CN210926953U - Electric cable strutting arrangement is faced in construction - Google Patents
Electric cable strutting arrangement is faced in construction Download PDFInfo
- Publication number
- CN210926953U CN210926953U CN201922199827.0U CN201922199827U CN210926953U CN 210926953 U CN210926953 U CN 210926953U CN 201922199827 U CN201922199827 U CN 201922199827U CN 210926953 U CN210926953 U CN 210926953U
- Authority
- CN
- China
- Prior art keywords
- bevel gear
- connecting rod
- bottom plate
- fixedly connected
- cable
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 238000010276 construction Methods 0.000 title claims abstract description 12
- 238000009435 building construction Methods 0.000 claims description 13
- 230000005611 electricity Effects 0.000 description 6
- 238000000034 method Methods 0.000 description 2
- 238000004804 winding Methods 0.000 description 2
- 230000001174 ascending effect Effects 0.000 description 1
- 230000009286 beneficial effect Effects 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
- 239000000463 material Substances 0.000 description 1
Images
Landscapes
- Installation Of Indoor Wiring (AREA)
Abstract
The utility model discloses a construction faces cable strutting arrangement, include the device bottom plate and fix the bracing piece at device bottom plate upper surface middle part, the top fixedly connected with device casing of bracing piece, the inside swing joint of device casing has the screwed pipe, the first bevel gear of surface fixed connection of screwed pipe, one side fixed mounting of device casing has rotatable connecting rod, the connecting rod is located the inside one end fixedly connected with second bevel gear of device casing, second bevel gear is connected with first bevel gear meshing, the tip fixedly connected with action bars of connecting rod. This electric cable strutting arrangement is faced in construction sets up through the cooperation of screwed pipe, first bevel gear, connecting rod, second bevel gear, action bars and threaded rod, can adjust the cable height at top for the cable is risen to safe height, has ensured the security of cable power consumption, improves the security of workman's power consumption.
Description
Technical Field
The utility model relates to a strutting arrangement technical field for the construction cable specifically is a building construction faces electric cable strutting arrangement.
Background
The temporary electricity utilization plays decisive role in the building construction process, the completion of every process is closely related with the temporary electricity utilization, the hidden danger of electricity utilization safety exists in the current building site of China facing the electric cable, this brings latent danger for our building construction industry, how to improve the problem that building site cable electricity utilization safety is difficult to solve always, because the building construction industry is each professional cross operation, each professional construction faces the electric laying, and lack the pertinence device in the electric laying is faced in the construction, the urgent need for a building construction faces electric cable strutting arrangement in the building construction, in order to reduce the temporary electricity utilization accident rate, guarantee cable electricity utilization safety.
Therefore, an electric cable support device for building construction is provided.
SUMMERY OF THE UTILITY MODEL
Technical problem to be solved
Not enough to prior art, the utility model provides a construction faces electric cable strutting arrangement has solved the problem that proposes in the above-mentioned background art.
(II) technical scheme
In order to achieve the above purpose, the utility model discloses a following technical scheme realizes: a temporary cable supporting device for building construction comprises a device bottom plate and a supporting rod fixed in the middle of the upper surface of the device bottom plate, the top of the supporting rod is fixedly connected with a device shell, the interior of the device shell is movably connected with a threaded pipe, the outer surface of the threaded pipe is fixedly connected with a first bevel gear, one side of the device shell is fixedly provided with a rotatable connecting rod, one end of the connecting rod, which is positioned in the device shell, is fixedly connected with a second bevel gear which is meshed and connected with the first bevel gear, the end part of the connecting rod is fixedly connected with an operating rod, the inner thread of the threaded pipe is connected with a threaded rod, the top of the threaded rod is fixedly connected with a fixed bottom plate, the upper surface of the fixed bottom plate is provided with a plurality of arc-shaped grooves, and a top pressing plate is arranged above the fixed base plate and is movably connected with the fixed base plate through a fixing screw.
Optionally, the upper surface of the device bottom plate is provided with four fixing holes.
Optionally, the threaded pipe and the connecting rod are both movably connected with the device housing through a ball bearing.
Optionally, a telescopic rod is arranged between the fixed bottom plate and the device shell.
Optionally, a pressing pad is arranged between the top pressing plate and the fixed bottom plate, and the pressing pad is made of rubber.
(III) advantageous effects
The utility model provides a construction faces electric cable strutting arrangement possesses following beneficial effect:
this electric cable strutting arrangement is faced in construction, through the screwed pipe, first bevel gear, the connecting rod, second bevel gear, the cooperation setting of action bars and threaded rod, can adjust the cable height at top, make the cable rise to safe height, the security of cable power consumption has been ensured, improve the security of workman power consumption, and simultaneously, through PMKD, the cooperation setting of top clamp plate and fixed screw, it is fixed to compress tightly conveniently the cable, moreover, the setting of a plurality of arc walls, can separate different cables, the winding between the cable has been avoided.
Drawings
FIG. 1 is a schematic view of the cross-sectional structure of the present invention;
fig. 2 is a schematic view of the structure of the present invention.
In the figure: 1. a device chassis; 2. a support bar; 3. a device housing; 4. a threaded pipe; 5. a first bevel gear; 6. a connecting rod; 7. a second bevel gear; 8. an operating lever; 9. a threaded rod; 10. fixing the bottom plate; 11. an arc-shaped slot; 12. a top platen; 13. fixing screws; 14. a fixing hole; 15. a ball bearing; 16. a telescopic rod; 17. and pressing the pad.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments.
Referring to fig. 1 to 2, the present invention provides a technical solution: a temporary cable supporting device for building construction comprises a device bottom plate 1 and supporting rods 2 fixed in the middle of the upper surface of the device bottom plate 1, wherein fixing holes 14 are formed in the upper surface of the device bottom plate 1, the number of the fixing holes 14 is four, a device shell 3 is fixedly connected to the tops of the supporting rods 2, a threaded pipe 4 is movably connected to the interior of the device shell 3, a first bevel gear 5 is fixedly connected to the outer surface of the threaded pipe 4, a rotatable connecting rod 6 is fixedly installed on one side of the device shell 3, the threaded pipe 4 and the connecting rod 6 are both movably connected with the device shell 3 through ball bearings 15, a second bevel gear 7 is fixedly connected to one end, located inside the device shell 3, of the connecting rod 6, the second bevel gear 7 is meshed with the first bevel gear 5, an operating rod 8 is fixedly connected to the end of the connecting rod 6, the top fixedly connected with PMKD 10 of threaded rod 9 is provided with telescopic link 16 between PMKD 10 and the device casing 3, and a plurality of arc wall 11 has been seted up to PMKD 10's upper surface, and PMKD 10's top is provided with top clamp plate 12, is provided with between top clamp plate 12 and the PMKD 10 and compresses tightly pad 17, and the material that compresses tightly pad 17 is rubber, and top clamp plate 12 passes through set screw 13 and PMKD 10 swing joint.
The utility model discloses when using, pass fixed orifices 14 through fixed screw or stock etc. and be fixed in ground with this device, arrange the cable in arc 11 on PMKD 10, then twist and move fixed screw 13 and make top clamp plate 12 compress tightly fixedly to the cable, then rotate action bars 8 for the second bevel gear 7 of connecting rod 6 and tip rotates, drive screwed pipe 4 through first bevel gear 5 and rotate, make threaded rod 9 carry out ascending removal from top to bottom, thereby carry out high adjustment to the cable at top.
To sum up, this electric cable strutting arrangement is faced in construction, through screwed pipe 4, first bevel gear 5, connecting rod 6, second bevel gear 7, the cooperation setting of action bars 8 and threaded rod 9, can adjust the cable height at top, make the cable rise to safe height, the security of cable power consumption has been ensured, improve the security of workman power consumption, and simultaneously, through PMKD 10, top clamp plate 12 and fixed screw 13's cooperation setting, can conveniently compress tightly fixedly the cable, and, the setting of a plurality of arc walls 11, can separate different cables, the winding between the cable has been avoided.
The above, only be the concrete implementation of the preferred embodiment of the present invention, but the protection scope of the present invention is not limited thereto, and any person skilled in the art is in the technical scope of the present invention, according to the technical solution of the present invention and the utility model, the concept of which is equivalent to replace or change, should be covered within the protection scope of the present invention.
Claims (5)
1. The utility model provides a construction faces electric cable strutting arrangement, includes device bottom plate (1) and fixes bracing piece (2) at device bottom plate (1) upper surface middle part, its characterized in that: the top of the supporting rod (2) is fixedly connected with a device shell (3), a threaded pipe (4) is movably connected inside the device shell (3), the outer surface of the threaded pipe (4) is fixedly connected with a first bevel gear (5), one side of the device shell (3) is fixedly provided with a rotatable connecting rod (6), one end, located inside the device shell (3), of the connecting rod (6) is fixedly connected with a second bevel gear (7), the second bevel gear (7) is meshed with the first bevel gear (5), the end part of the connecting rod (6) is fixedly connected with an operating rod (8), the inner thread of the threaded pipe (4) is connected with a threaded rod (9), the top of the threaded rod (9) is fixedly connected with a fixed bottom plate (10), and the upper surface of the fixed bottom plate (10) is provided with a plurality of arc-shaped grooves (11), a top pressing plate (12) is arranged above the fixed base plate (10), and the top pressing plate (12) is movably connected with the fixed base plate (10) through a fixing screw (13).
2. The temporary cable supporting device for building construction according to claim 1, wherein: the device is characterized in that the upper surface of the device bottom plate (1) is provided with four fixing holes (14).
3. The temporary cable supporting device for building construction according to claim 1, wherein: the threaded pipe (4) and the connecting rod (6) are movably connected with the device shell (3) through a ball bearing (15).
4. The temporary cable supporting device for building construction according to claim 1, wherein: an expansion link (16) is arranged between the fixed bottom plate (10) and the device shell (3).
5. The temporary cable supporting device for building construction according to claim 1, wherein: a pressing pad (17) is arranged between the top pressing plate (12) and the fixed base plate (10), and the pressing pad (17) is made of rubber.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201922199827.0U CN210926953U (en) | 2019-12-10 | 2019-12-10 | Electric cable strutting arrangement is faced in construction |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201922199827.0U CN210926953U (en) | 2019-12-10 | 2019-12-10 | Electric cable strutting arrangement is faced in construction |
Publications (1)
Publication Number | Publication Date |
---|---|
CN210926953U true CN210926953U (en) | 2020-07-03 |
Family
ID=71344791
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201922199827.0U Expired - Fee Related CN210926953U (en) | 2019-12-10 | 2019-12-10 | Electric cable strutting arrangement is faced in construction |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN210926953U (en) |
-
2019
- 2019-12-10 CN CN201922199827.0U patent/CN210926953U/en not_active Expired - Fee Related
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN211010166U (en) | Pipeline installation locating support for water conservancy and hydropower | |
CN210926953U (en) | Electric cable strutting arrangement is faced in construction | |
CN210397948U (en) | Electromechanical bidirectional earthquake-resistant support hanger for building | |
CN218771219U (en) | Adjustable cable tunnel self-supporting type round tunnel combined support | |
CN212617176U (en) | Power equipment installs insulating frame | |
CN211790443U (en) | Building indoor wiring auxiliary device | |
CN212543207U (en) | Wire tightening device for mounting extra-high voltage overhead line | |
CN211859487U (en) | Cable fixing support | |
CN206117066U (en) | WLG tubular busbar groove is with wind -powered electricity generation generating line mounting structure | |
CN206448179U (en) | A kind of nacelle device of bridge construction | |
CN215185764U (en) | Simple and direct type electric power constructs support construction reinforced structure | |
CN215580037U (en) | Strutting arrangement for electric power construction convenient to press from both sides tight circuit | |
CN214100550U (en) | Mounting and supporting device for distribution box | |
CN213638440U (en) | Protection measurement and control device for power system transformer substation | |
CN212852299U (en) | Bird-proof thorn device for high-voltage tower | |
CN218124141U (en) | GIL sliding support device | |
CN218275950U (en) | Cable fixing device | |
CN220830590U (en) | New forms of energy power supply control panel | |
CN220410644U (en) | Fixing auxiliary device for building electrical construction | |
CN219874510U (en) | Preassembled European style transformer substation | |
CN218816767U (en) | Mounting base for wind driven generator | |
CN211508987U (en) | Photovoltaic panel fixing device for photovoltaic power generation | |
CN210985354U (en) | Intelligent power transmission and distribution equipment with lightning protection function | |
CN213656269U (en) | Power equipment monitoring device stable in installation | |
CN216515726U (en) | Town road utility tunnel |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20200703 |