CN211050843U - Breathe pulmonary function rehabilitation training ware - Google Patents

Breathe pulmonary function rehabilitation training ware Download PDF

Info

Publication number
CN211050843U
CN211050843U CN201921642923.1U CN201921642923U CN211050843U CN 211050843 U CN211050843 U CN 211050843U CN 201921642923 U CN201921642923 U CN 201921642923U CN 211050843 U CN211050843 U CN 211050843U
Authority
CN
China
Prior art keywords
pipe
funnel
training
funnel cover
cover
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201921642923.1U
Other languages
Chinese (zh)
Inventor
李晓佳
杨敬平
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Chongqing Jiulongpo Peoples Hospital
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201921642923.1U priority Critical patent/CN211050843U/en
Application granted granted Critical
Publication of CN211050843U publication Critical patent/CN211050843U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

The utility model provides a breathe pulmonary function rehabilitation training ware, breathe pulmonary function rehabilitation training ware includes L shape rectangular pipe, training structure, the structure of blowing and adjusts the structure, training structure connects in the vertical end of L shape rectangular pipe, and training structure includes transparent long tube, activity ball, spring, montant, breather pipe, first funnel cover and second funnel cover, the first funnel cover of vertical end intercommunication of L shape rectangular pipe, and first funnel cover outer arc side communicates the second funnel cover respectively through a plurality of breather pipe, and transparent long tube level sets up and one end and second funnel cover intercommunication, the utility model provides a breathe pulmonary function rehabilitation training ware has and can change and blow and let in transparent long tube quantity to can change it and blow and receive the helping hand influence number, change its training and reduce, the different crowd training intensity of better laminating, perhaps the advantage of each stage intensity.

Description

Breathe pulmonary function rehabilitation training ware
Technical Field
The utility model relates to a rehabilitation training device technical field especially relates to a breathe pulmonary function rehabilitation training device.
Background
At present, the relatively poor patient of respiratory function need breathe pulmonary function rehabilitation training, and the rehabilitation training ware tradition adopts the inside spring coupling movable ball that is equipped with of long tube, blows the movable ball, draws high spring, blows repeatedly, accomplishes the training, because everybody respiratory capacity is different or each stage training respiratory intensity is also different, and single spring can only train specific training intensity patient, and the practicality reduces, and it is not obvious to produce the training effect to other patients.
Therefore, there is a need to provide a new rehabilitation trainer for respiratory lung function to solve the above technical problems.
SUMMERY OF THE UTILITY MODEL
For solving the technical problem, the utility model provides a can change and blow and let in transparent long tube quantity to can change it and blow and receive helping hand influence number, change its training and reduce, the different crowd training intensity of better laminating, perhaps the breathing lung function rehabilitation training ware of each training stage intensity.
The utility model provides a breathe pulmonary function rehabilitation training ware includes L shape rectangular tube, the training structure is connected in the vertical end of L shape rectangular tube, the training structure includes transparent long tube, movable ball, a spring, the montant, the breather pipe, first hopper cover and second hopper cover, the vertical end intercommunication first hopper cover of L shape rectangular tube, first hopper cover outer arc side communicates the second hopper cover respectively through a plurality of breather pipe, transparent long tube level sets up and one end and second hopper cover intercommunication, transparent long tube is close to second hopper cover one end internally mounted has the montant, the lateral wall of montant has the movable ball through spring coupling, the structure of blowing is connected in the horizontal end of L shape rectangular tube, adjust the structure, it connects in the training structure to adjust the structure.
Preferably, adjust the structure and include rotor plate, T shape column spinner, circular baffle, the hole of blowing, circular baffle sets up in first funnel cover bottom and with the bottom lateral wall laminating in the first funnel cover be connected, the circular baffle lower surface is equipped with the rotor plate of contact, rotor plate and circular baffle side all are equipped with the hole of blowing the same with breather pipe quantity, the hole of blowing communicates on breather pipe and the circular baffle, the inside rotation in first funnel cover top is connected T shape column spinner, T shape column spinner one end runs through circular baffle and fixed connection rotor plate central point and puts.
Preferably, one end of the T-shaped rotating column is rotatably connected with the inside of the circular partition plate, and the T-shaped rotating column penetrates through the outer side wall of the first funnel cover and penetrates through the outer side part of the circular partition plate to be connected with a sealing ring.
Preferably, the inner side surface of the vertical end of the L-shaped long tube is fixedly connected with an inclined partition plate, and the bottom side wall of the horizontal end of the L-shaped long tube is connected with a handheld frame.
Preferably, the blowing structure comprises a funnel box, a silica gel nozzle and an external threaded pipe, the silica gel nozzle is communicated with the inner bottom of the funnel box, the external threaded pipe is communicated with the outer bottom of the funnel box, and the other end of the external threaded pipe is in threaded connection with the inner part of the horizontal end of the L-shaped long pipe.
Preferably, the outer side wall of the bottom of the funnel box is connected with the conical silica gel ring.
Compared with the prior art, the utility model provides a breathe pulmonary function rehabilitation training device has following beneficial effect:
the utility model provides a breathe pulmonary function rehabilitation training ware, through training structure and regulation structure, the blowhole corresponds the number and changes the process on blowhole and the circular baffle on the rotor plate to can change its transparent long tube ventilation quantity, can change and blow and let in transparent long tube quantity, thereby can change it and blow and receive helping hand influence number, change its training and reduce, the different crowd training intensity of better laminating, perhaps each training stage intensity.
Drawings
Fig. 1 is a schematic structural view of a preferred embodiment of a rehabilitation training device for respiratory lung function according to the present invention;
FIG. 2 is an enlarged view of a portion A of FIG. 1;
fig. 3 is a schematic perspective view of the adjustment structure shown in fig. 2.
The drawing is marked with 1, L long tubes, 2, training structure, 3, air blowing structure, 4, inclined partition board, 5, hand-held frame, 6, adjusting structure, 21, transparent long tubes, 22, movable balls, 23, springs, 24, vertical rods, 25, vent tubes, 26, first funnel cover, 27, second funnel cover, 31, funnel box, 32, silica gel nozzle, 33, external threaded tube, 34, conical silica gel ring, 61, sealing ring, 62, rotating plate, 63, T-shaped rotating column, 64, circular partition board, 65 and air blowing hole.
Detailed Description
The present invention will be further described with reference to the accompanying drawings and embodiments.
Referring to fig. 1, fig. 2 and fig. 3, wherein fig. 1 is a schematic structural view of a preferred embodiment of the rehabilitation training device for respiratory lung function according to the present invention, fig. 2 is a schematic partial enlarged structural view of a position a shown in fig. 1, and fig. 3 is a schematic structural view of a three-dimensional disassembled structure of the adjustment structure shown in fig. 2, the rehabilitation training device for respiratory lung function includes an L-shaped elongated tube 1, a training structure 2, an air blowing structure 3 and an adjustment structure 6.
In a specific implementation process, as shown in fig. 1, 2 and 3, the training structure 2 is connected to the vertical end of the L-shaped long tube 1, the training structure 2 includes a transparent long tube 21, a movable ball 22, a spring 23, a vertical rod 24, a vent tube 25, a first funnel cover 26 and a second funnel cover 27, the vertical end of the L-shaped long tube 1 is communicated with the first funnel cover 26, the outer arc-shaped side of the first funnel cover 26 is respectively communicated with the second funnel cover 27 through a plurality of vent tubes 25, the transparent long tube 21 is horizontally arranged and one end of the transparent long tube is communicated with the second funnel cover 27, the vertical rod 24 is internally installed at one end of the transparent long tube 21 close to the second funnel cover 27, the side wall of the vertical rod 24 is connected with the movable ball 22 through the spring 23, it is required to explain that the horizontal end of the L-shaped long tube 1 is aligned to a mouth of a person needing arc training, the air blowing structure 3 is in contact with the mouth to blow, air flows into the interior of the transparent long tube 21 to blow the movable ball 22 to move, the rotating plate 23 is lifted, the rotating plate 23, the rotating strength of the rotating plate can be changed, the rotating plate 62, the rotating plate can be changed, the rotating plate 21, the rotating strength of the rotating plate can be changed, the rotating plate can be changed, the rotating plate 62, the rotating plate, the.
Referring to fig. 1, 2 and 3, the adjusting structure 6 is connected to the training structure 2, the adjusting structure 6 includes a rotating plate 62, a T-shaped rotating column 63, a circular partition 64 and a blowing hole 65, the circular partition 64 is disposed at the bottom of the first hopper cover 26 and is attached to the sidewall of the bottom of the first hopper cover 26, the lower surface of the circular partition 64 is provided with the rotating plate 62 in contact with the rotating plate 62, the side surfaces of the rotating plate 62 and the circular partition 64 are respectively provided with the blowing holes 65 with the same number as that of the ventilation pipes 25, the ventilation pipes 25 are communicated with the blowing holes 65 on the circular partition 64, the inside of the top of the first hopper cover 26 is rotatably connected with the T-shaped rotating column 63, one end of the T-shaped rotating column 63 penetrates through the circular partition 64 and is fixedly connected with the center of the rotating plate 62, when the number of the blowing holes 65 on the rotating plate 62 and the corresponding number of the, can change and blow and let in transparent long tube 21 quantity to can change it and blow and receive helping hand influence number, change its training and reduce, the different crowd's training intensity of better laminating, perhaps each training stage intensity, it needs to explain that first hopper cover 26, rotor plate 62 and circular baffle 64 adopt transparent material to make, can run through blowhole 65 to its number, the people's of being convenient for accurate regulation.
Referring to fig. 1 and 2, one end of the T-shaped rotating column 63 is rotatably connected with the inside of the circular partition plate 64, the T-shaped rotating column 63 penetrates through the outer side wall of the first funnel cover 26 and penetrates through the outer side part of the circular partition plate 64 to be connected with the sealing ring 61, so that the sealing performance is guaranteed in the rotating process, the friction force in the rotating process can be increased, and the rotating column can be rotated to a proper position to be stably placed.
Referring to fig. 1, the inner side surface of the vertical end of the L-shaped long pipe 1 is fixedly connected with the inclined partition plate 4, so that the blowing air can be better guided to flow into the first funnel cover 26, and the side wall of the bottom of the horizontal end of the L-shaped long pipe 1 is connected with the handheld frame 5, thereby facilitating the handheld operation.
Referring to fig. 1, the structure 3 of blowing connects in the horizontal end of L shape rectangular pipe 1, the structure 3 of blowing includes hopper box 31, silica gel mouth 32 and external screw thread pipe 33, bottom intercommunication silica gel mouth 32 in the hopper box 31, and hopper box 31 outer bottom intercommunication external screw thread pipe 33, and the external screw thread pipe 33 other end and L shape rectangular pipe 1 horizontal end internal thread are connected, and silica gel mouth 32 holds and blows, has elasticity, and the comfort level increases, can rotate to dismantle external screw thread pipe 33, disinfects silica gel mouth 32, guarantees to use cleanly next time.
Referring to fig. 1, the outer side wall of the bottom of the funnel box 31 is connected with a conical silicone ring 34, so that the tightness of screwing the external threaded pipe 33 can be improved.
The above only is the embodiment of the present invention, not limiting the scope of the present invention, all the equivalent structures or equivalent processes of the present invention are used in the specification and the attached drawings, or directly or indirectly applied to other related technical fields, and the same principle is included in the protection scope of the present invention.

Claims (6)

1. A respiratory lung function rehabilitation training device, comprising:
l-shaped long tube (1);
the funnel type pipe leakage training device comprises a training structure (2), wherein the training structure (2) is connected to the vertical end of an L-shaped long pipe (1), the training structure (2) comprises a transparent long pipe (21), a movable ball (22), a spring (23), a vertical rod (24), a vent pipe (25), a first funnel cover (26) and a second funnel cover (27), the vertical end of the L-shaped long pipe (1) is communicated with the first funnel cover (26), the outer arc-shaped side face of the first funnel cover (26) is respectively communicated with the second funnel cover (27) through the vent pipes (25), the transparent long pipe (21) is horizontally arranged, one end of the transparent long pipe (21) is communicated with the second funnel cover (27), the vertical rod (24) is installed inside one end, close to the second funnel cover (27), and the side wall of the vertical rod (24) is connected with the movable ball (22) through the spring (23);
the air blowing structure (3), the air blowing structure (3) is connected to the horizontal end of the L-shaped long pipe (1);
an adjustment structure (6), the adjustment structure (6) being connected to the training structure (2).
2. The respiratory lung function rehabilitation trainer according to claim 1, wherein the adjusting structure (6) comprises a rotating plate (62), a T-shaped rotating column (63), circular baffle (64), blowhole (65), circular baffle (64) set up in first hopper cover (26) bottom and with first hopper cover (26) interior bottom lateral wall laminating be connected, circular baffle (64) lower surface is equipped with rotor plate (62) of contact, rotor plate (62) and circular baffle (64) side all are equipped with blowhole (65) the same with breather pipe (25) quantity, blowhole (65) intercommunication on breather pipe (25) and circular baffle (64), T shape column spinner (63) is connected in inside rotation in first hopper cover (26) top, T shape column spinner (63) one end runs through circular baffle (64) and fixed connection rotor plate (62) central point puts.
3. The respiratory lung function rehabilitation training device as claimed in claim 2, wherein one end of the T-shaped rotating column (63) is rotatably connected with the inside of the circular partition plate (64), and the sealing ring (61) is connected to the T-shaped rotating column (63) penetrating through the outer side wall of the first funnel cover (26) and penetrating through the outer side part of the circular partition plate (64).
4. The respiratory lung function rehabilitation training device as claimed in claim 1, wherein the inner side surface of the vertical end of the L-shaped long tube (1) is fixedly connected with the inclined partition plate (4), and the bottom side wall of the horizontal end of the L-shaped long tube (1) is connected with the handheld frame (5).
5. The rehabilitation trainer for respiratory and pulmonary functions as claimed in claim 1, wherein the air blowing structure (3) comprises a funnel box (31), a silica gel nozzle (32) and an external threaded pipe (33), the inner bottom of the funnel box (31) is communicated with the silica gel nozzle (32), the outer bottom of the funnel box (31) is communicated with the external threaded pipe (33), and the other end of the external threaded pipe (33) is internally and threadedly connected with the horizontal end of the L-shaped long-strip pipe (1).
6. The rehabilitation trainer for respiratory lung function according to claim 5, wherein the outer side wall of the bottom of the funnel box (31) is connected with a conical silica gel ring (34).
CN201921642923.1U 2019-09-29 2019-09-29 Breathe pulmonary function rehabilitation training ware Expired - Fee Related CN211050843U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201921642923.1U CN211050843U (en) 2019-09-29 2019-09-29 Breathe pulmonary function rehabilitation training ware

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201921642923.1U CN211050843U (en) 2019-09-29 2019-09-29 Breathe pulmonary function rehabilitation training ware

Publications (1)

Publication Number Publication Date
CN211050843U true CN211050843U (en) 2020-07-21

Family

ID=71586969

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201921642923.1U Expired - Fee Related CN211050843U (en) 2019-09-29 2019-09-29 Breathe pulmonary function rehabilitation training ware

Country Status (1)

Country Link
CN (1) CN211050843U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114307083A (en) * 2022-02-10 2022-04-12 上海市肺科医院 Auxiliary respiration training equipment for nursing in department of respiration and use method thereof

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114307083A (en) * 2022-02-10 2022-04-12 上海市肺科医院 Auxiliary respiration training equipment for nursing in department of respiration and use method thereof

Similar Documents

Publication Publication Date Title
CN211328018U (en) Respiration training breathing device for respiration department
CN205235290U (en) Machine for training respiration
CN111790115B (en) Breathe recovered training aid
CN211050843U (en) Breathe pulmonary function rehabilitation training ware
CN209530013U (en) A kind of Respiratory Medicine lung capacity training device
CN212395763U (en) Breathe internal medicine rehabilitation training device
CN208145358U (en) A kind of musical respiration training device
CN215310066U (en) A patient's pulmonary function rehabilitation training device for breathing internal medicine
CN213698742U (en) Breathing training device
CN206492078U (en) A kind of traditional Chinese medical science atomizer
CN204815549U (en) Lung function exercise device
CN212491408U (en) Breathe internal medicine vital capacity trainer
CN211863752U (en) Breathe internal medicine vital capacity trainer
CN110755255B (en) Passive cardiopulmonary function rehabilitation training device convenient for air pressure adjustment
CN209204415U (en) Closed oxygen humidifying device
CN203555929U (en) Sputum excretion device
CN208193478U (en) A kind of medical respiration training
CN219941725U (en) Adjustable exerciser
CN215781330U (en) Thoracic surgery postoperative care is with breathing exercise device
CN207855998U (en) A kind of paediatrics sputum aspirator
CN211301961U (en) Pediatric respiratory lung function rehabilitation physiotherapy device
CN216877485U (en) Respiratory tract fluid regulating device
CN206688152U (en) A kind of absorption type table tennis pickup device
CN219630555U (en) Breathe internal medicine nursing vital capacity trainer
CN114534198B (en) Pediatric respiratory function rehabilitation physiotherapy device

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20200814

Address after: Department of respiratory and critical care medicine, district a, Chongqing Jiulongpo District People's Hospital, No. 23, Yangjiaping Qianjin Road, Jiulongpo District, Chongqing, 400050

Patentee after: CHONGQING JIULONGPO PEOPLE'S Hospital

Address before: Department of respiratory and critical care medicine, district a, Chongqing Jiulongpo District People's Hospital, No. 23, Yangjiaping Qianjin Road, Jiulongpo District, Chongqing, 400050

Patentee before: Li Xiaojia

TR01 Transfer of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20200721

Termination date: 20210929

CF01 Termination of patent right due to non-payment of annual fee