CN211007574U - Concrete pouring operation rack for building floor slab - Google Patents

Concrete pouring operation rack for building floor slab Download PDF

Info

Publication number
CN211007574U
CN211007574U CN201920894710.1U CN201920894710U CN211007574U CN 211007574 U CN211007574 U CN 211007574U CN 201920894710 U CN201920894710 U CN 201920894710U CN 211007574 U CN211007574 U CN 211007574U
Authority
CN
China
Prior art keywords
fixedly arranged
base
operation platform
sides
hydraulic telescopic
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201920894710.1U
Other languages
Chinese (zh)
Inventor
李寒妤
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhejiang Anchi Construction Co ltd
Original Assignee
Zhejiang Anchi Construction Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhejiang Anchi Construction Co ltd filed Critical Zhejiang Anchi Construction Co ltd
Priority to CN201920894710.1U priority Critical patent/CN211007574U/en
Application granted granted Critical
Publication of CN211007574U publication Critical patent/CN211007574U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

The utility model relates to the technical field of building engineering, in particular to a concrete pouring operation rack for building floor slabs, which comprises an operation platform, wherein a hydraulic telescopic oil cylinder is fixedly arranged on the lower surface of the operation platform, the control output end of the hydraulic telescopic oil cylinder is fixedly connected with four peripheral corners of the lower surface of the operation platform, the lower end of the hydraulic telescopic oil cylinder, which is far away from the operation platform, is fixedly provided with a support rod, the lower end of the support rod, which is far away from the hydraulic telescopic oil cylinder, is fixedly provided with a base, the lower side of the base is fixedly provided with a movable structure, reinforcing ribs are fixedly arranged on the inner side below the support rod and above the base, two sides are connected with a first ladder stand through being fixedly arranged between the support rods, two sides of the first ladder stand are respectively provided with a plurality of rectangular array distribution, and a second ladder stand, the device stability is high, it is convenient to use, is worth promoting.

Description

Concrete pouring operation rack for building floor slab
Technical Field
The utility model relates to a building engineering technical field especially relates to a floor concrete placement operation rack is built in room.
Background
In the house building floor concrete placement work progress, the staff tramples mostly on the floor framework of reinforcement that has ligature, the condition that floor framework of reinforcement warp, aversion, structural reinforcement protective layer thickness are not enough can appear, and in the work progress, staff's personal safety is most important moreover, but the security is lacked mostly to current operation rack, for this reason, we propose a house building floor concrete placement operation rack.
SUMMERY OF THE UTILITY MODEL
The utility model aims at solving the defects existing in the prior art and providing a building floor concrete pouring operation rack.
In order to achieve the above purpose, the utility model adopts the following technical scheme:
the utility model provides a floor concrete placement operation rack is built in room, includes the operation platform, fixed surface is equipped with the hydraulic stretching hydro-cylinder under the operation platform, the control output end of hydraulic stretching hydro-cylinder links to each other with four jiaos of operation platform lower surface are fixed, the lower extreme that the operation platform was kept away from to the hydraulic stretching hydro-cylinder is the fixed bracing piece that is equipped with all, the equal fixed base that is equipped with of lower extreme that the hydraulic stretching hydro-cylinder was kept away from to the bracing piece, the base downside is the fixed removal structure that is equipped with all, the bracing piece below inboard is located the fixed strengthening rib that is equipped with in base top, both sides all be equipped with first cat ladder through fixed between the bracing piece and be connected, both sides first cat ladder all is equipped with a plurality ofly and is the rectangular array and distributes.
Preferably, the moving structure comprises an arc-shaped support plate, universal wheels, telescopic rods and suckers, the arc-shaped support plate is fixedly installed on two sides of the base, the universal wheels are fixedly installed at the inclined lower ends of the arc-shaped support plate, the telescopic rods are fixedly installed in the middle of the surface of the base, and the lower ends, far away from the base, of the telescopic rods are fixedly connected with the suckers.
Preferably, a first tool box is fixedly mounted on the inner side of the reinforcing rib, second tool boxes are fixedly arranged on two sides of the surface of the operation platform, and a placement groove is formed in the surface of the operation platform.
Preferably, a plurality of first handrails are fixedly arranged on the outer sides of the four supporting rods, and second handrails are fixedly arranged at two ends of the upper surface of the operation platform.
Preferably, guardrails are fixedly arranged on two sides of the upper surface of the operation platform, and the height direction of the guardrails is vertical to the surface of the operation platform.
The utility model provides a floor concrete placement operation rack is built in room, beneficial effect lies in:
1. the hydraulic telescopic oil cylinder in the building floor concrete pouring operation rack enables the height of an operation platform to be adjusted, and convenience of construction is guaranteed;
2. the reinforcing ribs can improve the supporting strength of the bottom of the supporting rod and the strength inside the operation rack, tools needed in the construction process can be placed in the first tool box, the first tool box is convenient to carry, a placing groove is formed in the surface of the operation platform, tools carried by workers can be placed in the placing groove, or the tools can be directly placed, so that the construction needs of the workers can be facilitated, and the tools are prevented from falling off the operation rack to influence the working efficiency;
3. first cat ladder and second cat ladder can supply the staff to use from top to bottom for the staff is convenient from top to bottom, and first handrail and second handrail can assist the staff to climb operation platform, improve the security, and the guardrail not only can protect the staff, can give the certain psychological comfort of staff moreover, improves the efficiency that the staff was under construction.
Drawings
Fig. 1 is a schematic diagram of a left front oblique perspective three-dimensional structure of a concrete pouring operation rack for a building floor slab provided by the utility model;
fig. 2 is a schematic diagram of a right front oblique perspective three-dimensional structure of a concrete pouring operation rack for a building floor slab provided by the utility model;
fig. 3 is an enlarged schematic view of a portion a in fig. 2.
In the figure: the hydraulic telescopic hydraulic ladder comprises a base 1, a support rod 2, a hydraulic telescopic oil cylinder 3, a working platform 4, a reinforcing rib 5, a first tool box 6, a moving structure 7, an arc-shaped support plate 71, a universal wheel 72, a telescopic rod 73, a suction cup 74, a first ladder stand 8, a first handrail 9, a second ladder stand 10, a second handrail 11, a guardrail 12, a second tool box 13 and a placement groove 14.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments.
Referring to fig. 1-3, floor concrete placement operation rack is built in room, including operation platform 4, fixed surface is equipped with hydraulic stretching cylinder 3 under the operation platform 4, the control output of hydraulic stretching cylinder 3 links to each other with four all corners of operation platform 4 lower surface are fixed, hydraulic stretching cylinder 3 makes operation platform 4's height adjust, guarantee the convenience of construction, the lower extreme that operation platform 4 was kept away from to hydraulic stretching cylinder 3 is all fixed and is equipped with bracing piece 2, the lower extreme that hydraulic stretching cylinder 3 was kept away from to bracing piece 2 is all fixed and is equipped with base 1, base 1 downside is all fixed and is equipped with removal structure 7.
Remove structure 7 and include arc extension board 71, universal wheel 72, telescopic link 73 and sucking disc 74, arc extension board 71 fixed mounting is in the both sides of base 1, universal wheel 72 fixed mounting is in the slope lower extreme of arc extension board 71, telescopic link 73 fixed mounting is in the middle part on base 1 surface, the lower extreme and the sucking disc 74 fixed connection that base 1 was kept away from to telescopic link 73, this operation rack can realize removing through universal wheel 72, and can be through sucking disc 74 and ground mutual actuation, then keep static, have higher stability, guarantee the security of staff when the construction, in addition, the telescopic link 72 that mentions here comprises electric telescopic cylinder, be convenient for adjust.
2 below inboards of bracing piece are located the fixed strengthening rib 5 that is equipped with in 1 top of base, strengthening rib 5 can improve the support intensity of 2 bottoms of bracing piece, improve the inside intensity of this operation rack, 5 inboard fixed mounting of strengthening rib have first toolbox 6, the instrument that needs to use in the work progress can be placed to first toolbox 6, and convenient to carry, it is convenient to use, 4 fixed second toolboxes 13 that are equipped with in surface both sides of operation platform, place groove 14 has been seted up on 4 surfaces of operation platform, can place the instrument splendid attire equipment that the staff took or can directly place the instrument in placing groove 14, so that the staff construction needs, and prevent that the instrument from dropping from this operation rack, influence work efficiency.
The two side supporting rods 2 are connected through a first ladder 8, the two side first ladders 8 are respectively provided with a plurality of first handrails 9 which are distributed in a rectangular array, the first ladder 8 can be used by a worker up and down to enable the worker to move up and down conveniently, the outer sides of the four supporting rods 2 are respectively fixedly provided with a plurality of first handrails 9, the first handrails 9 can provide assistance in the process of the worker up and down to improve the safety, the two sides of the lower surface of the operation platform 4 and the positions between the hydraulic telescopic oil cylinders 3 are respectively and fixedly provided with a second ladder 10, the second ladder 10 is used for assisting the worker to climb onto the operation platform 4 from the first ladder 8, the two ends of the upper surface of the operation platform 4 are respectively and fixedly provided with a second handrail 11, the second handrail 11 can assist the worker to climb onto the operation platform 4, the two sides of the upper surface of the operation platform 4 are respectively and fixedly provided with a guardrail, the height of guardrail 12 is minimum will be with staff's thigh top parallel and level, not only can protect the staff, can give the certain psychological comfort of staff moreover, improves staff's efficiency of construction.
The above, only be the concrete implementation of the preferred embodiment of the present invention, but the protection scope of the present invention is not limited thereto, and any person skilled in the art is in the technical scope of the present invention, according to the technical solution of the present invention and the utility model, the concept of which is equivalent to replace or change, should be covered within the protection scope of the present invention.

Claims (5)

1. A building floor concrete pouring operation rack comprises an operation platform (4) and is characterized in that a hydraulic telescopic oil cylinder (3) is fixedly arranged on the lower surface of the operation platform (4), the control output end of the hydraulic telescopic oil cylinder (3) is fixedly connected with four corners of the lower surface of the operation platform (4), support rods (2) are fixedly arranged at the lower ends of the hydraulic telescopic oil cylinder (3) far away from the operation platform (4), a base (1) is fixedly arranged at the lower ends of the support rods (2) far away from the hydraulic telescopic oil cylinder (3), a moving structure (7) is fixedly arranged at the lower side of the base (1), reinforcing ribs (5) are fixedly arranged at the lower inner side of the support rods (2) and above the base (1), the support rods (2) at two sides are connected with each other through a first ladder stand (8), the first ladder stands (8) at two sides are both provided with a plurality of them and distributed in a rectangular array manner, and second crawling ladders (10) are fixedly arranged on two sides of the lower surface of the operation platform (4) and between the hydraulic telescopic oil cylinders (3).
2. The building floor concrete pouring work bench according to claim 1, characterized in that the moving structure (7) comprises arc-shaped support plates (71), universal wheels (72), telescopic rods (73) and suction cups (74), the arc-shaped support plates (71) are fixedly installed on two sides of the base (1), the universal wheels (72) are fixedly installed on the inclined lower ends of the arc-shaped support plates (71), the telescopic rods (73) are fixedly installed in the middle of the surface of the base (1), and the lower ends of the telescopic rods (73) far away from the base (1) are fixedly connected with the suction cups (74).
3. The building floor concrete pouring work bench according to claim 1, characterized in that a first tool box (6) is fixedly installed on the inner side of the reinforcing rib (5), second tool boxes (13) are fixedly arranged on both sides of the surface of the work platform (4), and a placement groove (14) is formed in the surface of the work platform (4).
4. The concrete pouring work bench for the building floor slab as claimed in claim 1, wherein a plurality of first handrails (9) are fixedly arranged on the outer sides of four support rods (2), and second handrails (11) are fixedly arranged at two ends of the upper surface of the work platform (4).
5. The concrete pouring work bench for the building floor slab as claimed in claim 1, wherein a guardrail (12) is fixedly arranged on each side of the upper surface of the work platform (4), and the height direction of the guardrail (12) is vertical to the surface of the work platform (4).
CN201920894710.1U 2019-06-14 2019-06-14 Concrete pouring operation rack for building floor slab Expired - Fee Related CN211007574U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201920894710.1U CN211007574U (en) 2019-06-14 2019-06-14 Concrete pouring operation rack for building floor slab

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201920894710.1U CN211007574U (en) 2019-06-14 2019-06-14 Concrete pouring operation rack for building floor slab

Publications (1)

Publication Number Publication Date
CN211007574U true CN211007574U (en) 2020-07-14

Family

ID=71479529

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201920894710.1U Expired - Fee Related CN211007574U (en) 2019-06-14 2019-06-14 Concrete pouring operation rack for building floor slab

Country Status (1)

Country Link
CN (1) CN211007574U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113738085A (en) * 2021-09-24 2021-12-03 陈贤峰 High-efficient environmental protection room building concrete placement workstation

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113738085A (en) * 2021-09-24 2021-12-03 陈贤峰 High-efficient environmental protection room building concrete placement workstation

Similar Documents

Publication Publication Date Title
CN210421868U (en) But height-adjusting's stable form engineering construction scaffold
CN211007574U (en) Concrete pouring operation rack for building floor slab
CN106315475A (en) Power maintenance vehicle
CN204753397U (en) Gallows is installed to steel case bridge temporarily
CN212453549U (en) Liftable scaffold for building decoration
CN217380565U (en) Movable platform for tunnel construction
CN204824005U (en) Novel cut fork lifter
CN214739732U (en) Steel pipe lifting scaffold with steel mesh protection structure
CN218324717U (en) Ladder for ascending height
CN209958710U (en) Anti-tilting scaffold
CN211101575U (en) Aluminum electrolysis vacuum ladle maintenance platform
CN217812221U (en) Brickwork construction lift control platform
CN218508979U (en) Building construction protection platform convenient to height-adjusting
CN216946107U (en) Electromechanical device overhauls uses lift platform
CN214364801U (en) Portable operation platform for building of formula of encorbelmenting
CN212478466U (en) Polyurethane energy-saving plate installation auxiliary device
CN213654167U (en) Adjustable scaffold for interior decoration
CN212983624U (en) Movable hanging basket
CN216043492U (en) Elevating platform is used in railway rails maintenance
CN213979831U (en) Interior decoration is with multi-level high decoration and fitment operation platform
CN211548755U (en) Hydraulic climbing formwork for building construction
CN214942161U (en) Scaffold for building engineering construction
CN218933768U (en) Prefabricated stair mounting rack
CN214531795U (en) Scaffold for building engineering
CN218757002U (en) Safe operation platform for steel bar binding

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20200714

Termination date: 20210614

CF01 Termination of patent right due to non-payment of annual fee