CN210944520U CN201921940777.0U CN201921940777U CN210944520U CN 210944520 U CN210944520 U CN 210944520U CN 201921940777 U CN201921940777 U CN 201921940777U CN 210944520 U CN210944520 U CN 210944520U
Authority
CN
China
Prior art keywords
sliding
rotating shaft
power equipment
suspension device
hanger
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201921940777.0U
Other languages
Chinese (zh)
Inventor
裴明军
孔凡龙
付荣
贾雪蒙
武麦花
樊立凤
陈亚辉
赵亚伟
孙云
周乐
樊毅
孟东杰
杨哲
张建新
张捍卫
唐东杰
樊建国
党帅
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Xinan Power Co Of Henan Power Co Of State Grid
State Grid Corp of China SGCC
Original Assignee
Xinan Power Co Of Henan Power Co Of State Grid
State Grid Corp of China SGCC
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Xinan Power Co Of Henan Power Co Of State Grid, State Grid Corp of China SGCC filed Critical Xinan Power Co Of Henan Power Co Of State Grid
Priority to CN201921940777.0U priority Critical patent/CN210944520U/en
Application granted granted Critical
Publication of CN210944520U publication Critical patent/CN210944520U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Load-Engaging Elements For Cranes (AREA)

Abstract

The utility model discloses a suspension device for mounting electric power equipment for power engineering, which comprises a hanger and a hook, wherein the middle position of the hanger is provided with a hanging hole, the hanging hole is connected with a lifting device at the upper end, the lower surface of the hanger is provided with an adjusting box, a rotating shaft is arranged in the adjusting box, the left half part and the right half part of the rotating shaft are both provided with threads, the thread turning directions are opposite, the left end and the right end of the rotating shaft are symmetrically connected with a sliding rod through threads, one side of the rotating shaft passes through the adjusting box to be connected with the output end of a motor, the lower end of the sliding rod is connected with the hook, the outer side surface of the sliding rod is fixedly connected with a connecting slide block, the upper end of the connecting slide block is slidably connected with a chute, the chute is slidably connected with a sliding column through a sliding sleeve arranged at one side of the chute, the suspension, the use safety is improved.

Description

Suspension device for mounting power equipment for power engineering
Technical Field
The utility model relates to an electrical equipment installs technical field, specifically is a hanging device for electrical equipment installation for power engineering.
Background
The power equipment mainly comprises power generation equipment and power supply equipment, wherein the power generation equipment mainly comprises a power station boiler, a steam turbine, a gas turbine, a water turbine, a generator, a transformer and the like, the power supply equipment mainly comprises power transmission lines, transformers, contactors and the like with various voltage grades, and the power equipment is sometimes required to be installed at a high position when being installed.
The current general hanging device is through overlapping the rope on power equipment, then promotes the eminence with power equipment through the hoist hook, to bigger power equipment, hooks the rope through single hook and lifts by crane, can lead to power equipment to make a round trip to rock at the in-process that rises, danger very.
Disclosure of Invention
The to-be-solved technical problem of the utility model is to overcome current defect, provide a suspension device for power equipment installation for power engineering, can carry out the couple of suitable position according to power equipment's variation in size fixed, can reduce the range of rocking of the in-process that rises by a wide margin simultaneously, improve the safety in utilization, can effectively solve the problem in the background art.
In order to achieve the above object, the utility model provides a following technical scheme: the utility model provides a suspension device is used in power equipment installation for power engineering, includes gallows and lifting hook, the intermediate position of gallows is equipped with the hanging hole, and the hanging hole is connected with the hoisting device of upper end, and the lower surface of gallows is equipped with the regulating box, is equipped with the pivot in the regulating box, and the left half of pivot all is equipped with screw thread and screw thread turn to opposite, and both ends symmetric thread connection has the slide bar about the pivot, and one side of pivot is passed the regulating box and is connected with the output of motor, and the lower extreme of slide bar is connected with the lifting hook, and the lateral surface fixedly connected with link block of slide bar, link block's upper end sliding connection has the spout, the spout is through setting up sliding sleeve and traveller sliding connection in its one side, and the lateral surface at the traveller is cup jointed to the sliding sleeve.
As an optimized technical scheme of the utility model, the intermediate position of pivot is equipped with the stopper.
As an optimized technical scheme of the utility model, be connected through wire rope between slide bar and the lifting hook.
As an optimized technical scheme of the utility model, be equipped with self-lubricating bearing between sliding sleeve and the traveller.
As a preferred technical scheme of the utility model, the motor passes through the motor support to be fixed at the lower surface of gallows, and the quantity of motor support is two, and two motor support symmetries set up both ends around the motor.
As an optimized technical scheme of the utility model, the upper end of gallows is the arc structure.
Compared with the prior art, the beneficial effects of the utility model are that: this hanging device for power equipment installation for power engineering compact structure, reasonable in design, occupation space is little during the use, can improve the stability to the power equipment hook through two slide bars and the lifting hook that sets up at the slide bar lower extreme, rotate through the motor drive pivot, can change the distance between two lifting hooks according to the power equipment of equidimension not, be convenient for adjust suitable couple position, safety in utilization has been improved, the link block that sets up at the slide bar lateral surface reciprocates in the traveller with spout sliding fit and through the sliding sleeve, guarantee power equipment at the in-process that rises along rectilinear rise, the phenomenon that the process of rising rocked has significantly reduced.
Drawings
FIG. 1 is a schematic structural view of the present invention;
fig. 2 is a front view of the present invention.
In the figure: 1 hanger, 2 hanging holes, 3 regulating boxes, 4 rotating shafts, 5 motors, 6 motor supports, 7 sliding rods, 8 lifting hooks, 9 connecting sliding blocks, 10 sliding grooves, 11 sliding sleeves, 12 vertical sliding tables, 13 sliding columns, 14 limiting blocks and 15 steel wire ropes.
Detailed Description
The technical solution in the embodiments of the present invention will be clearly and completely described below with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, but not all embodiments (for convenience of description and understanding, the following description is made with the upper side of fig. 2 being the upper side, and the left side of fig. 2 being the left side). Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
Referring to fig. 1-2, the present invention provides a technical solution: a suspension device for mounting power equipment in power engineering comprises a hanger 1 and a lifting hook 8, wherein the upper end of the hanger 1 is of an arc structure, a hanging hole 2 is formed in the middle of the hanger 1, the hanging hole 2 is connected with a lifting device at the upper end, an adjusting box 3 is arranged on the lower surface of the hanger 1, a rotating shaft 4 is arranged in the adjusting box 3, the left half part and the right half part of the rotating shaft 4 are respectively provided with threads, the thread rotating directions are opposite, the left end and the right end of the rotating shaft 4 are symmetrically and threadedly connected with a sliding rod 7, a limiting block 14 is arranged in the middle of the rotating shaft 4, the limiting block 14 is arranged to ensure that the two sliding rods 7 cannot collide during the moving process, the use safety is improved, one side of the rotating shaft 4 penetrates through the adjusting box 3 to be connected with the output end of a motor 5, the motor 5 is fixed on the lower surface of the hanger 1 through motor supports, the lower end of the sliding rod 7 is connected with a lifting hook 8, the sliding rod 7 is connected with the lifting hook 8 through a steel wire rope 15, the steel wire rope 15 with a certain length is arranged between the sliding rod 7 and the lifting hook 8, the service life can be prolonged, the sliding rod 7 can be seriously worn due to the adoption of pure rigid connection, the outer side surface of the sliding rod 7 is fixedly connected with a connecting slide block 9, the upper end of the connecting slide block 9 is slidably connected with a slide groove 10, the slide groove 10 is slidably connected with a slide column 13 through a slide sleeve 11 arranged on one side of the slide groove, the slide sleeve 11 is sleeved on the outer side surface of the slide column 13, a self-lubricating bearing is arranged between the slide sleeve 11 and the slide column 13, the self-lubricating bearing can ensure the smoothness of the slide sleeve 11 sliding up and down along the slide column 13, the slide column 13 is vertically fixed on the inner, occupation space is little during the use, can carry out the couple of suitable position according to power equipment's variation in size and fix, can reduce the range of rocking of the in-process that rises by a wide margin simultaneously, improves the safety in utilization.
When in use: according to the power equipment of equidimension not will fix the rope at power equipment both ends and tie, then rotate through motor 5 control shaft 4, adjust the distance between two slide bars 7, the link block 9 of fixing in slide bar 7 one side this moment can slide on spout 10 along with slide bar 7's removal, make lifting hook 8 can hang well with tying the rope in the power equipment both sides, then catch on hanging hole 2 and upwards promote through hoisting accessory this moment, slide bar 7 can drive sliding sleeve 11 through link block 9 and spout 10 and rise along traveller 13 this moment, guarantee the direction of rising and be vertical rising, do not take place the skew.
The utility model has compact structure, reasonable design and small occupied space when in use, and can fix the hook at a proper position according to the size of the power equipment, thereby improving the use convenience; through setting up the link block 9 and the spout 10 sliding fit of slide bar 7 lateral surface and reciprocate in traveller 13 through sliding sleeve 11, guarantee power equipment along rectilinear rise at the in-process that rises, the phenomenon that rocks has appeared in the process of rising that has significantly reduced, has improved the safety in utilization.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the invention, the scope of which is defined in the appended claims and their equivalents.

Claims (6)

1. The utility model provides a suspension device is used in power equipment installation for power engineering, includes gallows (1) and lifting hook (8), its characterized in that: the middle position of the hanger (1) is provided with a hanging hole (2), the hanging hole (2) is connected with a lifting device at the upper end, the lower surface of the hanger (1) is provided with an adjusting box (3), a rotating shaft (4) is arranged in the adjusting box (3), the left half part and the right half part of the rotating shaft (4) are provided with threads, the thread turning directions are opposite, the left end and the right end of the rotating shaft (4) are symmetrically connected with a sliding rod (7) in a threaded manner, one side of the rotating shaft (4) penetrates through the adjusting box (3) to be connected with the output end of a motor (5), the lower end of the sliding rod (7) is connected with a lifting hook (8), the outer side surface of the sliding rod (7) is fixedly connected with a connecting sliding block (9), the upper end of the connecting sliding block (9) is slidably connected with a sliding chute (10), the sliding chute (10) is slidably connected with a sliding column (, the sliding column (13) is vertically fixed on the inner side of the vertical sliding table (12), and the vertical sliding table (12) is arranged on one side of the sliding rod (7).
2. The suspension device for mounting electric power equipment for power engineering according to claim 1, wherein: and a limiting block (14) is arranged in the middle of the rotating shaft (4).
3. The suspension device for mounting electric power equipment for power engineering according to claim 1, wherein: the sliding rod (7) is connected with the lifting hook (8) through a steel wire rope (15).
4. The suspension device for mounting electric power equipment for power engineering according to claim 1, wherein: and a self-lubricating bearing is arranged between the sliding sleeve (11) and the sliding column (13).
5. The suspension device for mounting electric power equipment for power engineering according to claim 1, wherein: the motor (5) is fixed on the lower surface of the hanger (1) through the motor supports (6), the number of the motor supports (6) is two, and the two motor supports (6) are symmetrically arranged at the front end and the rear end of the motor (5).
6. The suspension device for mounting electric power equipment for power engineering according to claim 1, wherein: the upper end of the hanger (1) is of an arc-shaped structure.
CN201921940777.0U 2019-11-09 2019-11-09 Suspension device for mounting power equipment for power engineering Expired - Fee Related CN210944520U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201921940777.0U CN210944520U (en) 2019-11-09 2019-11-09 Suspension device for mounting power equipment for power engineering

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201921940777.0U CN210944520U (en) 2019-11-09 2019-11-09 Suspension device for mounting power equipment for power engineering

Publications (1)

Publication Number Publication Date
CN210944520U true CN210944520U (en) 2020-07-07

Family

ID=71374537

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201921940777.0U Expired - Fee Related CN210944520U (en) 2019-11-09 2019-11-09 Suspension device for mounting power equipment for power engineering

Country Status (1)

Country Link
CN (1) CN210944520U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110723634A (en) * 2019-11-09 2020-01-24 国网河南省电力公司新安县供电公司 Suspension device for mounting power equipment for power engineering
CN112249890A (en) * 2020-12-21 2021-01-22 河南工学院 A hoisting equipment for harbour materials handling
CN113562625A (en) * 2021-06-16 2021-10-29 华能伊春热电有限公司 Hoisting equipment for construction site

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110723634A (en) * 2019-11-09 2020-01-24 国网河南省电力公司新安县供电公司 Suspension device for mounting power equipment for power engineering
CN112249890A (en) * 2020-12-21 2021-01-22 河南工学院 A hoisting equipment for harbour materials handling
CN112249890B (en) * 2020-12-21 2021-03-09 河南工学院 A hoisting equipment for harbour materials handling
CN113562625A (en) * 2021-06-16 2021-10-29 华能伊春热电有限公司 Hoisting equipment for construction site

Similar Documents

Publication Publication Date Title
CN110723634A (en) Suspension device for mounting power equipment for power engineering
CN210944520U (en) Suspension device for mounting power equipment for power engineering
CN209113416U (en) A kind of lifting device
CN202586171U (en) Supporting plate device of special hook card for live line replacement linear horizontal double-division insulator
CN205565511U (en) Change insulators cross arm fixture for operation with two steel pipe poles that return of tower
CN201990380U (en) Special lifting tool for spools of ultra large rope forming machine
CN203907405U (en) Explosion-proof high-pole lamp
CN106856122A (en) A kind of fixed mount for being easy to distribution transformer to install
CN106744567B (en) Lifting device for overhauling tunnel cable
CN102412532A (en) Overhead line pulley device
CN204753036U (en) Jacquard knitting machine's guiding mechanism
CN201266807Y (en) Device for replacing insulator
CN205051296U (en) Damper of adjustable balance
CN220245293U (en) Tundish lifting appliance of copper rod continuous casting and rolling production line
CN207909629U (en) The transformer of adjustable vertical displacement
CN205419563U (en) A lift by crane translation device that condenser was changed on was used for pylon
CN219009779U (en) Auxiliary device for tower arm amplitude-variable fixed pulley rope threading
CN103101843B (en) A kind of lifting appliance
CN205582672U (en) Oily formula current transformer inflation ware hoisting device
CN209024132U (en) A kind of industrial electrical transformer protection installation lifting device
CN208791052U (en) A kind of power transformer load tap changer maintenance lifting device
CN208445204U (en) A kind of auxiliary device convenient for the maintenance of overhead net vertical direction
CN203319497U (en) Lifting equipment with adjustable pull rods and lifting lugs
CN204847305U (en) Novel foundry goods size measurement rules and assists upset device
CN203392754U (en) Transformer hanging device

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant