CN210920970U - Be used for municipal administration heating power pipeline leakage monitoring early warning equipment - Google Patents

Be used for municipal administration heating power pipeline leakage monitoring early warning equipment Download PDF

Info

Publication number
CN210920970U
CN210920970U CN201921691653.3U CN201921691653U CN210920970U CN 210920970 U CN210920970 U CN 210920970U CN 201921691653 U CN201921691653 U CN 201921691653U CN 210920970 U CN210920970 U CN 210920970U
Authority
CN
China
Prior art keywords
early warning
fixedly connected
fixture block
warning equipment
groove
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201921691653.3U
Other languages
Chinese (zh)
Inventor
范昌海
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201921691653.3U priority Critical patent/CN210920970U/en
Application granted granted Critical
Publication of CN210920970U publication Critical patent/CN210920970U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Clamps And Clips (AREA)

Abstract

The utility model discloses a be used for municipal administration heating power pipeline leakage monitoring early warning equipment, including monitoring early warning equipment body and unable adjustment base, monitoring early warning equipment body is located unable adjustment base's left side, the right side fixedly connected with slip fixture block of monitoring early warning equipment body, the anticreep draw-in groove has been seted up to the center department on slip fixture block right side, the equal fixedly connected with spacing fixture block in front side and the rear side on slip fixture block right side, unable adjustment base's left side fixedly connected with fixed mounting piece, spacing draw-in groove has all been seted up to the front side and the rear side of fixed mounting piece. Through the spacing draw-in groove that is located fixed mounting piece both sides with the inboard lug alignment of spacing fixture block, make monitoring early warning equipment body slowly slide downwards again, can install the monitoring early warning equipment body on unable adjustment base, only need the gliding monitoring early warning equipment body in the installation, labour saving and time saving has saved installation time greatly, has improved the installation effectiveness.

Description

Be used for municipal administration heating power pipeline leakage monitoring early warning equipment
Technical Field
The utility model relates to a municipal administration heating power pipe network technical field specifically is a be used for municipal administration heating power pipeline leakage monitoring early warning equipment.
Background
The heat pipe network is also called a heat pipeline, and starts from a boiler room, a direct-fired machine room, a heat supply center and the like, and leads heat sources to a heat supply pipeline of a building heat inlet. A plurality of heat supply pipelines form a pipe network. The design pressure of the heat supply hot water medium is less than or equal to 2.5MPa, the design temperature is less than or equal to 200 ℃, the design pressure of the heat supply steam medium is less than or equal to 1.6MPa, and the design temperature is less than or equal to 350 ℃.
The remote monitoring system for the heating power pipe network mainly detects the parameters of the heating power station and the pipe network in real time, adopts a polling-response communication mode to transmit the detected states of the heating power station and the heating power pipe network to a real-time database server through various communication modes, and enables each department to timely monitor the operating conditions of the heating power station and the heating power pipe network in a C/S or B/S mode, such as monitoring the worst pressure difference of the heating power network, coordinately controls the supply of a heat source to be suitable for the change of the load of the heating power network, and ensures the safe, reliable and efficient operation of the heating power network. Remote monitoring of the heat distribution network also requires a large number of instruments, such as temperature transmitters, pressure transmitters, flow meters, and the like.
The existing heating power pipeline leakage monitoring and early warning equipment needs to be welded or riveted with a base in advance in the installation process, and then the early warning equipment is riveted on the base, so that the installation process is very complicated, a plurality of screws need to be screwed in, the installation efficiency is greatly reduced, and therefore the municipal heating power pipeline leakage monitoring and early warning equipment is provided.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a be used for municipal administration heating power pipeline leakage monitoring early warning equipment to solve the problem that proposes among the above-mentioned background art.
In order to achieve the above object, the utility model provides a following technical scheme: the utility model provides a be used for municipal administration heating power pipeline leakage monitoring early warning equipment, includes monitoring early warning equipment body and unable adjustment base, monitoring early warning equipment body is located unable adjustment base's left side, the right side fixedly connected with slip fixture block of monitoring early warning equipment body, the anticreep draw-in groove has been seted up to the center department on slip fixture block right side, the equal fixedly connected with spacing fixture block in front side and the rear side on slip fixture block right side.
The utility model discloses a spring post, including unable adjustment base, fixed mounting piece, spacing draw-in groove has all been seted up to fixed mounting piece's left side fixedly connected with fixed mounting piece, spacing draw-in groove has all been seted up to the front side and the rear side of fixed mounting piece, the bottom fixedly connected with baffle of fixed mounting piece, movable cavity has been seted up to unable adjustment base's inner chamber, the right side fixedly connected with spring post of activity cavity, the left end fixedly connected with anticreep fixture block of spring post, the left end of anticreep fixture.
As further preferable in the present technical solution: the equal fixedly connected with connecting rod in both sides of anticreep fixture block, the groove of pulling has all been seted up to the both sides of activity cavity, the one end that the anticreep fixture block was kept away from to the connecting rod runs through unable adjustment base and extends to unable adjustment base's the outside.
As further preferable in the present technical solution: one end of the connecting rod, which is far away from the anti-falling clamping block, is fixedly connected with a pulling block.
As further preferable in the present technical solution: the inner side of the limiting clamping block is provided with a convex block, the convex block is matched with the limiting clamping groove, and the sliding clamping block is connected with the fixed base in a sliding mode.
As further preferable in the present technical solution: the top of anticreep fixture block is provided with the inclined plane, the inclination on inclined plane is forty to sixty degrees, the left end and the anticreep draw-in groove looks adaptation of anticreep fixture block.
As further preferable in the present technical solution: the connecting rod is in clearance fit with the pulling groove.
Compared with the prior art, the beneficial effects of the utility model are that: through the spacing draw-in groove that is located fixed mounting piece both sides with the inboard lug alignment of spacing fixture block, make monitoring early warning equipment body slowly slide downwards again, can install the monitoring early warning equipment body on unable adjustment base, only need the gliding monitoring early warning equipment body in the installation, labour saving and time saving has saved installation time greatly, has improved the installation effectiveness.
Drawings
Fig. 1 is a schematic structural view of the present invention;
fig. 2 is a schematic view of the sectional structure of the sliding clamping block of the present invention;
FIG. 3 is a schematic structural view of the fixing base of the present invention;
FIG. 4 is a schematic view of the sectional structure of the fixing base of the present invention;
fig. 5 is a schematic sectional top view of the fixing base according to the present invention.
In the figure: 1. monitoring an early warning device body; 2. sliding the clamping block; 3. a fixed base; 4. a pulling block; 5. pulling the groove; 6. fixing the mounting block; 7. a limiting clamping block; 8. an anti-drop clamping groove; 9. a limiting clamping groove; 10. an anti-falling clamping block; 11. a baffle plate; 12. a connecting rod; 13. a spring post.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
Examples
Referring to fig. 1-5, the present invention provides a technical solution: the utility model provides a be used for municipal administration heating power pipeline leakage monitoring early warning equipment, includes monitoring early warning equipment body 1 and unable adjustment base 3, and monitoring early warning equipment body 1 is located unable adjustment base 3's left side, and monitoring early warning equipment body 1's right side fixedly connected with slip fixture block 2, and the center department on 2 right sides of slip fixture block has seted up anticreep draw-in groove 8, the equal fixedly connected with spacing fixture block 7 in front side and the rear side on 2 right sides of slip fixture block.
Fixed base 3's left side fixedly connected with fixed mounting piece 6, fixed mounting piece 6's front side and rear side have all seted up spacing draw-in groove 9, fixed mounting piece 6's bottom fixedly connected with baffle 11, and the activity cavity has been seted up to fixed base 3's inner chamber, and the right side fixedly connected with spring post 13 of activity cavity, the left end fixedly connected with anticreep fixture block 10 of spring post 13, the left end of anticreep fixture block 10 runs through to fixed mounting piece 6's left side.
In this embodiment, specifically: the equal fixedly connected with connecting rod 12 in both sides of anticreep fixture block 10, pulling groove 5 has all been seted up to the both sides of activity cavity, and the one end that anticreep fixture block 10 was kept away from to connecting rod 12 runs through unable adjustment base 3 and extends to unable adjustment base 3's the outside, through above setting, dismantlement monitoring and early warning equipment body 1 that can be convenient.
In this embodiment, specifically: one end of the connecting rod 12, which is far away from the anti-falling clamping block 10, is fixedly connected with the pulling block 4, and the connecting rod 12 can be pulled conveniently through the arrangement.
In this embodiment, specifically: the inboard of spacing fixture block 7 is provided with the lug, lug and spacing draw-in groove 9 looks adaptation, and slip fixture block 2 and unable adjustment base 3 sliding connection through above setting, stability when can increase gliding monitoring and early warning equipment body 1 in the installation.
In this embodiment, specifically: the top on anticreep fixture block 10 is provided with the inclined plane, and the inclination on inclined plane is forty to sixty degrees, and the left end and the 8 looks adaptations of anticreep draw-in groove of anticreep fixture block 10 through above setting, can save the operation of pulling connecting rod 12 in the installation, further make things convenient for the installation operation.
In this embodiment, specifically: the connecting rod 12 is in clearance fit with the wrenching groove 5, so that the stability of the connecting rod 12 when the connecting rod 12 is wrenched and the inner cavity of the wrenching groove 5 slides is improved.
Working principle or structural principle, when in use, the inner side of the limiting clamping block 7 is aligned to the limiting clamping grooves 9 on the two sides of the fixed mounting block 6, then the monitoring and early warning device body 1 slowly slides downwards, the monitoring and early warning device body 1 drives the sliding clamping block 2 to slide downwards, the bottom of the sliding clamping block 2 extrudes the anti-falling clamping block 10, the anti-falling clamping block 10 slides towards the movable cavity under the action of the inclined plane at the top of the anti-falling clamping block 10, and simultaneously extrudes the spring column 13 towards the inner side of the movable cavity, when the bottom of the sliding clamping block 2 contacts with the baffle 11, at the moment, the left end of the anti-falling clamping block 10 is just opposite to the anti-falling clamping groove 8, the spring column 13 pushes the anti-falling clamping block 10 to pop out, so that the inner cavity of the anti-falling clamping groove 8, into which the left end of the anti-falling, the installation efficiency is improved, and when the mounting structure is dismounted, the connecting rod 12 is pulled through the pulling block 4 to slide in the inner cavity of the pulling groove 5, so that the anti-falling clamping block 10 can be driven to slide out of the inner cavity of the anti-falling clamping groove 8, and the monitoring and early warning device body 1 can be taken down after upwards sliding.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the invention, the scope of which is defined in the appended claims and their equivalents.

Claims (6)

1. The utility model provides a be used for municipal administration heating power pipeline leakage monitoring early warning equipment, includes monitoring early warning equipment body (1) and unable adjustment base (3), its characterized in that: the monitoring and early warning device body (1) is located on the left side of the fixed base (3), a sliding clamping block (2) is fixedly connected to the right side of the monitoring and early warning device body (1), an anti-falling clamping groove (8) is formed in the center of the right side of the sliding clamping block (2), and a limiting clamping block (7) is fixedly connected to the front side and the rear side of the right side of the sliding clamping block (2);
the left side fixedly connected with fixed mounting piece (6) of unable adjustment base (3), spacing draw-in groove (9) have all been seted up to the front side and the rear side of fixed mounting piece (6), the bottom fixedly connected with baffle (11) of fixed mounting piece (6), movable cavity has been seted up to the inner chamber of unable adjustment base (3), the right side fixedly connected with spring post (13) of activity cavity, the left end fixedly connected with anticreep fixture block (10) of spring post (13), the left end of anticreep fixture block (10) runs through to the left side of fixed mounting piece (6).
2. The municipal thermal pipeline leakage monitoring and early warning device as claimed in claim 1, wherein: the equal fixedly connected with connecting rod (12) in both sides of anticreep fixture block (10), pulling groove (5) have all been seted up to the both sides of activity cavity, unable adjustment base (3) are run through and extend to the outside of unable adjustment base (3) to the one end that anticreep fixture block (10) was kept away from in connecting rod (12).
3. The municipal thermal pipeline leakage monitoring and early warning device as claimed in claim 2, wherein: one end of the connecting rod (12) far away from the anti-falling clamping block (10) is fixedly connected with a pulling block (4).
4. The municipal thermal pipeline leakage monitoring and early warning device as claimed in claim 1, wherein: the inner side of the limiting clamping block (7) is provided with a convex block, the convex block is matched with the limiting clamping groove (9), and the sliding clamping block (2) is connected with the fixed base (3) in a sliding mode.
5. The municipal thermal pipeline leakage monitoring and early warning device as claimed in claim 1, wherein: the top of anticreep fixture block (10) is provided with the inclined plane, the inclination on inclined plane is forty to sixty degrees, the left end and the anticreep draw-in groove (8) looks adaptation of anticreep fixture block (10).
6. The municipal thermal pipeline leakage monitoring and early warning device as claimed in claim 1, wherein: the connecting rod (12) is in clearance fit with the wrenching groove (5).
CN201921691653.3U 2019-10-11 2019-10-11 Be used for municipal administration heating power pipeline leakage monitoring early warning equipment Active CN210920970U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201921691653.3U CN210920970U (en) 2019-10-11 2019-10-11 Be used for municipal administration heating power pipeline leakage monitoring early warning equipment

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201921691653.3U CN210920970U (en) 2019-10-11 2019-10-11 Be used for municipal administration heating power pipeline leakage monitoring early warning equipment

Publications (1)

Publication Number Publication Date
CN210920970U true CN210920970U (en) 2020-07-03

Family

ID=71366271

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201921691653.3U Active CN210920970U (en) 2019-10-11 2019-10-11 Be used for municipal administration heating power pipeline leakage monitoring early warning equipment

Country Status (1)

Country Link
CN (1) CN210920970U (en)

Similar Documents

Publication Publication Date Title
CN210920970U (en) Be used for municipal administration heating power pipeline leakage monitoring early warning equipment
CN213809313U (en) High-circulation air inlet pipe group with quick sealing joint
CN201561488U (en) Electrical heating system
CN208139624U (en) A kind of heat pump unit high-efficiency tank discrepancy waterpipe optimization structure
CN204593581U (en) A kind of high intelligent plate heat exchanger device group
CN215805061U (en) Air compressor energy-saving control device for decoration engineering
CN218821268U (en) Water circulation cooling equipment for glass production
CN201497070U (en) Aluminum superconducting electric heater
CN219243888U (en) Externally attached cooling device
CN205560983U (en) Intelligent type energy device management system
CN204003365U (en) Negative-pressure cyclic formula heat recovery unit
CN213577674U (en) Back pressure type circulating water heating device
CN218209776U (en) Heating and heat exchange energy-saving comprehensive utilization system of fan heater
CN215336633U (en) Novel energy-conserving height district directly links heating unit
CN215412130U (en) Air energy radiator
CN204458262U (en) A kind of heat energy recovery system for air compressor
CN215734872U (en) Lamp box device of heating machine
CN219344909U (en) Waste heat recovery system of air compressor
CN219934283U (en) Wall-mounted air energy water heater
CN210486068U (en) Natural gas heating equipment based on residents
CN217401894U (en) Anti-leakage device of heating ventilation fire engineering system
CN203518712U (en) Heavy oil/heat transfer oil heat exchanger
CN215063876U (en) Efficient vacuum steam high-conductivity energy-saving heating radiator
CN213362628U (en) Wall-mounted type electric heating stove side heating type light wave electric heating tube mounting structure
CN221197556U (en) Industrial air conditioner host computer heat dissipation processing apparatus

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant