CN211036603U - Pavement structure composed of concrete and construction waste - Google Patents
Pavement structure composed of concrete and construction waste Download PDFInfo
- Publication number
- CN211036603U CN211036603U CN201921466712.7U CN201921466712U CN211036603U CN 211036603 U CN211036603 U CN 211036603U CN 201921466712 U CN201921466712 U CN 201921466712U CN 211036603 U CN211036603 U CN 211036603U
- Authority
- CN
- China
- Prior art keywords
- well
- concrete
- support
- seat
- well seat
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- Road Paving Structures (AREA)
Abstract
A pavement structure composed of concrete and construction waste relates to the technical field of construction pavements; offer the well head of drainage well on the concrete surface course, well head department installs the well lid device, the well lid device is installed on well seat concrete support, the below that well seat concrete supported is the wall of a well, the outside of the wall of a well is provided with the soil and abandons the material bed course, the top that the bed course was abandoned to well seat concrete support and stereoplasm is provided with the concrete surface course, the material bed is abandoned to the soil and is provided with a plurality of support reinforcement and stereoplasm between material bed course and the well seat concrete support and abandons to the soil between bed course and the concrete surface course and the soil abandons, the intraformational material gap of stereoplasm abandons has pour the filling concrete. A road surface structure that concrete and building rubbish constitute, adopt building rubbish building road surface, reduced the quantity of concrete to road surface structure is waterproof, durable, and can make things convenient for the drainage.
Description
Technical Field
The utility model relates to a building road surface technical field, concretely relates to road surface structure that concrete and building rubbish constitute.
Background
The concrete pavement is a material used as a cement concrete surface layer and comprises ordinary concrete, reinforced concrete, continuous reinforced concrete, steel fiber concrete, roller compacted concrete and the like. In highways, urban roads and airport pavements, the most widely adopted in China at present are common concrete pavements cast in situ, and the concrete pavements are also called plain concrete pavements without arranging reinforcing steel bars except for joint areas and local areas (edges or corners).
The construction waste refers to residue, waste soil, waste material, residual mud and other wastes generated in the process of constructing, laying, dismantling and repairing various buildings, structures, pipe networks and the like by construction and construction units or individuals. At present, the random stacking of the construction wastes is easy to generate potential safety hazards, and the site selection of most urban construction waste stacking places has randomness to a great extent, so that a great number of potential safety hazards are left. During the process of stacking and burying the construction waste, leachate or leachate which is the sewage seeped by fermentation, leaching and scouring of rainwater and soaking of surface water and underground water can cause serious pollution to the surrounding surface water and underground water. The construction waste is classified, and some hard waste materials can play a secondary role in pavement construction, so that the environmental pollution can be avoided, and the construction cost can be reduced.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to prior art's defect and not enough, provide a simple structure, reasonable in design, convenient to use's concrete and the road surface structure that building rubbish constitutes.
In order to achieve the above object, the utility model adopts the following technical scheme: the well comprises a concrete surface layer, a well mouth, a drainage well, a well cover device, a well seat concrete support, a well wall, a hard waste material layer, filling concrete, support steel bars and a soil waste material cushion layer; concrete surface course on set up the well head of drainage well, well head department installs the well lid device, the well lid device is installed on well seat concrete support, the below that well seat concrete supported is the wall of a well, the outside of the wall of a well is provided with the soil property and abandons the material bed course, the top that the bed course was abandoned to well seat concrete support and stereoplasm is provided with the concrete surface course, the material bed course is abandoned to the soil property and is provided with a plurality of support reinforcement and stereoplasm between material bed course and the well seat concrete support and abandons the material bed between material bed course and the well seat concrete support, the intraformational material gap of stereoplasm abandons has pour the filling concrete.
Further, the well lid device comprises a well base, a well lid and a drainage ring; the inner ring steps of the well seat are matched with a well cover, and a drainage ring with a meshed opening is arranged on the well cover.
Furthermore, the well seat is connected with the well seat concrete support through screws.
Furthermore, a concrete adhesive is arranged between the concrete surface layer and the hard waste material layer.
Furthermore, a sealing gasket is arranged between the well seat and the well seat concrete support.
The utility model discloses a theory of operation does: the concrete abandoned material in the construction waste for the concrete abandoned material cushion layer is paved and tamped, a well wall is poured, supporting steel bars are inserted into a concrete surface layer, hard abandoned material is paved, concrete is poured at last, the hard abandoned material gap is filled with concrete, then a well seat concrete support is poured, the surface of the well seat concrete support is enabled to be flush with the upper surface of the hard abandoned material layer, then a well cover device is fixed through screws, and finally the concrete surface layer is poured after concrete mucilage glue is brushed.
After the structure is adopted, the utility model discloses the beneficial effect who produces does: a road surface structure that concrete and building rubbish constitute, adopt building rubbish building road surface, reduced the quantity of concrete to road surface structure is waterproof, durable, and can make things convenient for the drainage, the utility model has the advantages of simple structure, set up reasonable, the cost of manufacture low.
Drawings
FIG. 1 is a block diagram of the present invention;
FIG. 2 is a top view of FIG. 1;
fig. 3 is a structural diagram of the manhole cover device of the present invention.
Description of reference numerals:
concrete surface course 1, well head 2, drainage well 3, well lid device 4, well seat concrete support 5, the wall of a well 6, stereoplasm abandon the bed of material 7, fill concrete 8, support reinforcement 9, the bed course 10 is abandoned to the soil matter, well seat 11, well lid 12, drainage ring 13, sealed 14, concrete glue 15, screw 16.
Detailed Description
In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings needed to be used in the description of the embodiments or the prior art will be briefly described below, it is obvious that the drawings in the following description are only some embodiments of the present invention, and for those skilled in the art, other drawings can be obtained according to these drawings without inventive exercise.
Referring to fig. 1 to fig. 3, the following technical solutions are adopted in the present embodiment: the well comprises a concrete surface layer 1, a well mouth 2, a drainage well 3, a well cover device 4, a well seat concrete support 5, a well wall 6, a hard abandoned material layer 7, filling concrete 8, support steel bars 9 and a soil abandoned material cushion layer 10; the concrete surface layer 1 is provided with a well mouth 2 of a drainage well 3, the well mouth 2 is provided with a well cover device 4, the well cover device 4 is arranged on a well seat concrete support 5, a well wall 6 is arranged below the well seat concrete support 5, the outer side of the well wall 6 is provided with a soil abandoned material cushion layer 10, the concrete surface layer 1 is arranged above the well seat concrete support 5 and a hard abandoned material layer 7, a plurality of supporting steel bars 9 and the hard abandoned material layer 7 are arranged between the soil abandoned material cushion layer 10 and the concrete surface layer 1 and between the soil abandoned material cushion layer 10 and the well seat concrete support 5, a filling concrete 8 is poured in a material gap in the hard abandoned material layer 7, the soil abandoned material cushion layer 10 is paved and tamped by using the soil abandoned material in the construction waste, the well wall 6 is poured, the supporting steel bars 9 are inserted into the concrete surface layer 1, the hard abandoned material is paved, the concrete is poured finally, the hard abandoned material gap is filled with the concrete, then, the well seat concrete supports 5 are poured, the surfaces of the well seat concrete supports 5 are flush with the upper surface of the hard abandoned material layer 7, then the well cover device 4 is fixed through screws, and finally the concrete surface layer 1 is poured after the concrete adhesive 15 is brushed.
The well cover device 4 comprises a well seat 11, a well cover 12 and a drainage ring 13; the inner ring step of well seat 11 on the cooperation have well lid 12, be provided with the drainage ring 13 of netted trompil on the well lid 12, well seat 11 passes through screw 16 and is connected with well seat concrete support 5, drainage ring 13 is used for the drainage, water on the concrete surface course 1 is discharged into drainage well 3 by drainage ring 13, outwards arranges by drainage well 3 lower part, avoids ponding.
A sealing gasket 14 is arranged between the well seat 11 and the well seat concrete support 5, so that rainwater cannot enter a pavement structure, and a waterproof effect is achieved.
After adopting above-mentioned structure, this embodiment produces beneficial effect does: this embodiment a pavement structure that concrete and building rubbish constitute, adopt building rubbish building road surface, reduced the quantity of concrete to pavement structure is waterproof, durable, and can make things convenient for the drainage, and this embodiment has simple structure, sets up reasonable, cost of manufacture low grade advantage.
The basic principles and main features of the invention and the advantages of the invention have been shown and described above. It will be understood by those skilled in the art that the present invention is not limited to the above embodiments, and that the foregoing embodiments and descriptions are provided only to illustrate the principles of the present invention without departing from the spirit and scope of the present invention. The scope of the invention is defined by the appended claims and equivalents thereof.
Claims (5)
1. The utility model provides a road surface structure that concrete and building rubbish constitute which characterized in that: the well comprises a concrete surface layer, a well mouth, a drainage well, a well cover device, a well seat concrete support, a well wall, a hard waste material layer, filling concrete, support steel bars and a soil waste material cushion layer; concrete surface course on set up the well head of drainage well, well head department installs the well lid device, the well lid device is installed on well seat concrete support, the below that well seat concrete supported is the wall of a well, the outside of the wall of a well is provided with the soil property and abandons the material bed course, the top that the bed course was abandoned to well seat concrete support and stereoplasm is provided with the concrete surface course, the material bed course is abandoned to the soil property and is provided with a plurality of support reinforcement and stereoplasm between material bed course and the well seat concrete support and abandons the material bed between material bed course and the well seat concrete support, the intraformational material gap of stereoplasm abandons has pour the filling concrete.
2. A pavement structure composed of concrete and construction waste according to claim 1, characterized in that: the well cover device comprises a well base, a well cover and a drainage ring; the inner ring steps of the well seat are matched with a well cover, and a drainage ring with a meshed opening is arranged on the well cover.
3. A pavement structure composed of concrete and construction waste according to claim 2, characterized in that: the well seat is connected with the well seat concrete support through screws.
4. A pavement structure composed of concrete and construction waste according to claim 1, characterized in that: and a concrete adhesive is arranged between the concrete surface layer and the hard waste material layer.
5. A pavement structure composed of concrete and construction waste according to claim 2, characterized in that: and a sealing gasket is arranged between the well seat and the well seat concrete support.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201921466712.7U CN211036603U (en) | 2019-09-05 | 2019-09-05 | Pavement structure composed of concrete and construction waste |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201921466712.7U CN211036603U (en) | 2019-09-05 | 2019-09-05 | Pavement structure composed of concrete and construction waste |
Publications (1)
Publication Number | Publication Date |
---|---|
CN211036603U true CN211036603U (en) | 2020-07-17 |
Family
ID=71566008
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201921466712.7U Expired - Fee Related CN211036603U (en) | 2019-09-05 | 2019-09-05 | Pavement structure composed of concrete and construction waste |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN211036603U (en) |
-
2019
- 2019-09-05 CN CN201921466712.7U patent/CN211036603U/en not_active Expired - Fee Related
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN100412275C (en) | Waterproof and plugging construction method for precipitation well in foundation pit | |
CN107022938A (en) | Precast concrete road system and construction method | |
CN105254195B (en) | A kind of Waste tire regeneration concrete composite material and complex and its construction method | |
CN109972475A (en) | A kind of ecological permeable paving structure | |
CN113863289A (en) | Double-layer sleeve concrete pile and construction method thereof | |
KR20010000378A (en) | Filling method to protect hidden pipe | |
CN210529400U (en) | Solidified building residue soil road structure | |
CN211036603U (en) | Pavement structure composed of concrete and construction waste | |
CN211395755U (en) | Prefabricated square inspection shaft | |
CN114411921B (en) | Road reconstruction and extension roadbed drainage ditch masonry method and structure | |
CN207228166U (en) | A kind of town road heavy well cover walling crib ruggedized construction | |
CN110924257A (en) | Municipal road, pouring template for construction of municipal road and construction method of pouring template | |
CN216040467U (en) | Road design roadbed reinforced structure | |
CN107023061B (en) | Assembled plastic municipal drainage inspection well and construction method | |
CN205088137U (en) | Junked tire recycled concrete combined material and complex body | |
CN212128696U (en) | Road bridge links up mixed light dirt road bed structure of section bubble | |
CN210684364U (en) | Road surface layer structure that building rubbish was recycled | |
CN210288620U (en) | Prefabricated resin concrete escape canal | |
CN209538245U (en) | A kind of late poured band structure of basement bottom board | |
CN217231309U (en) | Adopt building rubbish's green road structure | |
CN211498324U (en) | Utilize platform back of body road bed filling structure of building discarded object | |
CN216129911U (en) | Terrace drainage system capable of being recycled | |
CN220080105U (en) | Road surface inspection well limit mouth reservation device | |
CN221608641U (en) | Round pipe culvert basement layer structure | |
CN213897005U (en) | A handle structure that is used for asphalt concrete prevention of seepage panel to sink |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20200717 Termination date: 20210905 |