CN211081879U - 机械法掘进隧道预制衬砌环缝错缝拼装结构 - Google Patents
机械法掘进隧道预制衬砌环缝错缝拼装结构 Download PDFInfo
- Publication number
- CN211081879U CN211081879U CN201921237448.XU CN201921237448U CN211081879U CN 211081879 U CN211081879 U CN 211081879U CN 201921237448 U CN201921237448 U CN 201921237448U CN 211081879 U CN211081879 U CN 211081879U
- Authority
- CN
- China
- Prior art keywords
- prefabricated
- tunnel
- seams
- circumferential
- adjacent
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Landscapes
- Lining And Supports For Tunnels (AREA)
Abstract
机械法掘进隧道预制衬砌环缝错缝拼装结构,以进一步加强隧道预制衬砌结构的整体性和均一性,提高横向和纵向刚度,且提高隧道衬砌的拼装速度。由预制衬砌环向拼装成单元环,各相邻单元环纵向拼装形成隧道衬砌结构,相邻单元环纵向拼接的端面之间形成环向接缝,各单元环上环向相邻两预制衬砌的环向拼接的端面之间形成纵向接缝。所述单元环中各预制衬砌的环向接缝位置纵向相错且相平行,在隧道衬砌结构的展开平面上各环向接缝与相邻两预制衬砌纵向接缝形成台阶状拼接缝。
Description
技术领域
本实用新型涉及盾构隧道,特别涉及一种机械法掘进隧道预制衬砌环缝错缝拼装结构。
背景技术
随着国家交通事业的快速发展,以盾构隧道为代表的机械法掘进隧道以其非开挖、施工速度快、劳动强度低等特点,在地铁、铁路、公路等行业得到了快速的发展。
通常,机械法掘进隧道由预制衬砌拼装而成。根据拼装后环与环之间纵缝的相对位置关系,可将预制衬砌拼装分为通缝拼装和错缝拼装两大类。通缝拼装,即各预制衬砌具有唯一拼装点位,预制衬砌纵缝沿隧道轴线拉通对齐,拼装简单,但隧道结构受力不好,拼装误差累积迅速。错缝拼装,通过调整环与环之间管片的拼装角度,实现纵缝相互错开,可有效加强隧道结构的整体性和均一性,并有效减少累积拼装误差。
现有错缝拼装虽在通缝拼装基础上上提高了隧道结构的整体性,但其只是实现了纵缝间的相互错开,其环缝实际仍为通缝设计,环与环之间通缝的存在使得隧道在纵向上仍是一种柔性结构,纵向刚度小,在不同地层条件下不均匀沉降较大。
此外,对于使用较多的盾构或单护盾TBM隧道,其在拼装预制衬砌时无法掘进隧道,大大降低了隧道的建设速度。
实用新型内容
本实用新型所要解决的技术问题是提供一种机械法掘进隧道预制衬砌环缝错缝拼装结构,以进一步加强隧道预制衬砌结构的整体性和均一性,提高横向和纵向刚度,且提高隧道衬砌的拼装速度。
本实用新型解决其技术问题所采用的技术方案如下:
本实用新型的机械法掘进隧道预制衬砌环缝错缝拼装结构,由预制衬砌环向拼装成单元环,各相邻单元环纵向拼装形成隧道衬砌结构,相邻单元环纵向拼接的端面之间形成环向接缝,各单元环上环向相邻两预制衬砌的环向拼接的端面之间形成纵向接缝,其特征是:所述单元环的各预制衬砌的环向接缝位置纵向相错且相平行,在隧道衬砌结构的展开平面上各环向接缝与相邻两预制衬砌纵向接缝形成台阶状拼接缝。
本实用新型的有益效果是,环向接缝位置纵向相错且相平行,可进一步加强隧道预制衬砌结构的整体性和均一性,提高横向和纵向刚度;可提高隧道衬砌的拼装速度,加速隧道衬砌成型,有效解决解决了当前盾构或单护盾TBM隧道无法同时进行管片拼装与隧道掘进的难题。
附图说明
本说明书包括如下两幅附图:
图1是隧道衬砌结构的断面图;
图2是本实用新型机械法掘进隧道预制衬砌环缝错缝拼装结构的展开平面图;
图中示出构件和对应的标记:预制衬砌10、纵向接缝21、环向接缝 22。
具体实施方式
下面结合附图和实施例对本实用新型进一步说明。
参照图1和图2,本实用新型的机械法掘进隧道预制衬砌环缝错缝拼装结构,由预制衬砌10环向拼装成单元环,各相邻单元环纵向拼装形成隧道衬砌结构,相邻单元环纵向拼接的端面之间形成环向接缝22,各单元环上环向相邻两预制衬砌10环向拼接的端面之间形成纵向接缝21。所述单元环的各预制衬砌10的环向接缝22位置纵向相错且相平行,在隧道衬砌结构的展开平面上各环向接缝22与相邻两预制衬砌10纵向接缝21 形成台阶状拼接缝。环向接缝22位置纵向相错且相平行,可进一步加强盾构隧道衬砌结构的整体性和均一性,提高横向和纵向刚度。
参照图2,预制衬砌10拼装时环向相互错开,使得成型隧道的环向接缝22交错布置,预制衬砌10拼装时可只回缩部分千斤顶,剩余千斤顶仍顶靠在已拼装预制衬砌10上提供反力,推动千斤顶向前掘进,可提高隧道衬砌的拼装速度,加速隧道衬砌成型,有效解决解决了当前盾构或单护盾TBM隧道无法同时进行拼装与隧道掘进的难题。
以上所述只是用图解说明本实用新型机械法掘进隧道预制衬砌环缝错缝拼装结构的一些原理,并非是要将本实用新型局限在所示和所述的具体结构和适用范围内,故凡是所有可能被利用的相应修改以及等同物,均属于本实用新型所申请的专利范围。
Claims (1)
1.机械法掘进隧道预制衬砌环缝错缝拼装结构,由预制衬砌(10)环向拼装成单元环,各相邻单元环纵向拼装形成隧道衬砌结构,相邻单元环纵向拼接的端面之间形成环向接缝(22),各单元环上环向相邻两预制衬砌(10)的环向拼接的端面之间形成纵向接缝(21),其特征是:所述单元环的各预制衬砌(10)的环向接缝(22)位置纵向相错且相平行,在隧道衬砌结构的展开平面上各环向接缝(22)与相邻两预制衬砌(10)纵向接缝(21)形成台阶状拼接缝。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201921237448.XU CN211081879U (zh) | 2019-08-01 | 2019-08-01 | 机械法掘进隧道预制衬砌环缝错缝拼装结构 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201921237448.XU CN211081879U (zh) | 2019-08-01 | 2019-08-01 | 机械法掘进隧道预制衬砌环缝错缝拼装结构 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN211081879U true CN211081879U (zh) | 2020-07-24 |
Family
ID=71640550
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201921237448.XU Active CN211081879U (zh) | 2019-08-01 | 2019-08-01 | 机械法掘进隧道预制衬砌环缝错缝拼装结构 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN211081879U (zh) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113389571A (zh) * | 2021-08-02 | 2021-09-14 | 上海市城市建设设计研究总院(集团)有限公司 | 设置倾斜环缝提高盾构管片结构缝处抗震性能的施工方法 |
-
2019
- 2019-08-01 CN CN201921237448.XU patent/CN211081879U/zh active Active
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113389571A (zh) * | 2021-08-02 | 2021-09-14 | 上海市城市建设设计研究总院(集团)有限公司 | 设置倾斜环缝提高盾构管片结构缝处抗震性能的施工方法 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN107218060B (zh) | 一种隧道预制衬砌接缝及其施工方法 | |
CN105781577A (zh) | 用于盾构隧道施工的十二边形管片及管片衬砌结构 | |
CN209011836U (zh) | 一种隧道掘进机及其超前探测与锚杆支护复合转换机构 | |
US3645102A (en) | Telescoping lining and support structure and method for lining tunnels and shafts | |
CN108729922B (zh) | 一种顶管机及可退回式顶管施工方法 | |
CN105822323A (zh) | 八边形和四边形管片环向交替拼装的隧道管片衬砌结构 | |
CN204677221U (zh) | 一种隧道移动支护结构 | |
CN105464675A (zh) | 一种新型面接触管幕结构及其施工方法 | |
CN107143349B (zh) | 盾构管片封顶块拼装装置及施作方法 | |
CN113775356A (zh) | 一种盾构地下对接段二次衬砌结构 | |
CN211081879U (zh) | 机械法掘进隧道预制衬砌环缝错缝拼装结构 | |
CN110671121A (zh) | 盾构机的拆卸结构、拆卸方法和修复方法 | |
CN104847393A (zh) | 一种隧道移动支护结构及其保护下的隧道施工方法 | |
CN104213928A (zh) | 一种马蹄形盾构隧道的衬砌结构 | |
CN111927877A (zh) | 一种掘进机主轴承及掘进机 | |
CN103277115B (zh) | 一种用于模型盾构机室内掘进试验的管片及管片环 | |
CN206409237U (zh) | 一种掘进机刀盘驱动抬升机构 | |
CN216008513U (zh) | 一种铁路盾构隧道管片环分块结构 | |
CN102691510A (zh) | 盾构隧道中对接段衬砌结构 | |
CN105863661A (zh) | 一种隧道掘进机的锤式掘进方法及应用该方法的非开挖隧道掘进机 | |
CN111535831B (zh) | 适用于穿越活断层的盾构隧道异形管片抗剪结构及方法 | |
CN205936638U (zh) | 一种多心圆盾构隧道衬砌 | |
CN214273662U (zh) | 一种盾构矿山交接隧道洞内连接结构 | |
WO2022170638A1 (zh) | 一种盾构隧道管片结构及其施工方法 | |
CN101608547B (zh) | 一种可以防止塌方的隧道挖掘方法及装置 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |