Combined chimney capable of prolonging service life of water jacket furnace smoke tube Download PDF

Info

Publication number
CN211011928U
CN211011928U CN201921855806.3U CN201921855806U CN211011928U CN 211011928 U CN211011928 U CN 211011928U CN 201921855806 U CN201921855806 U CN 201921855806U CN 211011928 U CN211011928 U CN 211011928U
Authority
CN
China
Prior art keywords
chimney
smoke
pipe
water
port
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201921855806.3U
Other languages
Chinese (zh)
Inventor
杨培东
常学义
管延收
宋玉波
郭学民
贾岩
刘娜
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shengli Oilfield Petroleum Development Center Co ltd
China Petroleum and Chemical Corp
Original Assignee
Shengli Oilfield Petroleum Development Center Co ltd
China Petroleum and Chemical Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shengli Oilfield Petroleum Development Center Co ltd, China Petroleum and Chemical Corp filed Critical Shengli Oilfield Petroleum Development Center Co ltd
Priority to CN201921855806.3U priority Critical patent/CN211011928U/en
Application granted granted Critical
Publication of CN211011928U publication Critical patent/CN211011928U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02BCLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO BUILDINGS, e.g. HOUSING, HOUSE APPLIANCES OR RELATED END-USER APPLICATIONS
    • Y02B30/00Energy efficient heating, ventilation or air conditioning [HVAC]

Landscapes

  • Chimneys And Flues (AREA)

Abstract

The utility model discloses an extension water jacket furnace tobacco pipe life's combination chimney, include: a flared mouth of the smoke tube; the front end of the flare opening of the smoke pipe is connected with a smoke outlet of the water jacket furnace; the front end opening of the flared mouth of the smoke tube is provided with a water baffle. And the inlet port of the short connecting pipe is connected with the rear port of the flared opening of the smoke pipe. And the inlet port of the chimney vertical pipe is connected with the outlet port of the short connecting pipe. The lower end of the chimney vertical pipe is provided with a water storage tank. And a drain hole is formed at the bottom of the water storage tank. The drain hole is provided with a water drain gate. The utility model discloses better solution prevents the problem of acid condensate water inflow tobacco pipe.

Description

Combined chimney capable of prolonging service life of water jacket furnace smoke tube
Technical Field
The utility model belongs to the technical field of gas steam injection boiler technique and specifically relates to a prolong water jacket furnace tobacco pipe life's combination chimney.
Background
The water jacket heating furnace mainly comprises a fire tube, a smoke tube, a heated coil, a shell, a chimney and accessories. The medium in the shell of the heating furnace is clean water, and the medium in the coil is usually water-containing crude oil. The working principle is that fuel is combusted in the fire tube to generate high-temperature flue gas, the high-temperature flue gas is heated by water around the fire tube and the fire tube, then the medium in the coil is heated in a water bath by the hot water, the temperature of the medium in the coil is raised, and the medium in the coil is usually high in pressure so as to be convenient for outward transportation.
In practical application, as the operation time of the heating furnace increases, the smoke tube perforation phenomenon occurs on part of the heating furnace, so that the production is influenced by the fault shutdown, the maintenance frequency increases, and the maintenance cost increases.
The water jacket heating furnace is generally a multi-smoke tube design scheme and aims to increase the convection heat exchange area of smoke tubes so as to improve the efficiency of the heating furnace. Through checking the perforation positions, the perforation is found to occur in the No. 1 smoke exhaust pipe at the bottom of the smoke pipe. And the perforation time mostly occurs in seasons with relatively low air temperature.
The water jacket heating furnace fuel is associated natural gas produced by oil wells, the main component of the associated natural gas is alkane, the combustion products are H2O and CO2, H2O starts to exist in a steam form, and the associated natural gas is cooled into liquid water in the process of rising along a chimney and flows down along the wall of the chimney. The flue gas contains certain sulfides which are reflected with liquid water to generate strong acid H2SO3, and due to design defects (the problem of backflow of condensed water is not considered), no flue baffle is arranged, SO that the acidic condensed water flows into the flue pipe along a chimney in a pouring manner, and the flue pipe is corroded to cause perforation. The corrosive debris on the inner wall of the chimney falls on the smoke pipe mouth to cause the terrain of the smoke pipe mouth to be higher, so that condensed water condensed in the chimney can more easily flow into the smoke pipe, but if the condensed water is not present, the corrosive debris is not generated. And observation and statistics show that the amount of corrosion debris of the chimney is different in the heating furnace with the perforated smoke pipe. Therefore, in order to prevent the acidic condensate water from flowing into the smoke tube, the main factor for solving the problem of too fast corrosion of the smoke tube is solved.
Application No.: 201220644157.4, filing date: 2012-11-29 discloses a non-corrosive chimney provided with a sandwich drainage structure. The corrosion-free chimney with the interlayer drainage structure comprises an outer barrel, an inner barrel and an interlayer arranged at a bracket between the outer barrel and the inner barrel, wherein a water collecting pit for collecting accumulated water in the interlayer is arranged at the bracket part of the outer barrel, and the bottom of the water collecting pit is communicated with an inner cavity of the chimney through a drainage pipe penetrating through the wall of the inner barrel. The utility model discloses bracket position between chimney urceolus and inner tube constructs an intermediate layer drainage structures with urceolus prevention of seepage, reaches the effect that the urceolus does not have the seepage, and the inner tube does not corrode. The structure consists of three parts, namely a partial waterproof coating on the inner surface of the outer cylinder, a short drainage pipe, a cover plate and the like. The structure is mainly applied to the design and the transformation of a chimney for rotationally discharging smoke, and ensures the all-weather safe operation of the chimney under special conditions, such as the condition that the construction process is not in place, the lining is cracked due to high-temperature thermal stress, and wet smoke enters the interlayer and forms condensed water under the extremely cold weather condition.
Application No.: 201721332206.X, filing date: 2017-10-16 discloses an environment-friendly chimney capable of preventing condensed water corrosion, and mainly relates to a chimney structure in smoke emission equipment. Including chimney main part, fixed baseplate, advance tobacco pipe way, drain pipe, dust filter and anti-backflow flange, chimney main part lateral wall is equipped with the condensate water chamber, is equipped with inlet tube and outlet pipe in the chimney main part, is equipped with first high temperature anticorrosive coating layer on the chimney main part inner wall, and the dust filter includes top annular collection liquid support, toper filter screen and bottom sprag support, advances the tobacco pipe way end and stretches into the inside 2 ~ 10cm of chimney main part, is equipped with annular drainage groove on the anti-backflow flange. The beneficial effects of the utility model reside in that: the content of smoke dust and the content of sulfide and nitride in the smoke gas can be reduced; the smoke entering the chimney main body from the smoke inlet pipeline is prevented from leaking into the atmosphere from the drain pipe; the condensed sewage formed in the chimney body is prevented from flowing down to the inner wall of the smoke inlet pipeline from the inner wall of the chimney body, so that the accumulated water and corrosion of the smoke inlet pipeline are avoided.
Application No.: 201320200668.1, filing date: 2013-04-20 relates to a boiler chimney condensed water collecting device, which comprises a transverse pipe (1) communicated with a boiler smoke outlet and a vertical pipe (2) communicated with a chimney, wherein the other end of the transverse pipe (1) communicated with the boiler smoke outlet is transversely inserted and extends into one section of the vertical pipe (2), the lower end part of the lower part of the position where the vertical pipe (2) is communicated with the transverse pipe (1) is closed and is provided with a bottom surface (21) located at the lowest point position, and a condensed water outlet (22) is arranged at the lowest point position of the bottom surface (21) of the vertical pipe (2). The boiler can not lead the condensed water generated by the chimney to flow into the boiler, can not lead the inside of the boiler to rust and corrode, and can prolong the service life of the boiler. The boiler can be led out from the bypass connection before the condensed water flows into the boiler, thereby avoiding boiler corrosion caused by the condensed water, greatly reducing the maintenance rate of the boiler, reducing the shutdown maintenance time of the boiler and ensuring the normal heat supply work of the boiler.
Application No.: 201721332206.X, filing date: 2017-10-16 discloses an environment-friendly chimney capable of preventing condensed water corrosion, and mainly relates to a chimney structure in smoke emission equipment. Including chimney main part, fixed baseplate, advance tobacco pipe way, drain pipe, dust filter and anti-backflow flange, chimney main part lateral wall is equipped with the condensate water chamber, is equipped with inlet tube and outlet pipe in the chimney main part, is equipped with first high temperature anticorrosive coating layer on the chimney main part inner wall, and the dust filter includes top annular collection liquid support, toper filter screen and bottom sprag support, advances the tobacco pipe way end and stretches into the inside 2 ~ 10cm of chimney main part, is equipped with annular drainage groove on the anti-backflow flange. The beneficial effects of the utility model reside in that: the content of smoke dust and the content of sulfide and nitride in the smoke gas can be reduced; the smoke entering the chimney main body from the smoke inlet pipeline is prevented from leaking into the atmosphere from the drain pipe; the condensed sewage formed in the chimney body is prevented from flowing down to the inner wall of the smoke inlet pipeline from the inner wall of the chimney body, so that the accumulated water and corrosion of the smoke inlet pipeline are avoided.
Technical scheme and the technical problem that will solve and the beneficial effect who produces of above disclosure technique all with the utility model discloses inequality, to the utility model discloses more technical characteristics and the technical problem and the beneficial effect that will solve all do not have the technological inspiration in the above technical document that discloses.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide an extension water jacket stove tobacco pipe life's combination chimney, better solution prevents the problem of acid comdenstion water inflow tobacco pipe.
In order to achieve the above object, the utility model adopts the following technical scheme, a prolong water jacket furnace tobacco pipe life's combination chimney, include:
a flared mouth of the smoke tube; the front end of the flare opening of the smoke pipe is connected with a smoke outlet of the water jacket furnace;
the front end opening of the flared mouth of the smoke tube is provided with a water baffle.
Further, the area of the water baffle plate accounts for 8% of the smoke channel of the front port of the horn-shaped mouth of the whole smoke pipe.
Furthermore, the water baffle and the inner wall of the front port of the flared mouth of the smoke pipe are welded into a whole.
Furthermore, the water baffle is fixedly arranged at the front end opening of the flared mouth of the smoke tube, and the water baffle is sealed with the inner wall of the front end opening of the flared mouth of the smoke tube.
Further, still include:
and the inlet port of the short connecting pipe is connected with the rear port of the flared opening of the smoke pipe.
Further, still include:
and the inlet port of the chimney vertical pipe is connected with the outlet port of the short connecting pipe.
Furthermore, rain-proof cap is installed to chimney standpipe upper end.
Furthermore, a water storage tank is arranged at the lower end of the chimney vertical pipe.
Furthermore, a drain hole is formed in the bottom of the water storage tank.
Further, the drain hole is provided with a water drain gate.
Compared with the prior art, the utility model following beneficial effect has:
1. the water baffle is added at the front end of the horn mouth of the chimney, the area of the water baffle accounts for about 8 percent of the whole smoke channel, thus the throughput of smoke is not influenced, and the water baffle prevents condensed water from entering the smoke tube.
2. The water storage tank for storing the condensed water is additionally arranged at the bottom of the chimney, and after the condensed water appears, the condensed water flows downwards along the wall of the chimney and is stored in the water storage tank.
3. The lower end of the water storage tank is provided with a water discharge gate for discharging condensed water collected in the water storage tank periodically. Therefore, the condensed water can not flow to the bottom of the smoke tube, and the corrosion problem is prevented.
Drawings
FIG. 1 is a schematic structural view of a combined chimney for prolonging the service life of a water jacket furnace smoke tube of the present invention;
FIG. 2 is a cross-sectional view of the flare of the smoke tube.
In the figure: 1. the water jacket heating furnace comprises a water jacket heating furnace 2, a smoke pipe bell mouth 3, a smoke pipe connecting short joint 4, a smoke pipe vertical pipe 5, a water storage tank 6, a water discharge gate 7 and a water baffle plate.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
Example 1:
referring to fig. 1 to 2, the present invention provides a technical solution: a combination chimney for prolonging the service life of a water jacket furnace smoke tube comprises:
a flared mouth 2 of the smoke tube; the front end of the flare opening of the smoke pipe is connected with a smoke outlet of the water jacket furnace;
the front end opening of the flared mouth of the smoke tube is provided with a water baffle 7.
Further, the area of the water baffle plate accounts for 8% of the smoke channel of the front port of the horn-shaped mouth of the whole smoke pipe.
Furthermore, the water baffle and the inner wall of the front port of the flared mouth of the smoke pipe are welded into a whole.
Furthermore, the water baffle is fixedly arranged at the front end opening of the flared mouth of the smoke tube, and the water baffle is sealed with the inner wall of the front end opening of the flared mouth of the smoke tube.
Further, still include:
the short connection pipe, namely the chimney, is connected with the short connector 3, and the inlet port of the short connection pipe is connected with the rear port of the flared port of the smoke pipe.
Further, still include:
and the inlet port of the chimney vertical pipe is connected with the outlet port of the short connecting pipe.
Furthermore, rain-proof cap is installed to chimney standpipe upper end.
Further, a water storage tank 5 is arranged at the lower end of the chimney vertical pipe.
Furthermore, a drain hole is formed in the bottom of the water storage tank.
Further, the drain hole is provided with a water discharge gate 6.
The working process is as follows: the heating furnace is characterized in that flue gas which is circulated and finished in the flue pipe flows to the flue pipe through the horn mouth of the flue pipe and is discharged from the flue pipe, condensed water flows down on the inner wall of the vertical part of the flue pipe and flows to the water storage tank, the water baffle is used for intercepting and preventing the condensed water from flowing into the bottom of the flue pipe, and a drain valve is used for draining periodically, so that the condensed water is ensured not to flow to the bottom of the flue pipe, and the corrosion problem is prevented.
Example 2:
referring to fig. 1 to 2, the present invention provides a technical solution: a combination chimney for prolonging the service life of a water jacket furnace smoke tube comprises:
a flared mouth 2 of the smoke tube; the front end of the flare opening of the smoke pipe is connected with a smoke outlet of the water jacket furnace;
the front end opening of the flared mouth of the smoke tube is provided with a water baffle 7.
Further, the area of the water baffle plate accounts for 8% of the smoke channel of the front port of the horn-shaped mouth of the whole smoke pipe.
Furthermore, the water baffle and the inner wall of the front port of the flared mouth of the smoke pipe are welded into a whole.
Further, still include:
the short connection pipe, namely the chimney, is connected with the short connector 3, and the inlet port of the short connection pipe is connected with the rear port of the flared port of the smoke pipe.
Further, still include:
and the inlet port of the chimney vertical pipe is connected with the outlet port of the short connecting pipe.
Furthermore, rain-proof cap is installed to chimney standpipe upper end.
Further, a water storage tank 5 is arranged at the lower end of the chimney vertical pipe.
Furthermore, a drain hole is formed in the bottom of the water storage tank.
Further, the drain hole is provided with a water discharge gate 6.
Example 3:
referring to fig. 1 to 2, the present invention provides a technical solution: a combination chimney for prolonging the service life of a water jacket furnace smoke tube comprises:
a flared mouth 2 of the smoke tube; the front end of the flare opening of the smoke pipe is connected with a smoke outlet of the water jacket furnace;
the front end opening of the flared mouth of the smoke tube is provided with a water baffle 7.
Further, the area of the water baffle plate accounts for 8% of the smoke channel of the front port of the horn-shaped mouth of the whole smoke pipe.
Furthermore, the water baffle and the inner wall of the front port of the flared mouth of the smoke pipe are welded into a whole.
Further, still include:
the short connection pipe, namely the chimney, is connected with the short connector 3, and the inlet port of the short connection pipe is connected with the rear port of the flared port of the smoke pipe.
Further, still include:
and the inlet port of the chimney vertical pipe is connected with the outlet port of the short connecting pipe.
Furthermore, rain-proof cap is installed to chimney standpipe upper end.
Further, a water storage tank 5 is arranged at the lower end of the chimney vertical pipe.
Furthermore, a drain hole is formed in the bottom of the water storage tank.
Example 4:
referring to fig. 1 to 2, the present invention provides a technical solution: a combination chimney for prolonging the service life of a water jacket furnace smoke tube comprises:
a flared mouth 2 of the smoke tube; the front end of the flare opening of the smoke pipe is connected with a smoke outlet of the water jacket furnace;
the front end opening of the flared mouth of the smoke tube is provided with a water baffle 7.
Further, the area of the water baffle plate accounts for 8% of the smoke channel of the front port of the horn-shaped mouth of the whole smoke pipe.
Furthermore, the water baffle and the inner wall of the front port of the flared mouth of the smoke pipe are welded into a whole.
Further, still include:
the short connection pipe, namely the chimney, is connected with the short connector 3, and the inlet port of the short connection pipe is connected with the rear port of the flared port of the smoke pipe.
Further, still include:
and the inlet port of the chimney vertical pipe is connected with the outlet port of the short connecting pipe.
Further, a water storage tank 5 is arranged at the lower end of the chimney vertical pipe.
Furthermore, a drain hole is formed in the bottom of the water storage tank.
Example 5:
referring to fig. 1 to 2, the present invention provides a technical solution: a combination chimney for prolonging the service life of a water jacket furnace smoke tube comprises:
a flared mouth 2 of the smoke tube; the front end of the flare opening of the smoke pipe is connected with a smoke outlet of the water jacket furnace;
the front end opening of the flared mouth of the smoke tube is provided with a water baffle 7.
Furthermore, the water baffle and the inner wall of the front port of the flared mouth of the smoke pipe are welded into a whole.
Further, still include:
the short connection pipe, namely the chimney, is connected with the short connector 3, and the inlet port of the short connection pipe is connected with the rear port of the flared port of the smoke pipe.
Further, still include:
and the inlet port of the chimney vertical pipe is connected with the outlet port of the short connecting pipe.
Further, a water storage tank 5 is arranged at the lower end of the chimney vertical pipe.
Furthermore, a drain hole is formed in the bottom of the water storage tank.
Example 6:
referring to fig. 1 to 2, the present invention provides a technical solution: a combination chimney for prolonging the service life of a water jacket furnace smoke tube comprises:
a flared mouth 2 of the smoke tube; the front end of the flare opening of the smoke pipe is connected with a smoke outlet of the water jacket furnace;
the front end opening of the flared mouth of the smoke tube is provided with a water baffle 7.
Furthermore, the water baffle and the inner wall of the front port of the flared mouth of the smoke pipe are welded into a whole.
Further, still include:
the short connection pipe, namely the chimney, is connected with the short connector 3, and the inlet port of the short connection pipe is connected with the rear port of the flared port of the smoke pipe.
Further, still include:
and the inlet port of the chimney vertical pipe is connected with the outlet port of the short connecting pipe.
Further, a water storage tank 5 is arranged at the lower end of the chimney vertical pipe.
Example 7:
referring to fig. 1 to 2, the present invention provides a technical solution: a combination chimney for prolonging the service life of a water jacket furnace smoke tube comprises:
a flared mouth 2 of the smoke tube; the front end of the flare opening of the smoke pipe is connected with a smoke outlet of the water jacket furnace;
the front end opening of the flared mouth of the smoke tube is provided with a water baffle 7.
Furthermore, the water baffle and the inner wall of the front port of the flared mouth of the smoke pipe are welded into a whole.
Further, still include:
the short connection pipe, namely the chimney, is connected with the short connector 3, and the inlet port of the short connection pipe is connected with the rear port of the flared port of the smoke pipe.
Further, still include:
and the inlet port of the chimney vertical pipe is connected with the outlet port of the short connecting pipe.
Although fig. 1 or fig. 2 is used in all the above embodiments, it is obvious to those skilled in the art that a separate drawing is not shown as long as parts or structural features missing in the embodiments are removed from the drawing. As will be clear to the skilled person. Of course, the embodiments with more components are only the preferred embodiments, and the embodiments with fewer components are the basic embodiments, but the basic utility model objects can also be achieved, so all these are within the protection scope of the present invention.
All parts and parts which are not discussed in the present application and the connection mode of all parts and parts in the present application belong to the known technologies in the technical field, and are not described again. Such as welding, threading, bolting, etc.
In the present application, the term "plurality" means two or more unless expressly defined otherwise. The terms "mounted," "connected," "fixed," and the like are to be construed broadly, and for example, "connected" may be a fixed connection, a removable connection, or an integral connection; "coupled" may be direct or indirect through an intermediary. The specific meaning of the above terms in the present invention can be understood according to specific situations by those skilled in the art.
In the description of the present invention, it should be understood that the terms "upper", "lower", "left", "right", "front", "back", and the like indicate orientations or positional relationships based on the orientations or positional relationships shown in the drawings, and are only for convenience of description and simplification of description, but do not indicate or imply that the device or unit indicated must have a specific direction, be constructed and operated in a specific orientation, and therefore, should not be construed as limiting the present invention.
In the description of the present specification, the description of the terms "one embodiment," "some embodiments," "specific embodiments," etc., means that a particular feature, structure, material, or characteristic described in connection with the embodiment or example is included in at least one embodiment or example of the invention. In this specification, the schematic representations of the terms used above do not necessarily refer to the same embodiment or example. Furthermore, the particular features, structures, materials, or characteristics described may be combined in any suitable manner in any one or more embodiments or examples.
The above description is only a preferred embodiment of the present invention and is not intended to limit the present invention, and various modifications and changes may be made by those skilled in the art. Any modification, equivalent replacement, or improvement made within the spirit and principle of the present invention should be included in the protection scope of the present invention.

Claims (10)

1. A combination chimney for prolonging the service life of a water jacket furnace smoke tube comprises:
a flared mouth of the smoke tube; the front end of the flare opening of the smoke pipe is connected with a smoke outlet of the water jacket furnace;
it is characterized in that a water baffle is arranged at the front port of the flared mouth of the smoke tube.
2. The combination chimney according to claim 1, wherein the area of the water baffle is 8% of the area of the smoke channel of the bell-mouth front end of the whole chimney.
3. The combined chimney according to claim 2, wherein the water baffle is welded to the inner wall of the flared front end of the chimney.
4. The combination chimney according to claim 2, wherein the baffle is fixed to the front end of the flared mouth of the chimney, and the baffle is sealed with the inner wall of the front end of the flared mouth of the chimney.
5. The combination chimney of claim 1 or 2, further comprising:
and the inlet port of the short connecting pipe is connected with the rear port of the flared opening of the smoke pipe.
6. The combination chimney of claim 5, further comprising:
and the inlet port of the chimney vertical pipe is connected with the outlet port of the short connecting pipe.
7. The combined chimney of claim 6, wherein a rain cap is mounted on the upper end of the chimney stem.
8. The combination chimney of claim 6, wherein the lower end of the chimney stem is provided with a water storage tank.
9. The combined chimney of claim 8, wherein the water storage tank has a drain hole at the bottom.
10. The combination chimney according to claim 9 wherein the drain hole is fitted with a water gate.
CN201921855806.3U 2019-10-30 2019-10-30 Combined chimney capable of prolonging service life of water jacket furnace smoke tube Active CN211011928U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201921855806.3U CN211011928U (en) 2019-10-30 2019-10-30 Combined chimney capable of prolonging service life of water jacket furnace smoke tube

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201921855806.3U CN211011928U (en) 2019-10-30 2019-10-30 Combined chimney capable of prolonging service life of water jacket furnace smoke tube

Publications (1)

Publication Number Publication Date
CN211011928U true CN211011928U (en) 2020-07-14

Family

ID=71477020

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201921855806.3U Active CN211011928U (en) 2019-10-30 2019-10-30 Combined chimney capable of prolonging service life of water jacket furnace smoke tube

Country Status (1)

Country Link
CN (1) CN211011928U (en)

Similar Documents

Publication Publication Date Title
CN201255417Y (en) Flue condensation economizer
CN104832934B (en) A kind of boiler smoke dedusting waste heat recovering energy conserving device
CN100595495C (en) Open back water reciprocating flue type normal pressure boiler
CN211011928U (en) Combined chimney capable of prolonging service life of water jacket furnace smoke tube
CN105485915B (en) A kind of flue gas waste heat recovery apparatus for oil-burning gas-fired boiler
CN207922567U (en) Portable self circulation heat-conducting oil heating sledge
CN111043619A (en) Waste heat utilization device and use method
CN104406185A (en) Boiler smoke gas cascade afterheat recovery energy-saving device
CN203464501U (en) Wall-hung boiler condensate seal tube with blocking protector
CN206890542U (en) A kind of horizontal type waste heat boiler that can improve heat exchange efficiency
CN104315872B (en) Boiler flue gas waste heat recycling and energy-saving device with boiler flue gas dust removing effect
CN212511087U (en) Anti-freezing condensate water recovery device
CN210717515U (en) Chain type grate multi-return biomass boiler
CN212673255U (en) Deicing device for top of steel chimney
CN209508302U (en) Iron-smelting furnace carbon brick protective device
CN206073117U (en) Cast aluminium heat exchanger smoke collection pipe road
CN201416878Y (en) Coal economizer of industrial boiler closed cycle phase-change heating system
CN2457514Y (en) Three return stroke wet back type gas and oil hot water boiler
CN205065161U (en) Eliminate steam conduit ponding water hammer device
CN206191897U (en) Slope thickness pipe heating furnace
CN220602253U (en) Heat exchange device
CN214249684U (en) Biomass boiler anticorrosion ultralow-temperature flue gas recovery energy-saving device
CN106338144B (en) Inclined multi-smoke tube heating furnace
CN209101311U (en) A kind of pipeline for gas flue water collector
CN217057582U (en) Boiler smoke discharging anticorrosion auxiliary device

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant