CN210947640U - Scaffold frame of building engineering construction usefulness - Google Patents
Scaffold frame of building engineering construction usefulness Download PDFInfo
- Publication number
- CN210947640U CN210947640U CN201921767515.9U CN201921767515U CN210947640U CN 210947640 U CN210947640 U CN 210947640U CN 201921767515 U CN201921767515 U CN 201921767515U CN 210947640 U CN210947640 U CN 210947640U
- Authority
- CN
- China
- Prior art keywords
- workbench
- groove
- workstation
- platform
- rod
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- Movable Scaffolding (AREA)
Abstract
The utility model discloses a scaffold for construction engineering construction, which comprises two support columns and a workbench, and also comprises a hidden platform arranged in the workbench, wherein the top parts of the two support columns penetrate through a first through groove, the first through groove is arranged on both sides of the workbench, and a groove is also arranged in the workbench, the hidden platform is movably arranged in the groove by arranging the groove in the workbench on the two support columns, when the working range on the workbench is enlarged according to the actual condition, the hidden platform can be pushed out from the groove in the workbench to enlarge the whole working space on the workbench, the use is more flexible, the practicability is stronger, the working efficiency of workers is greatly improved, the groove openings of the groove extend to the front side and the rear side of the workbench, so that the hidden platform can be drawn out from any direction according to the actual condition from the front side and the rear side of the workbench, the design is more humanized.
Description
Technical Field
The utility model relates to a scaffold frame field, in particular to scaffold frame of building engineering construction usefulness.
Background
The scaffold is a working platform which is erected for ensuring various construction processes to be smoothly carried out, and is divided into an outer scaffold and an inner scaffold according to the erected position, the scaffold can be divided into a wood scaffold, a bamboo scaffold and a steel pipe scaffold according to different materials, and the scaffold can be divided into a vertical rod type scaffold, a bridge type scaffold, a door type scaffold, a suspension type scaffold, a hanging type scaffold, a lifting type scaffold and the like according to the structural form. The existing scaffold for construction engineering construction has the advantages that the working range on the workbench cannot be enlarged according to actual conditions due to the fact that the working size of the workbench is fixed, the flexibility of use is low, and the working efficiency of workers is reduced.
SUMMERY OF THE UTILITY MODEL
The utility model discloses a main aim at provides a scaffold frame of building engineering construction usefulness can effectively solve the problem in the background art.
In order to achieve the above purpose, the utility model adopts the following technical scheme:
the utility model provides a scaffold frame that building engineering construction used, includes two support columns and workstation, still is including setting up hidden platform in the workstation, two first logical groove setting is worn out at the top of support column, just first logical groove is seted up in the both sides of workstation, the fluting has still been seted up in the workstation, just hide the fluting of the setting of platform activity in the workstation, the both sides of hiding the platform all have welded the draw runner, just hide the platform and pass through the gliding installation of draw runner and seted up in the spout on the cell wall in the fluting both sides.
Furthermore, a plurality of reinforcing rods are arranged on the two supporting columns, and the plurality of reinforcing rods on the same supporting column are distributed in the same vertical direction.
Furthermore, the reinforcing rod is a Z-shaped rod, and two ends of the reinforcing rod are fixedly arranged on the cross rod of the supporting column through screws.
Further, two second through grooves are formed in the workbench, and the two second through grooves are communicated with the grooves.
Further, hide bench fixedly connected with telescopic link, just the telescopic link setting is in the second leads to the groove.
Furthermore, the fixed grafting in top of telescopic link has the inserted bar, just the top welding of inserted bar has solid fixed ring.
Compared with the prior art, the utility model discloses following beneficial effect has: the utility model discloses an open the fluting in the workstation on two support columns, the activity is provided with hidden platform in the fluting, when working range on the workstation needs to be enlarged according to actual conditions, can push out the whole operation space size on enlarging the workstation from the fluting in the workstation hidden platform, use more flexibility, the practicality is stronger, great improvement workman's work efficiency, and the notched notch extends to both sides around the workstation, hide the platform like this and can follow the front and back side of workstation and take out from arbitrary direction according to actual conditions again, design more hommization.
Drawings
Fig. 1 is a schematic view of the overall structure of the present invention.
Fig. 2 is an enlarged view of the structure at a point a of the present invention.
In the figure: 1. a support pillar; 2. a reinforcing bar; 3. a work table; 4. a first through groove; 5. a second through groove; 6. grooving; 7. a hidden table; 8. a slide bar; 9. a chute; 10. a telescopic rod; 11. inserting a rod; 12. and (4) fixing the ring.
Detailed Description
In order to make the technical means, creation features, achievement purposes and functions of the present invention easy to understand, the present invention is further described below with reference to the following embodiments.
Please refer to fig. 1-2, a scaffold for construction engineering construction comprises two supporting columns 1 and a workbench 3, and further comprises a hidden platform 7 arranged in the workbench 3, wherein the tops of the two supporting columns 1 penetrate through a first through groove 4, the first through groove 4 is arranged on two sides of the workbench 3, a slot 6 is further arranged in the workbench 3, the hidden platform 7 is movably arranged in the slot 6 in the workbench 3, sliding strips 8 are welded on two sides of the hidden platform 7, and the hidden platform 7 is slidably arranged on the inner groove walls of two sides of the slot 6 through the sliding strips 8 and is provided with a sliding groove 9.
As shown in fig. 1, a plurality of reinforcing rods 2 are arranged on both the two supporting columns 1, and the plurality of reinforcing rods 2 on the same supporting column 1 are distributed in the same vertical direction.
Through adopting above-mentioned scheme, the setting of stiffener 2 on the support column 1, greatly increased this support column 1's overall stability and structural strength.
As shown in fig. 1, the reinforcing rod 2 is a "Z" shaped rod, and two ends of the reinforcing rod 2 are fixedly mounted on a cross rod of the supporting column 1 through screws.
As shown in fig. 2, two second through grooves 5 are formed in the worktable 3, and the two second through grooves 5 are communicated with the groove 6.
As shown in fig. 2, an expansion link 10 is fixedly connected to the hidden platform 7, and the expansion link 10 is disposed in the second through slot 5.
Through adopting above-mentioned scheme, utilize telescopic link 10 to promote hidden platform 7 in second through-slot 5, conveniently will hide platform 7 and release from fluting 6 in workstation 1.
As shown in fig. 2, an insertion rod 11 is inserted into the top end of the telescopic rod 10, and a fixing ring 12 is welded to the top end of the insertion rod 11.
By adopting the above scheme, the telescopic rod 10 is extended by the fixing ring 12 on the inserting rod 11, and the hidden table 7 is pushed out by the telescopic rod 10 extending out of the second through groove 5.
It should be noted that, the utility model relates to a scaffold frame of building engineering construction usefulness, when needs expand the operation scope on the workstation 3 according to actual conditions, at first through solid fixed ring 12 from workstation 3's second lead to groove 5 in elongated telescopic link 10, utilize the telescopic link 10 that extends second lead to groove 5 to come to hide platform 7 and release from fluting 6's notch, increase workstation 3 and go up holistic operation scope, the practical in design, the suitability is wider, and utilize telescopic link 10 and second lead to groove 5's both ends cell wall to play spacing effect to hiding platform 7, avoid it to appear the condition that drops in the fluting 6 in the workstation 3, support column 1 is last to "Z" shape stiffener 2's setting, not only make support column 1 wholeness stronger, its structural strength has still been strengthened, moreover, the steam generator is simple in structure, the practicality is stronger.
The basic principles and the main features of the invention and the advantages of the invention have been shown and described above. It will be understood by those skilled in the art that the present invention is not limited to the above embodiments, and that the foregoing embodiments and descriptions are provided only to illustrate the principles of the present invention without departing from the spirit and scope of the present invention. The scope of the invention is defined by the appended claims and equivalents thereof.
Claims (6)
1. The utility model provides a scaffold frame of building engineering construction usefulness, includes two support columns (1) and workstation (3), its characterized in that: still including setting up hidden platform (7) in workstation (3), two first logical groove (4) setting is worn out at the top of support column (1), just first logical groove (4) are seted up in the both sides of workstation (3), fluting (6) have still been seted up in workstation (3), just hide the setting of platform (7) activity in fluting (6) in workstation (3), the both sides of hiding platform (7) all weld have draw runner (8), just hide platform (7) through the gliding installation of draw runner (8) and seted up in spout (9) on the cell wall in fluting (6) both sides.
2. A scaffolding for use in construction work according to claim 1, wherein: two all be provided with a plurality of stiffener (2) on support column (1), it is same a plurality of stiffener (2) on support column (1) distribute in same vertical direction.
3. A scaffolding for use in construction work according to claim 2, wherein: the reinforcing rod (2) is a Z-shaped rod, and two ends of the reinforcing rod (2) are fixedly arranged on a cross rod of the supporting column (1) through screws.
4. A scaffolding for use in construction work according to claim 1, wherein: two second through grooves (5) are formed in the workbench (3), and the two second through grooves (5) are communicated with the grooves (6).
5. A scaffolding for use in construction work according to claim 1, wherein: hide fixedly connected with telescopic link (10) on platform (7), just telescopic link (10) set up in second logical groove (5).
6. A scaffold for construction of building engineering according to claim 5, characterized in that: the top end of the telescopic rod (10) is fixedly inserted with an insert rod (11), and the top end of the insert rod (11) is welded with a fixing ring (12).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201921767515.9U CN210947640U (en) | 2019-10-21 | 2019-10-21 | Scaffold frame of building engineering construction usefulness |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201921767515.9U CN210947640U (en) | 2019-10-21 | 2019-10-21 | Scaffold frame of building engineering construction usefulness |
Publications (1)
Publication Number | Publication Date |
---|---|
CN210947640U true CN210947640U (en) | 2020-07-07 |
Family
ID=71374252
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201921767515.9U Expired - Fee Related CN210947640U (en) | 2019-10-21 | 2019-10-21 | Scaffold frame of building engineering construction usefulness |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN210947640U (en) |
-
2019
- 2019-10-21 CN CN201921767515.9U patent/CN210947640U/en not_active Expired - Fee Related
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN210947640U (en) | Scaffold frame of building engineering construction usefulness | |
CN209723602U (en) | A kind of architectural engineering reinforced support device | |
CN217151955U (en) | Tunnel excavation trolley | |
CN218205601U (en) | Scaffold with telescopic auxiliary stay pole | |
CN210947637U (en) | Civil engineering safety construction scaffold frame | |
CN203230451U (en) | Hydraulic support for mining working surface roadway | |
CN202170801U (en) | Hydraulic bracket and telescopic beam device and mechanized mining face thereof | |
CN215484887U (en) | Building construction shock attenuation strutting arrangement | |
CN204686170U (en) | A kind of construction site cutter sweep | |
CN209353660U (en) | A kind of portable electric stair shaft workbench | |
CN202325609U (en) | Light hydraulic bracket of short wall working surface | |
CN210025873U (en) | Pipeline installation slotting device for construction | |
CN205153118U (en) | Steel construction | |
CN205224263U (en) | Symmetry steel construction | |
CN209407632U (en) | A kind of craft soldering multifunctional workstation | |
CN105401693A (en) | Symmetrical steel structure | |
CN220889577U (en) | Building construction foundation pit guardrail | |
CN206153467U (en) | Shield structure section of jurisdiction steel reinforcement cage rack for manufacturing | |
CN204456804U (en) | A kind of construction steel structure construction roof beam structure | |
CN210086776U (en) | Telescopic movable scaffold | |
CN221269559U (en) | Stacking device for shield segment steel reinforcement cage single-piece net | |
CN212743591U (en) | Building engineering protection network | |
CN220747595U (en) | Tripod for cantilever component independent supporting system | |
CN215762651U (en) | High-strength aluminum alloy section | |
CN216370834U (en) | Anti-toppling support frame for steel beam welding |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20200707 Termination date: 20211021 |