CN210951752U - Full heat exchanger tuyere - Google Patents

Full heat exchanger tuyere Download PDF

Info

Publication number
CN210951752U
CN210951752U CN201920927267.3U CN201920927267U CN210951752U CN 210951752 U CN210951752 U CN 210951752U CN 201920927267 U CN201920927267 U CN 201920927267U CN 210951752 U CN210951752 U CN 210951752U
Authority
CN
China
Prior art keywords
wind gap
cover
gap body
upper shield
heat exchanger
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201920927267.3U
Other languages
Chinese (zh)
Inventor
吴品建
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Wenzhou Lvmei Technology Co ltd
Original Assignee
Wenzhou Lvmei Technology Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Wenzhou Lvmei Technology Co ltd filed Critical Wenzhou Lvmei Technology Co ltd
Priority to CN201920927267.3U priority Critical patent/CN210951752U/en
Application granted granted Critical
Publication of CN210951752U publication Critical patent/CN210951752U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Blast Furnaces (AREA)

Abstract

The utility model discloses a full heat exchanger wind gap, the cover is equipped with the adapter sleeve on the surface of wind gap body, the adapter sleeve is including end cover and a plurality of elasticity fastener, elasticity fastener one end is fixed and is sheathe in at the end, is equipped with the fixture block that has the inclined plane on the other end, the annular snap ring of surface shape of elasticity fastener along the wind gap body, form the cavity that supplies the pipeline card to establish between the surface of snap ring inner wall and wind gap body, the adapter sleeve dustcoat is equipped with the upper shield, and the both ends of upper shield are equipped with the linking respectively and wear to establish the mouth, the one of upper shield inner wall near the linking is equipped with the internal thread, be equipped with the external screw thread with internal thread matched with on the surface of the end cover, the upper shield is close to the one end of wearing to establish the mouth, and transversal decline gradually the state formation of steadilying is. The utility model has the characteristics of fast and pipeline assembly, work efficiency is high, and the fastness is good.

Description

Full heat exchanger tuyere
Technical Field
The utility model relates to an exchanger equipment technical field, more specifically say, it relates to a full heat exchanger wind gap.
Background
The total heat exchanger is generally a fresh air and exhaust air exchange device containing a total heat exchange core. The air-conditioning system comprises a shell, wherein an exchange system is arranged in the shell, and two air ports are arranged on the shell and used for air inlet and air exhaust functions. When in use, a pipeline is usually sleeved at the air port to realize the input and output of the air source. In order to make the connection between the pipeline and the tuyere more secure, the connection is usually realized by a hoop. The hoop belongs to external equipment, and needs to be purchased in advance before use so as to meet the requirements during use. However, in the case of a fixed connection method such as the pipe, the pipe cannot be assembled when the hoop is lost, which affects the working efficiency of the equipment.
SUMMERY OF THE UTILITY MODEL
The utility model aims to provide a not enough to prior art exists, the utility model aims to provide a full heat exchanger wind gap convenient with pipe-line assembly, the fastness can be good.
In order to achieve the above purpose, the utility model provides a following technical scheme: a full heat exchanger tuyere comprises a tuyere body, wherein an installation convex edge is arranged at the bottom of the tuyere body, a plurality of bolt assembling holes are distributed along the circumference of the installation convex edge in a clearance manner, a fastening sleeve is sleeved on the outer surface of the tuyere body and comprises a bottom sleeve and a plurality of elastic clamping pieces, one end of each elastic clamping piece is fixed on the bottom sleeve, a clamping block with an inclined plane is arranged at the other end of each elastic clamping piece, each elastic clamping piece forms an annular clamping ring along the outer surface of the tuyere body, a concave cavity for clamping a pipeline is formed between the inner wall of the clamping ring and the outer surface of the tuyere body, a cover is arranged on the outer cover of the fastening sleeve, a sleeve opening and a penetrating opening are respectively arranged at two ends of the cover, an internal thread is arranged at one end, close to the internal thread, of the outer surface of the bottom sleeve is provided with an external thread matched with the internal thread, the cover is, and a plurality of convex teeth are arranged on the inner wall of the gathering end.
The utility model discloses further set up to: the capping is close to serving of running-on and is equipped with the arc breach, be equipped with annular inner groovy on the surface of end cover, the card is equipped with and has elastic arc clamp on the arc breach, the both ends of arc clamp buckle the lock on the surface of capping outward towards the arc breach, be equipped with a plurality of latches on the interior rampart of arc clamp, the latch extends to in the annular inner groovy of end cover.
The utility model discloses further set up to: the bottom sleeve, the elastic clamping piece and the clamping block are arranged in an integrated structure.
Through adopting above-mentioned technical scheme, full heat exchanger wind gap need not be with the help of external hoop when assembling with the pipeline, through the adapter sleeve that self set up and the cooperation of upper shield, just can assemble the pipeline fixedly. The assembling method has the advantages of no need of extra workpieces, simplicity and convenience in operation, high assembling firmness and improvement of assembling efficiency.
Drawings
Fig. 1 is an exploded view of the present invention;
fig. 2 illustrates the use of the tuyere body.
1. A tuyere body; 10. installing a convex edge; 11. a bolt assembly hole; 2. fastening sleeves; 20. a bottom cover; 21. An annular inner groove; 22. the elastic clamping piece; 23. a clamping block; 24. a concave cavity; 3. covering; 30. looping; 31. A hole is drilled; 32. gathering ends; 33. a convex tooth; 34. an arc-shaped notch; 4. an arc-shaped hoop; 40. clamping teeth; 5. total heat exchanger.
Detailed Description
Embodiments of the present invention are further described with reference to fig. 1 to 2.
A full heat exchanger tuyere comprises a tuyere body 1, wherein an installation convex edge 10 is arranged at the bottom of the tuyere body 1, a plurality of bolt assembling holes 11 are distributed along the circumference of the installation convex edge 10 in a clearance manner, a fastening sleeve 2 is sleeved on the outer surface of the tuyere body 1, the fastening sleeve 2 comprises a bottom sleeve 20 and a plurality of elastic clamping pieces 22, one end of each elastic clamping piece 22 is fixed on the bottom sleeve 20, a clamping block 23 with an inclined plane is arranged at the other end of each elastic clamping piece 22, an annular clamping ring is formed along the outer surface of the tuyere body 1 by the elastic clamping pieces 22, a cavity 24 for clamping a pipeline is formed between the inner wall of the clamping ring and the outer surface of the tuyere body 1, a sleeve cover 3 is arranged outside the fastening sleeve 2, a sleeve opening 30 and a penetrating opening 31 are respectively arranged at two ends of the sleeve cover 3, an internal thread is arranged at one end, close to the sleeve opening 30, of the inner wall of the sleeve cover, the sleeve cover 3 is close to one end of the penetrating opening 31, the cross section of the sleeve cover is gradually reduced to form a gathering end 32, and a plurality of convex teeth 33 are arranged on the inner wall of the gathering end 32. One of the cover 3 is close the cuff 30 serves and is equipped with arc breach 34, be equipped with annular inner groovy 21 on the surface of end cover 20, the card is equipped with and has elastic arc clamp 4 on the arc breach 34, the both ends of arc clamp 4 buckle the lock on the surface of cover 3 outward towards arc breach 34, be equipped with a plurality of latches 40 on the inner ring wall of arc clamp 4, latch 40 extends to in the annular inner groovy 21 of end cover 20. The bottom sleeve 20, the elastic clamping piece 22 and the clamping block 23 are arranged in an integral structure.
The operation flow is as follows: after the sleeve cover 3 is disassembled from the fastening sleeve 2 by screwing, the pipeline enters from the end of the penetrating opening 31 of the sleeve cover 3, and the end with the sleeve opening 30 extends out. Then the pipeline is sleeved on the tuyere body 1 and is positioned in the concave cavity 24 between the elastic clamping piece 22 and the tuyere body 1. And finally, the sleeve cover 3 is matched with the fastening sleeve 2, the sleeve cover 3 is matched with the bottom sleeve 20 through screwing, in the screwing process, one end of the elastic part, which is provided with the fixture block 23, enters the gathering end 32, the convex teeth 33 in the gathering end 32 are abutted against the fixture block 23, the elastic part is tightly attached to the outer wall of the pipeline, and the pipeline is fixed in the cavity 24. After the sleeve cover 3 is fixed on the fastening sleeve 2 through threads, the arc-shaped clamp 4 is buckled on the arc-shaped notch 34, the arc-shaped notch 34 is extended from the two ends of the arc-shaped clamp 4, the buckling is carried out on the outer wall of the sleeve cover 3, and after the arc-shaped notch 34 is penetrated and arranged by the latch 40 on the inner annular wall of the arc-shaped clamp 4, the latch conflicts in the annular inner groove 21 of the bottom sleeve 20. The latch 40 interferes with the bottom wall of the annular inner recess 21, making it difficult to screw-remove the sleeve. After the assembly is completed to the pipeline, the sleeve can be effectively prevented from being loosened by misoperation, and the matching firmness of the pipeline and the tuyere body 1 is reduced.
It is above only the utility model discloses a preferred embodiment, the utility model discloses a scope of protection does not only confine above-mentioned embodiment, the all belongs to the utility model discloses a technical scheme under the thinking all belongs to the utility model discloses a scope of protection. It should be noted that, for those skilled in the art, various modifications and decorations can be made without departing from the principle of the present invention, and these modifications and decorations should also be regarded as the protection scope of the present invention.

