CN211074658U - PE pipe extrusion production device with cooling box - Google Patents

PE pipe extrusion production device with cooling box Download PDF

Info

Publication number
CN211074658U
CN211074658U CN201921956362.2U CN201921956362U CN211074658U CN 211074658 U CN211074658 U CN 211074658U CN 201921956362 U CN201921956362 U CN 201921956362U CN 211074658 U CN211074658 U CN 211074658U
Authority
CN
China
Prior art keywords
cooling box
collecting
wall
cooler bin
groove
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201921956362.2U
Other languages
Chinese (zh)
Inventor
李梦瑶
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Panjin Yiyuan Plastic Pipe Co ltd
Original Assignee
Panjin Yiyuan Plastic Pipe Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Panjin Yiyuan Plastic Pipe Co ltd filed Critical Panjin Yiyuan Plastic Pipe Co ltd
Priority to CN201921956362.2U priority Critical patent/CN211074658U/en
Application granted granted Critical
Publication of CN211074658U publication Critical patent/CN211074658U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Extrusion Moulding Of Plastics Or The Like (AREA)

Abstract

The utility model belongs to PE pipe production facility field, especially, PE pipe extrusion apparatus for producing with cooler bin can't not shut down to the production facility that has the cooler bin now and salvages after the tubular product cooling, can only shut down the equipment and then carry out tubular product collection, has reduced the problem of production facility's efficiency, now proposes following scheme, and it includes the cooler bin, and the top of cooler bin is equipped with the extruder, the bottom fixed mounting of cooler bin has the cooler, has seted up the mounting hole on one side inner wall of cooler bin, and fixed mounting has the collecting box in the mounting hole, has seted up the collection hole on the top inner wall of collecting box, slidable mounting has the collecting plate in the cooler bin, and a plurality of through-holes have been seted up to one side of collecting plate, and threaded hole has been seted up to one side of collecting. The utility model discloses rational in infrastructure, convenient operation, production facility can carry out the non-stop after to the tubular product cooling and salvage and collect tubular product, has improved production facility's efficiency.

Description

PE pipe extrusion production device with cooling box
Technical Field
The utility model relates to a PE manages production facility technical field, especially relates to a PE manages extrusion apparatus for producing with cooler bin.
Background
PE is a polyethylene plastic pipe and is also a most basic plastic pipeline, in the municipal pipe market of China, a PE water supply pipe and a PE gas pipe are two largest application markets, and the PE material is widely applied to the field of water supply and drainage manufacturing due to the characteristics of high strength, high temperature resistance, corrosion resistance, no toxicity, wear resistance and the like, and is an ideal pipe for replacing a common iron water supply pipe because the PE material cannot rust, and natural air cooling forming and water cooling forming are the most common in the PE pipe extrusion production process;
however, the existing production equipment with the cooling box can not salvage the pipe without stopping the machine after cooling the pipe, and only can collect the pipe after stopping the equipment, so that the efficiency of the production equipment is reduced.
SUMMERY OF THE UTILITY MODEL
The utility model aims at solving the problem that the production equipment with the cooling box can not salvage pipes without stopping after cooling, and can only collect pipes after stopping the equipment, thereby reducing the defect of the efficiency of the production equipment and providing the PE pipe extrusion production device with the cooling box.
In order to achieve the above purpose, the utility model adopts the following technical scheme:
the utility model provides a PE pipe extrusion apparatus for producing with cooler bin, includes the cooler bin, and the top of cooler bin is equipped with the extruder, the bottom fixed mounting of cooler bin has the cooler, has seted up the mounting hole on the inner wall of one side of cooler bin, and fixed mounting has the collecting box in the mounting hole, has seted up the collecting hole on the inner wall of the top of collecting box, slidable mounting has the collecting plate in the cooler bin, and a plurality of through-holes have been seted up to one side of collecting plate, and threaded hole sets up the screw hole, and the one end of screw rod is rotated and is installed on one side inner wall of cooler bin, the fixed orifices has been seted up on the opposite side inner wall of cooler bin, and the fixed orifices fixedly connected with sealed bearing has cup jointed the rotation post in the interior axle of sealed bearing, and the one end fixed mounting of rotation post.
Preferably, one side slidable mounting of cooler bin has the control panel, and one side fixed mounting of control panel has the rack, and rack and gear engagement, one side of control panel is seted up flutedly, and slidable mounting has the removal seat in the recess, removes the seat and removes and drive control panel round trip movement on the control panel, and the control panel drives the gear round trip movement.
Preferably, a rotating groove is formed in one side of the moving seat, a fixing groove is formed in the inner wall of one side of the collecting box, two chain wheels are installed in the fixing groove in a rotating mode, the two chain wheels are meshed with one chain, and the rotating rod rotates on the moving seat and drives the moving seat to move back and forth.
Preferably, a motor groove is formed in the inner wall of one side of the fixing groove, a servo motor is fixedly mounted in the motor groove, an output shaft of the servo motor is connected to the chain wheel in a transmission mode, a rotating rod is fixedly connected to the chain, one end of the rotating rod is rotatably mounted in the rotating groove, the servo motor drives the chain wheel to rotate, the chain wheel drives the chain to move, and the chain drives the rotating rod to move back and forth.
Preferably, all seted up the sliding tray on the both sides inner wall of cooler bin, the equal fixed mounting in both sides of collecting plate has the sliding seat, and sliding seat slidable mounting drives the sliding seat and slides in the sliding tray when the collecting plate removes in the sliding tray that corresponds, can stabilize the position when collecting plate removes.
Compared with the prior art, the beneficial effects of the utility model reside in that:
(1) according to the scheme, the cooling box is filled with cooling water, the PE pipe extruded by the extruder enters the cooling box to be cooled, the cooled PE pipe is located in the cooling box, the servo motor drives the chain wheel to rotate, the chain drives the rotating rod to move back and forth, and the rotating rod rotates on the moving seat and drives the moving seat to move back and forth;
(2) according to the scheme, the movable seat moves on the control panel and drives the control panel to move back and forth, the gear drives the rotating column to rotate back and forth, the rotating column rotates back and forth in the sealing bearing and drives the lead screw to rotate, the PE pipe in the cooling box can be pushed into the collecting box, and the pipe can be salvaged and collected through the collecting hole;
the utility model discloses rational in infrastructure, convenient operation, production facility can carry out the non-stop after to the tubular product cooling and salvage and collect tubular product, has improved production facility's efficiency.
Drawings
Fig. 1 is a schematic structural view of a PE pipe extrusion production apparatus with a cooling box according to the present invention;
fig. 2 is a schematic structural view of a part a of a PE pipe extrusion production apparatus with a cooling box according to the present invention;
fig. 3 is a schematic structural diagram of a part B of the PE pipe extrusion production apparatus with a cooling box according to the present invention.
In the figure: 1. a cooling tank; 2. a cooling machine; 3. a collection box; 4. a collection well; 5. a collection plate; 6. a screw rod; 7. a fixing hole; 8. sealing the bearing; 9. rotating the column; 10. a gear; 11. a control panel; 12. a movable seat; 13. rotating the rod; 14. fixing grooves; 15. a servo motor; 16. a sprocket; 17. and a chain.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments.
Referring to fig. 1-3, a PE pipe extrusion production device with a cooling box comprises a cooling box 1, an extruder is arranged at the top of the cooling box 1, a cooler 2 is fixedly arranged at the bottom of the cooling box 1, a mounting hole is arranged on the inner wall of one side of the cooling box 1, a collecting box 3 is fixedly arranged in the mounting hole, a collecting hole 4 is arranged on the inner wall of the top of the collecting box 3, a collecting plate 5 is slidably arranged in the cooling box 1, a plurality of through holes are arranged on one side of the collecting plate 5, a threaded hole is arranged on one side of the collecting plate 5, a screw rod 6 is arranged in the threaded hole in a rotating manner, one end of the screw rod 6 is rotatably arranged on the inner wall of one side of the cooling box 1, a fixing hole 7 is arranged on the inner wall of the other side of the cooling box 1, a sealing bearing 8 is fixedly connected in the fixing hole 7, the other end of the rotating column 9 is fixedly provided with a gear 10.
In this embodiment, one side slidable mounting of cooler bin 1 has control panel 11, and one side fixed mounting of control panel 11 has the rack, and the rack meshes with gear 10, and one side of control panel 11 is seted up flutedly, and slidable mounting has removal seat 12 in the recess, and removal seat 12 moves and drives control panel 11 round trip movement on control panel 11, and control panel 11 drives gear 10 round trip movement.
In this embodiment, one side of moving seat 12 has been seted up and has been rotated the groove, has seted up fixed slot 14 on one side inner wall of collecting box 3, and two sprockets 16 are installed to the fixed slot 14 internal rotation, and the meshing has same chain 17 on two sprockets 16, and dwang 13 rotates and drives moving seat 12 round trip movement on moving seat 12.
In this embodiment, the motor groove has been seted up on one side inner wall of fixed slot 14, and motor inslot fixed mounting has servo motor 15, and servo motor 15's output shaft transmission is connected on sprocket 16, fixedly connected with dwang 13 on the chain 17, and the one end of dwang 13 is rotated and is installed at the rotation inslot, and servo motor 15 drives sprocket 16 and rotates, and sprocket 16 drives the motion of chain 17, and chain 17 drives dwang 13 back and forth movement.
In this embodiment, all seted up the sliding tray on the both sides inner wall of cooler bin 1, the equal fixed mounting in both sides of collecting plate 5 has the sliding seat, and sliding seat slidable mounting drives the sliding seat and slides in the sliding tray when collecting plate 5 removes in the sliding tray that corresponds, can stabilize the position when collecting plate 5 removes.
In this embodiment, through pack the cooling water in cooler bin 1, the power of extruder and servo motor 15 is all connected on switch, open the switch and can start extruder and servo motor 15, the PE pipe that the extruder extrudes gets into and cools off in cooler bin 1, cooler 2 lasts and cools off the cooling water in cooler bin 1, the model of cooler 2 is HS 7200-UV-L ED, the PE pipe after the cooling is in cooler bin 1, servo motor 15 drives sprocket 16 and rotates, sprocket 16 drives chain 17 motion, chain 17 drives dwang 13 round trip movement, dwang 13 rotates and drives removal seat 12 round trip movement on removing seat 12, move and drive control panel 11 round trip movement on control panel 11 through removal seat 12, control panel 11 drives gear 10 round trip movement, gear 10 drives rotation post 9 round trip movement, rotation post 9 round trip movement in sealed bearing 8 drives lead screw 6 and rotates, lead screw 6 drives collection board 5 round trip movement, can promote the PE pipe in cooler bin 1 in collection box 3, can be to fishing to the hole 4, the novel production is collected the tubular product, the pipe production is convenient, the production is collected the tubular product, the efficiency is improved to the utility model.

Claims (5)

1. A PE pipe extrusion production device with a cooling box comprises the cooling box (1), wherein an extruder is arranged at the top of the cooling box (1), and is characterized in that the cooler (2) is fixedly arranged at the bottom of the cooling box (1), a mounting hole is formed in the inner wall of one side of the cooling box (1), a collecting box (3) is fixedly arranged in the mounting hole, a collecting hole (4) is formed in the inner wall of the top of the collecting box (3), a collecting plate (5) is slidably arranged in the cooling box (1), a plurality of through holes are formed in one side of the collecting plate (5), a threaded hole is formed in one side of the collecting plate (5), a lead screw (6) is arranged in the threaded hole, one end of the lead screw (6) is rotatably arranged on the inner wall of one side of the cooling box (1), a fixing hole (7) is formed in the inner wall of the other side of the cooling box (1), and a sealing, a rotating column (9) is sleeved on an inner shaft of the sealing bearing (8), one end of the rotating column (9) is fixedly installed at one end of the screw rod (6), and a gear (10) is fixedly installed at the other end of the rotating column (9).
2. The PE pipe extrusion production device with the cooling box according to claim 1, wherein a control plate (11) is slidably mounted on one side of the cooling box (1), a rack is fixedly mounted on one side of the control plate (11) and meshed with the gear (10), a groove is formed in one side of the control plate (11), and a movable seat (12) is slidably mounted in the groove.
3. The PE pipe extrusion production device with the cooling box as claimed in claim 2, wherein a rotating groove is formed in one side of the moving seat (12), a fixing groove (14) is formed in the inner wall of one side of the collecting box (3), two chain wheels (16) are rotatably mounted in the fixing groove (14), and the same chain (17) is meshed with the two chain wheels (16).
4. The PE pipe extrusion production device with the cooling box according to claim 3, wherein a motor groove is formed in one inner wall of the fixing groove (14), a servo motor (15) is fixedly installed in the motor groove, an output shaft of the servo motor (15) is in transmission connection with the chain wheel (16), a rotating rod (13) is fixedly connected to the chain (17), and one end of the rotating rod (13) is rotatably installed in the rotating groove.
5. The PE pipe extrusion production device with the cooling box according to claim 1, wherein sliding grooves are formed in inner walls of two sides of the cooling box (1), sliding seats are fixedly installed on two sides of the collecting plate (5), and the sliding seats are slidably installed in the corresponding sliding grooves.
CN201921956362.2U 2019-11-13 2019-11-13 PE pipe extrusion production device with cooling box Active CN211074658U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201921956362.2U CN211074658U (en) 2019-11-13 2019-11-13 PE pipe extrusion production device with cooling box

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201921956362.2U CN211074658U (en) 2019-11-13 2019-11-13 PE pipe extrusion production device with cooling box

Publications (1)

Publication Number Publication Date
CN211074658U true CN211074658U (en) 2020-07-24

Family

ID=71636949

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201921956362.2U Active CN211074658U (en) 2019-11-13 2019-11-13 PE pipe extrusion production device with cooling box

Country Status (1)

Country Link
CN (1) CN211074658U (en)

Similar Documents

Publication Publication Date Title
CN111715567A (en) Automatic cleaning device for solar photovoltaic panel
CN211074658U (en) PE pipe extrusion production device with cooling box
CN214354078U (en) Draw gear is used in production of PVC pipe
CN213733245U (en) Cooling and shaping equipment for plastic products
CN206526786U (en) Improved carbon extruder
CN215786710U (en) Casting device for producing generator cylinder head
CN210866402U (en) Press-fitting device with automatic demoulding mechanism for lithium battery production
CN214517498U (en) Hollow ultrathin-wall section hot extrusion die
CN212194177U (en) High-efficient rigid plastic forming device
CN210477914U (en) Multi-station automatic die rotating mechanism
CN113071077A (en) Round rack rail type I-shaped workpiece injection mold device
CN208728657U (en) A kind of auto parts production mould suitable for high-speed production
CN213675012U (en) Demoulding device for rubber processing equipment
CN217701452U (en) Base drilling equipment for intelligent manufacturing machinery
CN219789118U (en) Plastic packaging box cover injection mold
CN219705867U (en) Movable pan feeding equipment
CN111571899B (en) A quick die assembly for plastic conduit production
CN219077620U (en) Lubricating grease partial shipment equipment
CN211440774U (en) Forming die for plastic tray production
CN219600172U (en) Adjustable rotational molding die closing positioning tool
CN212580267U (en) Potassium chloride fertilizer bagging and packaging equipment
CN212763722U (en) Automatic plastic pipe forming machine
CN214065387U (en) Rapid cooling equipment convenient to installation is maintained
CN221336665U (en) Multi-shaft hole digging machine for magnetic material processing
CN211806900U (en) Die assembly for die production

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant