CN210947652U - Civil engineering construction support - Google Patents

Civil engineering construction support Download PDF

Info

Publication number
CN210947652U
CN210947652U CN201921746241.5U CN201921746241U CN210947652U CN 210947652 U CN210947652 U CN 210947652U CN 201921746241 U CN201921746241 U CN 201921746241U CN 210947652 U CN210947652 U CN 210947652U
Authority
CN
China
Prior art keywords
fixedly connected
telescopic link
spliced pole
civil engineering
engineering construction
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201921746241.5U
Other languages
Chinese (zh)
Inventor
王英杰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201921746241.5U priority Critical patent/CN210947652U/en
Application granted granted Critical
Publication of CN210947652U publication Critical patent/CN210947652U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

The utility model discloses a civil engineering construction support, including backup pad, telescopic link, and stationary blade, the bottom fixedly connected with of stationary blade cup joints a section of thick bamboo, the side of telescopic link is provided with the adjustable ring, the bottom fixedly connected with spliced pole of telescopic link, the bottom of spliced pole is provided with the gyro wheel, the side fixedly connected with bracing piece and the stabilizer bar of spliced pole. This civil engineering construction support, a cup joint section of thick bamboo through backup pad bottom setting, the one end of telescopic link can be pegged graft, it dismantles after using up to be convenient for, the adjustable ring that sets up through the telescopic link side, can adjust the height of telescopic link, gyro wheel through the spliced pole bottom sets up, can make things convenient for the mobile device, flexible post through the flexible post that the bracing piece bottom set up, can adjust flexible post through the regulating block that flexible post side set up, the stability of equipment is kept in the convenience when being under construction, through the dead lever that the spliced pole side set up, can stabilize the telescopic link.

Description

Civil engineering construction support
Technical Field
The utility model relates to a building equipment technical field specifically is a civil engineering construction support.
Background
Wood engineering, which refers to applied materials and equipment, technical activities such as surveying, designing, constructing, maintaining and repairing, and also refers to objects of engineering construction, namely, various engineering facilities which are constructed on the ground or underground, on land or in water and directly or indirectly serve human life, production, military and scientific research, a bracket is usually required to be erected in advance to facilitate the subsequent working process when a worker is in construction, and the bracket is used for lifting and supporting the worker and building materials so as to increase the working space of the worker and facilitate the improvement of the construction efficiency; the support structure of prior art is coarse, and the technical merit is low, and the removal of support is comparatively difficult, and stability is relatively poor to unable adjustment support height, it is very inconvenient at the during operation, influence work efficiency and quality etc. consequently remove the difficulty to above-mentioned support, unable height-adjusting scheduling problem provides a new construction support.
SUMMERY OF THE UTILITY MODEL
Technical problem to be solved
Not enough to prior art, the utility model provides a civil engineering construction support has solved the problem of proposing in the above-mentioned background art.
(II) technical scheme
In order to achieve the above purpose, the utility model discloses a following technical scheme realizes: the utility model provides a civil engineering construction support, includes backup pad and telescopic link, the bottom fixedly connected with stationary blade of backup pad, the bottom fixedly connected with of stationary blade cup joints a section of thick bamboo, the side of telescopic link is provided with the adjustable ring, the bottom fixedly connected with spliced pole of telescopic link, the bottom of spliced pole is provided with the gyro wheel, the side fixedly connected with bracing piece and the stabilizer bar of spliced pole, the flexible post of bottom fixedly connected with of bracing piece, the side of flexible post is provided with the regulating block, the bottom fixedly connected with fixed disk of flexible post, the side fixedly connected with fixed block of spliced pole, the inside of fixed block is pegged graft and is had the dead lever.
Optionally, one end of the telescopic rod is inserted into the sleeve joint barrel.
Optionally, the number of the telescopic rods is four, and the four telescopic rods are arranged at the bottom of the supporting plate in a rectangular array.
Optionally, the lower surface of the fixing plate is fixedly connected with four fixing screws, and the number of the fixing screws is four, and the four fixing screws are arranged on the lower surface of the fixing plate in an annular array manner.
Optionally, the number of the socket sleeves is four, and the four socket sleeves are arranged on the lower surface of the support plate in a rectangular array.
Optionally, the number of the fixing rods is two, and the two fixing rods are arranged on the side face of the connecting column.
(III) advantageous effects
The utility model provides a civil engineering construction support possesses following beneficial effect:
this civil engineering construction support, a cup joint section of thick bamboo through backup pad bottom setting, the one end of telescopic link can be pegged graft, it dismantles after using up to be convenient for, the adjustable ring that sets up through the telescopic link side, can adjust the height of telescopic link, gyro wheel through the spliced pole bottom setting, can make things convenient for the mobile device, the flexible post through the flexible post that the bracing piece bottom set up, can adjust flexible post through the regulating block that flexible post side set up, the stability of equipment is kept in the construction to the convenience, stabilizer bar and bracing piece through spliced pole side fixed connection, can stabilize flexible post, the dead lever that sets up through the spliced pole side, can stabilize the telescopic link.
Drawings
FIG. 1 is a schematic perspective view of the present invention;
FIG. 2 is a schematic view of the bottom structure of the supporting plate of the present invention;
fig. 3 is a schematic side view of the connecting column of the present invention.
In the figure: 1. a support plate; 2. a telescopic rod; 3. an adjusting ring; 4. connecting columns; 5. a roller; 6. a stabilizer bar; 7. a support bar; 8. a telescopic column; 9. an adjusting block; 10. fixing the disc; 11. sleeving a sleeve; 12. a fixing sheet; 13. fixing screws; 14. a fixed block; 15. and (5) fixing the rod.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments.
Referring to fig. 1 to 3, the present invention provides a technical solution: the civil engineering building construction support comprises a supporting plate 1 and telescopic rods 2, one ends of the telescopic rods 2 are inserted into sleeve barrels 11 in an inserting mode, the number of the telescopic rods 2 is four, the four telescopic rods 2 are arranged at the bottom of the supporting plate 1 in a rectangular array mode, the bottom of the supporting plate 1 is fixedly connected with fixing pieces 12, the lower surfaces of the fixing pieces 12 are fixedly connected with fixing screws 13, the number of the fixing screws 13 is four, the four fixing screws 13 are arranged on the lower surfaces of the fixing pieces 12 in an annular array mode, the bottom of each fixing piece 12 is fixedly connected with a sleeve barrel 11, one ends of the telescopic rods 2 can be inserted into the sleeve barrels 11 arranged at the bottom of the supporting plate 1, the dismounting after use is facilitated, the number of the sleeve barrels 11 is four, and the four sleeve barrels 11 are arranged on the lower surface of the supporting plate 1 in;
the side surface of the telescopic rod 2 is provided with an adjusting ring 3, the height of the telescopic rod 2 can be adjusted through the adjusting ring 3 arranged on the side surface of the telescopic rod 2, the bottom of the telescopic rod 2 is fixedly connected with a connecting column 4, the telescopic rod 2 can be stabilized through a fixing rod 15 arranged on the side surface of the connecting column 4, the bottom of the connecting column 4 is provided with a roller 5, the roller 5 arranged on the bottom of the connecting column 4 can facilitate moving equipment, the side surface of the connecting column 4 is fixedly connected with a support rod 7 and a stabilizer rod 6, and the telescopic column 8 can be stabilized through the stabilizer rod 6 and the support rod;
the flexible post 8 of bottom fixedly connected with of bracing piece 7, flexible post 8 through bracing piece 7 bottom setting, the height of flexible post 8 can be adjusted through regulating block 9 that flexible post 8 side set up, the stability of equipment is kept in the construction to the convenience, the side of flexible post 8 is provided with regulating block 9, the bottom fixedly connected with fixed disk 10 of flexible post 8, the side fixedly connected with fixed block 14 of spliced pole 4, the inside of fixed block 14 is pegged graft and is had dead lever 15, the quantity of dead lever 15 is two, and two dead levers 15 all set up the side at spliced pole 4.
As an optimal technical solution of the utility model: the roller 5 arranged at the bottom of the connecting column 4 can facilitate the moving of the equipment.
Working principle and operation method, the civil engineering construction support, when using, insert the socket tube 11 that the bottom of the backup pad 1 sets up into one end of the telescopic link 2, adjust the height of the telescopic link 2 through the adjustable ring 3 that the side of the telescopic link 2 sets up, so as to reach the height that the construction needs, the gyro wheel that the bottom of the joint pole 4 sets up, it is comparatively convenient when moving, while constructing, through adjusting the regulating block that the side of the telescopic column 8 sets up, raise the apparatus integrally, guarantee the stability of the apparatus, through the socket tube 11 that the bottom of the backup pad 1 sets up, can peg graft one end of the telescopic link 2, it is convenient to dismantle after using up, through the adjustable ring 3 that the side of the telescopic column 2 sets up, can adjust the height of the telescopic column 2, through the gyro wheel 5 that the bottom of the joint pole 4 sets up, can facilitate the moving apparatus, through the telescopic column 8 that the bottom of the bracing piece 7 sets, the stability of equipment is kept to the convenience in the construction, through 4 side fixed connection's of spliced pole stabilizer bar 6 and bracing piece 7, can stabilize telescopic column 8, through the dead lever 15 that 4 sides of spliced pole set up, can stabilize telescopic link 2.
The above, only be the concrete implementation of the preferred embodiment of the present invention, but the protection scope of the present invention is not limited thereto, and any person skilled in the art is in the technical scope of the present invention, according to the technical solution of the present invention and the utility model, the concept of which is equivalent to replace or change, should be covered within the protection scope of the present invention.

Claims (6)

1. The utility model provides a civil engineering construction support, includes backup pad (1) and telescopic link (2), its characterized in that: the utility model discloses a flexible anchor clamps of shoe, including backup pad (1), the bottom fixedly connected with stationary blade (12) of backup pad (1), the bottom fixedly connected with cup joint section of thick bamboo (11) of stationary blade (12), the side of telescopic link (2) is provided with adjustable ring (3), the bottom fixedly connected with spliced pole (4) of telescopic link (2), the bottom fixedly connected with spliced pole (4) of spliced pole (4) is provided with gyro wheel (5), side fixedly connected with bracing piece (7) and stabilizer bar (6) of spliced pole (4), the flexible post (8) of bottom fixedly connected with of bracing piece (7), the side of flexible post (8) is provided with regulating block (9), the bottom fixedly connected with fixed disk (10) of flexible post (8), the side fixedly connected with fixed block (14) of spliced pole (4), the inside of fixed block (.
2. The civil engineering construction support of claim 1, wherein: one end of the telescopic rod (2) is inserted in the sleeve joint barrel (11).
3. The civil engineering construction support of claim 1, wherein: the number of the telescopic rods (2) is four, and the four telescopic rods (2) are arranged at the bottom of the supporting plate (1) in a rectangular array mode.
4. The civil engineering construction support of claim 1, wherein: the lower surface fixedly connected with set screw (13) of stationary blade (12), the quantity of set screw (13) is four, and four set screw (13) set up the lower surface at stationary blade (12) with the form of annular array.
5. The civil engineering construction support of claim 1, wherein: the number of the sleeve joint barrels (11) is four, and the four sleeve joint barrels (11) are arranged on the lower surface of the supporting plate (1) in a rectangular array mode.
6. The civil engineering construction support of claim 1, wherein: the number of the fixing rods (15) is two, and the two fixing rods (15) are arranged on the side face of the connecting column (4).
CN201921746241.5U 2019-10-17 2019-10-17 Civil engineering construction support Expired - Fee Related CN210947652U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201921746241.5U CN210947652U (en) 2019-10-17 2019-10-17 Civil engineering construction support

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201921746241.5U CN210947652U (en) 2019-10-17 2019-10-17 Civil engineering construction support

Publications (1)

Publication Number Publication Date
CN210947652U true CN210947652U (en) 2020-07-07

Family

ID=71388861

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201921746241.5U Expired - Fee Related CN210947652U (en) 2019-10-17 2019-10-17 Civil engineering construction support

Country Status (1)

Country Link
CN (1) CN210947652U (en)

Similar Documents

Publication Publication Date Title
CN104196235B (en) A kind of movable stencil supports truss and constructional method thereof
CN201106290Y (en) Project combined movable support apparatus
CN210947652U (en) Civil engineering construction support
CN210622322U (en) Detachable temporary support for constructional engineering construction
CN215858149U (en) Adjustable base is laid to stone material
CN210976521U (en) Building platform for outdoor building and indoor decoration
CN214117600U (en) Ancient building restores and uses interim stabilising arrangement
CN214531885U (en) Single-face punching-free formwork supporting device applied to assembly type wall building
CN211048690U (en) Command stand for engineering management
CN213654282U (en) Portable detachable cyclic utilization double-limb column type assembling jig frame
CN211224677U (en) Concatenation formula reinforcing bar storage rack for building
CN208310044U (en) A kind of keel positioning device of polygon column
CN210067530U (en) Bracing piece and support frame
CN220747778U (en) Post-cast strip steel pipe temporary supporting structure
CN206677863U (en) The quick assembly tool of photo-thermal sulculus
CN214659066U (en) Combined supporting pile for civil engineering
CN210622259U (en) Be used for civil engineering construction support
CN109296217A (en) A kind of strenthening member and its application method of pin
CN214783975U (en) Retaining structure for foundation pit
CN218862287U (en) Construction is with safety protection fence convenient to accomodate
CN217232892U (en) High stability strutting arrangement for civil engineering
CN218933776U (en) Safety construction frame
CN219638116U (en) Stable steel structure engineering support
CN216341197U (en) Civil engineering construction support
CN214786112U (en) Rack track support bed-jig that slides

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20200707

Termination date: 20211017

CF01 Termination of patent right due to non-payment of annual fee