CN210985497U CN201922010313.6U CN201922010313U CN210985497U CN 210985497 U CN210985497 U CN 210985497U CN 201922010313 U CN201922010313 U CN 201922010313U CN 210985497 U CN210985497 U CN 210985497U
Authority
CN
China
Prior art keywords
division board
groove
steel cable
sides
grooves
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201922010313.6U
Other languages
Chinese (zh)
Inventor
徐经纬
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shandong Jingjin Electromechanical Equipment Co ltd
Original Assignee
Shandong Jingjin Electromechanical Equipment Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shandong Jingjin Electromechanical Equipment Co ltd filed Critical Shandong Jingjin Electromechanical Equipment Co ltd
Priority to CN201922010313.6U priority Critical patent/CN210985497U/en
Application granted granted Critical
Publication of CN210985497U publication Critical patent/CN210985497U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

The utility model discloses a steel cable testing bridge, which comprises a tank body, the division board, cell body inner wall bottom side is provided with a set of mounting panel, be provided with the clearance between a set of cell body, be provided with the division board in the cell body, the division board bottom is provided with a set of groove of accepting, the position of a set of groove of accepting and the corresponding setting in position of a set of mounting panel, the division board top surface is provided with a plurality of unwrapping wire grooves, the corresponding both sides of division board top surface all are provided with accepts the board, the mounting panel is provided with a plurality ofly, the division board bottom surface is provided with a set of spread groove, a set of spread groove is accepted the corresponding setting of board with both sides, the division board bottom surface is provided with a plurality of joint grooves, a plurality of joint grooves all match the setting with a plurality of unwrapping. The utility model discloses have and to prevent the circuit winding, conveniently distinguish the beneficial effect of circuit, its mainly used lays the cable.

Description

Steel cable bridge
Technical Field
The utility model relates to a cable testing bridge technical field, specific steel cable testing bridge that says so.
Background
Cable testing bridge is mainly used for cable laying, and cable testing bridge divide into slot type, tray formula and ladder formula, latticed isotructure, and current slot type cable testing bridge simple structure, the functional type is single, when carrying out cable laying, if the cable is a plurality of then can cause the kinking, the condition emergence of being difficult to distinguish the circuit, the inconvenience of ten minutes when in-service use.
SUMMERY OF THE UTILITY MODEL
To the above-mentioned weak point that exists among the prior art, the utility model aims at providing a can prevent the circuit winding, conveniently distinguish the steel cable testing bridge of circuit.
The utility model discloses a realize that the technical scheme that above-mentioned purpose adopted is: a steel cable bridge comprises a groove body and a partition plate, wherein a group of mounting plates are arranged on the bottom side of the inner wall of the groove body, gaps are formed among the group of groove bodies, the partition plate is arranged in the groove body, a group of bearing grooves are formed in the bottom of the partition plate, the positions of the group of bearing grooves correspond to the positions of the group of mounting plates, a plurality of wire placing grooves are formed in the top surface of the partition plate, the bearing plates are arranged on two corresponding sides of the top surface of the partition plate, and the mounting plates are provided with a plurality of;
the division board bottom surface is provided with a set of spread groove, and is a set of spread groove and both sides accept the corresponding setting of board, the division board bottom surface is provided with a plurality of joint grooves, and is a plurality of the joint groove all matches the setting with a plurality of unwrapping wire groove, the division board top surface is provided with a plurality of wire receiving grooves, the corresponding both sides of division board top surface all are provided with the connecting plate, both sides the connecting plate is with both sides it is unanimous to accept the board structure, the division board is provided with a plurality ofly.
The structure of each division board is all unanimous, and each the length of division board all with the width phase-match of cell body sets up.
And the mounting plates are arranged in parallel with the side wall of the tank body and are matched with the tank body in length.
The length of the partition plate is matched with the width of the groove body.
All be provided with the protection pad on wire arrangement groove, joint groove, the line holding groove inner wall, the protection pad all with the assorted wire arrangement groove, joint groove, line holding groove adhesive connection.
The groove body is made of steel.
The utility model has the advantages that: the cable laying device has the advantages that the winding of a circuit can be prevented, the circuit is convenient to distinguish, when in use, a plurality of bearing plates are clamped to the separation plate through the bearing grooves at the bottom of the bearing plates according to preset positions, then the cable laying can be carried out on the plurality of paying-off grooves on the separation plate, if the number of the paying-off grooves is less than the number of the circuits to be laid, the separation plate can be clamped and connected with the bearing plates at the top surface of the separation plate through the connecting grooves at the bottom surface, because the bottom surface of the separation plate is provided with a plurality of clamping grooves which are matched with the paying-off grooves, the cable can be clamped, the cable can be prevented from sliding down, then the cable laying can be carried out in the plurality of bearing grooves on the separation plate, if the number of the bearing grooves still can not meet the number of the laid circuits, because the separation plate is provided with a plurality of separation plates, and the structures of, therefore, the cables can be separately paved, the winding of the lines can be prevented, and the situation that the lines are difficult to distinguish is generated.
Drawings
Fig. 1 is a schematic view of the sectional structure of the present invention.
In the figure: 1 cell body, 2 division boards, 3 mounting panels, 4 division boards, 5 accept the groove, 6 put the wire casing, 7 accept the board, 8 spread groove, 9 joint grooves, 10 hold the wire casing, 11 connecting plates.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
Referring to fig. 1, a steel cable bridge comprises a tank body 1 and a partition plate 2, wherein a group of mounting plates 3 are arranged on the bottom side of the inner wall of the tank body 1, gaps are arranged between the group of tank bodies 1, a partition plate 4 is arranged in the tank body 1, a group of receiving grooves 5 are arranged at the bottom of the partition plate 4, the positions of the group of receiving grooves 5 are arranged corresponding to the positions of the group of mounting plates 3, a plurality of wire placing grooves 6 are arranged on the top surface of the partition plate 4, two corresponding sides of the top surface of the partition plate 4 are provided with receiving plates 7;
2 bottom surfaces of division board are provided with a set of spread groove 8, and a set of spread groove 8 is accepted the corresponding setting of board 7 with both sides, and 2 bottom surfaces of division board are provided with a plurality of joint grooves 9, and a plurality of joint grooves 9 all set up with 6 phase-matchs in a plurality of unwrapping wire grooves, and 2 top surfaces of division board are provided with a plurality of wire receiving grooves 10, and the corresponding both sides of 2 top surfaces of division board all are provided with connecting plate 11, and 7 structures of board are accepted unanimously with both sides to both sides connecting plate 11, and division board.
In the utility model, the structures of the isolation plates 2 are consistent, and the length of each isolation plate 2 is matched with the width of the groove body 1, so that the isolation plates 2 are conveniently clamped in the groove body 1;
the group of mounting plates 3 are arranged in parallel with the side wall of the tank body 1, and the length of the group of mounting plates 3 is matched with that of the tank body 1, so that the partition plates 4 can be conveniently mounted;
the length of the partition plate 4 is matched with the width of the tank body 1;
protective pads are arranged on the inner walls of the pay-off groove 6, the clamping groove 9 and the wire bearing groove 10 and are in adhesive connection with the pay-off groove 6, the clamping groove 9 and the wire bearing groove 10 which are matched with each other, so that cables can be protected;
the tank body 1 is made of steel, so that the bending resistance is strong, and the structure is more stable.
The utility model discloses a theory of operation is: when in use, a plurality of separation plates 4 are clamped on a mounting plate 3 through a bearing groove 5 at the bottom of the separation plate 4 according to preset positions, then cable laying can be carried out on a plurality of wire laying grooves 6 on the separation plate 4, if the number of the wire laying grooves 6 is less than the number of circuits to be laid, the separation plate 2 can be clamped and connected with a bearing plate 7 at the top surface of the separation plate 4 through a connecting groove 8 at the bottom surface, because the bottom surface of the separation plate 2 is provided with a plurality of clamping grooves 9, and a plurality of clamping grooves 9 are all matched with the plurality of wire laying grooves 6, cables can be clamped and prevented from sliding off, then cable laying can be carried out in a plurality of wire bearing grooves 10 on the separation plate 2, if the number of the wire bearing grooves 10 can not meet the number of the laid circuits, because the separation plate 2 is provided with a plurality of separation plates 2, and the structures of the separation plates 2 are consistent, the, the cable laying is performed so that the cables can be separately laid.
It is obvious to a person skilled in the art that the invention is not restricted to details of the above-described exemplary embodiments, but that it can be implemented in other specific forms without departing from the spirit or essential characteristics of the invention. The present embodiments are therefore to be considered in all respects as illustrative and not restrictive, the scope of the invention being indicated by the appended claims rather than by the foregoing description, and all changes which come within the meaning and range of equivalency of the claims are therefore intended to be embraced therein. Any reference sign in a claim should not be construed as limiting the claim concerned.
Furthermore, it should be understood that although the present description refers to embodiments, not every embodiment may contain only a single embodiment, and such description is for clarity only, and those skilled in the art should integrate the description, and the embodiments may be combined as appropriate to form other embodiments understood by those skilled in the art.

Claims (6)

1. The utility model provides a steel cable testing bridge, includes cell body (1), division board (2), its characterized in that: a group of mounting plates (3) are arranged on the bottom side of the inner wall of the tank body (1), a gap is formed between the group of tank bodies (1), a partition plate (4) is arranged in the tank body (1), a group of bearing grooves (5) are arranged at the bottom of the partition plate (4), the positions of the group of bearing grooves (5) are arranged corresponding to the positions of the group of mounting plates (3), a plurality of wire releasing grooves (6) are arranged on the top surface of the partition plate (4), bearing plates (7) are arranged on two sides of the top surface of the partition plate (4) corresponding to each other, and a plurality of mounting plates (3) are;
division board (2) bottom surface is provided with a set of spread groove (8), and is a set of spread groove (8) and both sides accept the corresponding setting of board (7), division board (2) bottom surface is provided with a plurality of joint groove (9), and is a plurality of joint groove (9) all with a plurality of put wire casing (6) phase-match setting, division board (2) top surface is provided with a plurality of wire casing (10), the corresponding both sides of division board (2) top surface all are provided with connecting plate (11), both sides connecting plate (11) and both sides accept board (7) structure unanimity, division board (2) are provided with a plurality ofly.
2. The steel cable tray of claim 1, wherein: the structure of each division board (2) is all unanimous, and each the length of division board (2) all with the width phase-match setting of cell body (1).
3. The steel cable tray of claim 1, wherein: a set of mounting panel (3) all with cell body (1) lateral wall is parallel structure and sets up, and is a set of the length of mounting panel (3) all with the length phase-match setting of cell body (1).
4. The steel cable tray of claim 1, wherein: the length of the partition plate (4) is matched with the width of the groove body (1).
5. The steel cable tray of claim 1, wherein: all be provided with the protection pad on wire arrangement groove (6), joint groove (9), hold wire casing (10) inner wall, the protection pad all with the assorted wire arrangement groove (6), joint groove (9), hold wire casing (10) adhesive connection.
6. The steel cable tray of claim 1, wherein: the tank body (1) is made of steel.
CN201922010313.6U 2019-11-19 2019-11-19 Steel cable bridge Expired - Fee Related CN210985497U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201922010313.6U CN210985497U (en) 2019-11-19 2019-11-19 Steel cable bridge

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201922010313.6U CN210985497U (en) 2019-11-19 2019-11-19 Steel cable bridge

Publications (1)

Publication Number Publication Date
CN210985497U true CN210985497U (en) 2020-07-10

Family

ID=71438875

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201922010313.6U Expired - Fee Related CN210985497U (en) 2019-11-19 2019-11-19 Steel cable bridge

Country Status (1)

Country Link
CN (1) CN210985497U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113328394A (en) * 2021-06-28 2021-08-31 江苏国美钢网桥架有限公司 Convenient wire bundling mechanism of push-type self-locking grid bridge and use method thereof

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113328394A (en) * 2021-06-28 2021-08-31 江苏国美钢网桥架有限公司 Convenient wire bundling mechanism of push-type self-locking grid bridge and use method thereof

Similar Documents

Publication Publication Date Title
CN210985497U (en) Steel cable bridge
ES2141034A1 (en) Telephone connecting strip
CN206135121U (en) Novel stromatolite is female to be arranged
CN104455730A (en) Efficient cable bridge
CN204030500U (en) A kind of bus duct
CN213661096U (en) Cable bridge convenient to it is spacing
CN203014297U (en) Split-type wire groove
CN212957080U (en) Light wall board capable of laying stranded wires
CN207765637U (en) A kind of power of alterating and direct current connection terminal
CN206685839U (en) A kind of high-rise and Super High enclosed bus installing mechanism
CN211151390U (en) Fire-resistant twisted pair cable holder
CN219018315U (en) Cable installation wire device
CN213877670U (en) Branching device for processing electric wires and cables
CN210490009U (en) Guide rail type power strip
CN211183359U (en) Tapping box
CN204741141U (en) Arrange and insert subassembly
CN213692577U (en) Bus duct interface
CN207994555U (en) A kind of computer room bus duct device
CN214412175U (en) Separated waterproof wire slot with neat function of bunch
CN211790635U (en) Bus duct plugging device
CN213879210U (en) Rail mounted bus structure
CN212461892U (en) Explosion-proof battery pack
CN218216601U (en) Compact bus duct capable of guiding flat cables
CN214069786U (en) Multi-path MPPT inverter
CN217691546U (en) Battery pack with novel structure