CN210973637U - Material handling device for tunnel construction - Google Patents

Material handling device for tunnel construction Download PDF

Info

Publication number
CN210973637U
CN210973637U CN201921978502.6U CN201921978502U CN210973637U CN 210973637 U CN210973637 U CN 210973637U CN 201921978502 U CN201921978502 U CN 201921978502U CN 210973637 U CN210973637 U CN 210973637U
Authority
CN
China
Prior art keywords
fixedly connected
connecting block
motor
handling device
support
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201921978502.6U
Other languages
Chinese (zh)
Inventor
刘传涛
梁树锋
李鹏
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Building Installation Engineering Co Ltd of China Railway 18th Bureau Group Co Ltd
Original Assignee
Building Installation Engineering Co Ltd of China Railway 18th Bureau Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Building Installation Engineering Co Ltd of China Railway 18th Bureau Group Co Ltd filed Critical Building Installation Engineering Co Ltd of China Railway 18th Bureau Group Co Ltd
Priority to CN201921978502.6U priority Critical patent/CN210973637U/en
Application granted granted Critical
Publication of CN210973637U publication Critical patent/CN210973637U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Lining And Supports For Tunnels (AREA)

Abstract

The utility model belongs to the technical field of material handling devices, in particular to a material handling device for tunnel construction, which comprises a tunnel body, a support and a function box, wherein the support is fixedly connected inside the tunnel body, the function box is fixedly connected at the upper end of the support, an adjusting component is arranged inside the function box, the lower end of the adjusting component is fixedly connected with a connecting block, and a slide block is fixedly connected inside the connecting block; the utility model discloses, through setting up adjusting part, when people need shift the material, people still need pass through the first motor function of control switch control, drive the screw thread post simultaneously and rotate, under the cooperation of screw thread post and screw cap, can drive the connecting block that carries elevating assembly and remove, when the connecting block that carries elevating assembly removes to the material directly over, people only need stop the function through control switch control second motor, made things convenient for people to remove the connecting block that carries the goods workbin.

Description

Material handling device for tunnel construction
Technical Field
The utility model belongs to the technical field of material handling device, concretely relates to material handling device for tunnel construction.
Background
The tunnel is an engineering building buried in the stratum and is a form of utilizing underground space by human beings, the tunnel can be divided into a traffic tunnel, a hydraulic tunnel, a municipal tunnel and a mine tunnel, the structure of the tunnel comprises a main building and auxiliary equipment, the main building comprises a tunnel body and a tunnel door, the auxiliary equipment comprises a vehicle avoiding hole, a fire fighting facility, an emergency communication and water prevention and drainage facility, the long tunnel is also provided with special ventilation and lighting equipment, materials in the tunnel need to be transported out or external raw materials need to be transported into the tunnel for construction in the construction of the tunnel, a tunnel transport vehicle or a plate car is generally adopted for transporting the materials out or in, but the labor intensity of workers is increased, and the following devices are provided for solving the problems.
SUMMERY OF THE UTILITY MODEL
To solve the problems set forth in the background art described above. The utility model provides a material handling device for tunnel construction has simple structure, the simple operation to have the characteristics that facilitate the use.
In order to achieve the above object, the utility model provides a following technical scheme: the utility model provides a material handling device for tunnel construction, includes tunnel body, support and function case, support fixed connection is inside the tunnel body, function case fixed connection is in the support upper end, the inside adjusting part that is provided with of function case, adjusting part lower extreme fixedly connected with connecting block, the inside fixedly connected with slider of connecting block, support side fixedly connected with slide rail, slider sliding connection is in the slide rail, slider and slide rail respectively have two to the symmetry sets up in the inside both sides of connecting block, connecting block lower extreme fixedly connected with lifting unit, lifting unit lower extreme fixedly connected with freight house.
Preferably, the adjusting part includes the transmission storehouse, the transmission storehouse is seted up in the function case, the first motor of the inside fixedly connected with in transmission storehouse, the output shaft fixedly connected with screw thread post of first motor, the first pivot of the other end fixedly connected with of screw thread post, the first fixed station of the inside fixedly connected with in transmission storehouse, the first bearing of first fixed station side fixedly connected with, the other end of first pivot is worn to establish in first bearing.
Preferably, the threaded column surface is in threaded connection with a threaded cap, the threaded cap side is fixedly connected with a connecting rod, a movable groove is formed in the surface of the transmission bin, the connecting rod penetrates through the movable groove, and the other end of the connecting rod is fixedly connected to the upper end of the connecting block.
Preferably, the lifting assembly comprises a second fixing table, a second motor is fixedly connected to the side face of the second fixing table, a second rotating shaft is fixedly connected to an output shaft of the second motor, a third fixing table is fixedly connected to the lower surface of the connecting block, a second bearing is fixedly connected to the side face of the third fixing table, and the other end of the second rotating shaft penetrates through the second bearing.
Preferably, the surface of the second rotating shaft is fixedly connected with a pull rope, the other end of the pull rope is fixedly connected to the upper surface of the cargo box, and the pull rope is made of a nylon rope.
Compared with the prior art, the beneficial effects of the utility model are that:
by arranging the adjusting component, when people need to transfer materials, people also need to control the first motor to operate through the control switch and simultaneously drive the threaded column to rotate, under the matching of the threaded column and the threaded cap, the connecting block with the lifting component can be driven to move, when the connecting block with the lifting component moves to the position right above the material, people only need to control the second motor to stop operating through the control switch, thereby being convenient for people to move the connecting block loaded with the cargo box, under the action of the lifting component, when people need to lift the cargo box filled with materials, people control the second motor to operate through the control switch, thereby the drive is loaded the goods material case of material and is risen, avoids the goods material case that is equipped with the material at the in-process that removes, collides with the material in the environment, has improved the device's security.
Drawings
The accompanying drawings are included to provide a further understanding of the invention, and are incorporated in and constitute a part of this specification, illustrate embodiments of the invention, and together with the description serve to explain the invention and not to limit the invention. In the drawings:
fig. 1 is a schematic structural diagram of a side view section of the present invention;
FIG. 2 is a schematic structural diagram of an adjusting assembly of the present invention;
fig. 3 is a schematic structural view of the lifting assembly of the present invention;
in the figure: 1. a tunnel body; 2. a support; 3. a function box; 4. an adjustment assembly; 401. a transmission bin; 402. A first motor; 403. a threaded post; 404. a first rotating shaft; 405. a first fixed table; 406. a first bearing; 407. a threaded cap; 408. a connecting rod; 409. a movable groove; 5. connecting blocks; 6. a slider; 7. A slide rail; 8. a lifting assembly; 801. a second stationary stage; 802. a second motor; 803. a second rotating shaft; 804. A third stationary stage; 805. a second bearing; 806. pulling a rope; 9. a cargo box.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
Examples
Referring to fig. 1-3, the present invention provides the following technical solutions: the utility model provides a material handling device for tunnel construction, includes tunnel body 1, support 2 and function case 3, 2 fixed connection of support are inside tunnel body 1, 3 fixed connection of function case are in 2 upper ends of support, 3 inside adjusting part 4 that are provided with of function case, 4 lower extreme fixedly connected with connecting blocks 5 of adjusting part, 5 inside fixedly connected with sliders 6 of connecting blocks, 2 side fixedly connected with slide rails 7 of support, 6 sliding connection of slider are in slide rails 7, 6 and slide rails 7 respectively have two to the symmetry sets up in 5 inside both sides of connecting block, 5 lower extreme fixedly connected with lifting unit 8 of connecting block, 8 lower extreme fixedly connected with goods storehouse of lifting unit.
Specifically, the adjusting assembly 4 includes a transmission bin 401, the transmission bin 401 is arranged in the function box 3, the first motor 402 is fixedly connected inside the transmission bin 401, the output shaft of the first motor 402 is fixedly connected with a threaded column 403, the other end of the threaded column 403 is fixedly connected with a first rotating shaft 404, the first fixed table 405 is fixedly connected inside the transmission bin 401, the first bearing 406 is fixedly connected to the side surface of the first fixed table 405, and the other end of the first rotating shaft 404 is arranged in the first bearing 406 in a penetrating manner.
Specifically, threaded post 403 surface threaded connection has screw cap 407, screw cap 407 side fixedly connected with connecting rod 408, movable groove 409 has been seted up on transmission storehouse 401 surface, connecting rod 408 wears to establish in movable groove 409, the other end fixed connection of connecting rod 408 is in connecting block 5 upper end, through setting up adjusting part 4, when people need shift the material, people still need operate through the first motor 402 of control switch control, drive threaded post 403 simultaneously and rotate, under the cooperation of threaded post 403 and screw cap 407, can drive and carry connecting block 5 of lifting unit 8 and remove, when carrying connecting block 5 of lifting unit 8 and removing directly over the material, people only need stop the operation through control switch control second motor 802, made things convenient for people to remove connecting block 5 that carries workbin goods 9.
Specifically, the lifting assembly 8 includes a second fixed platform 801, a second motor 802 is fixedly connected to a side surface of the second fixed platform 801, an output shaft of the second motor 802 is fixedly connected with a second rotating shaft 803, a third fixed platform 804 is fixedly connected to a lower surface of the connecting block 5, a second bearing 805 is fixedly connected to a side surface of the third fixed platform 804, and the other end of the second rotating shaft 803 is inserted into the second bearing 805.
Specifically, second pivot 803 fixed surface is connected with stay cord 806, the other end fixed connection of stay cord 806 is on goods workbin 9 upper surface, the material of stay cord 806 is the nylon rope, under lifting unit 8's effect, when people need rise to the goods workbin 9 that is equipped with the material, people pass through control switch control second motor 802 and function to the drive is loaded the goods workbin 9 of material and is risen, avoids the in-process that the goods workbin 9 that is equipped with the material is removing, collides with the material in the environment, has improved the device's security.
The utility model discloses a theory of operation and use flow: the utility model discloses, when using, at first install the device in the tunnel body 1 that needs to be under construction, when people need shift the material, people still need to control the operation of first motor 402 through control switch, drive screw post 403 to rotate simultaneously, under the cooperation of screw post 403 and screw cap 407, can drive the connecting block 5 that carries lifting unit 8 and move, when the connecting block 5 that carries lifting unit 8 moves to directly over the material, people only need to control first motor 402 through control switch and stop the operation, then people need to control second motor 802 through control switch and operate, drive second pivot 803 to rotate simultaneously, thereby put down the pulling-up that twines on second pivot 803 surface, then people pack the material into goods case 9, then people control second motor 802 through control switch and operate, thereby drive goods case 9 that carries the material to rise, meanwhile, the first motor 402 is controlled to operate by the control switch, so that the material can be transferred to a designated position.
Finally, it should be noted that: although the present invention has been described in detail with reference to the foregoing embodiments, it will be apparent to those skilled in the art that modifications may be made to the embodiments described in the foregoing embodiments, or equivalents may be substituted for elements thereof. Any modification, equivalent replacement, or improvement made within the spirit and principle of the present invention should be included in the protection scope of the present invention.

Claims (5)

1. The utility model provides a material handling device for tunnel construction, includes tunnel body (1), support (2) and function case (3), its characterized in that: support (2) fixed connection is inside tunnel body (1), function box (3) fixed connection is in support (2) upper end, inside adjusting part (4) that is provided with of function box (3), adjusting part (4) lower extreme fixedly connected with connecting block (5), inside fixedly connected with slider (6) of connecting block (5), support (2) side fixedly connected with slide rail (7), slider (6) sliding connection is in slide rail (7), slider (6) and slide rail (7) respectively have two to the symmetry sets up in the inside both sides of connecting block (5), connecting block (5) lower extreme fixedly connected with lifting unit (8), lifting unit (8) lower extreme fixedly connected with goods storehouse.
2. The material-handling device for tunnel construction according to claim 1, characterized in that: the adjusting component (4) comprises a transmission bin (401), the transmission bin (401) is arranged in the function box (3), a first motor (402) is fixedly connected to the inside of the transmission bin (401), a threaded column (403) is fixedly connected to an output shaft of the first motor (402), a first rotating shaft (404) is fixedly connected to the other end of the threaded column (403), a first fixing table (405) is fixedly connected to the inside of the transmission bin (401), a first bearing (406) is fixedly connected to the side face of the first fixing table (405), and the other end of the first rotating shaft (404) is arranged in the first bearing (406) in a penetrating mode.
3. The material-handling device for tunnel construction according to claim 2, characterized in that: threaded connection has screw cap (407) on screw thread post (403) surface, screw cap (407) side fixedly connected with connecting rod (408), activity groove (409) have been seted up on transmission storehouse (401) surface, connecting rod (408) are worn to establish in activity groove (409), the other end fixed connection of connecting rod (408) is in connecting block (5) upper end.
4. The material-handling device for tunnel construction according to claim 1, characterized in that: the lifting assembly (8) comprises a second fixing table (801), a second motor (802) is fixedly connected to the side face of the second fixing table (801), a second rotating shaft (803) is fixedly connected to an output shaft of the second motor (802), a third fixing table (804) is fixedly connected to the lower surface of the connecting block (5), a second bearing (805) is fixedly connected to the side face of the third fixing table (804), and the other end of the second rotating shaft (803) penetrates through the second bearing (805).
5. The material-handling device for tunnel construction according to claim 4, wherein: the surface of the second rotating shaft (803) is fixedly connected with a pull rope (806), the other end of the pull rope (806) is fixedly connected to the upper surface of the cargo box (9), and the pull rope (806) is made of a nylon rope.
CN201921978502.6U 2019-11-15 2019-11-15 Material handling device for tunnel construction Expired - Fee Related CN210973637U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201921978502.6U CN210973637U (en) 2019-11-15 2019-11-15 Material handling device for tunnel construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201921978502.6U CN210973637U (en) 2019-11-15 2019-11-15 Material handling device for tunnel construction

Publications (1)

Publication Number Publication Date
CN210973637U true CN210973637U (en) 2020-07-10

Family

ID=71454337

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201921978502.6U Expired - Fee Related CN210973637U (en) 2019-11-15 2019-11-15 Material handling device for tunnel construction

Country Status (1)

Country Link
CN (1) CN210973637U (en)

Similar Documents

Publication Publication Date Title
CN203974658U (en) Truck dust keeper
CN210973637U (en) Material handling device for tunnel construction
CN203673746U (en) Bridge-type crane model for teaching
CN211971558U (en) Multifunctional intelligent gantry crane
CN206051380U (en) A kind of tower crane for carrying lowering or hoisting gear
CN211256692U (en) Transport beam structure of newly-built upper bridge on current bridge
CN211202023U (en) Large-section five-arm drill carriage
CN211116108U (en) Tunnel is with blockking up conveyor
CN209429908U (en) A kind of scalable vertical lift type Flood gate
CN217349398U (en) Material conveying device for tunnel construction
CN206232037U (en) A kind of removable colliery conveying equipment
CN205916927U (en) High -efficient type construction crane
CN211393512U (en) Swift current car protection device is prevented to construction elevator
JP4187445B2 (en) crane
CN209602035U (en) A kind of operation platform for waterproof and Drainage Construction of Tunnel
CN208700358U (en) A kind of transfer device applied to deep basal pit
CN218290055U (en) Vertical transportation device for building blocks
CN110921504A (en) Gantry hanging bracket
CN215758288U (en) Transportation rail mounting device for mining rail
CN204490334U (en) A kind of wireless single suspension centre automatic open-close type grab bucket
CN203497896U (en) Safety protection device of lifting frame
CN204778466U (en) A bridge type removal flatcar for installation of inlayer colored steel
CN211310669U (en) Elevating gear is used in civil engineering
CN215848123U (en) Outdoor GFRP bamboo recombined material or bamboo laminated wood structure system
CN209352519U (en) A kind of constructing tunnel scaffold structure

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20200710

CF01 Termination of patent right due to non-payment of annual fee