CN211038076U - Rail guard for construction that stability is high - Google Patents

Rail guard for construction that stability is high Download PDF

Info

Publication number
CN211038076U
CN211038076U CN201921290565.2U CN201921290565U CN211038076U CN 211038076 U CN211038076 U CN 211038076U CN 201921290565 U CN201921290565 U CN 201921290565U CN 211038076 U CN211038076 U CN 211038076U
Authority
CN
China
Prior art keywords
rail guard
fixed
main part
rail
recess
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201921290565.2U
Other languages
Chinese (zh)
Inventor
冯晓方
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Qinhuangdao Yunding Real Estate Development Co ltd
Original Assignee
Qinhuangdao Yunding Real Estate Development Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Qinhuangdao Yunding Real Estate Development Co ltd filed Critical Qinhuangdao Yunding Real Estate Development Co ltd
Priority to CN201921290565.2U priority Critical patent/CN211038076U/en
Application granted granted Critical
Publication of CN211038076U publication Critical patent/CN211038076U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)

Abstract

The utility model discloses a rail guard for construction that stability is high relates to building technical field, and it includes the rail guard main part, the equal fixedly connected with fixed plate of the left and right sides face of rail guard main part, the lower surface of fixed plate and the top fixed connection of fixed column, the fixed column sets up in the recess, the top at the connecting rod is seted up to the recess, the bottom of connecting rod is connected with the last fixed surface of gasket. This rail guard for construction that stability is high, through the screw thread post, picture peg, screw cap, bearing, adjustment disk, rail guard main part, fixed plate, fixed column, recess and the mutual cooperation between the connecting rod, correspond fixed column and recess earlier, through the rail guard main part entering recess in, the locating piece gets into the constant head tank simultaneously, consolidates being connected of rail guard main part and connecting rod, is moving this device to the assigned position, and the earth's surface is deepened with the picture peg with the foot, makes this device fixed immovable, thereby can fix this device.

Description

Rail guard for construction that stability is high
Technical Field
The utility model relates to a building technical field specifically is a rail guard for construction that stability is high.
Background
Peripheral department of building site generally is provided with the rail guard, play and remind the effect, avoid non-constructor and vehicle to get into and cause danger and destroy the job site, current rail guard structure variety is many, use in the place of construction such as building site and adopt the movable rail guard often, make things convenient for the engineering to finish demolising, ordinary rail guard inclines easily and is difficult to keep the horizontality, can not be suitable for the construction site with multiple shape, thereby can't carry out better protection to the job site, a rail guard for construction that stability is high now urgently needed.
SUMMERY OF THE UTILITY MODEL
Technical problem to be solved
The utility model provides a not enough to prior art, the utility model provides a rail guard for construction that stability is high has solved current rail guard structure kind a lot of, uses at the place of construction such as building site to adopt the movable rail guard often, makes things convenient for the engineering to end to demolish, and ordinary rail guard inclines easily to be difficult to keep the horizontality, can not be suitable for the construction site with multiple shape to can't carry out the problem of better protection to the job site.
(II) technical scheme
In order to achieve the above purpose, the utility model adopts the technical proposal that: the protective guard for building construction with high stability comprises a protective guard main body, wherein fixing plates are fixedly connected to the left side face and the right side face of the protective guard main body, the lower surfaces of the fixing plates are fixedly connected with the top ends of fixing columns, the fixing columns are arranged in grooves, the grooves are formed in the top ends of connecting rods, and the bottom ends of the connecting rods are fixedly connected with the upper surfaces of gaskets.
The lower surface of the gasket is fixedly connected with the upper surface of the fixing device, the positioning groove is formed in the lower surface of the guard rail main body, a positioning block is arranged in the positioning groove, the lower surface of the positioning block is fixedly connected with the upper surface of the fixing block, and the right side surface of the fixing block is fixedly connected with the left side surface of the connecting rod.
Preferably, fixing device includes the casing, the spout has all been seted up to shells inner wall's the left and right sides face, the upper surface of casing and the lower fixed surface of gasket are connected, and sliding connection has same slide in two spouts, the lower surface of slide and the top fixed connection of screw thread post, the bottom of screw thread post and the upper surface fixed connection of picture peg, the surperficial threaded connection of screw thread post has the screw cap, the screw cap cup joints in the bearing, the surface of bearing and the inner wall fixed connection of casing, the surface of screw cap is equipped with the adjustment disk.
Preferably, the number of the grooves is four, the four grooves are respectively arranged on the upper surfaces of the two connecting rods in a pairwise manner, and the size of the fixed column is smaller than that of the grooves.
Preferably, the adjusting disc is circular, and the surface of the adjusting disc is provided with anti-skid lines.
Preferably, the positioning groove is concave, the positioning block is rectangular, and the size of the positioning block is matched with that of the positioning groove.
(III) advantageous effects
The beneficial effects of the utility model reside in that:
1. this rail guard for construction that stability is high, through the screw thread post, picture peg, screw cap, bearing, adjustment disk, rail guard main part, fixed plate, fixed column, recess and the mutual cooperation between the connecting rod, correspond fixed column and recess earlier, through the rail guard main part entering recess in, the locating piece gets into the constant head tank simultaneously, consolidates being connected of rail guard main part and connecting rod, is moving this device to the assigned position, and the earth's surface is deepened with the picture peg with the foot, makes this device fixed immovable, thereby can fix this device.
2. This rail guard for construction that stability is high through setting up the adjustment disk, and the adjustment disk surface is provided with anti-skidding line to increased the friction between staff's palm and the adjustment disk, avoided the phenomenon that the staff appears skidding when twisting the adjustment disk, thereby brought the facility for the operation of staff to the adjustment disk.
3. This rail guard for construction that stability is high through setting up screw cap and screw thread post, through rotating the screw cap, the screw thread post upwards moves in the screw cap this moment, controls the relative position of left and right sides picture peg, and the rail guard main part of being convenient for adjusts to the horizontality in the use.
Drawings
Fig. 1 is a schematic front view of a cross-sectional structure of the present invention;
fig. 2 is a schematic structural view of the utility model from top view:
fig. 3 is a front view of the fixing device of the present invention;
fig. 4 is an enlarged schematic structural view of part a of the present invention.
In the figure: the protective guard comprises a protective guard main body 1, a fixing plate 2, a fixing column 3, a groove 4, a connecting rod 5, a gasket 6, a fixing device 7, a shell 71, a sliding groove 72, a sliding plate 73, a threaded column 74, an inserting plate 75, a threaded cap 76, a bearing 77, an adjusting plate 78, a positioning groove 8, a positioning block 9 and a fixing block 10.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
As shown in fig. 1-4, the utility model provides a technical solution: the utility model provides a rail guard for construction that stability is high, including rail guard main part 1, the equal fixedly connected with fixed plate 2 of the left and right sides face of rail guard main part 1, the lower surface of fixed plate 2 and the top fixed connection of fixed column 3, fixed column 3 sets up in recess 4, the quantity of recess 4 is provided with four, and four recess 4 are two liang respectively set up the upper surface at two connecting rods 5, the size of fixed column 3 is less than recess 4 size, through setting up recess 4, can realize rail guard main part 1 and connecting rod 5's fixed, recess 4 sets up the top at connecting rod 5, the bottom of connecting rod 5 and the upper surface fixed connection of gasket 6.
The lower surface of the gasket 6 is fixedly connected with the upper surface of the fixing device 7, the fixing device 7 comprises a shell 71, sliding grooves 72 are formed in the left side surface and the right side surface of the inner wall of the shell 71, the upper surface of the shell 71 is fixedly connected with the lower surface of the gasket 6, the same sliding plate 73 is slidably connected with the two sliding grooves 72, the lower surface of the sliding plate 73 is fixedly connected with the top end of a threaded column 74, the bottom end of the threaded column 74 is fixedly connected with the upper surface of an inserting plate 75, a threaded cap 76 is connected with the surface of the threaded column 74 in a threaded manner, the threaded cap 76 is sleeved in a bearing 77, the outer surface of the bearing 77 is fixedly connected with the inner wall of the shell 71, an adjusting plate 78 is arranged on the outer surface of the threaded cap 76, the threaded cap 76 and the threaded column 74 are arranged, the threaded column 74 moves upwards in the threaded cap 76 by rotating the threaded cap 76, the relative positions of, the adjusting disc 78 is round, the surface of the adjusting disc 78 is provided with anti-slip lines, the anti-slip lines are arranged on the surface of the adjusting disc 78, so that friction between a palm of a worker and the adjusting disc 78 is increased, the phenomenon that the worker slips when twisting the adjusting disc 78 is avoided, convenience is brought to the operation of the adjusting disc 78 for the worker, the lower surface of the protective guard main body 1 is provided with a positioning groove 8, the positioning groove 8 is concave, the positioning block 9 is rectangular, the size of the positioning block 9 is matched with that of the positioning groove 8, a positioning block 9 is arranged in the positioning groove 8, the lower surface of the positioning block 9 is fixedly connected with the upper surface of a fixing block 10, the right side surface of the fixing block 10 is fixedly connected with the left side surface of a connecting rod 5, and when the protective guard main body 1 is fixed by arranging the positioning groove 8, the positioning block 9 and, the positioning block 9 moves into the positioning groove 8, and the protective guard main body is better reinforced.
The utility model discloses an operating procedure does:
s1, when the device needs to be used, firstly, the protective guard main body 1 and the connecting rod 5 are moved to the designated positions, the inserting plate 75 is inserted into the underground fixed connecting rod 5 by feet, the fixed column 3 is correspondingly placed with the groove 4, then the protective guard main body 1 is moved downwards, the fixed column 3 enters the groove 4, and the positioning block 9 is moved into the positioning groove 8, so that the protective guard main body 1 is fixed;
s2, when the relative position of the inserting plate 75 needs to be adjusted, the adjusting disc 78 controls the threaded cap 76 to rotate anticlockwise, at the moment, the threaded column 74 moves downwards in the threaded cap 76, and meanwhile, the connecting rod 5 and the protective guard main body 1 are lifted upwards to a proper position, so that the device can be in a horizontal state;
s3, when the device needs to be removed, the connecting rod 5 is pulled upwards by hand, the inserting plate 75 moves upwards to be separated from the ground, the adjusting disc 78 controls the threaded cap 76 to rotate clockwise, the threaded column 74 moves upwards in the threaded cap 76, the inserting plate 75 moves upwards relative to the connecting rod 5, and the fixing column 3 moves upwards to be separated from the groove 4, so that the device is removed.
The above-mentioned embodiments further describe the objects, technical solutions and advantages of the present invention in detail, it should be understood that the above description is only the embodiments of the present invention, and is not intended to limit the present invention, and any modifications, equivalent substitutions, improvements and the like made within the spirit and principle of the present invention should be included in the scope of the present invention.

Claims (5)

1. The utility model provides a rail guard for construction that stability is high, includes rail guard main part (1), its characterized in that: the left side surface and the right side surface of the protective guard main body (1) are fixedly connected with fixing plates (2), the lower surfaces of the fixing plates (2) are fixedly connected with the top ends of fixing columns (3), the fixing columns (3) are arranged in grooves (4), the grooves (4) are formed in the top ends of connecting rods (5), and the bottom ends of the connecting rods (5) are fixedly connected with the upper surfaces of gaskets (6);
the lower surface of gasket (6) and the last fixed surface of fixing device (7) are connected, constant head tank (8) have been seted up to the lower surface of rail guard main part (1), be equipped with locating piece (9) in constant head tank (8), the lower surface of locating piece (9) and the last fixed surface of fixed block (10) are connected, the right flank of fixed block (10) and the left surface fixed connection of connecting rod (5).
2. The guard rail for building construction with high stability as claimed in claim 1, wherein: fixing device (7) include casing (71), spout (72) have all been seted up to the left and right sides face of casing (71) inner wall, the upper surface of casing (71) and the lower fixed surface of gasket (6) are connected, and sliding connection has same slide (73) in two spout (72), the lower surface of slide (73) and the top fixed connection of screw thread post (74), the bottom of screw thread post (74) and the last fixed surface of picture peg (75) are connected, the surperficial threaded connection of screw thread post (74) has screw cap (76), screw cap (76) cup joint in bearing (77), the surface of bearing (77) and the inner wall fixed connection of casing (71), the surface of screw cap (76) is equipped with adjusting disk (78).
3. The guard rail for building construction with high stability as claimed in claim 1, wherein: the number of the grooves (4) is four, the four grooves (4) are respectively arranged on the upper surfaces of the two connecting rods (5) in a pairwise mode, and the size of the fixing column (3) is smaller than that of the grooves (4).
4. The guard rail for building construction with high stability as claimed in claim 2, wherein: the adjusting disc (78) is round in shape, and anti-skid grains are arranged on the surface of the adjusting disc (78).
5. The guard rail for building construction with high stability as claimed in claim 1, wherein: the shape of constant head tank (8) sets up to the concave type, the shape of locating piece (9) sets up to the rectangle, and the size of locating piece (9) and the size looks adaptation of constant head tank (8).
CN201921290565.2U 2019-08-10 2019-08-10 Rail guard for construction that stability is high Expired - Fee Related CN211038076U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201921290565.2U CN211038076U (en) 2019-08-10 2019-08-10 Rail guard for construction that stability is high

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201921290565.2U CN211038076U (en) 2019-08-10 2019-08-10 Rail guard for construction that stability is high

Publications (1)

Publication Number Publication Date
CN211038076U true CN211038076U (en) 2020-07-17

Family

ID=71565807

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201921290565.2U Expired - Fee Related CN211038076U (en) 2019-08-10 2019-08-10 Rail guard for construction that stability is high

Country Status (1)

Country Link
CN (1) CN211038076U (en)

Similar Documents

Publication Publication Date Title
CN204649191U (en) A kind of Sopwith staff
CN204343790U (en) The embedded electric power safety fence rod that a kind of warning tape is connected firmly
CN107376248A (en) Dance barre easy to remove
CN211038076U (en) Rail guard for construction that stability is high
CN208858130U (en) A kind of building construction roof beam structure
CN214064410U (en) Based on surveying and mapping appearance positioner for engineering survey and mapping
CN211118531U (en) Vertical surveying instrument of geographical survey convenient to it is fixed
CN211037738U (en) Civil engineering construction is with device of ascending a height
CN213391110U (en) Building brick device for building house
CN206553146U (en) Novel electric power hoistable platform
CN208546128U (en) A kind of Portable safety type finishing ladder
CN107816982A (en) A kind of Construction of Civil Engineering measurement apparatus
CN213774384U (en) Strutting arrangement is used in building engineering construction
CN210901660U (en) Shoe supporting device for repairing shoes
CN207174940U (en) A kind of paint barrel structure for being easy to topple over paint
CN208344854U (en) A kind of waterproof roll transfer device
CN214114220U (en) Automatic barreled water stacker crane
CN216446019U (en) Building pile foundation convenient to installation of protecting intercommunication
CN204782696U (en) Safe staircase
CN206897502U (en) A kind of novel gypsum powder is modified grinding machine
CN107620563A (en) A kind of dual-gripper ladder of multifunction retractable
CN204357094U (en) The scaffold that a kind of novel high is adjustable and easy to use
CN214695301U (en) Isolating column for road construction
CN214196374U (en) Good mine exploitation of stability is with ventilation blower
CN209708480U (en) A kind of novel building design module

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20200717

Termination date: 20210810