CN211007747U - A assembled structure for installing elevator vestibule additional - Google Patents
A assembled structure for installing elevator vestibule additional Download PDFInfo
- Publication number
- CN211007747U CN211007747U CN201921625967.3U CN201921625967U CN211007747U CN 211007747 U CN211007747 U CN 211007747U CN 201921625967 U CN201921625967 U CN 201921625967U CN 211007747 U CN211007747 U CN 211007747U
- Authority
- CN
- China
- Prior art keywords
- corridor
- elevator
- aluminum alloy
- concrete wall
- floor
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- Types And Forms Of Lifts (AREA)
Abstract
The utility model relates to the technical field of elevator installation engineering, in particular to an assembly type structure for installing an elevator corridor, which comprises a precast concrete wall, a precast aluminum alloy window and a corridor floor; one end of the corridor floor in the first direction is connected with a steel beam additionally provided with an elevator shaft, and the other end of the corridor floor in the first direction is connected with a stair platform of a building body; the two precast concrete walls are symmetrically arranged at two opposite ends of the corridor floor in a second direction, and the first direction is perpendicular to the second direction; the prefabricated aluminum alloy window is installed on the end face, far away from the corridor floor, of the prefabricated concrete wall. The utility model provides an assembly type structure for installing elevator vestibule additional has compared the work load that has reduced the site operation in present vestibule structure, has solved the problem of the potential safety hazard of influence and existence that brings resident's life, personal safety during the construction simultaneously.
Description
Technical Field
The utility model relates to an install elevator engineering technical field additional, especially relate to an assembled structure for installing elevator vestibule additional.
Background
Most install additional of elevator scheme is add the steel construction well outside original building, then installs elevator equipment again, and the construction environment is mostly original residential area, and the stream of people is great, the engineering time is restricted to some extent, and the cycle is longer, the risk is high. The existing construction mode for additionally installing the corridor generally comprises two schemes, one scheme is that a ground corridor is installed between a building stair and an additionally installed hoistway, after the corridor is installed, an aluminum alloy window is customized according to the size measured on site, 10-15 days are generally needed from customization to goods receiving, the aluminum alloy window is installed on two opposite sides of the ground corridor and used for lighting and ventilation, the upper portion of the aluminum alloy window is openable and closable, the lower portion of the aluminum alloy window is not openable and closable, finally, a guardrail is installed on the lower portion of one side, close to the inner side, of the aluminum alloy window, the aluminum alloy window is protected and used for a handrail of a pedestrian, and the whole construction period generally needs 5; and after the second scheme is installed on the passageway, concrete walls are laid on the two opposite sides of the passageway in a stacking type construction mode, then the aluminum alloy windows are customized according to the size measured on site, the aluminum alloy windows are installed on the concrete walls in an openable and closable mode, handrails do not need to be arranged after the installation is finished, and the construction period of the construction scheme generally needs 6-8 months. Two kinds of construction scheme respectively have the advantage, but all have the construction cycle length, with high costs and the loaded down with trivial details drawback of on-the-spot technology step, owing to install the construction environment of elevator additional for resident's residential area, there are very big noise pollution and air pollution in steps such as concreting, bolt, outer wall and road surface cutting plastic, and aluminum alloy window, steel sheet and ceramic tile all have the hidden danger that drops, can cause very big harm to resident's life and pedestrian's safety like this. Therefore, innovative improvements to the structure of the added elevator corridor are necessary.
SUMMERY OF THE UTILITY MODEL
In order to overcome the defects of the prior art, the utility model aims to solve the technical problem that an easily be under construction and the reduction of erection time be used for installing elevator vestibule's assembled structure additional is provided.
In order to solve the technical problem, the utility model discloses a technical scheme be: an assembled structure for additionally installing an elevator corridor comprises a precast concrete wall, a precast aluminum alloy window and a corridor floor;
one end of the corridor floor in the first direction is connected with a steel beam additionally provided with an elevator shaft, and the other end of the corridor floor in the first direction is connected with a stair platform of a building body;
the two precast concrete walls are symmetrically arranged at two opposite ends of the corridor floor in a second direction, and the first direction is perpendicular to the second direction;
the prefabricated aluminum alloy window is installed on the end face, far away from the corridor floor, of the prefabricated concrete wall.
In an optional embodiment, a screw is embedded in the bottom of the precast concrete wall, and a mounting hole for the screw to pass through and lock is formed in the corridor floor.
In an optional embodiment, the precast concrete wall is connected with the additionally-installed elevator shaft and the building body respectively through pouring.
In an alternative embodiment, the precast concrete wall is internally provided with reinforcing bars which are distributed in a staggered manner.
In an alternative embodiment, the prefabricated aluminum alloy window is an openable and closable aluminum alloy window.
The beneficial effects of the utility model reside in that: the assembled structure for installing the elevator corridor comprises a precast concrete wall, precast aluminum alloy windows and a corridor floor, wherein the corridor floor is used for connecting and installing an elevator hoistway and a building body, the precast concrete wall and the precast aluminum alloy windows are arranged on two sides of the corridor floor, the height of the precast concrete wall, the height of the precast aluminum alloy windows and the sum of the heights of the precast concrete wall and the precast aluminum alloy windows can be preset according to construction standards such as the height of a building platform of the building body, the pouring height of reserved concrete, the bearing capacity of the corridor floor and the like, synchronous production can be realized when the steel structure hoistway and the corridor floor are installed, the precast concrete wall is only required to be fixed on the corridor floor during field installation, the installation can be finished by installing the precast aluminum alloy windows on the precast concrete wall, and finally, the precast concrete wall, the precast aluminum alloy windows, the corridor floor and other components are fixed through mechanical connection or thermal connection, compared with the prior floor which is firstly installed, after the concrete wall is hot-built on the floor, the construction scheme of the aluminum alloy window is customized according to the height, the concrete wall pouring steps are reduced, the on-site dimension measurement is not needed, the whole construction period of the elevator is shortened to 1-2 months, the workload of on-site construction is reduced, and the problems of influences on the life of residents and personal safety and potential safety hazards during construction are solved.
Drawings
Fig. 1 is a schematic structural view of a fabricated structure for installing an elevator corridor according to an embodiment of the present invention in a second direction;
fig. 2 is a schematic structural view of a fabricated structure for installing an elevator corridor according to an embodiment of the present invention in a first direction;
fig. 3 is a sectional view a-a of the fabricated structure for installing an elevator corridor according to the embodiment of the present invention;
description of reference numerals:
1-prefabricating a concrete wall; 11-a screw;
2-prefabricating an aluminum alloy window;
3-corridor floor;
4-installing an elevator shaft; 41-steel beam;
5-building body; 51-landing.
Detailed Description
In order to explain the technical content, the objects and the effects of the present invention in detail, the following description is made with reference to the accompanying drawings in combination with the embodiments.
Referring to fig. 1 to 3, the present invention relates to an assembly structure for installing an elevator corridor, which comprises a precast concrete wall, a precast aluminum alloy window and a corridor floor;
one end of the corridor floor in the first direction is connected with a steel beam additionally provided with an elevator shaft, and the other end of the corridor floor in the first direction is connected with a stair platform of a building body;
the two precast concrete walls are symmetrically arranged at two opposite ends of the corridor floor in a second direction, and the first direction is perpendicular to the second direction;
the prefabricated aluminum alloy window is installed on the end face, far away from the corridor floor, of the prefabricated concrete wall.
From the above description, the beneficial effects of the present invention are: the assembled structure for installing the elevator corridor comprises a precast concrete wall, precast aluminum alloy windows and a corridor floor, wherein the corridor floor is used for connecting and installing an elevator hoistway and a building body, the precast concrete wall and the precast aluminum alloy windows are arranged on two sides of the corridor floor, the height of the precast concrete wall, the height of the precast aluminum alloy windows and the sum of the heights of the precast concrete wall and the precast aluminum alloy windows can be preset according to construction standards such as the height of a building platform of the building body, the pouring height of reserved concrete, the bearing capacity of the corridor floor and the like, synchronous production can be realized when the steel structure hoistway and the corridor floor are installed, the precast concrete wall is only required to be fixed on the corridor floor during field installation, the installation can be finished by installing the precast aluminum alloy windows on the precast concrete wall, and finally, the precast concrete wall, the precast aluminum alloy windows, the corridor floor and other components are fixed through mechanical connection or thermal connection, compared with the prior floor which is firstly installed, after the concrete wall is hot-built on the floor, the construction scheme of the aluminum alloy window is customized according to the height, the concrete wall pouring steps are reduced, the on-site dimension measurement is not needed, the whole construction period of the elevator is shortened to 1-2 months, the workload of on-site construction is reduced, and the problems of influences on the life of residents and personal safety and potential safety hazards during construction are solved.
Furthermore, a screw is pre-embedded in the bottom of the precast concrete wall, and a mounting hole for the screw to penetrate through and be locked is formed in the corridor floor.
As can be known from the description, the precast concrete wall and the corridor floor are in locking connection through the screw rods and the mounting holes, and the structure is simple and firm, and the construction is easy.
Furthermore, the precast concrete wall is respectively connected with the additionally-installed elevator shaft and the building body through pouring.
As can be known from the above description, the prefabricated concrete wall after the assembly is connected with installing elevator well and building body respectively and is hot connected, further improves the holistic stability and the security of vestibule.
Furthermore, the inside of precast concrete wall is equipped with the reinforcing bar of crisscross distribution.
Further, the prefabricated aluminum alloy window is an openable aluminum alloy window.
Referring to fig. 1 to fig. 3, a first embodiment of the present invention is: an assembled structure for additionally installing an elevator corridor comprises a precast concrete wall 1, a precast aluminum alloy window 2 and a corridor floor 3;
one end of the corridor floor 3 in the first direction is connected with a steel beam 41 additionally provided with an elevator shaft 4, and the other end of the corridor floor 3 in the first direction is connected with a stair platform 51 of the building body 5;
the two precast concrete walls 1 are symmetrically arranged at two opposite ends of the corridor floor 3 in a second direction, and the first direction is perpendicular to the second direction;
the prefabricated aluminum alloy window 2 is installed on the end face, far away from the corridor floor 3, of the prefabricated concrete wall 1.
Referring to fig. 1 to fig. 3, a second embodiment of the present invention is: an assembled structure for additionally installing an elevator corridor comprises a precast concrete wall 1, a precast aluminum alloy window 2 and a corridor floor 3;
one end of the corridor floor 3 in the first direction is connected with a steel beam 41 additionally provided with an elevator shaft 4, and the other end of the corridor floor 3 in the first direction is connected with a stair platform 51 of the building body 5;
the two precast concrete walls 1 are symmetrically arranged at two opposite ends of the corridor floor 3 in a second direction, and the first direction is perpendicular to the second direction;
the prefabricated aluminum alloy window 2 is installed on the end face, far away from the corridor floor 3, of the prefabricated concrete wall 1.
The bottom of the precast concrete wall 1 is embedded with a screw 11, and the corridor floor 3 is provided with a mounting hole for the screw 11 to pass through and be locked. The precast concrete wall 1 is respectively connected with an additionally installed elevator shaft 4 and a building body 5 through pouring. And reinforcing steel bars which are distributed in a staggered manner are arranged in the precast concrete wall 1. The prefabricated aluminum alloy window 2 is an openable aluminum alloy window.
To sum up, the utility model provides an assembly type structure for installing elevator vestibule, which comprises a precast concrete wall, a precast aluminum alloy window and a vestibule floor, wherein the vestibule floor is used for connecting an elevator hoistway and a building body, both sides of the vestibule floor are provided with the precast concrete wall and the precast aluminum alloy window, the height of the precast concrete wall, the height of the precast aluminum alloy window and the sum of the heights of the precast concrete wall and the precast aluminum alloy window can be preset according to the building platform height of the building body, the preset concrete pouring height, the bearing capacity of the vestibule floor and other construction standards, the steel structure hoistway and the vestibule floor can be synchronously produced when being installed, the precast concrete wall is only required to be fixed on the vestibule floor during field installation, the precast aluminum alloy window is installed on the precast concrete wall again, and finally, the precast concrete wall, the precast aluminum alloy window, the vestibule floor and other components are fixed through mechanical connection or thermal connection, compared with the prior floor which is firstly installed, after the concrete wall is hot-built on the floor, the construction scheme of the aluminum alloy window is customized according to the height, the concrete wall pouring steps are reduced, the on-site dimension measurement is not needed, the whole construction period of the elevator is shortened to 1-2 months, the workload of on-site construction is reduced, and the problems of influences on the life of residents and personal safety and potential safety hazards during construction are solved.
The above mentioned is only the embodiment of the present invention, and not the limitation of the patent scope of the present invention, all the equivalent transformations made by the contents of the specification and the drawings, or the direct or indirect application in the related technical field, are included in the patent protection scope of the present invention.
Claims (5)
1. An assembled structure for additionally installing an elevator corridor is characterized by comprising a prefabricated concrete wall, a prefabricated aluminum alloy window and a corridor floor;
one end of the corridor floor in the first direction is connected with a steel beam additionally provided with an elevator shaft, and the other end of the corridor floor in the first direction is connected with a stair platform of a building body;
the two precast concrete walls are symmetrically arranged at two opposite ends of the corridor floor in a second direction, and the first direction is perpendicular to the second direction;
the prefabricated aluminum alloy window is installed on the end face, far away from the corridor floor, of the prefabricated concrete wall.
2. The assembly type structure for installing the elevator corridor is characterized in that a screw is embedded in the bottom of the precast concrete wall, and a mounting hole for the screw to penetrate through and be locked is formed in the corridor floor.
3. The fabricated structure for rigging an elevator corridor according to claim 1, wherein the precast concrete wall is connected to the rigging elevator hoistway and the building body by casting, respectively.
4. Fabricated structure for rigging of an elevator corridor according to claim 1, characterized in that the interior of the precast concrete wall is provided with staggered reinforcement.
5. The fabricated structure for rigging an elevator corridor according to claim 1, wherein the prefabricated aluminum alloy window is an openable and closable aluminum alloy window.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201921625967.3U CN211007747U (en) | 2019-09-27 | 2019-09-27 | A assembled structure for installing elevator vestibule additional |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201921625967.3U CN211007747U (en) | 2019-09-27 | 2019-09-27 | A assembled structure for installing elevator vestibule additional |
Publications (1)
Publication Number | Publication Date |
---|---|
CN211007747U true CN211007747U (en) | 2020-07-14 |
Family
ID=71471665
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201921625967.3U Expired - Fee Related CN211007747U (en) | 2019-09-27 | 2019-09-27 | A assembled structure for installing elevator vestibule additional |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN211007747U (en) |
-
2019
- 2019-09-27 CN CN201921625967.3U patent/CN211007747U/en not_active Expired - Fee Related
Similar Documents
Publication | Publication Date | Title |
---|---|---|
AU2017203291B2 (en) | Stronger wall system | |
CN201217898Y (en) | Concrete prefabricated stairs | |
CN107386447A (en) | A kind of assembled Mixed Architecture suitable for high residential building | |
WO2007011127A1 (en) | Precast stairway system, unit structure thereof, and method of constructing stairway system using the same | |
CN106245776B (en) | A kind of close cylinder system in assembly concrete house | |
JP7542522B2 (en) | Method for constructing a multi-storey structure, facade and building | |
KR20220154087A (en) | construction method | |
CN106892315A (en) | A kind of additional elevator hoistways of framework assembled | |
US3566558A (en) | Apartment buildings and the like | |
KR100760232B1 (en) | Precast stairs and the unit structure thereof, and constructing method for stairway using the same | |
CN107060152B (en) | Attachment device and method between a kind of prefabricated internal partition wall of substation and floor | |
CN211007747U (en) | A assembled structure for installing elevator vestibule additional | |
CN104727469B (en) | A kind of staircase prefabricated reinforced concrete fire barrier structure and construction thereof | |
CN116575602A (en) | Connection and installation method for vertical prefabricated parts of assembled building | |
CN206783059U (en) | A kind of additional elevator hoistways of framework assembled | |
CN215254267U (en) | Prefabricated light concrete modular elevator well of belted steel fossil fragments | |
KR100676193B1 (en) | Steel-frame stair structure | |
US20230417046A1 (en) | Multi-story building having prefabricated stair and elevator modules | |
CN211283343U (en) | Additional elevator capable of directly entering home | |
KR100763979B1 (en) | Multi slab for construction of underground parking lot | |
CN109610875B (en) | Assembled floor door frame of existing building with elevator and construction method | |
CN207525769U (en) | A kind of installation elevator pit | |
KR20210068283A (en) | Structural Systems and Methods for Floor Structural Work in Elevator Machine Room of Apartment Housing | |
CN221194380U (en) | Assembled reinforced concrete corridor based on flat floor entrance elevator | |
CN211447419U (en) | Energy-concerving and environment-protective steel construction concrete prefabricated plate and install elevator vestibule additional thereof |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||