CN210940133U - Vertical three-roller calender for processing silicon rubber - Google Patents

Vertical three-roller calender for processing silicon rubber Download PDF

Info

Publication number
CN210940133U
CN210940133U CN201921552605.6U CN201921552605U CN210940133U CN 210940133 U CN210940133 U CN 210940133U CN 201921552605 U CN201921552605 U CN 201921552605U CN 210940133 U CN210940133 U CN 210940133U
Authority
CN
China
Prior art keywords
roller
machine body
coupler
fixedly connected
flange
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201921552605.6U
Other languages
Chinese (zh)
Inventor
位思奇
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanxi Delizhongbang Rubber Products Co ltd
Original Assignee
Shanxi Delizhongbang Rubber Products Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanxi Delizhongbang Rubber Products Co ltd filed Critical Shanxi Delizhongbang Rubber Products Co ltd
Priority to CN201921552605.6U priority Critical patent/CN210940133U/en
Application granted granted Critical
Publication of CN210940133U publication Critical patent/CN210940133U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Casting Or Compression Moulding Of Plastics Or The Like (AREA)

Abstract

The utility model relates to a calendering equipment technical field just discloses a vertical three-roller calender of silicon rubber processing, which comprises a bod, the medial surface slidable mounting of organism has the gyro wheel, the first shaft coupling of side fixedly connected with of gyro wheel, the one end fixed mounting that first shaft coupling is located the organism outside has a gear motor, first shaft coupling is located the inside one end fixedly connected with lower roll of organism, there is a first intercommunication flange in the left side of organism through gyro wheel movable mounting. This vertical three-roller calender of silicon rubber processing can directly carry out the cooling and then better and energy resource consumption is lower than original outside mode effect of cooling to the inside of lower roll through first intercommunication flange and temperature sensor and refrigerating plant, has changed original outside heat supply mode of going up the roller through fan and heating chamber and second intercommunication flange and temperature sensor for heat utilization rate is high, realizes the effect that efficiency is higher.

Description

Vertical three-roller calender for processing silicon rubber
Technical Field
The utility model relates to a calendering equipment technical field specifically is a vertical three-roller calender of silicon rubber processing.
Background
The calender is a machine which is arranged by two or more than two rollers according to a certain form, presses and stretches rubber or plastic into a film with a certain thickness and a certain surface shape at a certain temperature, can carry out rubberizing on fiber curtain canvas or steel cord fabric, can be divided into two-roller, three-roller, four-roller, five-roller calenders and the like according to the number of the rollers, and can be divided into an L-shaped, T-shaped, F-shaped, Z-shaped, S-shaped and the like according to the arrangement mode of the rollers.
The calender is as an indispensable link of rubber production, the main effect position is exactly the compression roller, the temperature difference between the compression roller needs to be controlled, present compression roller generally adopts the mode of surface cooling or heat supply to go on when carrying out heat supply or cooling, this kind of mode not only is difficult to control and temperature variation speed is comparatively fast, cause very big influence to the quality of calendering, the effect is not good when the compression roller distance of some calenders carries out manual control moreover, lead to the compression roller to produce the condition of slope easily.
SUMMERY OF THE UTILITY MODEL
Not enough to prior art, the utility model provides a vertical three-roller calender of silicon rubber processing possesses the temperature difference control accuracy between the compression roller than higher, the use of the slower energy saving of temperature variation speed, and the compression roller has solved the problem mentioned in the above background art apart from the effectual advantage of control.
The utility model provides a following technical scheme: a vertical three-roller calender for processing silicon rubber comprises a calender body, wherein rollers are slidably mounted on the inner side surface of the calender body, a first coupling is fixedly connected to the side surface of each roller, a first speed reduction motor is fixedly mounted at one end, located on the outer side of the calender body, of the first coupling, a lower roller is fixedly connected to one end, located inside the calender body, of the first coupling, a first communication flange is movably mounted on the left side of the calender body through the rollers, one end, located inside the calender body, of the first communication flange is fixedly communicated with the other end of the lower roller, a first hydraulic rod is fixedly mounted at the bottom of an inner cavity of the calender body, the top of the first hydraulic rod is fixedly connected with the bottom of the first coupling, a temperature sensor is fixedly mounted on the inner side surface, located inside the calender body, of the calender body is fixedly mounted with a refrigerating device, and the bottom, the other end of the cold conveying pipe is fixedly communicated with the outer side face of the first communicating flange, a second speed reducing motor is fixedly arranged on the right side face of the machine body above the first speed reducing motor, the output end of the second speed reducing motor extends into the machine body and is fixedly connected with an intermediate roller, a second coupler is movably arranged on the side face of the machine body above the second speed reducing motor through a roller, a third speed reducing motor is fixedly arranged at one end of the second coupler outside the machine body, an upper roller is fixedly connected with one end of the second coupler inside the machine body, a second communicating flange is movably arranged on the left side face of the machine body above the intermediate roller through a roller, the other end of the second communicating flange is fixedly communicated with the other end of the upper roller, a second hydraulic rod is fixedly arranged at the top of the inner cavity of the machine body, and the bottom of the second hydraulic rod is fixedly connected with the top of the second coupler, the utility model discloses a heating device, including organism, heating chamber, fan, second intercommunication flange, electric heating pipe, fan, air-out pipe, the top fixed mounting of organism has the heating chamber, the inside fixed mounting of heating chamber has electric heating pipe, the top fixed mounting of heating chamber has the fan, the fixed intercommunication in left side of heating chamber has the air-out pipe, the other end and the fixed intercommunication of second intercommunication flange outside one end of air-out pipe, the right flank fixed mounting of organism has.
Preferably, the bottom fixed mounting of internal chamber of the organism has the mount pad, the inside fixed mounting of mount pad has the restriction board, the top slidable mounting of mount pad has the slide, the top screw thread of slide is installed with restriction board matched with fastening bolt, the top fixedly connected with of slide cuts apart the board.
Preferably, the inner side surface of the second communicating flange is fixedly provided with a temperature sensor which is the same as that of the first communicating flange, and the controller is electrically connected with the temperature sensor, the refrigerating device and the electric heating pipe.
Preferably, the upper and intermediate rollers and the lower roller are hollow inside.
Compared with the prior art, the utility model discloses possess following beneficial effect:
1. this vertical three-roller calender of silicon rubber processing can directly carry out the cooling and then better and energy resource consumption is lower than original outside mode effect of cooling to the inside of lower roll through first intercommunication flange and temperature sensor and refrigerating plant, has changed original outside heat supply mode of going up the roller through fan and heating chamber and second intercommunication flange and temperature sensor for heat utilization rate is high, realizes the effect that efficiency is higher.
2. This vertical three-roller calender of silicon rubber processing makes the lower roll and goes up the distance between roller and the middle roller and adjust more conveniently and more accurately can not cause the problem that the roll inclined to appear in the accommodation process simultaneously through first hydraulic stem and second hydraulic stem.
Drawings
FIG. 1 is a schematic structural view of the present invention;
FIG. 2 is a side view of the structure of the present invention;
fig. 3 is an enlarged view of the structure a of the present invention.
In the figure: 1. a body; 2. a first reduction motor; 3. a first coupling; 4. a second reduction motor; 5. a third reduction motor; 6. a second coupling; 7. a controller; 8. upper roll; 9. a heating chamber; 10. an electric heating tube; 11. a fan; 12. an air outlet pipe; 13. a second hydraulic rod; 14. a second communication flange; 15. an intermediate roll; 16. a refrigeration device; 17. a temperature sensor; 18. a cold conveying pipe; 19. a first communication flange; 20. a lower roll; 21. a first hydraulic lever; 22. a roller; 23. a mounting seat; 24. a limiting plate; 25. a slide base; 26. dividing the plate; 27. and fastening the bolt.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
Referring to fig. 1-3, a vertical three-roller calender for processing silicone rubber comprises a machine body 1, a roller 22 is slidably mounted on the inner side surface of the machine body 1, a first coupling 3 is fixedly connected to the side surface of the roller 22, a first speed reduction motor 2 is fixedly mounted at one end of the first coupling 3 located at the outer side of the machine body 1, a lower roller 20 is fixedly connected to one end of the first coupling 3 located inside the machine body 1, the upper roller 8, the middle roller 15 and the lower roller 20 are hollow, a first communication flange 19 is movably mounted at the left side of the machine body 1 through the roller 22, one end of the first communication flange 19 located inside the machine body 1 is fixedly communicated with the other end of the lower roller 20, a first hydraulic rod 21 is fixedly mounted at the bottom of the inner cavity of the machine body 1, the top of the first hydraulic rod 21 is fixedly connected with the bottom of the first coupling 3, a temperature sensor 17 is fixedly mounted on the inner side, a refrigerating device 16 is fixedly installed on the left side surface of the machine body 1, a cold conveying pipe 18 is fixedly communicated with the bottom of the refrigerating device 16, the other end of the cold conveying pipe 18 is fixedly communicated with the outer side surface of a first communicating flange 19, the inside of a lower roller 20 can be directly cooled through the first communicating flange 19, a temperature sensor 17 and the refrigerating device 16, the effect is better than that of the original external cooling mode, the energy consumption is lower, a second speed reducing motor 4 is fixedly installed on the right side surface of the machine body 1 above the first speed reducing motor 2, the output end of the second speed reducing motor 4 extends into the machine body 1 and is fixedly connected with an intermediate roller 15, a second coupler 6 is movably installed on the side surface of the machine body 1 above the second speed reducing motor 4 through a roller 22, a third speed reducing motor 5 is fixedly installed on one end of the second coupler 6 outside the machine body 1, an upper roller 8 is fixedly connected with one end of the second coupler 6 inside the machine body 1, a second communicating flange 14 is movably arranged on the left side surface of the machine body 1 above the middle roller 15 through a roller 22, the other end of the second communicating flange 14 is fixedly communicated with the other end of the upper roller 8, a second hydraulic rod 13 is fixedly arranged on the top of the inner cavity of the machine body 1, the bottom of the second hydraulic rod 13 is fixedly connected with the top of the second coupler 6, the distance between the lower roller 20 and the upper roller 8 and the middle roller 15 can be adjusted more conveniently and accurately through a first hydraulic rod 21 and the second hydraulic rod 13, and the problem that the rollers incline in the adjusting process cannot be caused, a heating chamber 9 is fixedly arranged on the top of the machine body 1, an electric heating pipe 10 is fixedly arranged in the heating chamber 9, a fan 11 is fixedly arranged on the top of the heating chamber 9, an air outlet pipe 12 is fixedly communicated with the left side of the heating chamber 9, and the other end of the air outlet pipe 12, the original heat supply mode of the outer portion of the upper roller 8 is changed through the fan 11, the heating chamber 9, the second communicating flange 14 and the temperature sensor 17, the heat utilization rate is high, the effect of higher efficiency is achieved, the right side face of the machine body 1 is fixedly provided with the controller 7, the inner side face of the second communicating flange 14 is fixedly provided with the temperature sensor 17 which is the same as that of the first communicating flange 19, the controller 7 is electrically connected with the temperature sensor 17, the refrigerating device 16 and the electric heating pipe 10, the bottom of the inner cavity of the machine body 1 is fixedly provided with the mounting seat 23, the limiting plate 24 is fixedly arranged inside the mounting seat 23, the sliding seat 25 is slidably arranged at the top of the mounting seat 23, the fastening bolt 27 matched with the limiting plate 24 is installed on the top thread of the sliding seat 25, and the dividing plate 26.
The working principle is that when the calendering is carried out, the first speed reducing motor 2, the second speed reducing motor 4 and the third speed reducing motor 5 respectively drive the lower roller 20, the middle roller 15 and the upper roller 8 to rotate, at the moment, the rotating speed of the lower roller 20 is the same as that of the middle roller 15, the rotating speed of the middle roller 15 is higher than that of the upper roller 8, at the moment, the fan 11 and the electric heating pipe 10 work to supply hot air to the inside of the upper roller 8 through the air outlet pipe and the second communicating flange 14, at the same time, the refrigerating device 16 works to supply cold air to the inside of the lower roller 20 through the cold conveying pipe 18 and the first communicating flange 19, the temperature sensors 17 monitor the temperatures of the upper roller 8 and the lower roller 20 in real time, and adjust the temperatures of the upper roller 8 and the lower roller 20 in real time through the controller 7, when the calendered rubber needs to be synchronously cut, the sliding seat 25 is adjusted to a distance on the mounting seat 23, and then the upper partition plate 26 is installed.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the invention, the scope of which is defined in the appended claims and their equivalents.

Claims (4)

1. The utility model provides a vertical three-roller calender of silicon rubber processing, includes organism (1), its characterized in that: the roller (22) is slidably mounted on the inner side face of the machine body (1), a first coupler (3) is fixedly connected to the side face of the roller (22), a first speed reduction motor (2) is fixedly mounted at one end, located on the outer side of the machine body (1), of the first coupler (3), a lower roller (20) is fixedly connected to one end, located inside the machine body (1), of the first coupler (3), a first communicating flange (19) is movably mounted on the left side of the machine body (1) through the roller (22), one end, located inside the machine body (1), of the first communicating flange (19) is fixedly communicated with the other end of the lower roller (20), a first hydraulic rod (21) is fixedly mounted at the bottom of an inner cavity of the machine body (1), the top of the first hydraulic rod (21) is fixedly connected with the bottom of the first coupler (3), and a temperature sensor (17) is fixedly mounted on the inner side face, located inside the machine body (1), of, the refrigerator is characterized in that a refrigerating device (16) is fixedly mounted on the left side face of the machine body (1), a cold conveying pipe (18) is fixedly communicated with the bottom of the refrigerating device (16), the other end of the cold conveying pipe (18) is fixedly communicated with the outer side face of a first communicating flange (19), a second speed reducing motor (4) is fixedly mounted on the right side face of the machine body (1) above a first speed reducing motor (2), the output end of the second speed reducing motor (4) extends to the interior of the machine body (1) and is fixedly connected with an intermediate roller (15), a second coupler (6) is movably mounted on the side face of the machine body (1) above the second speed reducing motor (4) through a roller (22), a third speed reducing motor (5) is fixedly mounted on one end of the second coupler (6) outside the machine body (1), an upper roller (8) is fixedly connected to one end of the second coupler (6) inside the machine body (1), a second communicating flange (14) is movably arranged on the left side surface of the machine body (1) above the middle roller (15) through a roller (22), the other end of the second communicating flange (14) is fixedly communicated with the other end of the upper roller (8), a second hydraulic rod (13) is fixedly arranged at the top of the inner cavity of the machine body (1), the bottom of the second hydraulic rod (13) is fixedly connected with the top of the second coupler (6), a heating chamber (9) is fixedly arranged at the top of the machine body (1), an electric heating pipe (10) is fixedly arranged inside the heating chamber (9), a fan (11) is fixedly arranged at the top of the heating chamber (9), an air outlet pipe (12) is fixedly communicated with the left side of the heating chamber (9), the other end of the air outlet pipe (12) is fixedly communicated with one end of the outer side of the second communicating flange (14), and a controller (7) is fixedly mounted on the right side face of the machine body (1).
2. The vertical three-roll calender for processing silicone rubber according to claim 1, wherein: the bottom fixed mounting of organism (1) inner chamber has mount pad (23), the inside fixed mounting of mount pad (23) has limiting plate (24), the top slidable mounting of mount pad (23) has slide (25), the top screw thread of slide (25) is installed and is restricted plate (24) matched with fastening bolt (27), the top fixedly connected with of slide (25) cuts apart board (26).
3. The vertical three-roll calender for processing silicone rubber according to claim 1, wherein: the inner side surface of the second communicating flange (14) is fixedly provided with a temperature sensor (17) which is the same as that of the first communicating flange (19), and the controller (7) is electrically connected with the temperature sensor (17), the refrigerating device (16) and the electric heating pipe (10).
4. The vertical three-roll calender for processing silicone rubber according to claim 1, wherein: the upper roller (8), the middle roller (15) and the lower roller (20) are hollow.
CN201921552605.6U 2019-09-18 2019-09-18 Vertical three-roller calender for processing silicon rubber Active CN210940133U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201921552605.6U CN210940133U (en) 2019-09-18 2019-09-18 Vertical three-roller calender for processing silicon rubber

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201921552605.6U CN210940133U (en) 2019-09-18 2019-09-18 Vertical three-roller calender for processing silicon rubber

Publications (1)

Publication Number Publication Date
CN210940133U true CN210940133U (en) 2020-07-07

Family

ID=71375742

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201921552605.6U Active CN210940133U (en) 2019-09-18 2019-09-18 Vertical three-roller calender for processing silicon rubber

Country Status (1)

Country Link
CN (1) CN210940133U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113618999A (en) * 2021-07-21 2021-11-09 杨颜宁 Avoid temperature shock can step by step refrigerated rubber goods production with calendering device

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113618999A (en) * 2021-07-21 2021-11-09 杨颜宁 Avoid temperature shock can step by step refrigerated rubber goods production with calendering device

Similar Documents

Publication Publication Date Title
CN103057095B (en) Roll extrusion shaping equipment
CN210940133U (en) Vertical three-roller calender for processing silicon rubber
CN107471693A (en) A kind of upper mould cutting means of wood moulding processing
CN105500578A (en) Three-roll calendar for GPPS diffusion plate
CN206544335U (en) The miniature press production line of tyre wire cord fabric
CN204687191U (en) A kind of shaped device of asphalt stock waterproof roll cooling twice
CN105347698A (en) A roller press used for hollow glass
CN210253550U (en) Cooling device for copper wire calender
CN207091727U (en) Temperature control calender
CN112248340A (en) Rolling device for graphene film
CN102642371B (en) Lithium battery substrate lamination machine
CN204748982U (en) Open pair of roller rubber mixing machine
CN201728763U (en) Four-roll refining mill
CN216237885U (en) Device for adjusting thickness of paper web
CN103448252B (en) A kind of honeycomb panel forming device
CN202664171U (en) Steamed bun making machine with heating device
CN207825330U (en) One kind rolling operation temperature adjustment calendering formation roller for synthetic leather
CN213203491U (en) Auxiliary cooling device of non-woven fabric setting machine
CN204604716U (en) A kind of vacuum high-temperature heat pressing forming machines
CN109502956B (en) Pressure adjusting device of glass calender
CN114645461B (en) Light shadow leather processing equipment with controllable temperature and method thereof
CN203358001U (en) Lamination composite equipment for porous battery diaphragm material
CN220198320U (en) Roller distance adjusting device of UV adhesive tape calender
CN208101117U (en) A kind of roller press type platen-press
CN209478939U (en) A kind of double SAPMAC method devices of the expanded material of film production

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant