisition unit according to the switch control signal. The utility model discloses avoided prior art to need to set up the defect that external switch brought, had advantages such as easy and simple to handle, reliability height.

Description

Earthquake data acquisition station and system with intelligent controllable switch
Technical Field
The utility model relates to a seismic detection technical field especially relates to an intelligence controllable switch's seismic data acquisition station, and collection system.
Background
Seismic data acquisition stations are used for outdoor seismic data acquisition, typically deployed on the ground in a geological exploration area to acquire seismic data. When the device works, the power is supplied by an internal battery power supply, and the internal battery power supply needs to be turned off when the device is in non-working states such as storage and transportation stages after production, manufacturing and inspection are finished. When data are collected in the earthquake field, the power supply of the earthquake data collecting station is required to be started or closed according to the working mode of data collection (sometimes the power supply is required to be started and shut down every day).
The earthquake data acquisition station is arranged on the ground during geological exploration (several days or even dozens of days), is exposed to the sun, rain, frost and snow, has a very bad working environment, and is required to bear rolling and falling of a certain height (usually one meter).
SUMMERY OF THE UTILITY MODEL
The to-be-solved technical problem of the utility model lies in that, a seismic data acquisition station of intelligence controllable switch is provided.
The to-be-solved technical problem of the present invention is to provide an intelligent controllable switch seismic data acquisition system.
The utility model provides a technical scheme that its technical problem adopted is: the earthquake data acquisition station comprises a closed shell, a power supply unit arranged in the closed shell and an earthquake detection acquisition unit powered by the power supply unit; the seismic data acquisition station also comprises a switch control unit and a switch induction unit which are arranged in the closed shell; wherein the content of the first and second substances,
the switch sensing unit is electrically connected with the switch control unit, senses and generates a switch control signal and transmits the switch control signal to the switch control unit;
the switch control unit is electrically connected with the switch induction unit, the earthquake detection acquisition unit and the power supply unit, and controls the power supply unit to supply power or stop supplying power to the earthquake detection acquisition unit according to the switch control signal.
Preferably, the switch sensing unit includes a magnetic induction sensing unit for sensing and generating the switch control signal when the external magnet approaches.
Preferably, the magnetic induction sensing unit includes a magnetic induction sensor for sensing that an external magnet is close to generate a trigger signal, and a signal conditioning circuit connected to the magnetic induction sensor for conditioning the trigger signal to generate the switch control signal.
Preferably, the magnetic induction sensor comprises one or more of a magnetic resistance element, a hall element and a reed switch.
Preferably, the switch sensing unit includes a magnetic resistance sensor for sensing the proximity of the permanent magnet and generating a trigger signal, and a signal conditioning circuit connected to the magnetic resistance sensor for conditioning the trigger signal to generate the switch control signal.
Preferably, the switch sensing unit includes a hall sensor IC circuit that senses the proximity of the permanent magnet and generates a trigger signal, and a signal conditioning circuit that is connected to the hall sensor IC circuit and conditions the trigger signal to generate the switch control signal.
Preferably, the hall sensor IC circuit comprises a hall sensor, a resistor R, a capacitor C1, and a capacitor C2; one end of the resistor R is connected with a power supply anode V +, the other end of the resistor R is connected with the output end of the Hall sensor IC circuit 412, the output end of the resistor R is connected with the capacitor C2 to a power supply cathode V-, one end of the capacitor C1 is connected with the power supply anode V +, the other end of the capacitor C1 is connected with the power supply cathode V-, and the output end of the Hall sensor IC circuit 412 outputs signals to the signal conditioning circuit.
Preferably, the switch control unit is an STM32F2xx series chip.
The utility model also provides a seismic data acquisition system, including any one of the seismic data acquisition station and the signal trigger piece separated from the seismic data acquisition station; and a switch sensing unit of the seismic data acquisition station senses the signal trigger and generates a switch control signal.
Preferably, the signal trigger member comprises a permanent magnet.
Compared with the prior art, the utility model have following advantage: the switch induction unit arranged in the closed shell senses and generates a switch control signal, and the switch control unit controls the power supply unit to supply power or stop supplying power for the earthquake detection and acquisition unit according to the switch control signal, so that the defect that an external switch needs to be arranged in the prior art is overcome, and the earthquake detection and acquisition device has the advantages of simplicity and convenience in operation, high reliability and the like.
Drawings
The invention will be further explained with reference to the drawings and examples, wherein:
FIG. 1 is a schematic diagram of one embodiment of a seismic data acquisition station of the present invention;
FIG. 2 is a schematic block diagram of one embodiment of a seismic data acquisition station of the present invention;
FIG. 3 is a schematic circuit diagram of a switch sensing unit of an embodiment of the seismic data acquisition station of the present invention;
FIG. 4 is a schematic circuit diagram of another mode of the switch sensing unit of an embodiment of the seismic data acquisition station of the invention;
fig. 5 is a schematic flow chart of the startup and shutdown control method of the seismic data acquisition station of the present invention.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
As shown in fig. 1 and 2, the seismic data acquisition station according to an embodiment of the present invention includes a sealed housing 100, and a power supply unit 200, an earthquake detection acquisition unit 300, a switch control unit 500, a switch sensing unit 400, and the like, which are disposed in the sealed housing 100. The switch control signal is generated by sensing the switch sensing unit 400 arranged in the closed shell 100, and the power supply unit 200 is controlled by the switch control unit 500 according to the switch control signal to supply power or stop supplying power to the earthquake detection and acquisition unit 300, so that the defects caused by the need of arranging an external switch in the prior art are overcome, and the earthquake detection and acquisition device has the advantages of simplicity and convenience in operation, high reliability and the like.
As shown, the hermetic case 100 includes an upper case 110, a lower case 120; the upper case 110 and the lower case 120 may be combined to form a closed whole, thereby achieving waterproof sealing of internal circuits, devices, etc. thereof. In this embodiment, the upper housing 110 and the lower housing 120 are detachable structures, and various existing waterproof sealing structures may be disposed between the two. It is understood that in other embodiments, the upper housing 110 and the lower housing 120 may be non-detachable, so as to form a complete sealing body.
Further, in order to facilitate the fixed installation of the seismic data acquisition station to a suitable acquisition site, a detachable fixed cone assembly 130 or the like may be further provided at the lower portion of the hermetic enclosure 100, and the entire seismic data acquisition station may be installed to a suitable site using the fixed cone assembly 130. It will be appreciated that the seismic data acquisition station may be installed in any of a variety of known installation manners without the use of the stationary cone assembly 130, provided that the seismic data acquisition station is fixedly installed.
A power supply unit 200, an earthquake detection and collection unit 300, a switch control unit 500, a switch sensing unit 400, and the like are mounted in the sealed case 100. In the present embodiment, the power supply unit 200 is installed in the lower housing 120, the earthquake detection acquisition unit 300, the switch control unit 500, the switch sensing unit 400 and the like are installed in the upper housing 110, and the power supply unit 200 supplies power to the earthquake detection acquisition unit 300, the switch control unit 500, the switch sensing unit 400 and the like through the terminal assembly, and the split arrangement facilitates operations such as charging, data reading and the like. It can be understood that the arrangement of the power unit 200, the seismic acquisition unit 300, the switch control unit 500, the switch sensing unit 400, and the like can also be adjusted according to actual needs.
The power supply unit 200 supplies power to the entire seismic data acquisition station, and includes a rechargeable battery pack 210, a power management circuit 220, and the like. In the present embodiment, the rechargeable battery pack 210 is disposed in the lower case 120, and the power management circuit 220 is disposed in the upper case 110, electrically connected by contact terminals. The power management circuit 220 may be disposed on the same circuit board as the earthquake detection and collection unit 300, the switch sensing unit 400, the switch control unit 500, and the like, and is fixedly installed in the upper housing 110, so as to transmit signals and data through a communication interface and the like.
It is understood that in other embodiments, the rechargeable battery pack 210 and the power management circuit 220 may be disposed in the lower case 120 or the upper case 110; the power management circuit 220, the earthquake detection acquisition unit 300, the switch sensing unit 400, the switch control unit 500, and the like may also be disposed on the same circuit board or multiple circuit boards.
The power management circuit 220 is electrically connected to the earthquake detection acquisition unit 300, the switch sensing unit 400, the switch control unit 500, and the like, and converts the power of the rechargeable battery pack 210 to supply power to the earthquake detection acquisition unit 300, the switch sensing unit 400, and the switch control unit 500. It is understood that the power management circuit 220 may include an operational power supply module and a standby operational module. The working power supply module is connected with the earthquake detection and acquisition unit 300 so as to connect the rechargeable battery pack 210 to supply power to the earthquake detection and acquisition unit 300 under a normal working state; the standby working module is connected with the switch sensing unit and the switch control unit 500, so that in a standby state, the rechargeable battery pack 210 is switched on to supply power to the switch sensing unit and the switch control unit 500, the power consumption of the whole collection station is reduced, and the service life is prolonged; and after receiving the switch control signal, the working power supply module is triggered to enter a normal working state to supply power to the earthquake detection acquisition unit 300. Of course, the rechargeable battery pack 210 may also employ one or more sets of rechargeable and/or non-rechargeable batteries to provide power under different conditions.
Further, the seismic data acquisition station may also be provided with an indicator unit within the enclosed housing 100. in some embodiments, the indicator unit may include L ED lights and drive circuitry the operational status of the seismic data acquisition station is indicated by L ED lights.
In this embodiment, the earthquake detection and collection unit 300 includes a geophone, a data collection unit, a control unit, a storage unit, a communication interface unit, and the like, and may be disposed on the same or different circuit boards and installed in the sealed housing 100 to implement the earthquake detection and collection operation. The geophone is arranged at the bottom inside the shell of the seismic data acquisition station, senses and detects seismic waves, converts the seismic waves into corresponding electric signals and outputs the electric signals to the data acquisition unit. It is to be understood that the seismic acquisition unit 300 may employ various existing acquisition schemes without limitation.
The switch sensing unit 400 and the switch control unit 500 are also disposed in the sealed housing 100, and are used for controlling the power supply unit 200 to supply power to the earthquake detection and acquisition unit 300 or stop supplying power. The switch sensing unit 400 is electrically connected to the switch control unit 500, and is configured to sense and generate a switch control signal to be transmitted to the switch control unit 500. The switch control unit 500 is electrically connected to the switch sensing unit 400, the earthquake detection and acquisition unit 300 and the power supply unit 200, and is used for controlling the power supply unit 200 to supply power to the earthquake detection and acquisition unit 300 or stop supplying power according to the switch control signal.
In this embodiment, the switch sensing unit 400 includes a magnetic induction sensing unit for sensing and generating the switch control signal when the external magnet approaches. The magnetic induction sensing unit comprises a magnetic induction sensor 410 and a signal conditioning circuit 420 connected to the magnetic induction sensor 410.
The magnetic induction sensor 410 is used for generating a trigger signal when the sensed external magnet approaches, and sending the trigger signal to the signal conditioning circuit 420. The magnetic induction sensor 410 includes one or more of a magnetic resistance element, a hall element, and a reed switch. The magnetic induction sensor 410 senses a magnetic strength signal of an external magnet, and generates a trigger signal when the magnetic strength signal is greater than a preset value, so that the technical solutions of shell sealing, water and moisture prevention, electric leakage prevention and short circuit prevention brought to the seismic data acquisition station by a conventional contact switch are simplified, and compared with a wireless remote control scheme, the magnetic induction sensor has the advantages of simple circuit, low cost, simplicity and convenience in operation and good anti-interference performance.
The signal conditioning circuit 420 is connected to the switch control unit 500, and is configured to condition the trigger signal to generate a switch control signal and send the switch control signal to the switch control unit 500. In this embodiment, when the external magnet approaches the magnetic induction sensor 410 multiple times, a plurality of trigger signals are generated, and the signal conditioning circuit 420 conditions the magnetically induced trigger signals to generate a plurality of trigger pulse signals as the switch control signals, and sends the trigger pulse signals to the switch control unit 500. And the switch control unit 500 judges whether the power supply unit 200 meets a preset switching rule or not, so as to control the power supply unit 200 to supply power to the earthquake detection and acquisition unit 300 or stop supplying power.
The switch control unit 500 is electrically connected to the switch sensing unit 400, the earthquake detection and acquisition unit 300 and the power supply unit 200, and is used for controlling the power supply unit 200 to supply power to the earthquake detection and acquisition unit 300 or stop supplying power according to the switch control signal. In this embodiment, the switch control unit 500 may adopt an embedded processor, such as an embedded chip STM32F2xx, an STM32F3xx, an STM32F4xx chip series, or other embedded chips with similar functions. In the seismic exploration field, when strong magnetic field interference occurs, the switch sensing unit 400 outputs sensing signals, and because the strength and the duration of the magnetic interference signals are irregular, the interference signals are filtered out through digital filtering processing of the switch control unit 500, the anti-interference capability is improved, and reliable connection and disconnection of a seismic data acquisition station power supply are ensured.
The switch control unit 500 includes a signal level determination and duration timing module, an effective signal counting module, a state storage module, and a switch control execution module. The signal level determination and duration timing module is connected to the switch sensing unit 400, and is configured to determine whether the switch control signal is an active switch control signal. In this embodiment, the switch control signal is a magnetic induction pulse signal. Whether the duration time of the high potential or the low potential of the magnetic induction pulse signal reaches the set time is judged. When the output pulse of the switch sensing unit 400 is a high potential, judging that the duration time of the high potential reaches the set time and judging that the high potential is an effective switch control signal; when the duration time of the high potential is too short, the high potential is judged as interference clutter, and is an invalid switch control signal, and filtering is carried out; when the pulse output by the switch sensing unit 400 is at a low potential, the switch sensing unit judges that the low potential duration reaches a set time and then judges that the switch sensing unit is a valid switch control signal; when the duration of the low potential is too short, the noise wave is judged to be interference noise wave, and the noise wave is an invalid switch control signal to carry out filtering processing.
The effective signal counting module is connected with the signal level judging and duration timing module and is used for calculating the pulse quantity of the magnetic induction pulse signals within a set time interval and counting the times. It is understood that the set time may be 1 second or other set time interval set according to actual needs.
The switch control execution module is connected with the effective signal counting module and the state storage module, and is used for changing the working state of the whole acquisition station stored by the state storage module according to the pulse times and correspondingly generating a control signal to control the power supply unit 200 to supply power or cut off power for the earthquake detection acquisition unit 300. When the counted times are equal to the first set times, the working state of the earthquake acquisition station is changed into a starting state, the current state is stored, and the power supply unit 200 is controlled to supply power to the earthquake detection acquisition unit 300; and when the number of times is equal to a second set number of times, changing the working state of the earthquake acquisition station to a shutdown state and storing the current state, and controlling the power supply unit 200 to power off the earthquake detection acquisition unit 300.
In this embodiment, the pulse level obtained after the magnetic induction pulse signal determined as the effective signal by the signal level determination and duration timing module is digitally filtered is changed from a low level to a high level, and then from the high level to the low level, and is determined as a pulse signal, and the embedded processor counts the number of the magnetic induction pulse signals detected and received within a preset detection time interval.
When the seismic data acquisition station is in a shutdown sleep mode, if the pulse number detected by the embedded processor accords with a preset magnetic induction pulse numerical value, the embedded processor confirms that the signal is a startup signal, sends a startup control command, and switches on a power supply unit 200 of the seismic data acquisition station, the seismic data acquisition station enters a working mode from the sleep mode, sets a working state mark and stores the working state mark, and drives L ED lamps through an indicating unit 140 to prompt the power supply to be switched on in a flickering mode, if the number of the magnetic induction trigger pulse signals received in a preset detection time interval does not accord with the preset magnetic induction trigger signal number, the seismic data acquisition station judges that the seismic data acquisition station is external interference, does not respond to the trigger signal, and avoids false startup operation.
When the seismic data acquisition station is in a starting-up working mode, if the pulse number detected by the embedded processor accords with a preset magnetic induction pulse numerical value and accords with a preset numerical value, the embedded processor sends a shutdown control command to enable the seismic data acquisition station to enter a sleep mode from the working mode, a sleep state mark is set and stored, the L ED lamp is driven by the indicating unit 140 to prompt the power supply to be turned off in a flashing mode, the number of magnetic induction trigger pulse signals received in a preset detection time interval does not accord with the preset magnetic induction trigger signal number, the electromagnetic external interference is judged, the magnetic induction trigger signals are not responded, and misoperation is avoided.
No matter the mode is a starting mode or a shutdown mode, the frequency range of the input pulse signals in the preset induction trigger signal detection time interval is an integer of 1-n, and the preset detection time interval value can be 1 second or other time interval values.
The preset detection time interval values of the startup mode and the shutdown mode and the input pulse number in the preset detection time interval can be independently set without mutual influence, and different startup and shutdown combination modes can be conveniently preset through different detection time interval values and different input pulse number combinations.
In another embodiment of the seismic data acquisition station, the seismic data acquisition station comprises a power supply unit 200, a seismic detection acquisition unit 300, a switch control unit 500, a switch sensing unit 400 and the like. The power supply unit 200, the seismic acquisition unit 300, and the like refer to the previous embodiment.
In this embodiment, the switch sensing unit 400 may adopt the embodiment shown in fig. 3 or fig. 4, as shown in fig. 3, the switch sensing unit 400 includes a magnetoresistive sensor 411 (e.g., SM3xx L T series) and a signal conditioning circuit 421 (e.g., SN74AUP1G 04), and as shown in fig. 4, another embodiment of the switch sensing unit 400 includes a hall sensor IC circuit 412 (e.g., M L X90248) and a signal conditioning circuit 422 (e.g., SN74AUP1G 04), where one end of a resistor R of the hall sensor IC circuit 412 is connected to a positive power supply V +, the other end of the resistor R is connected to an output end of the hall sensor IC circuit 412, and the output end is connected to a negative power supply V-of a capacitor C2, one end of a capacitor C2 is connected to a positive power supply V +, the other end of the capacitor C1 is connected to a negative power supply V-, and the output end of the hall sensor IC.
The switch control unit 500 of the present embodiment uses an STM32F2xx series chip, and may also use an STM32F3xx, an STM32F4xx series chip, or other embedded chips with similar functions.
The switch sensing unit 400, the switch control unit 500, the earthquake detection acquisition unit 300, the power supply unit 200, the indicating unit and the like are all installed on the same PCB. The rechargeable battery pack 210 of the power supply unit 200 supplies power to the switching induction unit 400, the switching control unit 500, the earthquake detection acquisition unit 300 and the like through the power management circuit 220, the earthquake detection acquisition unit 300, the indication unit and the like operate under the control of the switching control unit 500, and the switching control unit 500 can also control the power management circuit 220 to charge the rechargeable battery pack 210.
In this embodiment, the working process is as follows:
after the battery is installed on the seismic data acquisition station, the switch control unit 500 performs initialization setting on each unit inside the seismic data acquisition station, after the setting operation is completed, a sleep mode flag is set and stored, and the seismic data acquisition station enters a sleep mode under the control of the switch control unit 500.
When the seismic data acquisition station is in a sleep mode, once a permanent magnet approaches the magnetoresistive sensor 411, the output of the magnetoresistive sensor 411 becomes low, the permanent magnet leaves the magnetoresistive sensor 411, the output of the magnetoresistive sensor 411 becomes high, and a trigger signal is generated, a sensing trigger signal of the magnetoresistive sensor 411 is processed by the signal conditioning circuit 421, and then a magnetic induction pulse signal (i.e., a switch control signal) is output, when the external permanent magnet continuously and repeatedly approaches to and leaves the magnetoresistive switch element, finally, the magnetic induction unit is caused to output a series of changed magnetic induction pulse signals, and the magnetic induction pulse signals are output to an input signal detection end of the embedded chip STM32F2xx, the embedded chip STM32F2xx performs detection according to the program flow of fig. 5, the embedded chip STM32F2xx detects the magnetic induction pulse signals output by the magnetic induction sensor unit through the trigger signal detection end, and when the number of the magnetic induction pulse signals is a preset number (for 2 times (for example) within a preset detection time interval of 2 seconds, the embedded chip STM32F2xx confirms that the input pulse signals are preset startup signals are preset, drives a slow flashing lamp of an indicating unit, an operating personnel switches on a working station, and controls the seismic data acquisition station to acquire seismic data, and enter a working mode of an embedded chip, and control work station, and the seismic data acquisition mode of the seismic data acquisition station, and the seismic data.
The detection time interval preset by the embedded chip STM32F2xx is in seconds, or may be preset by the embedded chip STM32F2xx to a value other than 2 seconds, or the number of the magnetic induction pulse signals in the preset detection time interval may be preset by the embedded chip STM32F2xx to an integer value other than 2.
When the seismic data acquisition station is in a working mode, once a permanent magnet is arranged outside and is close to the magnetoresistive sensor 411, a trigger signal is output from the magnetoresistive sensor 411, the trigger signal of the magnetoresistive sensor 411 is processed by the signal conditioning circuit 420, a magnetic induction signal is output, when the external permanent magnet continuously and repeatedly approaches to and leaves the magnetoresistive sensor 411, finally, the magnetic induction sensing unit outputs a series of magnetic induction pulse signals (namely, a switch control signal) with level changes, the magnetic induction pulse signals are output to an input signal detection end of the embedded chip STM32F2xx, the embedded chip STM32F2xx detects the magnetic induction pulse signals output by the magnetic induction sensing unit through the trigger signal detection end according to the program flow of fig. 5, the magnetic induction pulse signals are detected by the trigger signal detection end, and in a preset detection time interval of 2 seconds, when the number of the magnetic induction pulse signals is preset times (for example, 3 times), the embedded chip STM32F2xx confirms that the signals are shutdown signals, a power supply of units of the indicating unit is driven to flash quickly for 5 seconds, an earthquake L ED lamp, an operator is prompted to shut down, power supply of the units of the seismic data acquisition station, a sleep.
The detection time interval preset by the embedded chip STM32F2xx is in seconds, or may be other time interval values than 2 seconds preset by the embedded chip STM32F2xx, or the number of times of change of the preset magnetic induction trigger signal may be other integer values than 3 preset by the embedded chip STM32F2 xx.
When the seismic exploration field encounters strong magnetic field interference, the magnetic resistance sensor 411 outputs induction signals, and the strength and the duration of the magnetic interference signals are irregular, so that the interference signals are filtered out through digital filtering processing of an embedded chip STM32F2xx, the anti-interference capability is improved, and the reliable connection and disconnection of a seismic data acquisition station power supply are ensured.
In the working principle block diagram of the seismic data acquisition station shown in fig. 2, when the circuit principle block diagram of the hall element magnetic induction unit shown in fig. 4 is adopted as the magnetic induction unit, the working process is similar to the working process when the circuit principle block diagram of the magnetic induction unit shown in fig. 3 is adopted as the magnetic induction unit.
When the seismic data acquisition station is in a sleep mode (or a working mode), once an external permanent magnet approaches to the hall sensor M L X90248, the output of the hall sensor becomes low, the permanent magnet leaves from the hall sensor M L X90248, the output of the hall sensor M L X90248 becomes high, a trigger signal of the hall sensor M L X90248 is processed by the signal conditioning circuit 422, a magnetic induction pulse signal (i.e., a switch control signal) is output, when the external permanent magnet continuously and repeatedly approaches to and leaves from the hall sensor M L X90248, finally, the magnetic induction unit is caused to output a series of changed magnetic induction pulse signals to an input signal detection end of the embedded chip M32F2xx, the embedded chip STM32F2xx detects according to the flow of fig. 5, the embedded chip STM32F2xx detects the magnetic induction pulse signals output by the magnetic induction unit through the trigger signal detection end, when the number of the magnetic induction pulse signals is a preset number (for example, within a preset detection time interval of 2 seconds, the number of magnetic induction pulse signals is a preset number (for example, when the embedded chip STM32F 2F xx confirms that the input pulse signals is a preset sleep mode (a sleep mode or a power supply) for switching on or a slow start-off indication unit, an embedded power supply for controlling seismic data acquisition station (an embedded data acquisition station) is set), and an embedded data acquisition control unit) for switching on or a slow acquisition control unit, an embedded data acquisition control unit (for switching mode) for switching mode or an embedded data acquisition station, an embedded.
Similarly, when strong electromagnetic field interference occurs in a seismic exploration site, the Hall sensor M L X90248 outputs induction signals, and because the strength and the duration of the electromagnetic interference signals are irregular, the interference signals are filtered through digital filtering processing of an embedded chip STM32F2xx, the anti-interference capability is improved, and the power supply of a seismic data acquisition station is ensured to be switched on and off correctly and reliably.
In one embodiment of the seismic data acquisition system, the seismic data acquisition system comprises the seismic data acquisition station of any of the embodiments described above, and a seismic data acquisition station-separate signal trigger. It will be appreciated that there may be a plurality of seismic data acquisition stations, and that any of the embodiments of seismic data acquisition stations described above may be used, depending on the particular seismic monitoring environment.
The signal trigger can be carried by any user, and when the signal trigger is close to the switch induction unit 400 of the seismic data acquisition station, the switch induction unit 400 senses and generates a switch control signal. In this embodiment, the signal trigger comprises a permanent magnet, and the switch sensing unit 400 comprises a magnetic induction sensor 410. When the permanent magnet approaches the magnetic induction sensor 410, an induction signal is generated by induction, and the magnetic induction signal is processed by the signal conditioning circuit 420 to generate a trigger pulse signal, and is output to the detection input end of the embedded processor.
Fig. 5 is a schematic flow chart of an embodiment of a method for controlling the startup and shutdown of a seismic data acquisition station. The seismic data acquisition station may adopt the acquisition station of any of the above embodiments. The startup and shutdown method comprises the following steps:
and recording the working state of the seismic data acquisition station. After the seismic data acquisition station is powered on, the switch control unit 500 controls the whole seismic data acquisition station to enter a sleep mode, and records that the working state of the seismic data acquisition station is a shutdown state. When the external permanent magnet is close to the magnetic induction sensor 410, the magnetic induction unit generates a trigger signal to wake up the switch control unit 500, the switch control unit 500 is switched on the power supply unit 200 in the seismic data acquisition station according to a preset startup mode, and the seismic data acquisition station enters a working mode and records that the working state is a startup state; if the mobile phone is in the power-on state, the mobile phone is powered off according to a preset mode, enters a sleep mode, and records that the working state of the mobile phone is the power-off state.
A switch control signal is sensed and generated. In this embodiment, a magnetic induction sensor 410 built in the seismic data acquisition station senses a magnetic strength signal of an external magnet, and generates a trigger signal when the magnetic strength signal is greater than a preset value. The switch control signal is generated according to the trigger signal, specifically, a plurality of trigger signals are generated when the external magnet approaches the magnetic induction sensor 410 for a plurality of times, and the signal conditioning circuit 420 conditions the magnetic induction trigger signal to generate a plurality of trigger pulse signals as the switch control signal, and sends the switch control signal to the switch control unit 500 (step S501).
And changing and storing the working state of the earthquake acquisition station according to the switch control signal so as to control the power supply unit 200 to supply power to the earthquake detection acquisition unit 300 or stop supplying power. In this embodiment, the switch control signal is a magnetic induction pulse signal. Whether the clutter signal is generated is judged by judging whether the duration time of the high potential or the low potential of the magnetic induction pulse signal reaches the set time.
Then, it is judged whether or not the switch control signal is an active signal (step S502): when the output pulse of the switch sensing unit 400 is a high potential, judging that the duration time of the high potential reaches the set time and judging that the high potential is an effective switch control signal; when the duration time of the high potential is too short, the high potential is judged as interference clutter, and is an invalid switch control signal, and filtering is carried out; when the pulse output by the switch sensing unit 400 is at a low potential, the switch sensing unit judges that the low potential duration reaches a set time and then judges that the switch sensing unit is a valid switch control signal; when the duration of the low potential is too short, the noise wave is judged to be interference noise wave, and the noise wave is an invalid switch control signal to carry out filtering processing.
Then, whether the number of pulse signals of the switch control signal reaches the set number of times is judged (step S503);
in this embodiment, the pulse level obtained after the magnetic induction pulse signal determined as the effective signal by the signal level determination and duration timing module is digitally filtered is changed from a low level to a high level, and then from the high level to the low level, and is determined as a pulse signal, and the embedded processor counts the number of the magnetic induction pulse signals detected and received within a preset detection time interval.
When the counted times are equal to the first set times, the working state of the earthquake acquisition station is changed into a starting state and stored, and the power supply unit 200 is controlled to supply power to the earthquake detection acquisition unit 300; and when the times are equal to a second set time, changing the working state of the earthquake acquisition station into a shutdown state and storing the shutdown state, and controlling the power supply unit 200 to power off the earthquake detection acquisition unit 300.
The method comprises the steps of detecting a working state mark of the seismic data acquisition station (step S504), when the seismic data acquisition station is in a shutdown sleep mode (step S505), if the pulse number detected by an embedded processor accords with a preset magnetic induction pulse numerical value, the embedded processor confirms that a startup signal is generated, sending a startup control command, switching on a power supply unit 200 of the seismic data acquisition station, enabling the seismic data acquisition station to enter a working mode from the sleep mode, setting and storing the working state mark (step S506), driving L ED lamps through an indicating unit to prompt power supply to be switched on in a flashing mode, entering a working state, enabling the seismic data acquisition station to carry out data acquisition, storage, transmission and other works (step S507), and if the number of magnetic induction trigger pulse signals does not accord with the preset number of magnetic induction trigger signals within a preset detection time interval, judging the seismic data acquisition station to be external interference, not responding to the trigger signals, and avoiding false startup operation.
When the seismic data acquisition station is in a startup working mode (step S508), if the pulse number detected by the embedded processor accords with a preset magnetic induction pulse numerical value and accords with a preset numerical value, the embedded processor sends a shutdown control command to enable the seismic data acquisition station to enter a sleep mode from the working mode, a sleep state mark is set and stored (step S509), and an L ED lamp is driven by an indicating unit to prompt the power supply to be turned off in a flashing mode, so that the seismic data acquisition station enters a dormant state (step S510);
and if the number of the magnetic induction trigger pulse signals received in the preset detection time interval does not accord with the preset number of the magnetic induction trigger signals, judging the signals to be electromagnetic external interference, and not responding to the magnetic induction trigger signals to avoid misoperation.
No matter the mode is a starting mode or a shutdown mode, the frequency range of the input pulse signals in the preset induction trigger signal detection time interval is an integer of 1-n, and the preset detection time interval value can be 1 second or other time interval values.
The preset detection time interval values of the startup mode and the shutdown mode and the input pulse number in the preset detection time interval can be independently set without mutual influence, and different startup and shutdown combination modes can be conveniently preset through different detection time interval values and different input pulse number combinations.
While the invention has been described with reference to a preferred embodiment, it will be understood by those skilled in the art that various changes in form and details may be made therein without departing from the spirit and scope of the invention.

Claims (10)

1. An earthquake data acquisition station with an intelligent controllable switch comprises a closed shell, a power supply unit arranged in the closed shell and an earthquake detection acquisition unit powered by the power supply unit; the earthquake data acquisition station is characterized by further comprising a switch control unit and a switch induction unit, wherein the switch control unit and the switch induction unit are arranged in the closed shell; wherein the content of the first and second substances,
the switch sensing unit is electrically connected with the switch control unit, senses and generates a switch control signal and transmits the switch control signal to the switch control unit;
the switch control unit is electrically connected with the switch induction unit, the earthquake detection acquisition unit and the power supply unit, and controls the power supply unit to supply power or stop supplying power to the earthquake detection acquisition unit according to the switch control signal.
2. The seismic data acquisition station of claim 1, wherein the switch sensing unit comprises a magnetic induction sensing unit that senses when an external magnet is in proximity to generate the switch control signal.
3. The seismic data acquisition station of claim 2, wherein the magnetic induction sensing unit comprises a magnetic induction sensor that senses the proximity of an external magnet to generate a trigger signal, and signal conditioning circuitry coupled to the magnetic induction sensor that conditions the trigger signal to generate the switch control signal.
4. The seismic data acquisition station of claim 3, wherein the magnetic induction sensors comprise one or more of magnetoresistive elements, Hall elements, reed switches.
5. The seismic data acquisition station of claim 3, wherein the switching sense unit comprises a magnetoresistive sensor that senses proximity of a permanent magnet and generates a trigger signal, and a signal conditioning circuit coupled to the magnetoresistive sensor that conditions the trigger signal to generate the switching control signal.
6. The seismic data acquisition station of claim 3, wherein the switch sensing unit comprises a Hall sensor IC circuit that senses the proximity of a permanent magnet and generates a trigger signal, and a signal conditioning circuit connected to the Hall sensor IC circuit that conditions the trigger signal to generate the switch control signal.
7. The seismic data acquisition station of claim 6, wherein the hall sensor IC circuit comprises a hall sensor, a resistor R, a capacitor C1, a capacitor C2; one end of the resistor R is connected with a power supply anode V +, the other end of the resistor R is connected with the output end of the Hall sensor IC circuit (412), the output end of the resistor R is connected with the capacitor C2 to a power supply cathode V-, one end of the capacitor C1 is connected with the power supply anode V +, the other end of the capacitor C1 is connected with the power supply cathode V-, and the output end of the Hall sensor IC circuit (412) outputs signals to the signal conditioning circuit.
8. A seismic data acquisition station according to any of claims 1 to 7, wherein the switch control unit is an STM32F2xx series chip.
9. A seismic data acquisition system comprising a seismic data acquisition station as claimed in any of claims 1 to 8, and a signal trigger separate from the seismic data acquisition station; and a switch sensing unit of the seismic data acquisition station senses the signal trigger and generates a switch control signal.
10. The seismic data acquisition system of claim 9, wherein the signal trigger comprises a permanent magnet.
CN201922081254.1U 2019-11-27 2019-11-27 Earthquake data acquisition station and system with intelligent controllable switch Active CN211086626U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201922081254.1U CN211086626U (en) 2019-11-27 2019-11-27 Earthquake data acquisition station and system with intelligent controllable switch

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201922081254.1U CN211086626U (en) 2019-11-27 2019-11-27 Earthquake data acquisition station and system with intelligent controllable switch

Publications (1)

Publication Number Publication Date
CN211086626U true CN211086626U (en) 2020-07-24

Family

ID=71626163

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201922081254.1U Active CN211086626U (en) 2019-11-27 2019-11-27 Earthquake data acquisition station and system with intelligent controllable switch

Country Status (1)

Country Link
CN (1) CN211086626U (en)

Similar Documents

Publication Publication Date Title
CN104599445A (en) Multifunctional broadcast early warning rainfall monitoring system and monitoring method
CN209878053U (en) NB-IoT remote transmission non-magnetic water meter
CN105931454A (en) Low-power-consumption wireless communication detection device and detection method
CN211086626U (en) Earthquake data acquisition station and system with intelligent controllable switch
CN105513263A (en) Remote-controlled intelligent remote control
CN218976783U (en) Geological disaster data acquisition and communication device
CN110907985A (en) Earthquake data acquisition station and system of intelligent controllable switch and startup and shutdown control method
CN107038873A (en) A kind of earth magnetism vehicle checker
CN206876844U (en) Power communication battery wireless monitor integrated device
CN210625712U (en) Low-power-consumption wireless vibrating wire acquisition instrument supporting Beidou positioning
CN105160847A (en) Touch filtering type power-saving remote controller
CN204297029U (en) Water area monitoring device
CN210629869U (en) Wireless low-power consumption sensing network system for geological disaster early warning
CN210324599U (en) Parking space detection system
CN212322405U (en) Waterproof water leakage detector
CN218350735U (en) Self-powered wireless temperature and vibration composite sensor
CN210835699U (en) NB-based micro-power consumption water affair data acquisition terminal
CN206962542U (en) A kind of chargeable gas meter, flow meter and its charging system
CN214408066U (en) Monitoring device
CN220171638U (en) Vehicle detection system and vehicle detection apparatus
CN209433268U (en) Environmental monitor for smart phone pavilion
CN214227940U (en) Spare power on-off control device for 5G communication base station
CN220063106U (en) Water logging water level acquisition terminal
CN204375116U (en) Multifunctional broadcast early warning rainfall monitoring system
US11444484B2 (en) Sensor, corresponding system and operating method

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant