CN211036997U CN201921460434.4U CN201921460434U CN211036997U CN 211036997 U CN211036997 U CN 211036997U CN 201921460434 U CN201921460434 U CN 201921460434U CN 211036997 U CN211036997 U CN 211036997U
Authority
CN
China
Prior art keywords
sheet pile
foundation
pile structure
support
connecting beam
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201921460434.4U
Other languages
Chinese (zh)
Inventor
阳凤萍
周书东
张彤炜
谢璋辉
廖俊晟
张益�
任夏
梁荣耀
麦镇东
叶雄明
刘亮
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Dongguan Institute Of Building Science
Dongguan Guancheng Construction Engineering Co ltd
Original Assignee
Dongguan Institute Of Building Science
Dongguan Guancheng Construction Engineering Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Dongguan Institute Of Building Science, Dongguan Guancheng Construction Engineering Co ltd filed Critical Dongguan Institute Of Building Science
Priority to CN201921460434.4U priority Critical patent/CN211036997U/en
Application granted granted Critical
Publication of CN211036997U publication Critical patent/CN211036997U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Bulkheads Adapted To Foundation Construction (AREA)

Abstract

The utility model provides a supporting construction and supporting system, wherein, supporting construction includes first sheet pile structure, second sheet pile structure, third sheet pile structure, pile top support subassembly and shutoff structure, first sheet pile structure set up in the first side of linkage segment, second sheet pile structure set up in the second side of linkage segment, third sheet pile structure set up in the third side of linkage segment, pile top support subassembly set up in the top of linkage segment, first sheet pile structure second sheet pile structure and third sheet pile structure three respectively with subassembly fixed connection is supported on the pile top, shutoff structure fixed connection in second sheet pile is structural and be located the below of basis tie beam, with right the bottom space of basis tie beam carries out the shutoff. The utility model discloses a supporting construction can avoid the original structure of existing building to receive destruction, can guarantee the excavation supporting security again.

Description

支护结构及支护系统Support structure and support system

技术领域technical field

本发明涉及建筑工程技术领域,尤其涉及一种支护结构及支护系统。The invention relates to the technical field of construction engineering, in particular to a support structure and a support system.

背景技术Background technique

现有大部分基坑,都是因为建筑物新建地下空间建设而产生的。随着城市改造工程的增加,既有建筑物新建地下空间的项目开始出现,既有建筑的原有结构中基础梁较易影响新建基坑的支护。尤其是在既有建筑物室内外新建基坑的施工工程中,既有建筑物的室内新建基坑与室外新建基坑之间的连接段处会有幕墙基础梁和钢结构基础连梁,在既有建筑物室内外开外土方来建设基坑时,容易对既有建筑物室内外新建基坑连接段的幕墙基础梁和钢结构基础连梁等原有结构造成破坏,现有的工程中针对既有建筑物室内外新建基坑穿越基础梁的的情况偏少,此种情况下,缺少一种可保证原有结构不受破坏以及保证既有建筑物室内外新建基坑的支护安全性的支护结构。Most of the existing foundation pits are caused by the construction of new underground spaces in buildings. With the increase of urban renovation projects, projects of new underground space for existing buildings have begun to appear, and the foundation beams in the original structure of existing buildings are more likely to affect the support of new foundation pits. Especially in the construction of new foundation pits indoors and outdoors in existing buildings, there will be curtain wall foundation beams and steel structure foundation beams at the connection section between the indoor new foundation pits and the outdoor new foundation pits of existing buildings. When the foundation pit is constructed by excavating the earthwork inside and outside of the building, it is easy to cause damage to the original structures such as the curtain wall foundation beam and the steel structure foundation connecting beam of the new foundation pit connection between the indoor and outdoor buildings of the existing building. It is rare for newly built foundation pits to pass through the foundation beams. In this case, there is a lack of a support structure that can ensure that the original structure is not damaged and ensure the support safety of the new foundation pits inside and outside the existing buildings. .

因此,急需一种既能不破坏既有建筑的原有结构,又能保证基坑支护安全性的支护结构及支护系统。Therefore, there is an urgent need for a support structure and a support system that can not only damage the original structure of the existing building, but also ensure the safety of foundation pit support.

发明内容SUMMARY OF THE INVENTION

本发明的第一目的在于提供一种可避免既有建筑的原有结构受到破坏,又能保证基坑支护安全性的支护结构。The first object of the present invention is to provide a support structure that can avoid damage to the original structure of an existing building and ensure the safety of foundation pit support.

本发明的第二目的在于提供一种可避免既有建筑的原有结构受到破坏,又能保证基坑支护安全性的支护系统。The second object of the present invention is to provide a support system that can avoid damage to the original structure of the existing building and can ensure the safety of foundation pit support.

为实现上述第一目的,本发明提供了一种支护结构,用于对建筑物室内外新建基坑之间的连接段、基础梁及基础连系梁进行支护,所述连接段具有第一侧面、第二侧面及第三侧面,所述第二侧面连接于所述第一侧面与所述第三侧面之间,所述基础连系梁穿设于所述第二侧面,所述支护结构包括第一板桩结构、第二板桩结构、第三板桩结构、桩顶支护组件及封堵结构,所述第一板桩结构设置于所述连接段的第一侧面,所述第二板桩结构设置于所述连接段的第二侧面,所述第三板桩结构设置于所述连接段的第三侧面,所述桩顶支护组件设置于所述连接段的顶部,所述第一板桩结构、所述第二板桩结构以及所述第三板桩结构三者分别与所述桩顶支护组件固定连接,所述封堵结构固定连接于所述第二板桩结构上并位于所述基础连系梁的下方,以对所述基础连系梁底下空间进行封堵。In order to achieve the above-mentioned first purpose, the present invention provides a support structure for supporting the connecting section, foundation beam and foundation connecting beam between newly built foundation pits inside and outside the building, and the connecting section has a first section. A side surface, a second side surface and a third side surface, the second side surface is connected between the first side surface and the third side surface, the base connecting beam passes through the second side surface, the support The protective structure includes a first sheet pile structure, a second sheet pile structure, a third sheet pile structure, a pile top support component and a plugging structure, and the first sheet pile structure is arranged on the first side of the connecting section, so The second sheet pile structure is arranged on the second side of the connecting section, the third sheet pile structure is arranged on the third side of the connecting section, and the pile top supporting component is arranged on the top of the connecting section , the first sheet pile structure, the second sheet pile structure and the third sheet pile structure are respectively fixedly connected to the pile top support assembly, and the blocking structure is fixedly connected to the second sheet pile structure. The sheet pile is structurally located below the foundation tie beam, so as to block the space under the foundation tie beam.

与现有技术相比,本发明的支护结构通过将第一板桩结构、第二板桩结构以及第三板桩结构对应设置在连接段暴露在外的第一侧面、第二侧面以及第三侧面,以抵抗水平方向的土压力,再通过桩顶支护组件将第一板桩结构、第二板桩结构、第三板桩结构三者固定定位,同时可对支护连接段的顶部外缘起支护座椅,从而保证连接段土体的支护安全性,并通过在基础连系梁的下方设置封堵结构,从而对基础连系梁底下空间进行封堵,避免由于基础连系梁底下的土方被开挖而导致连接段的第二侧面的土方发生坍塌,进而避免既有建筑的原有结构受到破坏。因此,本发明的支护结构可避免既有建筑的原有结构受到破坏,又能保证基坑支护安全性;另外,第一板桩结构、第二板桩结构、第三板桩结构、桩顶支护组件及封堵结构可采用装配式施工,施工简单方便,施工速度快,大大降低此类基坑的施工成本和工期,具有较好的经济和社会效益,并可回收利用,较好践行绿色环保理念。Compared with the prior art, in the support structure of the present invention, the first sheet pile structure, the second sheet pile structure and the third sheet pile structure are correspondingly arranged on the exposed first side, the second side and the third side of the connecting section. To resist the earth pressure in the horizontal direction, the first sheet pile structure, the second sheet pile structure and the third sheet pile structure are fixed and positioned through the pile top support component, and the top of the support connection section can be fixed and positioned. The edge support seat is used to ensure the support safety of the soil body in the connection section, and the space under the foundation tie beam is blocked by setting a blocking structure under the foundation tie beam to avoid the foundation tie beam. The earthwork underneath is excavated, causing the earthwork on the second side of the connecting section to collapse, thereby avoiding damage to the original structure of the existing building. Therefore, the support structure of the present invention can avoid damage to the original structure of the existing building, and can also ensure the safety of foundation pit support; in addition, the first sheet pile structure, the second sheet pile structure, the third sheet pile structure, The pile top support components and the plugging structure can be constructed by prefabricated construction, which is simple and convenient to construct, and the construction speed is fast, which greatly reduces the construction cost and construction period of such foundation pits, has good economic and social benefits, and can be recycled. It is good to practice the concept of green environmental protection.

较佳地,所述第一板桩结构包括若干个第一钢板桩,各所述第一钢板桩呈竖直地设置于所述第一侧面,各所述第一钢板桩依次相接。Preferably, the first sheet pile structure includes a plurality of first steel sheet piles, each of the first steel sheet piles is vertically disposed on the first side surface, and the first steel sheet piles are connected in sequence.

较佳地,所述第二板桩结构包括若干个第二钢板桩,各所述第二钢板桩呈竖直地设置于所述第二侧面,各所述第二钢板桩依次相接。Preferably, the second sheet pile structure includes a plurality of second steel sheet piles, each of the second steel sheet piles is vertically disposed on the second side surface, and each of the second steel sheet piles is connected in sequence.

较佳地,所述第三板桩结构包括若干个第三钢板桩,各所述第三钢板桩呈竖直地设置于所述第三侧面,各所述第三钢板桩依次相接。Preferably, the third sheet pile structure includes a plurality of third steel sheet piles, each of the third steel sheet piles is vertically arranged on the third side surface, and the third steel sheet piles are connected in sequence.

较佳地,所述桩顶支护组件包括第一连梁、第二连梁及围檩,所述第一连梁与所述第一板桩结构固定连接,所述第一连梁沿所述第一侧面的顶边设置,所述第二连梁与所述第三板桩结构固定连接,所述第二连梁沿所述第三侧面的顶边设置,所述围檩与所述第二板桩结构固定连接,所述围檩沿所述第二侧面的顶边设置。Preferably, the pile top support assembly includes a first connecting beam, a second connecting beam and a purlin, the first connecting beam is fixedly connected with the first sheet pile structure, and the first connecting beam is along the The top edge of the first side is arranged, the second connecting beam is fixedly connected to the third sheet pile structure, the second connecting beam is arranged along the top edge of the third side, and the purlin is connected to the The second sheet pile structure is fixedly connected, and the purlin is arranged along the top edge of the second side surface.

较佳地,所述桩顶支护组件还包括若干个对拉杆,各所述对拉杆分别连接于所述第一连梁与所述第二连梁之间。Preferably, the pile top support assembly further includes a plurality of pairs of tie rods, and each pair of tie rods is respectively connected between the first connecting beam and the second connecting beam.

较佳地,各所述对拉杆呈等间隔设置。Preferably, the pairs of tie rods are arranged at equal intervals.

较佳地,所述封堵结构包括若干个封堵件,所述封堵件沿上、下方向依次紧贴地连接并位于所述基础连系梁的下方,所述封堵件的两端分别与所述第二板桩结构固定连接。Preferably, the blocking structure includes a plurality of blocking members, the blocking members are closely connected in sequence along the upper and lower directions and are located below the basic connecting beam, and the two ends of the blocking members are They are respectively fixedly connected with the second sheet pile structure.

较佳地,位于顶部的所述封堵件紧贴于所述基础连系梁的底部。Preferably, the blocking member located at the top is closely attached to the bottom of the base connecting beam.

为实现上述第二目的,本发明提供了一种支护系统,包括对撑件及上述的支护结构,所述支护结构的数量为两个,所述对撑件连接于两所述桩顶支护组件之间。In order to achieve the above second object, the present invention provides a support system, comprising a pair of supports and the above-mentioned support structure, the number of the support structures is two, and the pair of supports is connected to the two piles. between the top support components.

与现有技术相比,本发明的支护系统通过对撑件将两支护结构连接起来,从而对既有建筑室内外新建基坑之间的两相对的连接段进行支护,由于支护结构通过将第一板桩结构、第二板桩结构以及第三板桩结构对应设置在连接段暴露在外的第一侧面、第二侧面以及第三侧面,以抵抗水平方向的土压力,再通过桩顶支护组件将第一板桩结构、第二板桩结构、第三板桩结构三者固定定位,同时可对支护连接段的顶部外缘起支护座椅,从而保证连接段土体的支护安全性,并通过在基础连系梁的下方设置封堵结构,从而对基础连系梁底下空间进行封堵,避免由于基础连系梁底下的土方被开挖而导致连接段的第二侧面的土方发生坍塌,进而避免既有建筑的原有结构受到破坏。因此,本发明的支护系统可避免既有建筑的原有结构受到破坏,又能保证基坑支护安全性;另外,第一板桩结构、第二板桩结构、第三板桩结构、桩顶支护组件及封堵结构可采用装配式施工,施工简单方便,施工速度快,大大降低此类基坑的施工成本和工期,具有较好的经济和社会效益,并可回收利用,较好践行绿色环保理念。Compared with the prior art, the support system of the present invention connects the two support structures through the support members, so as to support the two opposite connection sections between the new foundation pits inside and outside the existing building. Structure The first sheet pile structure, the second sheet pile structure and the third sheet pile structure are correspondingly arranged on the exposed first side, the second side and the third side of the connecting section to resist the earth pressure in the horizontal direction, and then pass The pile top support assembly fixes and positions the first sheet pile structure, the second sheet pile structure and the third sheet pile structure, and at the same time can support the seat on the top outer edge of the support connection section, so as to ensure the soil mass of the connection section. The space under the foundation tie beam is blocked by setting up a blocking structure under the foundation tie beam to avoid the excavation of the earth under the foundation tie beam, which may lead to the first failure of the connection section. The earthwork on the two sides collapsed, thereby avoiding damage to the original structure of the existing building. Therefore, the support system of the present invention can avoid damage to the original structure of the existing building, and can also ensure the safety of foundation pit support; in addition, the first sheet pile structure, the second sheet pile structure, the third sheet pile structure, The pile top support components and the plugging structure can be constructed by prefabricated construction, which is simple and convenient to construct, and the construction speed is fast, which greatly reduces the construction cost and construction period of such foundation pits, has good economic and social benefits, and can be recycled. It is good to practice the concept of green environmental protection.

较佳地,所述对撑件为工字钢或钢管。Preferably, the pair of braces are I-beams or steel pipes.

附图说明Description of drawings

图1是本发明的支护系统对建筑物室内外新建基坑之间的连接段支护时的立体结构示意图。FIG. 1 is a schematic three-dimensional structure diagram of the support system of the present invention when supporting the connection section between the newly built foundation pits inside and outside the building.

图2是本发明的支护结构对其中一连接段支护时的立体结构示意图。FIG. 2 is a schematic three-dimensional structure diagram of the support structure of the present invention when one of the connecting sections is supported.

图3是图2所示的支护结构对其中一连接段支护时的另一角度的立体结构示意图。FIG. 3 is a schematic three-dimensional structural diagram of another angle when the support structure shown in FIG. 2 supports one of the connecting sections.

图4是本发明的支护结构的桩顶支护组件的结构示意图。FIG. 4 is a schematic structural diagram of the pile top support assembly of the support structure of the present invention.

图5是本发明的支护结构的封堵结构的结构示意图。FIG. 5 is a schematic structural diagram of the plugging structure of the support structure of the present invention.

具体实施方式Detailed ways

为了详细说明本发明的技术内容、构造特征,以下结合实施方式并配合附图作进一步说明。In order to describe the technical content and structural features of the present invention in detail, further description will be given below with reference to the embodiments and the accompanying drawings.

请参阅图1至图3,本发明的支护系统200用于对建筑物室内外新建基坑之间的连接段500、基础梁600及基础连系梁700进行支护,连接段500具有第一侧面501、第二侧面502及第三侧面503,第二侧面502连接于第一侧面501与第三侧面503之间,基础连系梁700穿设于第二侧面502,其中,建筑物的室内新建基坑300和室外新建基坑400之间的连接段500有两个,两连接段500呈相对分布,两连接段500之间具有连通室内新建基坑300与室外新建基坑400的连通空间。支护系统200包括对撑件6及支护结构100,支护结构100的数量为两个,两支护结构100对应支护两连接段500;支护结构100包括第一板桩结构1、第二板桩结构2、第三板桩结构3、桩顶支护组件4及封堵结构5,第一板桩结构1设置于连接段500的第一侧面501,第二板桩结构2设置于连接段500的第二侧面502,第三板桩结构3设置于连接段500的第三侧面503,桩顶支护组件4设置于连接段500的顶部,第一板桩结构1、第二板桩结构2以及第三板桩结构3三者分别与桩顶支护组件4固定连接,封堵结构5固定连接于第二板桩结构2上并位于基础连系梁700的下方,以对基础连系梁700底下空间进行封堵;对撑件6连接于两桩顶支护组件4之间,对撑件6的数量可设有多个,以保证两支护结构100的连接稳固性,从而保证支护系统200的稳固性,具体地,对撑件6可为工字钢或钢管。其中,上述的固定连接方式可采用焊接的方式,但不以此为限,也可采用螺栓固定等方式。更具体的如下:Please refer to FIGS. 1 to 3 , the support system 200 of the present invention is used to support the connecting section 500, the foundation beam 600 and the foundation connecting beam 700 between the newly built foundation pits inside and outside the building, and the connecting section 500 has a first A side surface 501, a second side surface 502 and a third side surface 503. The second side surface 502 is connected between the first side surface 501 and the third side surface 503. The foundation connecting beam 700 passes through the second side surface 502. There are two connection sections 500 between the new indoor foundation pit 300 and the new outdoor foundation pit 400. The two connection sections 500 are arranged in opposite directions. space. The support system 200 includes a pair of supports 6 and a support structure 100. The number of support structures 100 is two, and the two support structures 100 support two connection sections 500 correspondingly. The support structure 100 includes a first sheet pile structure 1, The second sheet pile structure 2 , the third sheet pile structure 3 , the pile top support assembly 4 and the plugging structure 5 , the first sheet pile structure 1 is arranged on the first side 501 of the connecting section 500 , and the second sheet pile structure 2 is arranged On the second side 502 of the connecting section 500, the third sheet pile structure 3 is arranged on the third side 503 of the connecting section 500, the pile top supporting component 4 is arranged on the top of the connecting section 500, the first sheet pile structure 1, the second The sheet pile structure 2 and the third sheet pile structure 3 are respectively fixedly connected to the pile top support assembly 4, and the plugging structure 5 is fixedly connected to the second sheet pile structure 2 and is located under the foundation connecting beam 700 to prevent The space under the foundation tie beam 700 is blocked; the braces 6 are connected between the two pile top support assemblies 4, and the number of braces 6 can be provided in multiples to ensure the connection stability of the two support structures 100 , so as to ensure the stability of the support system 200. Specifically, the supporting member 6 can be an I-beam or a steel pipe. Wherein, the above-mentioned fixed connection method may adopt the method of welding, but is not limited to this, and may also adopt the method of bolting and the like. More specific as follows:

请参阅图2及图3,在本实施例中,第一板桩结构1包括若干个第一钢板桩11,各第一钢板桩11呈竖直地设置于第一侧面501,各第一钢板桩11依次相接;第二板桩结构2包括若干个第二钢板桩21,各第二钢板桩21呈竖直地设置于第二侧面502,各第二钢板桩21依次相接;第三板桩结构3包括若干个第三钢板桩31,各第三钢板桩31呈竖直地设置于第三侧面503,各第三钢板桩31依次相接。其中,第一钢板桩11、第二钢板桩21以及第三钢板桩31可采用现有的拉森钢板桩,但不以此为限。值得注意的是,在其他实施例中,第一板桩结构1、第二板桩结构2及第三板桩结构3也可采用其他的板桩,如木板桩等。Please refer to FIG. 2 and FIG. 3 , in this embodiment, the first sheet pile structure 1 includes a plurality of first steel sheet piles 11 , each first steel sheet pile 11 is vertically disposed on the first side 501 , and each first steel sheet pile 11 is vertically disposed on the first side surface 501 . The piles 11 are connected in sequence; the second sheet pile structure 2 includes a plurality of second steel sheet piles 21 , each second steel sheet pile 21 is vertically arranged on the second side 502 , and each second steel sheet pile 21 is connected in sequence; the third The sheet pile structure 3 includes a plurality of third steel sheet piles 31 , and each third steel sheet pile 31 is vertically disposed on the third side surface 503 , and the third steel sheet piles 31 are connected in sequence. The first steel sheet pile 11 , the second steel sheet pile 21 and the third steel sheet pile 31 may adopt the existing Larsen steel sheet piles, but are not limited thereto. It should be noted that, in other embodiments, the first sheet pile structure 1 , the second sheet pile structure 2 and the third sheet pile structure 3 may also use other sheet piles, such as wood piles and the like.

请参阅图2及图4,桩顶支护组件4包括第一连梁41、第二连梁42及围檩43,第一连梁41与第一板桩结构1固定连接,第一连梁41沿第一侧面501的顶边设置,第二连梁42与第三板桩结构3固定连接,第二连梁42沿第三侧面503的顶边设置,围檩43与第二板桩结构2固定连接,围檩43沿第二侧面502的顶边设置,围檩43可起到固定第二板桩结构2作用和传递荷载的作用。具体地,第一连梁41及第二连梁42可采用槽钢连梁,围檩43可采用现有的HW型钢,但不以此为限。进一步地,桩顶支护组件4还包括若干个对拉杆44,各对拉杆44分别连接于第一连梁41与第二连梁42之间。通过设置对拉杆44,从而提高第一连梁41、第二连梁42以及围檩43三者连接的稳固性。具体地,各对拉杆44呈等间隔设置,从而保证受力平衡。其中,对拉杆44可采用现有的槽钢对拉杆,但不以此为限;对拉杆44与第一连梁41的连接方式以及对拉杆44与第二连梁42的连接方式可采用现有的焊接固定的方式,但不以此为限。Please refer to FIG. 2 and FIG. 4 , the pile top support assembly 4 includes a first connecting beam 41 , a second connecting beam 42 and a purlin 43 . The first connecting beam 41 is fixedly connected with the first sheet pile structure 1 , and the first connecting beam 41 is arranged along the top edge of the first side 501, the second connecting beam 42 is fixedly connected to the third sheet pile structure 3, the second connecting beam 42 is arranged along the top edge of the third side 503, and the purlin 43 is connected to the second sheet pile structure 2. Fixed connection, the purlin 43 is arranged along the top edge of the second side surface 502, and the purlin 43 can play the role of fixing the second sheet pile structure 2 and transferring the load. Specifically, the first coupling beam 41 and the second coupling beam 42 may be channel steel coupling beams, and the purlin 43 may be existing HW-shaped steel, but not limited thereto. Further, the pile top support assembly 4 also includes a plurality of pairs of tie rods 44 , and each pair of tie rods 44 is respectively connected between the first connecting beam 41 and the second connecting beam 42 . By arranging the pair of tie rods 44 , the connection stability of the first connecting beam 41 , the second connecting beam 42 and the purlin 43 is improved. Specifically, each pair of tie rods 44 are arranged at equal intervals, so as to ensure the force balance. Wherein, the existing channel steel pairing rod can be used for the tie rod 44, but it is not limited to this; There are some ways of welding and fixing, but not limited to this.

请参阅图2及图5,在本实施例中,封堵结构5包括若干个封堵件51,各封堵件51沿上、下方向依次紧贴地连接并位于基础连系梁700的下方,封堵件51的两端分别与第二板桩结构2固定连接。通过封堵件51对沿上、下方向依次紧贴地连接在基础连系梁700的下方,从而对基础连系梁700底下空间进行封堵,避免由于基础连系梁700底下的土方被开挖而导致连接段500的第二侧面502的土方发生坍塌,进而避免既有建筑的原有结构受到破坏。具体地,位于顶部的封堵件51紧贴于基础连系梁700的底部,充分对基础连系梁700的底下空间全部进行封堵,从而进一步提高安全性。Please refer to FIG. 2 and FIG. 5 , in this embodiment, the blocking structure 5 includes a plurality of blocking members 51 , and each blocking member 51 is closely connected in sequence along the upper and lower directions and is located below the basic connecting beam 700 , the two ends of the blocking member 51 are respectively fixedly connected with the second sheet pile structure 2 . The blocking member 51 is closely connected to the bottom of the foundation tie beam 700 in the upper and lower directions in turn, so as to block the space under the foundation tie beam 700 to prevent the earthwork under the foundation tie beam 700 from being opened. The earthwork on the second side surface 502 of the connection section 500 collapses due to the excavation, thereby avoiding damage to the original structure of the existing building. Specifically, the blocking member 51 located at the top is closely attached to the bottom of the basic connecting beam 700, and fully blocks all the space under the basic connecting beam 700, thereby further improving the safety.

请参阅图1至图5,本发明的既有建筑内外基坑连接段500支护方法包括以下步骤:Please refer to FIG. 1 to FIG. 5 , the method for supporting the connection section 500 of the existing building inside and outside the foundation pit of the present invention includes the following steps:

S1,提供第一板桩结构1、第二板桩结构2、第三板桩结构3、第一连梁41、第二连梁42、围檩43及若干个封堵件51,确定既有建筑的基础梁600和基础连系梁700的位置,将土方平整开挖至基础梁600的底面以下一预设距离,该预设距离不超过20厘米,设置施工放线位置,并根据施工放线位置安装导框,将第一板桩结构1设置于两连接段500的第一侧面501,将第二板桩结构2设置于两连接段500的第二侧面502,将第三板桩结构3设置于两连接段500的第三侧面503;S1, provide a first sheet pile structure 1, a second sheet pile structure 2, a third sheet pile structure 3, a first coupling beam 41, a second coupling beam 42, a purlin 43 and a number of blocking members 51, and determine the existing For the positions of the foundation beam 600 and the foundation connecting beam 700 of the building, excavate the earthwork to a preset distance below the bottom surface of the foundation beam 600, and the preset distance should not exceed 20 cm. Install the guide frame at the line position, set the first sheet pile structure 1 on the first side 501 of the two connecting sections 500, set the second sheet pile structure 2 on the second side 502 of the two connecting sections 500, and set the third sheet pile structure on the second side 502 of the two connecting sections 500. 3 is arranged on the third side surface 503 of the two connecting sections 500;

S2,将第一连梁41与第一板桩结构1固定连接,并将第一连梁41设置于两第一侧面501的顶边位置处,将第二连梁42与第三板桩结构3固定连接,并将第二连梁42设置于两第三侧面503的顶边位置处,将围檩43与第二板桩结构2固定连接,将围檩43设置于两第二侧面502的顶边位置处,从而形成用于支护连接段500顶部的桩顶支护组件4;在基础梁600与基础连系梁700之间开挖通槽,将多个对拉杆44穿过通槽并分别连接于第一连梁41与第二连梁42之间,并将各对拉杆44等间隔设置;S2, the first coupling beam 41 is fixedly connected with the first sheet pile structure 1, the first coupling beam 41 is set at the top edge position of the two first side surfaces 501, the second coupling beam 42 is connected with the third sheet pile structure 3. Fixed connection, and the second connecting beam 42 is arranged at the top edge position of the two third sides 503, the purlin 43 is fixedly connected with the second sheet pile structure 2, and the purlin 43 is arranged on the two second sides 502. At the top edge position, the pile top support assembly 4 for supporting the top of the connecting section 500 is formed; a through groove is excavated between the foundation beam 600 and the foundation connecting beam 700, and a plurality of pairs of tie rods 44 are passed through the through groove and are respectively connected between the first connecting beam 41 and the second connecting beam 42, and each pair of tie rods 44 are arranged at equal intervals;

S3,将对撑件6连接与两围檩43之间;对坡顶的土方进行清理,并对坡顶喷射100毫米厚的素混凝土进行防护;S3, connect the brace 6 with the two surrounding purlins 43; clean up the earthwork at the top of the slope, and spray 100 mm thick plain concrete to protect the top of the slope;

S4,分层开挖土方,每层高度不超过1米;S4, excavating earthwork in layers, the height of each layer shall not exceed 1 meter;

S5,开挖至基础连系梁700的底部后,将其中一封堵件51设置于基础连系梁700的下方,并将封堵件51的两端固定连接于第二板桩结构2上,以对基础连系梁700的底空间进行封堵;S5, after excavating to the bottom of the foundation tie beam 700, set one of the blocking pieces 51 under the foundation tie beam 700, and fix both ends of the blocking piece 51 to the second sheet pile structure 2 , to block the bottom space of the foundation connecting beam 700;

S6,随着土方继续开挖,将其余封堵件51自上而下地固定连接于第二板桩结构2上,将上、下相邻的两封堵件51紧贴设置,以继续对基础连系梁700的底空间进行封堵。S6, as the earthwork continues to excavate, the remaining plugging members 51 are fixedly connected to the second sheet pile structure 2 from top to bottom, and the two adjacent plugging members 51 on the upper and lower sides are placed in close contact, so as to continue to compress the foundation. The bottom space of the tie beam 700 is blocked.

其中,在S5及S6中,封堵件51与第二板桩结构2之间搭接的长度范围为200-300毫米。Wherein, in S5 and S6, the overlapping length between the blocking member 51 and the second sheet pile structure 2 is in the range of 200-300 mm.

综上,本发明通过将第一板桩结构1、第二板桩结构2以及第三板桩结构3对应设置在连接段500暴露在外的第一侧面501、第二侧面502以及第三侧面503,以抵抗水平方向的土压力,再通过桩顶支护组件4将第一板桩结构1、第二板桩结构2、第三板桩结构3三者固定定位,同时可对支护连接段500的顶部外缘起支护座椅,从而保证连接段500土体的支护安全性,并通过在基础连系梁700的下方设置封堵结构5,从而对基础连系梁700底下空间进行封堵,避免由于基础连系梁700底下的土方被开挖而导致连接段500的第二侧面502的土方发生坍塌,进而避免既有建筑的原有结构受到破坏。因此,本发明的支护结构100可避免既有建筑的原有结构受到破坏,又能保证基坑支护安全性;另外,第一板桩结构1、第二板桩结构2、第三板桩结构3、桩顶支护组件4及封堵结构5可采用装配式施工,施工简单方便,施工速度快,大大降低此类基坑的施工成本和工期,具有较好的经济和社会效益,并可回收利用,较好践行绿色环保理念。To sum up, in the present invention, the first sheet pile structure 1 , the second sheet pile structure 2 and the third sheet pile structure 3 are correspondingly arranged on the exposed first side 501 , the second side 502 and the third side 503 of the connecting section 500 . , in order to resist the earth pressure in the horizontal direction, and then the first sheet pile structure 1, the second sheet pile structure 2, and the third sheet pile structure 3 are fixed and positioned through the pile top support component 4, and at the same time, the support connection section can be fixed and positioned. The outer edge of the top of the 500 supports the seat, so as to ensure the support safety of the soil body of the connection section 500, and by setting the blocking structure 5 under the foundation tie beam 700, the space under the foundation tie beam 700 is sealed. It can prevent the earthwork on the second side 502 of the connection section 500 from collapsing due to the earthwork under the foundation connecting beam 700 being excavated, thereby preventing the original structure of the existing building from being damaged. Therefore, the support structure 100 of the present invention can avoid damage to the original structure of the existing building, and can also ensure the safety of foundation pit support; in addition, the first sheet pile structure 1, the second sheet pile structure 2, the third sheet pile structure The pile structure 3, the pile top supporting component 4 and the plugging structure 5 can be constructed by prefabricated construction, the construction is simple and convenient, and the construction speed is fast, which greatly reduces the construction cost and construction period of such foundation pits, and has good economic and social benefits. It can be recycled and reused, and it is better to practice the concept of green environmental protection.

以上所揭露的仅为本发明的较佳实例而已,不能以此来限定本发明之权利范围,因此依本发明权利要求所作的等同变化,均属于本发明所涵盖的范围。The above disclosures are only preferred examples of the present invention, and cannot be used to limit the scope of rights of the present invention. Therefore, the equivalent changes made according to the claims of the present invention all belong to the scope covered by the present invention.

Claims (11)

1. A supporting structure is used for supporting a connecting section, a foundation beam and a foundation connecting beam between newly-built foundation pits indoors and outdoors of a building, the connecting section is provided with a first side surface, a second side surface and a third side surface, the second side surface is connected between the first side surface and the third side surface, the foundation connecting beam is arranged on the second side surface in a penetrating way, the supporting structure is characterized by comprising a first sheet pile structure, a second sheet pile structure, a third sheet pile structure, a pile top supporting component and a plugging structure, the first sheet pile structure is arranged on the first side surface of the connecting section, the second sheet pile structure is arranged on the second side surface of the connecting section, the third sheet pile structure is arranged on the third side surface of the connecting section, the pile top supporting component is arranged on the top of the connecting section, and the first sheet pile structure, the second sheet pile structure and the third sheet pile structure are respectively and fixedly connected with the pile top supporting component, the blocking structure is fixedly connected to the second sheet pile structure and located below the foundation connecting beam so as to block the space below the foundation connecting beam.
2. The supporting structure of claim 1, wherein the first sheet pile structure comprises a plurality of first steel sheet piles, each first steel sheet pile is vertically arranged on the first side face, and the first steel sheet piles are connected in sequence.
3. The supporting structure of claim 1, wherein the second sheet pile structure comprises a plurality of second steel sheet piles, each second steel sheet pile is vertically arranged on the second side face, and the second steel sheet piles are connected in sequence.
4. The supporting structure of claim 1, wherein the third sheet pile structure comprises a plurality of third sheet piles, each third sheet pile is vertically arranged on the third side surface, and the third sheet piles are connected in sequence.
5. The supporting structure of claim 1, wherein the pile top supporting assembly comprises a first connecting beam, a second connecting beam and a surrounding purlin, the first connecting beam is fixedly connected with the first sheet pile structure, the first connecting beam is arranged along the top edge of the first side surface, the second connecting beam is fixedly connected with the third sheet pile structure, the second connecting beam is arranged along the top edge of the third side surface, the surrounding purlin is fixedly connected with the second sheet pile structure, and the surrounding purlin is arranged along the top edge of the second side surface.
6. The support structure of claim 5, wherein the pile top support assembly further comprises a plurality of tie-rods, each tie-rod being connected between the first and second connecting beams.
7. The support structure of claim 6, wherein each of the tie-rods is equally spaced.
8. The supporting structure according to claim 1, wherein the blocking structure comprises a plurality of blocking pieces, the blocking pieces are sequentially and tightly connected along the upper direction and the lower direction and are positioned below the foundation connecting beam, and two ends of each blocking piece are fixedly connected with the second sheet pile structures respectively.
9. The support structure of claim 8, wherein the top closure is affixed to the bottom of the foundation tie beam.
10. A support system including two counter-bracing members and a support structure according to any one of claims 1 to 9, the counter-bracing members being connected between two of said pile top support assemblies.
11. The support system of claim 10, wherein the counter-stay is an i-steel or steel tube.
CN201921460434.4U 2019-09-03 2019-09-03 Supporting structure and supporting system Active CN211036997U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201921460434.4U CN211036997U (en) 2019-09-03 2019-09-03 Supporting structure and supporting system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201921460434.4U CN211036997U (en) 2019-09-03 2019-09-03 Supporting structure and supporting system

Publications (1)

Publication Number Publication Date
CN211036997U true CN211036997U (en) 2020-07-17

Family

ID=71540357

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201921460434.4U Active CN211036997U (en) 2019-09-03 2019-09-03 Supporting structure and supporting system

Country Status (1)

Country Link
CN (1) CN211036997U (en)

Similar Documents

Publication Publication Date Title
KR102071225B1 (en) Construction method of sheathing temporary facility using steel sheet pile
CN110424411B (en) Irregular foundation pit assembled steel supporting device and construction application method thereof
CN105926669A (en) Construction method of subway station
CN203654294U (en) Foundation pit supporting structure used in reverse building method
CN103938634B (en) A kind of deep foundation pit supporting structure and construction method
CN113136993A (en) Overhanging outer curtain wall supporting structure of building adjacent to historical landscape protection and construction method thereof
CN203213021U (en) Large-span non-ground type cast-in-place beam falsework
CN110387889A (en) A Supporting Method for Multi-Arch Foundation Pit Used in Long and Deep Foundation Pit
CN206396775U (en) A kind of masonry house concrete filled steel tube pillar support shock insulating foundation structure
CN114017040B (en) Construction method for karst tunnel to penetrate into high-water-level underground river and water guide structure
Sereshkeh et al. Induced settlement reduction of adjacent masonry building in residential constructions
CN211036997U (en) Supporting structure and supporting system
KR100856723B1 (en) Steel frame reverse casting system and method using cantilever type girder
CN111173042B (en) Advanced water stop post-cast strip of foundation slab and construction method
US20070151173A1 (en) Method of constructing structures with seismically-isolated base
CN112031495A (en) Prefabricated cabin transformer substation assembled steel structure foundation and construction splicing method thereof
CN117166510A (en) Deep large-diameter open caisson construction method
CN213572357U (en) Basement board reinforcing structure under one-column one-pile working condition of top-down construction method
CN219732023U (en) Fender pile and steel diagonal bracing fender structure
CN207727587U (en) A kind of preassembling supporting beam composite structure suitable for deposited reinforced concrete pile
CN110512617B (en) Supporting structure, supporting system and supporting method for connecting sections of foundation pits inside and outside existing building
CN219732015U (en) Single-side formwork supporting device for outer wall of foundation pit adjacent to building enclosure
CN215101658U (en) Tower crane embedded support leg reinforcing structure
CN217104669U (en) Combined transfer platform of temporary construction trestle
CN220789812U (en) Steel construction flood control wall cofferdam

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant