CN211013117U - Multi-meter series connection positioning device - Google Patents
Multi-meter series connection positioning device Download PDFInfo
- Publication number
- CN211013117U CN211013117U CN202020114502.8U CN202020114502U CN211013117U CN 211013117 U CN211013117 U CN 211013117U CN 202020114502 U CN202020114502 U CN 202020114502U CN 211013117 U CN211013117 U CN 211013117U
- Authority
- CN
- China
- Prior art keywords
- flange
- water
- supporting leg
- meter
- flange plate
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 claims abstract description 104
- 230000000712 assembly Effects 0.000 claims 2
- 238000000429 assembly Methods 0.000 claims 2
- 238000001514 detection method Methods 0.000 abstract description 25
- 230000000694 effects Effects 0.000 abstract description 6
- 238000000034 method Methods 0.000 description 6
- 238000009434 installation Methods 0.000 description 3
- 238000012986 modification Methods 0.000 description 2
- 230000004048 modification Effects 0.000 description 2
- 239000007787 solid Substances 0.000 description 2
- 238000013461 design Methods 0.000 description 1
- 238000011900 installation process Methods 0.000 description 1
- 238000007726 management method Methods 0.000 description 1
- 238000005259 measurement Methods 0.000 description 1
- 230000000087 stabilizing effect Effects 0.000 description 1
- 238000012360 testing method Methods 0.000 description 1
Images
Landscapes
- Measuring Volume Flow (AREA)
Abstract
The utility model provides a many meters positioner that establishes ties belongs to water gauge detection technical field. The multi-meter serial positioning device comprises a water inlet pipe, wherein a first flange plate is installed at one end of the water inlet pipe, a first water meter is installed at one side of the first flange plate, a second flange plate is installed at one side of the first water meter, a tube bundle rectifier is installed at one side of the second flange plate, a third flange plate is installed at the other end of the tube bundle rectifier, a second water meter is installed at one side of the third flange plate, a fourth flange plate is installed at one side of the second water meter, a water outlet pipe is installed at one side of the fourth flange plate, a pipeline positioning block is installed at the bottom of the water outlet pipe, a flange plate positioning block is installed at the bottom of the fourth flange plate, a groove is formed in the flange plate positioning, therefore, the multi-meter serial positioning device has the effects of high detection efficiency, small occupied area and accurate horizontal detection result of the adjustable device.
Description
Technical Field
The utility model relates to a water gauge detects technical field, particularly, relates to a many meters positioner that establishes ties.
Background
The water meter is a theoretical measuring instrument for national key management, the accuracy of the water meter has direct influence on water quantity measurement, the water meter needs to be detected in precision before delivery, the unqualified water meter can cause unnecessary loss to property of consumers after flowing out to the market for use, the detection method of the water meter comprises the steps of arranging the water meter in a detection device, passing a certain amount of water through the water meter, then comparing the reading of the water meter with the flowing water to detect the precision of the water meter, generally connecting the water meters in series for increasing efficiency to detect, installing the water meter in the series connection process, manually positioning and installing the water meter and a water pipe in the installation process, the operation process is inconvenient, the working efficiency is low, in the water detection process, the requirement of the water meter on the stability of the flow of water in the water pipe is very high, and the water flow after flowing through the water meter is unstable, the current method is to extend a pipeline between two water meters and lead the water flow to pass the next water meter after being stabilized, but the occupied area of the water meter detection device can be increased, because the water meters are precise devices, the levelness of the detection device is extremely high in the detection process, the whole detection process needs to be kept in a horizontal environment to ensure the detection accuracy, the current detection device is not provided with a structure for adjusting the level of the detection device, and the detection result is inaccurate because the detection result cannot be adjusted when the device is not level due to the fact that the ground is uneven or other reasons.
SUMMERY OF THE UTILITY MODEL
In order to compensate above not enough, the utility model provides a many tables series connection positioner through increase the tube bank rectifier and add positioner and level adjustment device in the water gauge of establishing ties, has improved current water gauge detection device detection efficiency low, area is big and can not adjust the level and lead to the unsafe problem of testing result.
The utility model discloses a realize like this:
a multi-meter series connection positioning device comprises a water inlet pipe, wherein a first flange plate is installed at one end of the water inlet pipe, a first water meter is installed on one side of the first flange plate, a second flange plate is installed on one side of the first water meter, a tube bundle rectifier is installed on one side of the second flange plate, a third flange plate is installed at the other end of the tube bundle rectifier, a second water meter is installed on one side of the third flange plate, a fourth flange plate is installed on one side of the second water meter, a water outlet pipe is installed on one side of the fourth flange plate, a pipeline positioning block is installed at the bottom of the water outlet pipe, a flange plate positioning block is installed at the bottom of the fourth flange plate, a groove is formed in the flange plate positioning block, a base is installed at the bottom of the pipeline positioning block, a level gauge is installed on, the supporting leg assembly comprises a first supporting leg, a sleeve, a second supporting leg and a fixing ring, the first supporting leg is installed at the top of the sleeve, the second supporting leg is installed at the bottom of the sleeve, and the fixing ring is installed on the surface of the second supporting leg.
In an embodiment of the present invention, the diameter of the water inlet pipe is equal to the diameter of the tube bundle rectifier and the diameter of the water outlet pipe.
The utility model discloses an in one embodiment, first water gauge with the ring flange of second water gauge both sides with first ring flange the second ring flange the third ring flange with the size and the shape of fourth ring flange are all unanimous.
The utility model discloses an in one embodiment, the ring flange locating piece includes first circular arc portion, and the recess that the surface of this first circular arc portion was seted up is the circular arc groove, the thickness dimension of first ring flange does half of recess width dimension.
In an embodiment of the present invention, the pipe positioning block includes a second arc portion, and the arc portion is adapted to the outer surface of the inlet pipe, the tube bundle rectifier and the outlet pipe.
In an embodiment of the present invention, a first thread groove is formed on a surface of one end of the first support leg, a second thread groove is formed on a surface of one end of the second support leg, a third thread groove is formed on an inner wall surface of the sleeve, a fourth thread groove is formed on an inner wall surface of the fixing ring, a direction of the first thread groove and a direction of the second thread groove are clockwise, and a direction of the third thread groove and a direction of the fourth thread groove are counterclockwise.
The utility model discloses an in the embodiment, the quantity of supporting leg subassembly is four, evenly distributed in the bottom of base.
The utility model has the advantages that: the utility model discloses a many tables of locating device that establishes ties that obtains through above-mentioned design, the tube bank rectifier is through second ring flange and third ring flange respectively with first water gauge and second water gauge intercommunication, replace the longer pipeline that originally needs with shorter tube bank rectifier and reduce area, the pipeline locating piece is installed in the bottom of inlet tube, tube bank rectifier and outlet pipe, the ring flange locating piece is installed respectively in the bottom of first ring flange, second ring flange, third ring flange and fourth ring flange, first water gauge and second water gauge are directly installed inside the ring flange locating piece and can accomplish the location and install fast, thereby promoted work efficiency, the supporting leg subassembly is installed in the bottom of base, the spirit level is installed in one side of base, the top of first supporting leg threaded connection sleeve, the bottom of second supporting leg threaded connection sleeve, solid fixed ring threaded connection is in second supporting leg surface, the distance between the first supporting leg and the second supporting leg can be changed by rotating the sleeve, so that the length of the supporting leg assembly changes the level of the adjusting device, and the multi-meter series connection positioning device has the effects of high detection efficiency, small occupied area and accurate level detection result of the adjusting device.
Drawings
In order to more clearly illustrate the technical solutions of the embodiments of the present invention, the drawings that are required to be used in the embodiments will be briefly described below, it should be understood that the following drawings only illustrate some embodiments of the present invention, and therefore should not be considered as limiting the scope, and for those skilled in the art, other related drawings can be obtained according to the drawings without inventive efforts.
FIG. 1 is a schematic structural view of a multi-meter serial positioning device according to an embodiment of the present invention;
fig. 2 is a schematic front view of a pipe positioning block according to an embodiment of the present invention;
fig. 3 is a schematic front view of a flange positioning block according to an embodiment of the present invention;
fig. 4 is a schematic top view of a flange positioning block according to an embodiment of the present invention;
fig. 5 is a schematic cross-sectional structural view of a support leg assembly provided by an embodiment of the present invention.
In the figure: 1-water inlet pipe; 2-a first flange; 3-a first water meter; 4-a second flange plate; 5-a tube bundle rectifier; 6-third flange plate; 7-a second water meter; 8-a fourth flange plate; 9-water outlet pipe; 10-a pipeline positioning block; 11-a flange plate positioning block; 1101-grooves; 12-a base; 13-a level gauge; 14-a support leg assembly; 1401-a first support leg; 1402-a sleeve; 1403-a second support leg; 1404 — a fixed ring.
Detailed Description
To make the objects, technical solutions and advantages of the embodiments of the present invention clearer, the drawings of the embodiments of the present invention are combined to clearly and completely describe the technical solutions of the embodiments of the present invention, and obviously, the described embodiments are some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
Thus, the following detailed description of the embodiments of the present invention, presented in the accompanying drawings, is not intended to limit the scope of the invention, as claimed, but is merely representative of selected embodiments of the invention. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
Examples
Referring to fig. 1-5, the present invention provides a technical solution: a multi-meter series connection positioning device comprises a water inlet pipe 1, wherein a first flange plate 2 is installed at one end of the water inlet pipe 1, a first water meter 3 is installed at one side of the first flange plate 2, a second flange plate 4 is installed at one side of the first water meter 3, a tube bundle rectifier 5 is installed at one side of the second flange plate 4, the tube bundle rectifier 5 is used for stabilizing unstable flow in a water pipe, a third flange plate 6 is installed at the other end of the tube bundle rectifier 5, a second water meter 7 is installed at one side of the third flange plate 6, a fourth flange plate 8 is installed at one side of the second water meter 7, a water outlet pipe 9 is installed at one side of the fourth flange plate 8, a pipeline positioning block 10 is installed at the bottom of the water outlet pipe 9, a flange positioning block 11 is installed at the bottom of the fourth flange plate 8, a groove 1101 is formed in the flange positioning block 11, the spirit level 13 is used for instructing the horizontality of current device, supporting leg assembly 14 is installed to the bottom of base 12, the quantity of supporting leg assembly 14 is four, evenly distributed is in the bottom of base 12, supporting leg assembly 14 includes first supporting leg 1401, sleeve 1402, second supporting leg 1403 and solid fixed ring 1404, first supporting leg 1401 is installed in the top of sleeve 1402, second supporting leg 1403 is installed in the bottom of sleeve 1402, gu fixed ring 1404 is installed in the surface of second supporting leg 1403, make many table series connection positioner have detection efficiency height, area is little and can the accurate effect of adjusting device's level detection result.
Referring to fig. 1-3, the diameter of the water inlet pipe 1 is consistent with the diameter of the tube bundle rectifier 5 and the diameter of the water outlet pipe 9, the pipe positioning block 10 includes a second circular arc portion, the circular arc portion is matched with the outer surfaces of the water inlet pipe 1, the tube bundle rectifier 5 and the water outlet pipe 9, the pipe positioning block 10 is installed at the bottom of the water inlet pipe 1, the tube bundle rectifier 5 and the water outlet pipe 9, the pipe positioning block 10 positions the water inlet pipe 1, the tube bundle rectifier 5 and the water outlet pipe 9 at the top of the base 12, the heights of the water inlet pipe 1, the tube bundle rectifier 5 and the water outlet pipe 9 are on the same horizontal line, the flanges at the two sides of the first water meter 3 and the second water meter 7 are consistent with the first flange 2, the second flange 4, the third flange 6 and the fourth flange 8 in size and shape, the flange positioning block 11 includes a first circular arc portion, the thickness dimension of first ring flange 2 is half of recess 1101 width dimension, ring flange locating piece 11 with first ring flange 2, second ring flange 4, third ring flange 6 and the top of fourth ring flange 8 location installation in base 12, first ring flange 2, second ring flange 4, the height that third ring flange 6 and fourth ring flange 8 were located is on same water flat line, first water gauge 3 and second water gauge 7 direct mount can accomplish with the location of pipeline inside the recess 1101 that ring flange locating piece 11 top was seted up, the installation rate has been accelerated, thereby make many tables series connection positioner have detection efficiency height, promote work efficiency's effect.
Referring to fig. 5, a first thread groove is formed on the surface of one end of a first support leg 1401, a second thread groove is formed on the surface of one end of a second support leg 1403, a third thread groove is formed on the inner wall surface of a sleeve 1402, a fourth thread groove is formed on the inner wall surface of a fixing ring 1404, the direction of the first thread groove and the direction of the second thread groove are clockwise, the direction of the third thread groove and the direction of the fourth thread groove are counterclockwise, the sleeve 1402 is rotated, the third thread groove formed on the inner wall surface of the sleeve 1402 is respectively engaged with the first thread groove formed on the outer wall of one end of the first support leg 1401 and the second thread groove formed on the surface of one end of the second support leg 1403, the distance between the first support leg 1401 and the second support leg 1403 is reduced or increased along with the rotation of the sleeve 1402, the length of the support leg assembly 14 is changed, the length of the support leg assembly 14 is adjusted by observing a level meter 13 so as to, after the adjustment is completed, the sleeve 1402 is fixed by rotating the fixing ring 1404, so that the multi-meter serial positioning device has the effect of adjusting the level detection result of the device to be accurate.
Specifically, this many tables series connection positioner's theory of operation: the pipe bundle rectifier 5 is arranged between the first water meter 3 and the second water meter 7, the water flow quantity of the water flow from the water outlet of the first water meter 3 is changed to be stable after passing through the second water meter 7 after passing through the pipe bundle rectifier 5, the pipe bundle rectifier 5 can replace a longer pipeline which is originally needed by using the pipe bundle rectifier 5, so that the occupied area is reduced, the pipeline positioning block 10 is arranged at the bottom of the water inlet pipe 1, the pipe bundle rectifier 5 and the water outlet pipe 9, the flange positioning blocks 11 are respectively arranged at the bottom of the first flange 2, the second flange 4, the third flange 6 and the fourth flange 8, the thickness sizes of the flanges at the two sides of the first flange 2, the second flange 4, the third flange 6, the fourth flange 8 and the first water meter 3 and the second water meter 7 are half of the width size of the groove 1101, and the first water meter 3 and the second water meter 7 can be directly arranged in the groove 1101 arranged at the top of the flange positioning, the installation speed is accelerated, thereby the working efficiency is improved, the supporting leg assembly 14 is installed at the bottom of the base 12, the gradienter 13 is installed at one side of the base 12, the top of the first supporting leg 1401 threaded connection sleeve 1402 is arranged at the top of the second supporting leg 1403, the bottom of the second supporting leg 1403 threaded connection sleeve 1402 is arranged at the bottom of the second supporting leg 1403, the fixing ring 1404 is loosened, the distance between the first supporting leg 1401 and the second supporting leg 1403 can be changed by rotating the sleeve 1402, the level of the adjusting device is changed by the length of the supporting leg assembly 14, the length of the supporting leg assembly 14 is adjusted to be the integral level of the device by observing the gradienter 13, the fixing ring 1404 is rotated to fix the sleeve 1402 after the adjustment is completed, and the multi-meter series connection positioning device has the effects of high detection efficiency, small floor area and accurate level detection result.
It should be noted that the specific model and specification of the tube bundle rectifier 5 need to be determined by type selection according to the actual specification of the device, and the specific type selection adopts the prior art in the field, so detailed description is omitted.
The principle of the tube bundle rectifier 5 is clear to the person skilled in the art and will not be described in detail here.
The above description is only a preferred embodiment of the present invention and is not intended to limit the present invention, and various modifications and changes may be made by those skilled in the art. Any modification, equivalent replacement, or improvement made within the spirit and principle of the present invention should be included in the protection scope of the present invention.
Claims (7)
1. The utility model provides a many meters positioner that establishes ties, its characterized in that, includes inlet tube (1), first ring flange (2) are installed to the one end of inlet tube (1), first water gauge (3) are installed to one side of first ring flange (2), second ring flange (4) are installed to one side of first water gauge (3), tube bank rectifier (5) are installed to one side of second ring flange (4), third ring flange (6) are installed to the other end of tube bank rectifier (5), second water gauge (7) are installed to one side of third ring flange (6), fourth ring flange (8) are installed to one side of second water gauge (7), outlet pipe (9) are installed to one side of fourth ring flange (8), pipeline locating piece (10) are installed to the bottom of pipe flange (9), ring flange locating piece (11) are installed to the bottom of fourth ring flange (8), the novel pipeline positioning device is characterized in that a groove (1101) is formed in the flange positioning block (11), a base (12) is installed at the bottom of the pipeline positioning block (10), a level gauge (13) is installed on one side of the base (12), a supporting leg assembly (14) is installed at the bottom of the base (12), the supporting leg assembly (14) comprises a first supporting leg (1401), a sleeve (1402), a second supporting leg (1403) and a fixing ring (1404), the first supporting leg (1401) is installed at the top of the sleeve (1402), the second supporting leg (1403) is installed at the bottom of the sleeve (1402), and the fixing ring (1404) is installed on the surface of the second supporting leg (1403).
2. A multi-meter positioning device in series according to claim 1, characterized in that the diameter of the inlet pipe (1) coincides with both the diameter of the tube bundle rectifier (5) and the diameter of the outlet pipe (9).
3. A multi-meter serial positioning device according to claim 1, wherein the flanges on both sides of said first water meter (3) and said second water meter (7) are identical in size and shape to said first flange (2), said second flange (4), said third flange (6) and said fourth flange (8).
4. A multi-meter serial positioning device according to claim 1, wherein the flange positioning block (11) comprises a first arc portion, the surface of the first arc portion is provided with a groove (1101) which is an arc groove, and the thickness dimension of the first flange (2) is half of the width dimension of the groove (1101).
5. The multi-meter serial positioning device according to claim 1, wherein the pipe positioning block (10) comprises a second circular arc portion, and the circular arc portion is matched with the outer surfaces of the water inlet pipe (1), the pipe bundle rectifier (5) and the water outlet pipe (9).
6. The multi-meter serial positioning device according to claim 1, wherein a first thread groove is formed in the surface of one end of the first support leg (1401), a second thread groove is formed in the surface of one end of the second support leg (1403), a third thread groove is formed in the surface of the inner wall of the sleeve (1402), a fourth thread groove is formed in the surface of the inner wall of the fixing ring (1404), the direction of the first thread groove and the direction of the second thread groove are clockwise, and the direction of the third thread groove and the direction of the fourth thread groove are counterclockwise.
7. A multi-meter serial positioning device according to claim 1, wherein the number of the supporting leg assemblies (14) is four, and the supporting leg assemblies are uniformly distributed at the bottom of the base (12).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202020114502.8U CN211013117U (en) | 2020-01-17 | 2020-01-17 | Multi-meter series connection positioning device |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202020114502.8U CN211013117U (en) | 2020-01-17 | 2020-01-17 | Multi-meter series connection positioning device |
Publications (1)
Publication Number | Publication Date |
---|---|
CN211013117U true CN211013117U (en) | 2020-07-14 |
Family
ID=71476371
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202020114502.8U Expired - Fee Related CN211013117U (en) | 2020-01-17 | 2020-01-17 | Multi-meter series connection positioning device |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN211013117U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO2023248031A1 (en) * | 2022-06-20 | 2023-12-28 | Sasu - Ecova Environnemen | Water monitoring and management system in distribution networks |
-
2020
- 2020-01-17 CN CN202020114502.8U patent/CN211013117U/en not_active Expired - Fee Related
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO2023248031A1 (en) * | 2022-06-20 | 2023-12-28 | Sasu - Ecova Environnemen | Water monitoring and management system in distribution networks |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN211013117U (en) | Multi-meter series connection positioning device | |
CN110715700B (en) | Flow regulator and metering device integrated device | |
CN102494742A (en) | Method for on-line calibration of large-caliber flow meter | |
CN103197400B (en) | Method for high-precision leveling of ridge of right-angle reflecting prism by adopting leveling device | |
CN201259433Y (en) | Horizontal screw wing dismantling water meter | |
CN214224252U (en) | Water gauge installing support convenient to use | |
CN204854573U (en) | A multi -functional chi for piping installation | |
CN210268766U (en) | Multi-channel ultrasonic flowmeter | |
CN213902487U (en) | Venturi flow meter | |
Kumar et al. | Effects of flow measurement on sloped pipes using ultrasonic flowmeter | |
CN105318153A (en) | Universal mounting mechanism for supporting, fixing, mounting and debugging equipment | |
CN203069212U (en) | Cross section rectifier type flowmeter | |
CN210513285U (en) | Novel flow adjuster and metering device integration device | |
CN212377615U (en) | Engineering cost surveyor's level support | |
CN211527493U (en) | Precession vortex flowmeter | |
CN218644540U (en) | Motor plate positioning device for axial flow fan | |
CN205332971U (en) | Measure wall thickness difference's device | |
CN218236926U (en) | Geographic information mapping device | |
CN205209565U (en) | High accuracy ultrasonic wave reflection table body structure | |
CN219300427U (en) | Laser ranging device for survey and drawing engineering | |
Shen | Characterization of swirling flow and its effects on orifice metering | |
CN215450915U (en) | Device for measuring inclination angle of fuel channel end part | |
CN214748171U (en) | Detachable multi-point matrix type flowmeter | |
CN219223746U (en) | Range finder convenient to dismouting | |
Wyler et al. | Comparisons between throat and pipe wall tap nozzles |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20200714 |
|
CF01 | Termination of patent right due to non-payment of annual fee |