CN211006638U CN201921751232.5U CN201921751232U CN211006638U CN 211006638 U CN211006638 U CN 211006638U CN 201921751232 U CN201921751232 U CN 201921751232U CN 211006638 U CN211006638 U CN 211006638U
Authority
CN
China
Prior art keywords
continuous wall
underground continuous
grouting
wall
pipe
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201921751232.5U
Other languages
Chinese (zh)
Inventor
任贵生
张艳芳
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Beijing Geo Engineering Co
Original Assignee
Beijing Geo Engineering Co
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Beijing Geo Engineering Co filed Critical Beijing Geo Engineering Co
Priority to CN201921751232.5U priority Critical patent/CN211006638U/en
Application granted granted Critical
Publication of CN211006638U publication Critical patent/CN211006638U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Bulkheads Adapted To Foundation Construction (AREA)

Abstract

The utility model relates to a prefabricated fashioned underground continuous wall relates to building wall's technical field to the bottom is unstable appears in the construction easily in the underground continuous wall who solves among the prior art prefabricated shaping, produces easily and subsides technical problem. The method comprises the steps that a plurality of grouting pipes which are installed in a full-length mode are installed in the underground diaphragm wall, and the grouting pipes are grouted to avoid the settlement of the underground diaphragm wall. The utility model discloses be used for improving underground continuous wall's stability, satisfy people to the requirement of wall body safe handling.

Description

Prefabricated underground continuous wall
Technical Field
The utility model belongs to the technical field of building wall's technique and specifically relates to a prefabricated fashioned underground continuous wall.
Background
The underground continuous wall can be used in the fields of foundation pit support, water stop, foundation engineering and the like. A grooving machine is adopted on the ground, a long and narrow deep groove is dug along the peripheral axis of the deep excavation project under the condition of slurry wall protection, then the wall section is continuously hung, and a continuous reinforced concrete wall is built underground to be used as a structure for intercepting water, preventing seepage, bearing and retaining water. The prefabricated underground continuous wall section is prefabricated on the ground, the concrete quality can be guaranteed, maintenance is not needed after the concrete section is hung, the construction speed is high, and the integrity is good. The prior art is after underground wall installation, handles the wall seam of prefabricated wall, prevents the infiltration, and it causes the unstable wall body bottom easily, appears subsiding's problem easily.
In view of this, the present invention is especially provided.
SUMMERY OF THE UTILITY MODEL
The application provides a prefabricated underground continuous wall to the bottom is unstable appears in the construction easily to the underground continuous wall who solves among the prior art prefabricated and take shape, produces easily and subsides technical problem. The technical scheme of the scheme has a plurality of technical effects, which are shown below.
A plurality of grouting pipes which are installed in a full-length mode are installed in the underground continuous wall, and the grouting pipes are grouted to avoid the settlement of the underground continuous wall.
Optionally, a positioning element is arranged at the top end of the grouting pipe, and the positioning element is used for marking the position of the pipe orifice of the grouting pipe so as to facilitate grouting of the grouting pipe;
the positioning piece comprises a sleeve arranged at the top of the grouting pipe, the pipe opening of the sleeve is flush with the grouting pipe, the sleeve is filled with expansion materials, and the contact opening of the expansion materials and air forms a convex mark on the grouting pipe. The condition that a grouting opening is not easy to find after the wall is constructed is avoided, the operation effect is improved, and the labor cost is saved.
Optionally, the expandable material is a foam.
Optionally, the orifice of the casing is provided with a seal capable of preventing the intumescent material from coming into contact with air.
Optionally, an inclinometer pipe is further arranged in the continuous wall, and whether the wall body inclines or not can be judged through the inclinometer pipe.
Optionally, the side surface of the underground continuous wall is further provided with a through long groove, a porous grouting pipe is embedded in the through long groove, and grouting is performed on the porous grouting pipe to fill gaps between adjacent underground continuous walls
The beneficial effect that this application was sent is as follows:
through the grout pipe that sets up on the wall body, grout to the wall body, improve the stability of wall body bottom, strengthen the leakproofness of underground continuous wall joint department, effectively reduce the distance that the wall body subsides.
Drawings
In order to more clearly explain the technical solution of the present application, the drawings needed to be used in the embodiments will be briefly described below, and it is obvious to those skilled in the art that other drawings can be obtained according to the drawings without creative efforts.
FIG. 1 is a schematic structural view of a prefabricated underground diaphragm wall of the present invention;
FIG. 2 is a schematic structural view of a positioning member in the prefabricated underground diaphragm wall of the present invention;
FIG. 3 is a top view of a pre-formed diaphragm wall of the present invention
FIG. 4 is the schematic structural diagram of the prefabricated underground diaphragm wall with porous grouting pipes of the utility model
Fig. 5 is a front view of the prefabricated underground continuous wall porous grouting pipe of the utility model.
Detailed Description
Reference will now be made in detail to embodiments, examples of which are illustrated in the accompanying drawings. When the following description refers to the accompanying drawings, like numbers in different drawings represent the same or similar elements unless otherwise indicated. The embodiments described in the following examples do not represent all embodiments consistent with the present application. But merely as exemplifications of systems and methods consistent with certain aspects of the application, as recited in the claims.
Referring to fig. 1 to the prefabricated underground diaphragm wall, a plurality of grout pipes 1 installed in a through-length manner are installed in the wall body.
The prefabricated underground continuous wall adopts a grooving machine on the ground, a long and narrow deep groove is excavated along the peripheral axis of the deep excavation engineering under the condition of slurry wall protection, and then the prefabricated underground continuous wall is hung without maintenance, so that the construction speed is high, and the integrity is better. In order to enhance the sealing performance of the joint of the underground continuous wall, the wall body is grouted through the grouting pipe arranged on the wall body, the stability of the bottom of the wall body is improved, the sealing performance of the joint of the underground continuous wall is enhanced, and the settlement distance of the wall body is effectively reduced.
And (3) field construction:
1. the prefabricated underground continuous wall with grouting pipes is manufactured on the ground, the length and the width of the groove section are determined according to the site conditions of the foundation pit, and the grouting pipes are connected with reinforcing steel bars in the wall body in an overlapping mode.
2. Adopting a conventional method to carry out guide wall and grooving construction;
3. hoisting underground continuous wall groove sections in the sequence of firstly turning wall sections and then straight wall sections;
4. and after the plurality of adjacent two sections of wall panels are finished, grouting can be performed at the wall end and the wall side, the wall side grouting pipe is a plastic pipe or a steel pipe with a grouting hole on the side surface, and the wall end grouting pipe is a through long pipe and only discharges grouting at the bottom. The number of grouting pipes can be adjusted according to the shape of the wall, the wall thickness and the like.
Optionally, as shown in fig. 2, a positioning element is arranged at the top end of the grouting pipe 1, and the positioning element is used for marking the position of the pipe orifice of the grouting pipe, so that grouting of the grouting pipe is facilitated.
Further, the positioning member comprises a sleeve 2 arranged at the top of the grouting pipe, the opening of the sleeve is flush with the grouting pipe, and an expansion material layer 3 is filled in the sleeve, wherein the expansion material is foam rubber, and the expansion material and an air contact opening form a convex mark on the grouting pipe 1. Be equipped with the setting element on grout pipe 1 top to mark grout pipe 1 mouth of pipe position, be convenient for to grout pipe 1 grout, avoid after presetting diaphragm wall installation, inconvenient grout pipe mouth of pipe position of looking for.
Further, the opening of the casing is provided with a seal capable of preventing the expandable material from contacting air, and the seal is removed in use.
Optionally, an inclinometer 4 is further arranged in the continuous wall, and the horizontal deformation of each section of wall body can be detected through the inclinometer 4. Inclinometer tubes, for example, of the domestic common type: YT-CXG 70.
Optionally, as shown in fig. 4 and 5, the side surface of the underground continuous wall is further provided with a through-long groove, the through-long groove is embedded with the porous grouting pipe 5, and the through-long groove and the porous grouting pipe 5 are matched in shape. The gaps between the adjacent underground continuous walls are filled by grouting into the porous grouting pipes 5. Grouting is carried out through the porous grouting pipes 5, gaps between the walls are plugged, the walls are connected, the shearing resistance of the walls is improved, water is prevented from permeating the gaps between the walls, and the effect of sealing and stopping water is achieved.
The embodiments provided in the present application are only a few examples of the general concept of the present application, and do not limit the scope of the present application. Any other embodiments extended according to the scheme of the present application without inventive efforts will be within the scope of protection of the present application for a person skilled in the art.

Claims (6)

1. The prefabricated underground continuous wall is characterized in that a plurality of grouting pipes which are installed in a full-length mode are installed in the underground continuous wall, and the grouting pipes are grouted to avoid the settlement of the underground continuous wall.
2. The underground continuous wall as claimed in claim 1, wherein a positioning member is arranged at the top end of the grouting pipe, and the positioning member is used for marking the position of the mouth of the grouting pipe so as to facilitate grouting of the grouting pipe;
the positioning piece comprises a sleeve arranged at the top of the grouting pipe, the pipe opening of the sleeve is flush with the grouting pipe, the sleeve is filled with expansion materials, and the contact opening of the expansion materials and air forms a convex mark on the grouting pipe.
3. The underground continuous wall of claim 2, wherein the intumescent material is foam.
4. Underground continuous wall according to claim 2 or 3, characterized in that the nozzles of the casing are provided with seals capable of preventing the intumescent material from coming into contact with air.
5. The underground continuous wall according to claim 1, wherein a inclinometer pipe is further arranged in the continuous wall, and the horizontal deformation of the continuous wall is detected through the inclinometer pipe.
6. The underground continuous wall as claimed in claim 1, wherein the side of the underground continuous wall is further provided with a through slot, a porous grouting pipe is embedded in the through slot, and grouting is performed on the porous grouting pipe to fill gaps between adjacent underground continuous walls.
CN201921751232.5U 2019-10-18 2019-10-18 Prefabricated underground continuous wall Active CN211006638U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201921751232.5U CN211006638U (en) 2019-10-18 2019-10-18 Prefabricated underground continuous wall

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201921751232.5U CN211006638U (en) 2019-10-18 2019-10-18 Prefabricated underground continuous wall

Publications (1)

Publication Number Publication Date
CN211006638U true CN211006638U (en) 2020-07-14

Family

ID=71478727

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201921751232.5U Active CN211006638U (en) 2019-10-18 2019-10-18 Prefabricated underground continuous wall

Country Status (1)

Country Link
CN (1) CN211006638U (en)

Similar Documents

Publication Publication Date Title
CN109750660B (en) Underground diaphragm wall with seepage-proof joint and construction method thereof
US11384502B2 (en) Concrete inside interface processing structure and method for secant pile construction
CN107542115A (en) Underground project waterproof structure and its construction method
CN102839691B (en) Quick sealing method and device for sandless cement pipe deep well dewatering wellhead
CN202194149U (en) Water-proof curtain
CN201649068U (en) U-shaped concrete sheet pile
CN110700280A (en) Narrow zone foundation pit supporting construction flow guide device and construction method
CN201538975U (en) Seepage-proofing joint of underground continuous wall
CN201103127Y (en) Water stop locking notch tube of underground continuous wall
CN207159990U (en) One kind combination steel construction support pile
CN211006638U (en) Prefabricated underground continuous wall
CN105297706B (en) Double-lock-catch flat steel pipe pile used for foundation pit support
CN205382942U (en) Multilayer underground space curtain posture subsurface excavated construction's supporting construction under existing facility
CN210151660U (en) Embedded concrete antiskid tenon grout stone retaining wall
CN111119908A (en) Semi-open-cut and semi-underground-cut multi-arch tunnel structure and construction method thereof
CN203530959U (en) High-strength underground diaphragm wall
CN105113513A (en) Anti-seepage foundation pit supporting structure and construction method
CN214993750U (en) Different retaining structure juncture construction node of foundation ditch
CN216405317U (en) Impervious structure of weak position is connected with earth dam to masonry dam
CN213088018U (en) Shield constructs down and wears building to prevent supporting construction of settlement control
CN212223974U (en) Underground continuous wall and back cover concrete's leak protection connection structure
CN210797598U (en) Deep basal pit stagnant water structure
CN211598668U (en) Semi-open-cut and semi-underground-cut multi-arch tunnel structure
CN105442528A (en) Cement grouting plate pile with sealing rings
CN215715439U (en) Underground water sealing system for building foundation pit

Legal Events