CN211059473U - Reinforced concrete pipeline installation vehicle - Google Patents

Reinforced concrete pipeline installation vehicle Download PDF

Info

Publication number
CN211059473U
CN211059473U CN201922192402.7U CN201922192402U CN211059473U CN 211059473 U CN211059473 U CN 211059473U CN 201922192402 U CN201922192402 U CN 201922192402U CN 211059473 U CN211059473 U CN 211059473U
Authority
CN
China
Prior art keywords
reinforced concrete
hinge plate
fixed
driven shaft
bottom frame
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201922192402.7U
Other languages
Chinese (zh)
Inventor
马宏宇
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
No 1 Engineering Co Ltd of CCCC First Highway Engineering Co Ltd
Original Assignee
No 1 Engineering Co Ltd of CCCC First Highway Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by No 1 Engineering Co Ltd of CCCC First Highway Engineering Co Ltd filed Critical No 1 Engineering Co Ltd of CCCC First Highway Engineering Co Ltd
Priority to CN201922192402.7U priority Critical patent/CN211059473U/en
Application granted granted Critical
Publication of CN211059473U publication Critical patent/CN211059473U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Sewage (AREA)

Abstract

The utility model belongs to a reinforced concrete pipeline installation car, constitute by removing wheel and crank, the rear end both sides limit correspondence of underframe frame is equipped with a left side, right capstan mounting panel, the middle part axle of driving shaft is established on the initiative axle bed, be located and be equipped with the crank on the driving shaft in the left capstan support outside, be located and be equipped with the initiative pinion on the inboard driving shaft of left capstan support, it is fixed with a left side to correspond two leading wheels on the driven shaft, right capstan, be fixed with the driven gear wheel with the initiative pinion on the driven shaft of initiative pinion lower extreme, two wire rope's one end is fixed respectively on a left side, right capstan, two wire rope's the other end is located the front end of underframe frame around two corresponding leading wheels respectively. The utility model discloses can improve reinforced concrete pipeline installation efficiency and accurate, have simple structure, labour saving and time saving, the personnel selection is few, and the installation rate is fast, convenient to use and effectual advantage.

