CN211058714U - Drilling equipment is used in road construction - Google Patents

Drilling equipment is used in road construction Download PDF

Info

Publication number
CN211058714U
CN211058714U CN201921681733.0U CN201921681733U CN211058714U CN 211058714 U CN211058714 U CN 211058714U CN 201921681733 U CN201921681733 U CN 201921681733U CN 211058714 U CN211058714 U CN 211058714U
Authority
CN
China
Prior art keywords
fixedly connected
water
casing
water tank
drilling
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201921681733.0U
Other languages
Chinese (zh)
Inventor
杨理光
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201921681733.0U priority Critical patent/CN211058714U/en
Application granted granted Critical
Publication of CN211058714U publication Critical patent/CN211058714U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Earth Drilling (AREA)

Abstract

The utility model discloses a drilling equipment is used in road construction, which comprises a housin, the equal swing joint in four corners of casing bottom has the gyro wheel, the left side fixedly connected with water tank of casing inner chamber bottom, the top intercommunication of water tank has the water injection pipe, the left bottom fixedly connected with level sensor of water tank inner chamber, the right side fixedly connected with timer of water tank, the bottom of casing inner chamber and the right side fixedly connected with water pump that is located the water tank. The utility model discloses a cooperation of outlet pipe, electric flow control valve, water pump, inlet tube, water tank, level sensor, water injection pipe, timer, dead lever, ring pipe and shower nozzle is used, can carry out the water spray cooling at the in-process of drilling, can avoid the dust to raise simultaneously, has solved current drilling equipment for road construction and can produce a large amount of dusts at the in-process of drilling, and the too high problem that can cause the fracture condition of road surface temperature in drilling process simultaneously.

Description

Drilling equipment is used in road construction
Technical Field
The utility model relates to a road construction technical field specifically is a drilling equipment is used in road construction.
Background
Road engineering refers to the whole process of planning, designing, constructing, maintaining and managing work performed on roads and the engineering entity engaged in the work, and has obvious characteristics in the aspects of technology, economy and management like civil engineering of any other types of departments.
Need drill to the road surface at the in-process of road construction, current drilling equipment for road construction can produce a large amount of dusts at the in-process of drilling, and the condition that the road surface high temperature can cause the fracture in drilling process simultaneously.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a drilling equipment for road construction possesses the advantage of avoiding the dust to raise, has solved current drilling equipment for road construction and can produce a large amount of dusts at the in-process of drilling, and the problem that the too high pavement temperature can cause the fracture condition in drilling process simultaneously.
In order to achieve the above object, the utility model provides a following technical scheme: a drilling device for road construction comprises a shell, wherein idler wheels are movably connected to four corners of the bottom of the shell, a water tank is fixedly connected to the left side of the bottom of an inner cavity of the shell, a water injection pipe is communicated with the top of the water tank, a liquid level sensor is fixedly connected to the left bottom of the inner cavity of the water tank, a timer is fixedly connected to the right side of the water tank, a water pump is fixedly connected to the bottom of the inner cavity of the shell and positioned on the right side of the water tank, a water inlet end of the water pump is communicated with a water inlet pipe, one end, away from the water pump, of the water inlet pipe penetrates to the bottom of the inner cavity of the water tank, a water outlet end of the water pump is communicated with a water outlet pipe, a fixing rod is fixedly connected to the bottom of the shell, an annular pipe is fixedly connected to, the surface of the water outlet pipe, which is positioned in the inner cavity of the shell, is fixedly provided with an electric flow regulating valve, both sides of the top of the inner cavity of the shell are fixedly connected with first hydraulic cylinders, the bottom of the first hydraulic cylinder is fixedly connected with a connecting plate, a fixed sleeve is fixedly connected between the opposite sides of the connecting plate, the inner cavity of the fixed sleeve is fixedly connected with a motor, the bottom of the output end of the motor is fixedly connected with a drill bit, the bottom of the drill bit sequentially penetrates to the bottom of the shell and the inner ring of the annular pipe, the right side of the bottom of the inner cavity of the shell is fixedly connected with a storage battery, the left side of the front surface of the shell is movably connected with a box door through a hinge, the left side of the front surface of the shell is fixedly connected with a controller, the center department of casing obverse surface and back of the body surface bottom all fixedly connected with fixed plate, the bottom fixedly connected with second pneumatic cylinder of fixed plate, the bottom fixedly connected with backup pad of second pneumatic cylinder.
Preferably, four corners of the bottom of the shell are fixedly connected with two support plates, and the bottoms of the backward opposite sides of the support plates are movably connected with the rollers through bearings.
Preferably, the top of the left side of the shell is fixedly connected with a handle, and the surface of the handle is fixedly sleeved with an anti-skid pad.
Preferably, the bottom of casing is seted up with the through-hole that the drill bit cooperation was used, the bottom of casing just is located the left side fixedly connected with splint of battery, and the right side in close contact with in the left side of splint and battery.
Preferably, the output of controller passes through the one-way electric connection of wire with electric flow control valve, water pump, motor, first pneumatic cylinder and second pneumatic cylinder's input respectively, the input of controller and the output bidirectional signal of timer are connected, the one-way electric connection of wire is passed through with the input of controller to the output of battery.
Compared with the prior art, the beneficial effects of the utility model are as follows:
1. The utility model discloses a cooperation of outlet pipe, electric flow control valve, water pump, inlet tube, water tank, level sensor, water injection pipe, timer, dead lever, ring pipe and shower nozzle is used, can carry out the water spray cooling at the in-process of drilling, can avoid the dust to raise simultaneously, has solved current drilling equipment for road construction and can produce a large amount of dusts at the in-process of drilling, and the too high problem that can cause the fracture condition of road surface temperature in drilling process simultaneously.
2. The utility model discloses a use of water injection pipe, can conveniently add water to the water tank, use through the handle, can conveniently promote drilling equipment to drilling department, use through second pneumatic cylinder and backup pad, can conveniently fix drilling equipment, use through the gyro wheel, can make things convenient for drilling equipment to remove, use through level sensor, can detect the water level in the water tank, avoid the phenomenon of water pump dry-pumping, use through the timer, can adjust the water spray time, use through electric flow control valve, can adjust the water spray volume.
Drawings
FIG. 1 is a schematic structural view of the present invention;
FIG. 2 is an enlarged structural view of A in FIG. 1 according to the present invention;
FIG. 3 is a front view of the structure of the present invention;
Fig. 4 is a schematic diagram of the system of the present invention.
In the figure: the automatic control device comprises a shell 1, rollers 2, a water outlet pipe 3, an electric flow control valve 4, a water pump 5, a water inlet pipe 6, a water tank 7, a liquid level sensor 8, a handle 9, a water injection pipe 10, a timer 11, a connecting plate 12, a fixed sleeve 13, a motor 14, a first hydraulic cylinder 15, a storage battery 16, a drill bit 17, a fixed rod 18, a ring pipe 19, a spray head 20, a fixed plate 21, a second hydraulic cylinder 22, a support plate 23, a box door 24 and a controller 25.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
In the description of the present invention, it should be noted that the terms "upper", "lower", "inner", "outer", "front end", "rear end", "both ends", "one end", "the other end", and the like indicate orientations or positional relationships based on the orientations or positional relationships shown in the drawings, and are only for convenience of description and simplification of description, but do not indicate or imply that the device or element to be referred must have a specific orientation, be constructed in a specific orientation, and be operated, and thus, should not be construed as limiting the present invention. Furthermore, the terms "first" and "second" are used for descriptive purposes only and are not to be construed as indicating or implying relative importance.
In the description of the present invention, it is to be noted that, unless otherwise explicitly specified or limited, the terms "mounted", "provided", "connected", and the like are to be construed broadly, such as "connected", which may be fixedly connected, detachably connected, or integrally connected; can be mechanically or electrically connected; they may be connected directly or indirectly through intervening media, or they may be interconnected between two elements. The specific meaning of the above terms in the present invention can be understood in specific cases to those skilled in the art.
The utility model discloses a casing 1, gyro wheel 2, outlet pipe 3, electric flow control valve 4, water pump 5, inlet tube 6, water tank 7, level sensor 8, handle 9, water injection pipe 10, timer 11, connecting plate 12, fixed cover 13, motor 14, first pneumatic cylinder 15, battery 16, drill bit 17, dead lever 18, ring pipe 19, shower nozzle 20, fixed plate 21, second pneumatic cylinder 22, backup pad 23, chamber door 24 and controller 25 part are the parts that universal standard spare or technical personnel in the field know, its structure and principle all can learn through the technical manual or learn through conventional experimental approach for this technical personnel.
Referring to fig. 1-4, a drilling device for road construction comprises a casing 1, wherein two support plates are fixedly connected to four corners of the bottom of the casing 1, the support plates are movably connected to rollers 2 through bearings between the bottoms of the backward opposite sides of the support plates, the drilling device can be moved conveniently by using the rollers 2, a handle 9 is fixedly connected to the top of the left side of the casing 1, a non-slip mat is fixedly sleeved on the surface of the handle 9, the drilling device can be pushed to a drilling position conveniently by using the handle 9, the rollers 2 are movably connected to the four corners of the bottom of the casing 1, a water tank 7 is fixedly connected to the left side of the bottom of an inner cavity of the casing 1, the top of the water tank 7 is communicated with a water injection pipe 10, water can be conveniently added into the water tank 7 by using the water injection pipe 10, a liquid level sensor 8 is fixedly connected to the bottom of the left side, the water level in the water tank 7 can be detected, the phenomenon of dry pumping of the water pump 5 is avoided, the right side of the water tank 7 is fixedly connected with a timer 11, the water spraying time can be adjusted by using the timer 11, the bottom of the inner cavity of the shell 1 and the right side of the water tank 7 are fixedly connected with the water pump 5, the water inlet end of the water pump 5 is communicated with a water inlet pipe 6, one end, away from the water pump 5, of the water inlet pipe 6 penetrates to the bottom of the inner cavity of the water tank 7, the water outlet end of the water pump 5 is communicated with a water outlet pipe 3, the bottom of the shell 1 is fixedly connected with a fixing rod 18, the bottom of the fixing rod 18 is fixedly connected with a ring pipe 19, the bottom of the ring pipe 19 is communicated with a spray head 20 in a surrounding manner, one end, away from the water pump 5, of the water outlet pipe 3 penetrates to the bottom, the water spraying quantity can be adjusted, both sides of the top of the inner cavity of the shell 1 are fixedly connected with a first hydraulic cylinder 15, the bottom of the first hydraulic cylinder 15 is fixedly connected with a connecting plate 12, a fixed sleeve 13 is fixedly connected between the opposite sides of the connecting plate 12, the inner cavity of the fixed sleeve 13 is fixedly connected with a motor 14, the bottom of the output end of the motor 14 is fixedly connected with a drill bit 17, the bottom of the drill bit 17 sequentially penetrates through the bottom of the shell 1 and the inner ring of a ring pipe 19, the right side of the bottom of the inner cavity of the shell 1 is fixedly connected with a storage battery 16, the bottom of the shell 1 is provided with a through hole matched with the drill bit 17 for use, the bottom of the shell 1 is fixedly connected with a clamping plate positioned at the left side of the storage battery 16, the right side of the clamping plate is closely contacted with, the equal fixedly connected with fixed plate 21 of center department of casing 1 obverse surface and back of the body bottom of surface, the bottom fixedly connected with second pneumatic cylinder 22 of fixed plate 21, first pneumatic cylinder 15 and second pneumatic cylinder 22 all are connected with outside hydro-cylinder power supply, the bottom fixedly connected with backup pad 23 of second pneumatic cylinder 22, use through second pneumatic cylinder 22 and backup pad 23, can conveniently fix drilling equipment, the output of controller 25 respectively with electronic flow control valve 4, water pump 5, motor 14, the input of first pneumatic cylinder 15 and second pneumatic cylinder 22 passes through the one-way electric connection of wire, the input of controller 25 and the output two-way signal connection of timer 11, the output of battery 16 and the input of controller 25 pass through the one-way electric connection of wire, through outlet pipe 3, electronic flow control valve 4, water pump 5, inlet tube 6, water tank 7, Liquid level sensor 8, water injection pipe 10, timer 11, dead lever 18, ring pipe 19 and shower nozzle 20's cooperation is used, can spray water the cooling at the in-process of drilling, can avoid the dust to raise simultaneously, has solved current drilling equipment for road construction and can produce a large amount of dusts at the in-process of drilling, and the too high problem that can cause the fracture condition of road surface temperature in drilling process simultaneously.
When the device is used, the timing duration of the timer 11 is preset, the drilling device is pushed to a drilling position, the oil cylinder of the second hydraulic cylinder 22 is controlled by the controller 25 to supply oil, the support plate 23 is driven to move downwards until the support plate is tightly contacted with the ground, a fixing effect is achieved, the motor 14 is controlled by the controller 25 to work, the output end of the motor is driven to drive the drill bit 17 to rotate, the oil cylinder of the first hydraulic cylinder 15 is controlled by the controller 25 to supply oil, the drill bit 17 is driven to move downwards to drill, the water pump 5 is controlled by the controller 25 to pump water from the water tank 7, the timer 11 starts to time and sequentially passes through the water inlet pipe 6, the water outlet pipe 3, the annular pipe 19 and the spray head 20 to be sprayed to the drilling position, the drilling position is cooled, dust is prevented from being lifted, the electric flow regulating valve 4 is controlled by the controller 25 to work, the water, it sends a signal to the controller 25 to control the water pump 5 to stop working, so as to achieve intermittent water supply.
In summary, the following steps: this drilling equipment for road construction uses through the cooperation of outlet pipe 3, electric flow control valve 4, water pump 5, inlet tube 6, water tank 7, level sensor 8, water injection pipe 10, timer 11, dead lever 18, ring pipe 19 and shower nozzle 20, has solved current drilling equipment for road construction and can produce a large amount of dusts at the in-process of drilling, and the too high problem that can cause the fracture condition of road surface temperature simultaneously in drilling process.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the invention, the scope of which is defined in the appended claims and their equivalents.

Claims (5)

1. The utility model provides a drilling equipment for road construction, includes casing (1), its characterized in that: the four corners of the bottom of the shell (1) are movably connected with idler wheels (2), the left side of the bottom of an inner cavity of the shell (1) is fixedly connected with a water tank (7), the top of the water tank (7) is communicated with a water injection pipe (10), the left bottom of the inner cavity of the water tank (7) is fixedly connected with a liquid level sensor (8), the right side of the water tank (7) is fixedly connected with a timer (11), the bottom of the inner cavity of the shell (1) is fixedly connected with a water pump (5) positioned on the right side of the water tank (7), the water inlet end of the water pump (5) is communicated with a water inlet pipe (6), one end, far away from the water pump (5), of the water inlet pipe (6) penetrates through to the bottom of the inner cavity of the water tank (7), the water outlet end of the water pump (5) is communicated with a water outlet pipe (3), the, the bottom of ring pipe (19) encircles the intercommunication and has shower nozzle (20), the one end that water pump (5) were kept away from in outlet pipe (3) runs through to the bottom of casing (1) and communicates in the left side of ring pipe (19), outlet pipe (3) are located the fixed surface of casing (1) inner chamber and install electronic flow control valve (4), the equal fixedly connected with first pneumatic cylinder (15) in both sides at casing (1) inner chamber top, the bottom fixedly connected with connecting plate (12) of first pneumatic cylinder (15), fixedly connected with fixed cover (13) between the relative one side of connecting plate (12), the inner chamber fixedly connected with motor (14) of fixed cover (13), the bottom fixedly connected with drill bit (17) of motor (14) output, the bottom of drill bit (17) runs through to the bottom of casing (1) and the inner circle of ring pipe (19) in proper order, the utility model discloses a solar battery, including casing (1), right side fixedly connected with battery (16) of casing (1) inner chamber bottom, there is chamber door (24) on the left side of casing (1) positive surface through hinge swing joint, left side fixedly connected with controller (25) of casing (1) positive surface, the equal fixedly connected with fixed plate (21) of center department of casing (1) positive surface and back of the body surface bottom, the bottom fixedly connected with second pneumatic cylinder (22) of fixed plate (21), the bottom fixedly connected with backup pad (23) of second pneumatic cylinder (22).
2. The drilling device for road construction according to claim 1, wherein: the four corners of the bottom of the shell (1) are fixedly connected with two support plates, and the bottoms of the backward opposite sides of the support plates are movably connected with the rollers (2) through bearings.
3. The drilling device for road construction according to claim 1, wherein: the novel multifunctional portable electronic device is characterized in that a handle (9) is fixedly connected to the top of the left side of the shell (1), and an anti-slip mat is sleeved on the surface of the handle (9).
4. The drilling device for road construction according to claim 1, wherein: the bottom of casing (1) is seted up with drill bit (17) cooperation through-hole that uses, the bottom of casing (1) just is located the left side fixedly connected with splint of battery (16), and the right side of splint and the left side in close contact with of battery (16).
5. The drilling device for road construction according to claim 1, wherein: the output of controller (25) passes through the one-way electric connection of wire with electric flow control valve (4), water pump (5), motor (14), first pneumatic cylinder (15) and the input of second pneumatic cylinder (22) respectively, the input of controller (25) and the two-way signal connection of output of timer (11), the one-way electric connection of wire is passed through with the input of controller (25) to the output of battery (16).
CN201921681733.0U 2019-10-09 2019-10-09 Drilling equipment is used in road construction Expired - Fee Related CN211058714U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201921681733.0U CN211058714U (en) 2019-10-09 2019-10-09 Drilling equipment is used in road construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201921681733.0U CN211058714U (en) 2019-10-09 2019-10-09 Drilling equipment is used in road construction

Publications (1)

Publication Number Publication Date
CN211058714U true CN211058714U (en) 2020-07-21

Family

ID=71591666

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201921681733.0U Expired - Fee Related CN211058714U (en) 2019-10-09 2019-10-09 Drilling equipment is used in road construction

Country Status (1)

Country Link
CN (1) CN211058714U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112943089A (en) * 2021-03-26 2021-06-11 白薇 Traffic engineering road construction drilling machine
CN113787218A (en) * 2021-09-01 2021-12-14 盐城加美机电科技有限公司 Annular drill collar with heat radiation structure

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112943089A (en) * 2021-03-26 2021-06-11 白薇 Traffic engineering road construction drilling machine
CN113787218A (en) * 2021-09-01 2021-12-14 盐城加美机电科技有限公司 Annular drill collar with heat radiation structure
CN113787218B (en) * 2021-09-01 2022-09-13 盐城加美机电科技有限公司 Annular drill collar with heat radiation structure

Similar Documents

Publication Publication Date Title
CN211058714U (en) Drilling equipment is used in road construction
CN207219385U (en) A kind of hydraulic engineering irrigation rig easy to remove
CN212417379U (en) Green building site dust device that facilitates use for construction
CN206721792U (en) A kind of construction dust arrester
CN212358175U (en) Building site production is with dust removal watering equipment
CN208668287U (en) A kind of bridge maintenance device
CN211407145U (en) Water supply installation is used in maize cultivation
CN210445174U (en) A water-saving irrigation device for agricultural skill
CN212696607U (en) Forestry feedwater fertilization sprinkling irrigation equipment
CN210358190U (en) Portable whirlpool flowing water belt cleaning device convenient to clearance industrial equipment
CN210481965U (en) Road surface evener for highway engineering
CN210383766U (en) Overpass handrail belt cleaning device
CN214758361U (en) Adjustable water-saving irrigation device
CN214973778U (en) Quantitative adding device for three-proofing paint production
CN219840581U (en) Road drilling machine for traffic engineering
CN207775801U (en) A kind of road construction watering device
CN211036657U (en) Grouting device for maintaining highway pavement fracture joints
CN212901982U (en) Water conservancy and hydropower equipment freeze-proof device
CN218700221U (en) Electromechanical energy-saving floor drilling machine
CN212883070U (en) Watering device for building construction
CN214132299U (en) Multifunctional water spraying vehicle
CN220908082U (en) Vibration leveling trolley for municipal road construction
CN213773164U (en) Road dust device for construction
CN107838929A (en) A kind of multi-function security robot
CN211526711U (en) Temperature-changing automatic flushing device for hydraulic and hydroelectric engineering construction

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20200721

Termination date: 20211009