CN210947651U - Folding beam frame for building construction - Google Patents

Folding beam frame for building construction Download PDF

Info

Publication number
CN210947651U
CN210947651U CN201921737211.8U CN201921737211U CN210947651U CN 210947651 U CN210947651 U CN 210947651U CN 201921737211 U CN201921737211 U CN 201921737211U CN 210947651 U CN210947651 U CN 210947651U
Authority
CN
China
Prior art keywords
roof
sets
support piece
sleeve
groups
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201921737211.8U
Other languages
Chinese (zh)
Inventor
常桃霞
刘德芳
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201921737211.8U priority Critical patent/CN210947651U/en
Application granted granted Critical
Publication of CN210947651U publication Critical patent/CN210947651U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Roof Covering Using Slabs Or Stiff Sheets (AREA)

Abstract

The utility model discloses a folding roof beam structure of construction, including bottom plate, regulating part, drawknot spare and support piece, the regulating part has all been welded in the four corners department of the diapire of bottom plate, the regulating part includes backing plate, screw thread post and sleeve pipe, the diapire welding of backing plate has the screw thread post, screw thread post and sleeve pipe threaded connection, the sheathed tube bottom welding has the extension board, the lateral wall welding of extension board has the horizontal pole, the screw with the stock adaptation is all seted up in the four corners department of extension board, the roof of bottom plate is fixed with storing box and support piece, be provided with baffle and foam pad in the storing box, support piece includes roof, well hollow column and square column, one side of support piece is fixed with two sets of fasteners, support piece's inside is fixed with four groups drawknot spare, the drawknot spare includes ring flange, screw rod and pipe. The folding beam frame for building construction can adapt to outdoor uneven ground and has high stability.

Description

Folding beam frame for building construction
Technical Field
The utility model belongs to the technical field of the construction, concretely relates to folding roof beam structure of construction.
Background
The building construction refers to production activities in the engineering construction implementation stage, is the construction process of various buildings, and also can be a process of changing various lines on a design drawing into a real object at a specified place. At present, during construction, in order to obtain suitable height, need use the construction roof beam structure, because there is the unevenness in the road surface in the building site, the construction roof beam structure is inconvenient to make level, and the stability of construction roof beam structure can receive the influence, takes place to empty even, endangers constructor's safety.
Therefore, in order to meet the current situation, the design and production of a folding beam frame for building construction are urgently needed to meet the requirement of practical use.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a folding roof beam structure of construction to solve the problem that proposes among the above-mentioned background art.
In order to achieve the above object, the utility model provides a following technical scheme: the utility model provides a folding roof beam structure of construction, includes bottom plate, regulating part, drawknot spare and support piece, the regulating part has all been welded in the four corners department of the diapire of bottom plate, the roof of bottom plate is fixed with storing box and support piece, one side of support piece is fixed with two sets of fasteners, support piece's inside is fixed with four sets of drawknot spare.
Preferably, the regulating part comprises a base plate, a threaded column and a sleeve, the threaded column is welded on the bottom wall of the base plate and is in threaded connection with the sleeve, the support plate is welded at the bottom end of the sleeve, a cross rod is welded on the side wall of the support plate, and screw holes matched with the anchor rod are formed in four corners of the support plate.
Preferably, the drawknot spare includes ring flange, screw rod and pipe, ring flange and screw rod all are provided with two sets ofly, two sets of the ring flange has all been welded to the tip of screw rod, and is two sets of the screw rod all with pipe threaded connection.
Preferably, support piece includes roof, well cavity post and square column, the roof integrated into one piece of roof has the multiunit arch, the both sides of roof all are connected with the deflector through the pivot, there are well cavity post, four groups all through bolted connection in the four corners department of the diapire of roof the outer wall homogeneous body shaping of well cavity post has the flange that has the through-hole, four groups the square column has all been inserted to the inside of well cavity post, four groups the equal threaded connection of lateral wall of well cavity post has locking bolt, four groups the screw of the bolt adaptation in multiunit and the ring flange is all seted up to the lateral wall of square column, four groups the bottom of square column all is fixed with well cavity post.
Preferably, the clamping part comprises a sleeve, a guide rod and a clamping plate, a vertical plate with a through hole is integrally formed at one end of the sleeve, the guide rod is inserted into the other end of the sleeve, a plurality of groups of screw holes matched with the lock pins on the side wall of the sleeve are formed in the side wall of the guide rod, the lock pins are L-shaped, the U-shaped clamping plate is welded at one end, away from the sleeve, of the guide rod, two groups of screw holes matched with the fastening pins are formed in two groups of side plates of the clamping plate, and rubber pads are bonded at the end parts of the fastening pins.
Preferably, the inner walls of the two groups of symmetrical storage boxes are provided with clamping grooves matched with the partition plates, and the inner walls of the storage boxes and the side walls of the partition plates are fixed with foam pads.
The utility model discloses a technological effect and advantage: according to the folding beam frame for building construction, a cross rod on the side wall of a sleeve is held by a hand to rotate the sleeve and anchor rods at four corners of a support plate, the height of an adjusting piece is adjusted, so that the bottom end of the anchor rod is pricked into the ground, and a bottom plate can adapt to the uneven ground outdoors; the square column, the hollow column and the top plate are combined, so that the assembly and disassembly are convenient, the space is saved, and the support piece can be additionally arranged according to the construction requirement, so that the overall height can be controlled; the round pipe is rotated, so that the length of the pulling piece can be adjusted, two adjacent groups of square columns are pulled, the square columns are prevented from being inclined after being pressed, and the overall stability is improved; the length of fastener can be adjusted to the screw of pulling guide arm and with the one end screw in guide arm lateral wall different positions of lockpin, and the cardboard combines with the fastening pin, can link together building structure and square column, prevents that the construction roof beam structure is whole to be emptyd, has ensured safety, and this folding roof beam structure of construction can adapt to outdoor unevenness's ground, has higher stability.
Drawings
Fig. 1 is a front view of the present invention;
FIG. 2 is a schematic structural view of the adjusting member of the present invention;
fig. 3 is a top view of the storage box of the present invention;
fig. 4 is a top view of the clip of the present invention.
In the figure: the storage box comprises a base plate 1, a regulating member 2, a backing plate 20, a threaded column 21, a sleeve 22, a support plate 23, an anchor rod 24, a storage box 3, a partition plate 30, a foam pad 31, a tie-in member 4, a flange plate 40, a screw rod 41, a round tube 42, a support member 5, a top plate 50, a rotating plate 51, a hollow column 52, a square column 53, a clamping member 6, a sleeve 60, a lock pin 61, a guide rod 62, a clamping plate 63 and a fastening pin 64.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
Unless defined otherwise, all references to up, down, left, right, front, back, inner and outer directions herein are to be interpreted as referring to up, down, left, right, front, back, inner and outer directions in the drawings to which the invention is applied, and all references are hereby incorporated herein by reference.
The utility model provides a folding roof beam structure of construction as shown in fig. 1-4, including bottom plate 1, regulating part 2, drawknot spare 4 and support piece 5, the four corners department of the diapire of bottom plate 1 has all welded regulating part 2, the roof of bottom plate 1 has storing box 3 and support piece 5 through the bolt fastening, there are two sets of fasteners 6 in one side of support piece 5 through the bolt fastening, there are four groups drawknot spare 4 in support piece 5's inside through the bolt fastening.
Specifically, regulating part 2 includes backing plate 20, screw thread post 21 and sleeve pipe 22, the diapire welding of backing plate 20 has screw thread post 21, screw thread post 21 and sleeve pipe 22 threaded connection, the bottom welding of sleeve pipe 22 has extension board 23, the lateral wall welding of extension board 23 has the horizontal pole, the screw with 24 adaptations of stock is all seted up to the four corners department of extension board 23, holds the stock 24 of the horizontal pole rotating sleeve 22 of sleeve pipe 22 lateral wall and rotatory extension board 23 four corners department, adjusts regulating part 2's height for ground is pricked to the bottom of stock 24, can make bottom plate 1 adapt to outdoor pothole uneven ground.
Specifically, drawknot spare 4 includes ring flange 40, screw rod 41 and pipe 42, ring flange 40 and screw rod 41 all are provided with two sets ofly, two sets of ring flange 40 has all been welded to screw rod 41's tip, and is two sets of screw rod 41 all with pipe 42 threaded connection, rotatory pipe 42 can adjust the length of drawknot spare 4, carries out the drawknot to adjacent two sets of square columns 53, prevents that square columns 53 from slope after the pressurized, has improved holistic stability.
Specifically, support piece 5 includes roof 50, cavity post 52 and square column 53, roof integrated into one piece of roof 50 has the multiunit arch, the both sides of roof 50 all are connected with runner 51 through the pivot, upset runner 51 makes runner 51 be in the horizontality, can increase the area of roof 50 to catch the cement or debris that fall down on the wall, there is cavity post 52 all through bolted connection in the four corners department of the diapire of roof 50, four groups the equal integrated into one piece of outer wall of cavity post 52 has the flange that has the through-hole, four groups the square column 53 has all been inserted in the inside of cavity post 52, four groups the equal threaded connection of lateral wall of cavity post 52 has locking bolt, four groups the screw of bolt adaptation in multiunit and the ring flange 40 is all seted up to the lateral wall of square column 53, four groups the bottom of square column 53 all is fixed with cavity post 52 through locking bolt, square column 53, cavity post 52 combines with roof 50, the assembling and disassembling of the two adjacent groups of supporting pieces 5 are facilitated, the space is saved, and the supporting pieces 5 can be additionally arranged according to construction requirements.
Specifically, the clamping piece 6 comprises a sleeve 60, a guide rod 62 and a clamping plate 63, a vertical plate with a through hole is integrally formed at one end of the sleeve 60, the guide rod 62 is inserted into the other end of the sleeve 60, multiple groups of screw holes matched with the screw holes of the screw pins 61 on the side wall of the sleeve 60 are formed in the side wall of the guide rod 62, the screw pins 61 are L-shaped, the U-shaped clamping plate 63 is welded at one end, away from the sleeve 60, of the guide rod 62, two groups of screw holes matched with the fastening pins 64 are formed in two groups of side plates of the clamping plate 63, rubber pads are bonded at the end portions of the four groups of fastening pins 64, the guide rod 62 is pulled, one end of the screw pins 61 is screwed into the screw holes in different positions of the side wall of the guide rod 62, the length of the clamping piece 6 can be adjusted, the clamping plate 63 is combined with the.
Specifically, the draw-in groove of multiunit and baffle 30 adaptation is all seted up to the inner wall that two sets of symmetries of storing box 3 set up, the inner wall of storing box 3 and the lateral wall of baffle 30 all bond there is foam pad 31.
Specifically, this folding roof beam structure of building construction, hold horizontal pole rotary sleeve 22 of sleeve 22 lateral wall and rotate the stock 24 of extension board 23 four corners department, highly adjust adjustment 2, make the bottom of stock 24 prick into ground, can make bottom plate 1 adapt to outdoor uneven ground, utilize the bolt to be connected well post 52 with bottom plate 1, square column 53, well post 52 combines with roof 50, be convenient for the equipment of two sets of adjacent support piece 5, rotatory pipe 42, can adjust the length of drawknot piece 4, drawknot is carried out to two sets of adjacent square columns 53, the drawing guide rod 62 and the screw with the one end screw in guide rod 62 lateral wall different positions of lockpin 61, can adjust the length of fastener 6, cardboard 63 combines with holding pin 64, can link together building structure and square column 53, prevent wholly empting, safety has been ensured.
Finally, it should be noted that: although the present invention has been described in detail with reference to the foregoing embodiments, it will be apparent to those skilled in the art that modifications and variations can be made in the embodiments or in part of the technical features of the embodiments without departing from the spirit and the scope of the invention.

Claims (6)

1. The utility model provides a folding roof beam structure of construction, includes bottom plate (1), regulating part (2), drawknot spare (4) and support piece (5), its characterized in that: all the welding of four corners department of the diapire of bottom plate (1) has adjusting part (2), the roof of bottom plate (1) is fixed with storing box (3) and support piece (5), one side of support piece (5) is fixed with two sets of fastener (6), the inside of support piece (5) is fixed with four groups of drawknot spare (4).
2. The construction folding beam frame as claimed in claim 1, wherein: regulating part (2) include backing plate (20), screw thread post (21) and sleeve pipe (22), the diapire welding of backing plate (20) has screw thread post (21), screw thread post (21) and sleeve pipe (22) threaded connection, the bottom welding of sleeve pipe (22) has extension board (23), the lateral wall welding of extension board (23) has the horizontal pole, the screw with stock (24) adaptation is all seted up in the four corners department of extension board (23).
3. The construction folding beam frame as claimed in claim 1, wherein: the drawknot piece (4) includes ring flange (40), screw rod (41) and pipe (42), ring flange (40) and screw rod (41) all are provided with two sets ofly, two sets of ring flange (40), two sets of all welding of tip of screw rod (41) all with pipe (42) threaded connection.
4. The construction folding beam frame as claimed in claim 1, wherein: support piece (5) are including roof (50), well cavity post (52) and square column (53), the roof integrated into one piece of roof (50) has the multiunit arch, the both sides of roof (50) all are connected with runner (51) through the pivot, the four corners department of the diapire of roof (50) all has well cavity post (52), four groups the equal integrated into one piece of outer wall of well cavity post (52) has the flange that has the through-hole, four groups square column (53), four groups have all been inserted to the inside of well cavity post (52) the equal threaded connection of lateral wall of well cavity post (52) has the locking bolt, four groups the screw of the bolt adaptation in multiunit and ring flange (40) is all seted up to the lateral wall of square column (53), four groups the bottom of square column (53) all is fixed with well cavity post (52).
5. The construction folding beam frame as claimed in claim 1, wherein: fastener (6) include sleeve (60), guide arm (62) and cardboard (63), the one end integrated into one piece of sleeve (60) has the riser that has the through-hole, guide arm (62) have been inserted to the other end of sleeve (60), the screw of multiunit and lockpin (61) adaptation of sleeve (60) lateral wall is seted up to the lateral wall of guide arm (62), lockpin (61) are L shape, sleeve (60) was kept away from in guide arm (62) one end welding has cardboard (63) of U-shaped, all set up two sets of screws with fastening pin (64) adaptation in two sets of curb plates of cardboard (63), four sets of the tip of fastening pin (64) all bonds and has the cushion.
6. The construction folding beam frame as claimed in claim 1, wherein: the inner wall that two sets of symmetries of storing box (3) set up all sets up the draw-in groove of multiunit and baffle (30) adaptation, the inner wall of storing box (3) and the lateral wall of baffle (30) all are fixed with foam pad (31).
CN201921737211.8U 2019-10-16 2019-10-16 Folding beam frame for building construction Expired - Fee Related CN210947651U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201921737211.8U CN210947651U (en) 2019-10-16 2019-10-16 Folding beam frame for building construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201921737211.8U CN210947651U (en) 2019-10-16 2019-10-16 Folding beam frame for building construction

Publications (1)

Publication Number Publication Date
CN210947651U true CN210947651U (en) 2020-07-07

Family

ID=71392679

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201921737211.8U Expired - Fee Related CN210947651U (en) 2019-10-16 2019-10-16 Folding beam frame for building construction

Country Status (1)

Country Link
CN (1) CN210947651U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112221680A (en) * 2020-09-23 2021-01-15 山东交通职业学院 Civil engineering construction waste treatment device

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112221680A (en) * 2020-09-23 2021-01-15 山东交通职业学院 Civil engineering construction waste treatment device

Similar Documents

Publication Publication Date Title
CN202616247U (en) Solar assembly installation support
CN210947651U (en) Folding beam frame for building construction
CN205927622U (en) Anchor clamps bottom plate
CN103628692B (en) A kind of floor beam mounting bracket and use it to install the method for floor beam
CN202252669U (en) Stable mounting frame
CN214942401U (en) Adjustable supporting structure of cast-in-place box girder template
CN210396063U (en) Movable lifting scaffold for high-altitude operation of hydraulic river model
CN204850392U (en) Full hall scaffold
CN211114968U (en) Building engineering strutting arrangement
CN210141374U (en) Pipeline slope finding device
CN210289050U (en) Building assembled scaffold
CN113323447A (en) Temporary supporting device for steel structure hoisting construction
CN203640313U (en) Floor beam installing support
CN207603523U (en) A kind of fixing device of the solar powered plate of adjustable angle
CN102330495B (en) Supporting construction for building
CN205945609U (en) Adjustable solar support
CN216553025U (en) Residential building engineering template supporting device
CN111663772A (en) Aluminum alloy template boundary beam triangle bracing reinforcing apparatus
CN218698804U (en) Truss robot capable of adjusting flatness of truss surface member
CN209469068U (en) A kind of detachable beacon
CN211037753U (en) Novel scaffold for constructional engineering
CN221609434U (en) Scaffold with auxiliary climbing structure
CN216040725U (en) Novel No. 0 piece of continuous beam is under construction with support bracket
CN216586579U (en) Foundation ditch construction support for railway engineering
CN104481032B (en) One nuclear power plant body of wall hanger and construction method thereof

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20200707

Termination date: 20211016

CF01 Termination of patent right due to non-payment of annual fee