Description

Reinforced concrete pipeline installation vehicle
Technical Field
The utility model belongs to a reinforced concrete pipeline installation car.
Background
The prefabricated concrete pipeline is widely applied to urban water supply and drainage pipeline construction, the diameter of the concrete pipeline is large, the inner diameter of the concrete pipeline is between 1.5 and 2 meters, a ditch is dug out by an excavator during pipeline construction, the bottom of the ditch is fixed, and then the concrete pipeline is laid at the bottom of the dug ditch. After the concrete pipelines are installed, the joint of the adjacent concrete pipelines is subjected to cement pointing, and then backfilled soil is filled to seal the road ditch. Because concrete pipe diameter is too big, cross heavy, and the piping erection engineering volume is big, in the past the pipeline transferred the time adopt the manual work to push away to the ditch more, often lead to reinforced concrete pipe local damage, waste time and energy, with the people many, the slow inefficiency of installation rate, and because reinforced concrete pipe single section is heavier, transfer the back and hardly make its accurate positioning by manual movement to it is inseparable to guarantee to connect between the tube coupling section, leaks easily.
Disclosure of Invention
The utility model aims at designing a reinforced concrete pipeline installation car, can improve reinforced concrete pipeline installation efficiency and accurate, have simple structure, labour saving and time saving, the personnel selection is few, and the installation rate is fast, convenient to use and effectual advantage.
Therefore, the utility model consists of a movable wheel and a crank. The lower extreme of several stands is the interval distance and fixes the middle part at the corresponding both sides of underframe frame, and the upper end of several stands is the interval distance and fixes the lower extreme at the corresponding both sides of top frame. And inclined supporting rods are arranged between the two ends of the bottom frame and the two sides of the corresponding top frame. The middle part of the top frame is provided with a roller column, and two guide wheels are arranged on the roller column at intervals. The four corners of the bottom frame are provided with moving wheels. The two sides of the back end of the bottom frame are correspondingly provided with a left capstan supporting plate and a right capstan supporting plate. The upper end of the left capstan supporting plate is provided with a driving shaft seat. The left and right capstan support plates at the lower end of the driving shaft seat are correspondingly provided with a left and right driven shaft seat. The middle part of the driving shaft is axially arranged on the driving shaft seat, a crank is arranged on the driving shaft positioned on the outer side of the left winch support, and a driving pinion is arranged on the driving shaft positioned on the inner side of the left winch support. The two end shafts of the driven shaft are arranged in the left and right driven shaft seats on the left and right capstan support plates, and the left and right capstan are fixed on the driven shaft at intervals corresponding to the two guide wheels. A driven gearwheel meshed with the driving pinion is fixed on a driven shaft at the lower end of the driving pinion. One ends of the two steel wire ropes are respectively fixed on the left and right hinge plates, the other ends of the two steel wire ropes respectively bypass the two corresponding guide wheels and are positioned at the front end of the bottom frame, and the ends of the two steel wire ropes positioned at the front end of the bottom frame are respectively provided with a connecting hook.
The middle parts of the two guide wheels are groove surfaces. The reinforced concrete pipeline installation vehicle is trapezoidal. The gear ratio of the driving pinion to the driven bull gear is 1: 10 to 20.
The structure achieves the purpose of the utility model.
The utility model discloses can improve reinforced concrete pipeline installation efficiency and accurate, have simple structure, labour saving and time saving, the personnel selection is few, and the installation rate is fast, convenient to use and effectual advantage.
Compared with the prior art, the utility model has the following advantages and positive effects:
1. the utility model discloses do not receive influences such as geographical operational environment, the homoenergetic carries out accurate installation to the concrete pipe, and the installation rate is fast, and is efficient.
2. Because the utility model discloses the dependable performance, the personnel selection is few during the installation, and is safe, and labour saving and time saving has reduced the personnel selection cost by a wide margin.
3. The utility model discloses think about unique, simple structure, compact reasonable, the working property is reliable, the flexible operation is laborsaving, has suitable construction use, is convenient for promote etc. advantage.
Drawings
Fig. 1 is a schematic structural diagram of the present invention.
Fig. 2 is a schematic diagram of the rear side structure of the present invention.
Detailed Description
As shown in fig. 1 and 2, a reinforced concrete pipe installation vehicle is composed of moving wheels 11 and a crank 6. The lower ends of 6-8 stand columns 8 are equally divided and are fixed in the middle of two corresponding sides of the bottom frame 9 at intervals, and the upper ends of the stand columns are fixed at the lower ends of two corresponding sides of the top frame 1 at intervals. And an inclined strut 10 is arranged between the two ends of the bottom frame and the two sides of the corresponding top frame, and is used for increasing the strength of the top frame.
The two ends of the roller 3 are fixed with the two sides of the middle of the top frame into a whole by welding, two guide wheels 2 are arranged on the roller at intervals and are of the same axis, and the middle parts of the two guide wheels are groove surfaces so as to be beneficial to guiding the steel wire rope.
Be equipped with on the four corners of underframe frame and remove wheel 11 to do benefit to the removal the utility model discloses. The reinforced concrete pipeline installation vehicle is trapezoidal.
The two sides of the back end of the bottom frame are correspondingly provided with a left capstan supporting plate 7 and a right capstan supporting plate 22. The upper end of the left capstan supporting plate is provided with a driving shaft seat 17. A left driven shaft seat 18 and a right driven shaft seat 14 are correspondingly arranged on the left and right capstan support plates at the lower end of the driving shaft seat. The middle part of the driving shaft 16 is axially arranged on the driving shaft seat, the driving shaft positioned on the outer side of the left winch support is provided with a crank 6, and the driving shaft positioned on the inner side of the left winch support is provided with a driving pinion 15.
The two ends of the driven shaft 20 are arranged in the left and right driven shaft seats on the left and right capstan support plates. A left wire twisting disc 4 and a right wire twisting disc 21 are fixed on the driven shaft at intervals corresponding to the two guide wheels by welding. A driven gearwheel 19 meshed with the driving pinion is fixed on the driven shaft at the lower end of the driving pinion through welding. The gear ratio of the driving pinion to the driven bull gear is 1: 10-20 to save labor.
One ends of the two steel wire ropes 5 are respectively fixed on the left and right hinge plates, the other ends of the two steel wire ropes respectively bypass the two corresponding guide wheels and are positioned at the front end of the bottom frame, and the ends of the two steel wire ropes positioned at the front end of the bottom frame are respectively provided with a connecting hook 13.
During the use, push away concrete pipe 12 earlier to the ditch one side border of going up, then will the utility model discloses the front end pushes away to the concrete pipe rear end and penetrates the concrete pipe hole with two wire rope ends from both sides limit, and the hookup on the wire rope end of two is detained each other again and is colluded integrative. One person holds the crank tightly, and another person pushes away the concrete pipeline to the ditch with the pinch bar, and the concrete pipeline hangs in the ditch under two wire rope pulling forces, only needs slow turning handle, drives driven gear wheel through the initiative pinion and makes the driven shaft rotate, and the driven shaft rotates and drives left and right capstan with the same direction of turning, exports two wire rope on it in step respectively, and the slow extension of two wire rope puts into the ditch bottom as the crane with the concrete pipeline, and the reuse manual work is pushed to the location department. Continuing to rotate the crank handle to enable the two steel wire ropes to be unloaded, separating the connecting hooks, and unloading the concrete pipeline; then the crank is rotated reversely to drive the driving pinion to rotate reversely, so that the left and right wire reels rotate reversely in the same direction to synchronously tighten the two steel wire ropes on the left and right wire reels.
In a word, the utility model discloses can improve reinforced concrete pipeline installation efficiency and accurate, have simple structure, labour saving and time saving, the personnel selection is few, and the installation rate is fast, convenient to use and effectual advantage.

Claims (4)

1. The utility model provides a reinforced concrete pipeline installation car, comprises removal wheel and crank, its characterized in that: the lower ends of a plurality of stand columns are fixed at intervals in the middle of two corresponding sides of the bottom frame, the upper ends of a plurality of stand columns are fixed at intervals in the lower ends of two corresponding sides of the top frame, oblique supporting rods are arranged between two ends of the bottom frame and two corresponding sides of the top frame, a roller column is arranged in the middle of the top frame, two guide wheels are arranged on the roller column in an interval mode, moving wheels are arranged on four corners of the bottom frame, a left hinge plate support plate and a right hinge plate support plate are correspondingly arranged on two sides of the rear end of the bottom frame, a driving shaft seat is arranged at the upper end of the left hinge plate support plate, a left driven shaft seat and a right driven shaft seat are correspondingly arranged on the left hinge plate support plate and the right hinge plate support plate at the lower end of the driving shaft seat, a crank is arranged on the driving shaft on the outer side of the left hinge plate support, a driving pinion is arranged on the, In the right driven shaft seat, a left hinge plate and a right hinge plate are fixed on the driven shaft corresponding to the two guide wheels at intervals, a driven large gear meshed with the driving small gear is fixed on the driven shaft at the lower end of the driving small gear, one ends of the two steel wire ropes are fixed on the left hinge plate and the right hinge plate respectively, the other ends of the two steel wire ropes bypass the corresponding two guide wheels and are located at the front end of the bottom frame, and connecting hooks are arranged at the ends of the two steel wire ropes located at the front end of the bottom frame respectively.
2. A reinforced concrete pipe installation vehicle as claimed in claim 1, wherein: the middle parts of the two guide wheels are groove surfaces.
3. A reinforced concrete pipe installation vehicle as claimed in claim 1, wherein: the reinforced concrete pipeline installation vehicle is trapezoidal.
4. A reinforced concrete pipe installation vehicle as claimed in claim 1, wherein: the gear ratio of the driving pinion to the driven bull gear is 1: 10 to 20.
CN201922192402.7U 2019-12-10 2019-12-10 Reinforced concrete pipeline installation vehicle Expired - Fee Related CN211059473U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201922192402.7U CN211059473U (en) 2019-12-10 2019-12-10 Reinforced concrete pipeline installation vehicle

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201922192402.7U CN211059473U (en) 2019-12-10 2019-12-10 Reinforced concrete pipeline installation vehicle

Publications (1)

Publication Number Publication Date
CN211059473U true CN211059473U (en) 2020-07-21

Family

ID=71592113

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201922192402.7U Expired - Fee Related CN211059473U (en) 2019-12-10 2019-12-10 Reinforced concrete pipeline installation vehicle

Country Status (1)

Country Link
CN (1) CN211059473U (en)

Similar Documents

Publication Publication Date Title
CN215908537U (en) Water supply and drainage pipeline optimizes laying device
CN108426094A (en) A kind of push pipe poling construction equipment and its method
CN211059473U (en) Reinforced concrete pipeline installation vehicle
CN108275579B (en) Quick dismantling device for pipeline in tunnel
CN216836869U (en) Portable hoist device for piping erection
CN214291748U (en) PCCP pipe steel cylinder repair welding overturning platform
CN215215042U (en) Inner pipe-penetrating pushing moving mechanism
CN215060432U (en) Trenchless pipeline repairing system
CN210147293U (en) Shaft pipeline installation device
CN209308070U (en) A kind of sleiding form support frame
CN214696028U (en) Pipeline dredging machine for sewage and rainwater
CN110616798A (en) Dredging and slag-removing equipment for sewer well pipeline
CN205892255U (en) Portable hydraulic drive conveyor belt coiling mechanism
CN203558727U (en) Traveling mechanism of gantry crane
CN212128692U (en) Urban rail by-pass construction supporting device
CN110700277A (en) Freely telescopic inner support for covering and digging station construction
CN211056669U (en) Overturning platform for box culvert and comprehensive pipe gallery concrete square pipe joints
CN221030017U (en) River mouth trash removal fence for hydraulic engineering
CN215891375U (en) Tool for pipeline to pass through pipe gallery frame
CN211922946U (en) Dredging and slag-removing equipment for sewer well pipeline
CN215563263U (en) Municipal administration public works sewer scrubbing equipment
CN213915287U (en) Oil pipe scale removal device for oil field development
CN211594519U (en) Support frame for placing lining pipe
CN215515893U (en) Dumping device for building construction
CN213833522U (en) Pipeline overturning transmission device

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20200721