Claims (3)

1. The utility model provides a full heat exchanger wind gap, includes the wind gap body, is equipped with the protruding edge of installation in the bottom of wind gap body, and it has a plurality of bolt pilot holes, its characterized in that to be clearance distribution along the circumference on the protruding edge of installation: the utility model discloses a wind gap body, including wind gap body, clamping ring inner wall and wind gap body, be equipped with the cover, the cover is equipped with the adapter sleeve on the surface of wind gap body, the adapter sleeve is equipped with the clamping block that has the inclined plane on the bottom cover, elasticity fastener forms annular snap ring along the surface of wind gap body, form the cavity that supplies the pipeline card to establish between the surface of snap ring inner wall and wind gap body, the adapter sleeve dustcoat is equipped with the upper shield, and the both ends of upper shield are equipped with the linking respectively and wear to establish the mouth, one that the upper shield inner wall is close the linking is equipped with the internal thread, is equipped with the external screw thread with internal thread matched with on the surface of the lower cover, the upper shield is close the one end of wearing to establish the mouth, and transversal personally submits the gradual deg.
2. The total heat exchanger tuyere of claim 1, wherein: the capping is close to serving of running-on and is equipped with the arc breach, be equipped with annular inner groovy on the surface of end cover, the card is equipped with and has elastic arc clamp on the arc breach, the both ends of arc clamp buckle the lock on the surface of capping outward towards the arc breach, be equipped with a plurality of latches on the interior rampart of arc clamp, the latch extends to in the annular inner groovy of end cover.
3. The total heat exchanger tuyere of claim 2, wherein: the bottom sleeve, the elastic clamping piece and the clamping block are arranged in an integrated structure.
CN201920927267.3U 2019-06-19 2019-06-19 Full heat exchanger tuyere Active CN210951752U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201920927267.3U CN210951752U (en) 2019-06-19 2019-06-19 Full heat exchanger tuyere

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201920927267.3U CN210951752U (en) 2019-06-19 2019-06-19 Full heat exchanger tuyere

Publications (1)

Publication Number Publication Date
CN210951752U true CN210951752U (en) 2020-07-07

Family

ID=71379449

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201920927267.3U Active CN210951752U (en) 2019-06-19 2019-06-19 Full heat exchanger tuyere

Country Status (1)

Country Link
CN (1) CN210951752U (en)

Similar Documents

Publication Publication Date Title
CN210951752U (en) Full heat exchanger tuyere
US20080211227A1 (en) Wall Bushing For Air Conditioner
CN211084133U (en) Flame tube head structure
JP5021840B1 (en) Core pin
US20060037767A1 (en) Air cylinder for reciprocating pneumatic tool
CN210637661U (en) Blowing air bag
CN209637884U (en) Hot gas conducts shell and gas-turbine plant
CN212203304U (en) Quick butt joint valve flange
CN104018942A (en) Fuel manifold joint for gas turbine and gas turbine
CN204610897U (en) Electric throttle valve
CN210830958U (en) Connect fast and stable's spiral duct
CN206929989U (en) A kind of heat gun air duct fast joint structure
CN210460806U (en) Modularized combined water-cooling shield for exhaust pipe of diesel engine
CN110594513A (en) Blowing air bag
CN214889688U (en) Bypass clamping and pressing pipe fitting for heating pipeline
CN211314320U (en) Air inlet flow guide cover for silencer
CN205678319U (en) Quick connector
CN220112664U (en) Protection structure of air inlet flange of exhaust pipe
CN215258469U (en) Water pipe joint installation component and electrical equipment with same
CN213684841U (en) Threaded fastener for mechanical assembly
CN208581114U (en) A kind of motor fan housing
CN217683717U (en) High-strength anti-oxidation integrated stove gas branch pipe
CN207873975U (en) Eyeglass polishing relaying jig
CN218845243U (en) Inner valve core pipe convenient to assemble and faucet with inner valve core pipe convenient to assemble
CN208895242U (en) A kind of cylinder part self orientation auxiliary drilling tool

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant