CN211018167U - Cable erection supporting device for building electromechanical installation engineering - Google Patents

Cable erection supporting device for building electromechanical installation engineering Download PDF

Info

Publication number
CN211018167U
CN211018167U CN201922094608.6U CN201922094608U CN211018167U CN 211018167 U CN211018167 U CN 211018167U CN 201922094608 U CN201922094608 U CN 201922094608U CN 211018167 U CN211018167 U CN 211018167U
Authority
CN
China
Prior art keywords
rod
wall
paying
extension rod
extension
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201922094608.6U
Other languages
Chinese (zh)
Inventor
朱波
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hunan Chuang Neng Power Engineering Co ltd
Original Assignee
Hunan Chuang Neng Power Engineering Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hunan Chuang Neng Power Engineering Co ltd filed Critical Hunan Chuang Neng Power Engineering Co ltd
Priority to CN201922094608.6U priority Critical patent/CN211018167U/en
Application granted granted Critical
Publication of CN211018167U publication Critical patent/CN211018167U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Installation Of Indoor Wiring (AREA)

Abstract

The utility model relates to a cable erection supporting device for building electromechanical installation engineering, which comprises a wall rod fixedly connected on a wall, wherein the wall rod is provided with a paying-off mechanism through an extension rod fixedly connected with the top end of the wall rod; the paying-off mechanism comprises a paying-off cross rod and a reinforcing rod, wherein the paying-off cross rod is horizontally installed on the wall back to the tail end of the extending rod, the connecting position where the extending rod is connected with the wall rod is provided with a paying-off groove, the reinforcing rod is fixedly connected to one side, facing the wall, of the extending rod, and the paying-off cross rod and the upper end face of the reinforcing rod are provided with paying-off grooves at equal intervals. The utility model discloses on the basis of guaranteeing the support stability ability, adopt the streamline to buckle the extension rod that sets up and will be provided with the horizontal pole and the stiffener space dislocation set of wire discharge groove, increase the interval that the cable was placed, do not pile up and twine, the wiring is standard, and then ensures that it has enough space all around, realizes the circulation of air for the heat dissipation, but the construction of being convenient for again overhauls.

Description

Cable erection supporting device for building electromechanical installation engineering
Technical Field
The utility model relates to a cable strutting arrangement field specifically indicates a building is cable erection bracing device for electromechanical installation engineering.
Background
The cable room, the power distribution room or the electric control room is a main control room controlled by a circuit, and is generally an electric box covered in a basement, a top building, a house with small space on the ground or a fan cover. Corresponding pay-off boxes or racks are generally arranged to be stacked up and down in order to prevent cables from being wound and facilitate maintenance. Because spaces such as basement, fan housing are narrow and small, piling up from top to bottom places the cable, is unfavorable for construction and maintenance to the circulation of air is poor, the heat dissipation is slow, and the cable conductor leads to calamity such as catching a fire because of overheated easily.
Therefore design how a section sets up corresponding cable erection strutting arrangement in limited and narrow and small total accuse room, can be regular emission electric wire, can make again have sufficient space so that overhaul and construction between the cable conductor to the space that enables between the cable conductor can make to generate heat to arrange scattered, it is to be unlikely to the cable conductor is overheated the utility model discloses the purpose of research.
Disclosure of Invention
To the problem that above-mentioned prior art exists, the utility model provides a strutting arrangement is erect to cable for building electromechanical installation engineering, this strutting arrangement is erect to electric wire can effectively solve the problem that above-mentioned prior art exists.
The technical scheme of the utility model is that:
a cable erection supporting device for building electromechanical installation engineering comprises a wall rod fixedly connected to a wall, wherein a pay-off mechanism is arranged on the wall rod through an extension rod fixedly connected to the top end of the wall rod, and an included angle is formed between the extension rod and the wall; the pay-off mechanism comprises pay-off cross rods which are horizontally arranged back to the wall at the tail ends of the extension rods and the connection positions of the extension rods and the wall rods, and pay-off grooves are formed in the upper end surfaces of the pay-off cross rods at equal intervals;
the paying-off mechanism further comprises a reinforcing rod fixedly connected to one side, facing the wall, of the extension rod, wire releasing grooves are formed in the upper end face of the reinforcing rod at equal intervals, one end, connected with the extension rod, of the reinforcing rod downwards forms a streamline fixing plate, and one end, not connected with the extension rod, of the reinforcing rod is upwards turned over to form a positioning plate fixed with the wall.
The positioning plate and the wall rod are respectively provided with at least one threaded hole, the wall is provided with bolt holes with the number and the intervals corresponding to the threaded holes, and the reinforcing rod and the wall rod are respectively corresponding to the bolt holes through the threaded holes and the bolt holes and are screwed with corresponding bolts to be connected and positioned on the wall.
The extension rod is of a streamline bending structure, and the bottom of the extension rod is welded to the top end of the wall rod.
The reinforcing rod and the fixed connecting plate are of an integrated structure and are welded at the middle position of the extension rod.
The tail ends of the paying-off cross rods are all upwards turned and extended to be provided with first wire blocking blocks.
One end of the paying-off cross rod connected with the extension rod extends upwards to be provided with a second wire blocking block.
The utility model has the advantages that:
1) the utility model discloses on the basis of guaranteeing the support stability ability, the extension rod that adopts the streamline to buckle the setting is with paying out machine's unwrapping wire horizontal pole and stiffener space dislocation set, at the interval that increases the cable and place, does not pile up and twine, and the wiring is standard, and then ensures that it has enough space all around, realizes the circulation of air for the heat dissipation, but the construction of being convenient for again overhauls.
2) The paying-off cross rods are fixedly connected with the connecting positions of the extension rods and the wall rods, so that the connecting stability of the extension rods and the wall rods can be enhanced, and the number of the paying-off cross rods and the paying-off grooves can be increased. Through the setting of the reinforcing rod, one can be with the stability of strong extension rod rigid coupling, and two can be at the dislocation of extension rod both sides setting reinforcing rod and unwrapping wire horizontal pole, increase the quantity of unwrapping wire groove.
3) The first wire blocking block and the second wire blocking block on the paying-off cross rod are matched to be arranged to further limit and position the cable, the cable is prevented from falling and being wound, and the limiting of the cable is further optimized.
Drawings
Fig. 1 is a schematic structural diagram of the present invention.
Fig. 2 is a schematic view of the usage state of the present invention.
Detailed Description
To facilitate understanding of those skilled in the art, the structure of the present invention will now be described in further detail with reference to the following examples:
referring to fig. 1-2, a cable erection supporting device for building electromechanical installation engineering comprises a wall rod 2 fixedly connected to a wall 1, wherein the wall rod 2 is provided with a paying-off mechanism 4 through an extension rod 3 fixedly connected to the top end of the wall rod, and the extension rod 3 forms an included angle with the wall 1; the paying-off mechanism 4 comprises paying-off cross rods 401 which are horizontally arranged back to the wall 1 at the tail ends of the extension rods 3 and at the connection positions of the extension rods 3 and the wall rods 2, and paying-off grooves 5 are formed in the upper end surfaces of the paying-off cross rods 401 at equal intervals;
paying out machine constructs 4 still includes the rigid coupling and is in extension rod 3 is towards stiffener 402 of wall 1 one side, the up end of stiffener 402 is provided with wire releasing groove 5 according to equidistant, the one end that extension rod 3 was connected to stiffener 402 is downwards formed the streamline and is consolidated board 9, and its one end of not connecting extension rod 3 turns over upwards to form locating plate 6 fixed with wall 1.
The positioning plate 6 and the wall rod 2 are respectively provided with at least one threaded hole 7, the wall 1 is provided with corresponding bolt holes with the number and the intervals of the bolt holes 7, and the reinforcing rod 402 and the wall rod 2 are respectively connected and positioned on the wall 1 through the corresponding bolt holes 8 which correspond to the threaded holes 7 and are screwed with the corresponding bolts.
The extension rod 3 is of a streamline bending structure, and the bottom of the extension rod is welded at the top end of the wall rod 2.
The reinforcing rod 402 and the fixed connection plate 9 are of an integrated structure and are welded at the middle position of the extension rod 3.
The tail ends of the paying-off cross rods 401 are all upwards turned and extended to be provided with first wire blocking blocks 403.
The paying-off cross rod 401 is connected with one end of the extension rod 3, and a second wire blocking block 404 extends upwards.
The traditional stacking and placing mode of cables is adopted, the paying-off cross rods 401 and the reinforcing rods 402 which are provided with the paying-off grooves 5 are arranged in a staggered mode through the extension rods 3 which are arranged in a bent mode through streamline, the cable placing space is increased, stacking and winding are avoided, wiring is standard, and therefore enough space is guaranteed around the cables, air circulation is achieved, and heat dissipation is accelerated; the reinforcing rod 402 can reinforce the fixed connection stability of the extension rod 3 on the basis of increasing the wire laying grooves 5; the arrangement of the line cross bar 401 at the junction of the extension bar 3 and the wall bar 2 also enhances the stability of the connection.
The foregoing is only a preferred embodiment of the present invention, and it should be noted that, for those skilled in the art, a plurality of modifications and decorations can be made without departing from the principle of the present invention, and these modifications and decorations should also be regarded as the protection scope of the present invention.

Claims (6)

1. The utility model provides a strutting arrangement is erect to cable for building electromechanical installation engineering, includes wall pole (2) of rigid coupling on wall (1), its characterized in that: the wall rod (2) is provided with a paying-off mechanism (4) through an extension rod (3) fixedly connected with the top end of the wall rod, and the extension rod (3) and the wall (1) form an included angle; the paying-off mechanism (4) comprises paying-off cross rods (401) which are horizontally arranged back to the wall (1) and are arranged at the tail ends of the extension rods (3) and the connection positions of the extension rods (3) and the wall rods (2), and paying-off grooves (5) are formed in the upper end faces of the paying-off cross rods (401) at equal intervals;
paying out machine constructs (4) still include the rigid coupling and is in extension rod (3) are towards stiffener (402) of wall (1) one side, stiffener (402) up end is provided with wire releasing groove (5) according to the equidistant, the one end that extension rod (3) were connected in stiffener (402) downwards forms the solid fishplate bar of streamline (9), and its one end of not connecting extension rod (3) upwards turns over the formation and fixes locating plate (6) with wall (1).
2. The cable erection support device for building electromechanical installation engineering of claim 1, characterized in that: the wall structure is characterized in that the positioning plate (6) and the wall rod (2) are respectively provided with at least one threaded hole (7), the wall (1) is provided with corresponding bolt holes with the number and the interval of the bolt holes and the threaded holes (7), and the reinforcing rod (402) and the wall rod (2) are respectively corresponding to the bolt holes through the threaded holes (7) and the bolt holes and are connected with corresponding bolts (8) in a screwing mode to be connected and positioned on the wall (1).
3. The cable erection support device for building electromechanical installation engineering of claim 1, characterized in that: the extension rod (3) is of a streamline bending structure, and the bottom of the extension rod is welded to the top end of the wall rod (2).
4. The cable erection support device for building electromechanical installation engineering of claim 1, characterized in that: the reinforcing rod (402) and the fixed connection plate (9) are of an integrated structure and are welded at the middle position of the extension rod (3).
5. The cable erection support device for building electromechanical installation engineering of claim 1, characterized in that: the tail ends of the paying-off cross rods (401) are all upwards turned and extended to be provided with first wire blocking blocks (403).
6. The cable erection support device for building electromechanical installation engineering of claim 5, characterized in that: one end of the paying-off cross rod (401) connected with the extension rod (3) extends upwards to be provided with a second wire blocking block (404).
CN201922094608.6U 2019-11-28 2019-11-28 Cable erection supporting device for building electromechanical installation engineering Active CN211018167U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201922094608.6U CN211018167U (en) 2019-11-28 2019-11-28 Cable erection supporting device for building electromechanical installation engineering

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201922094608.6U CN211018167U (en) 2019-11-28 2019-11-28 Cable erection supporting device for building electromechanical installation engineering

Publications (1)

Publication Number Publication Date
CN211018167U true CN211018167U (en) 2020-07-14

Family

ID=71481215

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201922094608.6U Active CN211018167U (en) 2019-11-28 2019-11-28 Cable erection supporting device for building electromechanical installation engineering

Country Status (1)

Country Link
CN (1) CN211018167U (en)

Similar Documents

Publication Publication Date Title
US20160215511A1 (en) Device and a procedure for cast-in-situ a wall or similar
KR101027683B1 (en) Sectional cable tray for apartment house
CN211018167U (en) Cable erection supporting device for building electromechanical installation engineering
CN102518875B (en) The wire installation frame of a kind of dome or arc or slope use
CN209212028U (en) A kind of rapid rush-repair tower
US10738431B2 (en) Connection structure for a marine installation, marine installation and method of erecting a marine installation
KR101049961B1 (en) Fixing device of power distributing box of apartment house
CN203930169U (en) A kind of electric system can be coiled cable protection formula optical cable connecting box
CN211320837U (en) Flame-retardant bridge
CN203942223U (en) A kind of wall insulator bracket of supporting
CN107942453A (en) Butterfly cable
CN208046174U (en) Face electrical cables stringer in a kind of floor
CN216240041U (en) Quick-release temporary steel pipe tower
CN206602725U (en) Wire-management device and rack
CN204670225U (en) A kind of anti-bird occupying device
CN208299375U (en) A kind of house cable gantry
CN217469424U (en) Plugging device capable of adjusting positioning of embedded line pipe
KR101931483B1 (en) Cable arrange apparatus for cable tray
CN221031765U (en) 220KV double-circuit short type cable terminal rod
CN213143872U (en) Elbow protection and interval control device on pre-buried electric pipe
CN214303135U (en) Tension member on wall
JP2598633B2 (en) Reactor building and its grounding method
CN218767450U (en) Screen cabinet foundation and cable laying support combined module
CN215870675U (en) A connect subrack for bus duct distribution
CN216085807U (en) Power cabinet convenient to side winding displacement

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant