CN210918293U - Pre-positioning pay-off device for building construction - Google Patents

Pre-positioning pay-off device for building construction Download PDF

Info

Publication number
CN210918293U
CN210918293U CN201921347567.0U CN201921347567U CN210918293U CN 210918293 U CN210918293 U CN 210918293U CN 201921347567 U CN201921347567 U CN 201921347567U CN 210918293 U CN210918293 U CN 210918293U
Authority
CN
China
Prior art keywords
block
winding
base
pay
cylinder
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201921347567.0U
Other languages
Chinese (zh)
Inventor
牟光敏
范永妮
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201921347567.0U priority Critical patent/CN210918293U/en
Application granted granted Critical
Publication of CN210918293U publication Critical patent/CN210918293U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

The utility model discloses a construction is with prepositioning pay-off, including base and dead lever, surface mounting has the curb plate on the rear end of base, and is connected with at the left end rear surface middle part of base and supports the dog, the rear end of curb plate is connected with special-shaped piece, and the rear end internally mounted of special-shaped piece has the turning block, the front side of turning block is provided with the winding axle, and installs the fixture block in the front end outside of winding axle, the outside winding of winding axle has the winding wire, and the left side of winding wire is provided with the cylinder, the dead lever is located the upper end of winding wire, and the right-hand member fixedly connected with connecting block of winding wire, the downside of connecting block is connected with the balancing weight, and both ends all are connected with the connecting rod around. This pre-positioning pay-off is used in construction, unwrapping wire length is accurate, easy operation, and convenient to use is convenient for fix the winding line, and the steady unwrapping wire of being convenient for avoids the waste of winding line.

Description

Pre-positioning pay-off device for building construction
Technical Field
The utility model relates to a construction technical field specifically is a construction is with prepositioning pay-off.
Background
The construction engineering civil engineering construction stage is set out, which is roughly divided into the stages of building positioning, earthwork excavation, foundation construction, main body construction setting out and the like, wherein the building settlement observation is to master whether the building has settlement, inclination, cracks and the like so as to take measures and ensure the safe use of the building;
the pre-positioning pay-off device for the existing building construction is not accurate in pay-off length, complex in operation, inconvenient to use, inconvenient to fix a winding wire, inconvenient to stably pay off and easy to tie off to cause waste, so that the pre-positioning pay-off device for the building construction is provided so as to solve the problem provided in the prior art.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a construction is with prepositioning pay-off to solve the steady unwrapping wire of being not convenient for that prior art exists, easily tie a knot and cause extravagant problem.
In order to achieve the above object, the utility model provides a following technical scheme: a pre-positioning pay-off device for building construction comprises a base and a fixed rod, wherein the upper surface of the rear end of the base is provided with a side plate, the middle part of the rear surface of the left end of the base is connected with a stop block, and the left side of the base is provided with a pulling plate, the rear end of the side plate is connected with a special-shaped block, the rear end of the special-shaped block is internally provided with a rotating block, the front side of the rotating block is provided with a winding shaft, a clamping block is arranged on the outer side of the front end of the winding shaft, a winding wire is wound on the outer side of the winding shaft, a cylinder is arranged on the left side of the winding wire, and the front and rear ends of the left side of the cylinder are both connected with springs, the fixed rod is positioned at the upper end of the winding wire, the right end of the winding wire is fixedly connected with a connecting block, the lower side of the connecting block is connected with a balancing weight, and both ends all are connected with the connecting rod around the inside of balancing weight to the upper end of connecting rod is connected with the fixed block.
Preferably, the base is connected with the side plate through a hinge, the base and the abutting block form a rotating structure, and the side plate and the abutting block are attached to each other.
Preferably, the base and the pulling plate form a rotating structure, and the pulling plate is of a hollow structure.
Preferably, the dysmorphism piece constitutes block structure in the curb plate, and dysmorphism piece is connected through the welded mode with the turning block to dysmorphism piece and fixture block all are connected with the winding axle block.
Preferably, the fixed block is connected with connecting rod threaded connection, and the lower extreme of connecting rod is connected through articulated mode with the balancing weight to connecting block and balancing weight all are connected with the connecting rod block.
Preferably, the cylinder and the base form a telescopic structure, the length of the cylinder is equal to the length between the special-shaped block and the fixture block, and the cylinder and the fixing rod are both attached to the winding line.
Compared with the prior art, the beneficial effects of the utility model are that: the pre-positioning pay-off device for building construction is accurate in pay-off length, simple to operate, convenient to use, convenient to fix winding wires, convenient to stably pay off and capable of avoiding waste of the winding wires;
1. the pay-off device is provided with a side plate, a special-shaped block, a rotating block and a winding shaft, wherein the special-shaped block forms a clamping structure in the side plate, the special-shaped block is connected with the rotating block in a welding mode, the special-shaped block and a clamping block are clamped and connected with the winding shaft, the clamping block is driven to rotate by the rotation of a motor, and then the clamping block is further rotated by manual rotation, so that the pay-off length is accurate, the operation is simple, and the use is convenient;
2. the winding machine is provided with a cylinder, a spring, a winding wire and a fixed rod, wherein the cylinder and a base form a telescopic structure under the action of the spring, the cylinder and the fixed rod are both attached to the winding wire, and the winding wire is pressed against the cylinder and the fixed rod, so that the winding wire is conveniently and stably wound and unwound, and waste caused by knotting is avoided;
3. be provided with winding line, connecting block, balancing weight and connecting rod, fixed block and connecting rod threaded connection, the lower extreme of connecting rod is connected through articulated mode with the balancing weight, and connecting block and balancing weight all are connected with the connecting rod block, fix the connecting block on the balancing weight through the fixed block to be convenient for fix the winding line.
Drawings
Fig. 1 is a schematic top view of the present invention;
FIG. 2 is a schematic side view of the present invention;
FIG. 3 is a schematic side view of the cross-sectional structure of the base and the cylinder of the present invention;
fig. 4 is a schematic view of a side view of the connection between the winding wire and the counterweight block of the present invention.
In the figure: 1. a base; 2. a side plate; 3. a stop block; 4. pulling a plate; 5. a shaped block; 6. rotating the block; 7. a fixed block; 8. a winding shaft; 9. a clamping block; 10. a cylinder; 11. a spring; 12. winding a wire; 13. fixing the rod; 14. connecting blocks; 15. a balancing weight; 16. a connecting rod.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
Referring to fig. 1-4, the present invention provides a technical solution: a pre-positioning pay-off device for building construction comprises a base 1, a side plate 2, a resisting block 3, a pulling plate 4, a special-shaped block 5, a rotating block 6, a fixing block 7, a winding shaft 8, a clamping block 9, a cylinder 10, a spring 11, a winding wire 12, a fixing rod 13, a connecting block 14, a balancing weight 15 and a connecting rod 16, wherein the side plate 2 is installed on the upper surface of the rear end of the base 1, the resisting block 3 is connected to the middle of the rear surface of the left end of the base 1, the pulling plate 4 is installed on the left side of the base 1, the special-shaped block 5 is connected to the rear end of the side plate 2, the rotating block 6 is installed inside the rear end of the special-shaped block 5, the winding shaft 8 is arranged on the front side of the rotating block 6, the clamping block 9 is installed on the outer side of the front end of the winding shaft 8, the winding wire 12 is wound on the outer side of the winding wire 12, the cylinder, and the right-hand member fixedly connected with connecting block 14 of winding wire 12, the downside of connecting block 14 is connected with balancing weight 15, and both ends all are connected with connecting rod 16 around the inside of balancing weight 15 to the upper end of connecting rod 16 is connected with fixed block 7.
As shown in fig. 1 and 2, a base 1 is connected with a side plate 2 by a hinge, the base 1 and a stop block 3 form a rotating structure, the side plate 2 and the stop block 3 are attached to each other, so that the side plate 2 is fixed conveniently, the base 1 and a pulling plate 4 form a rotating structure, the pulling plate 4 is a hollow structure, so that the base 1 is pushed and pulled conveniently, a special-shaped block 5 forms a clamping structure in the side plate 2, the special-shaped block 5 is connected with a rotating block 6 by welding, the special-shaped block 5 and a clamping block 9 are both clamped and connected with a winding shaft 8, and accurate paying-off is facilitated by a motor and the rotating block 6;
fixing block 7 and connecting rod 16 threaded connection in fig. 2 and 4, and the lower extreme of connecting rod 16 is connected through articulated mode with balancing weight 15, and connecting block 14 and balancing weight 15 all are connected with connecting rod 16 block, be convenient for fix connecting block 14, constitute extending structure with base 1 in fig. 2 and 3, and the length dimension of cylinder 10 equals with the length dimension between dysmorphism piece 5 and the fixture block 9, and cylinder 10 and dead lever 13 all set up with the laminating of winding line 12, be convenient for steady putting and receiving winding line 12.
The working principle is as follows: when the pre-positioning pay-off device for building construction is used, as shown in fig. 1, the pulling plate 4 is pulled to move the base 1 to a construction site, firstly, the clamping block 9 is driven to rotate through the operation of the motor, so that the winding wire 12 on the outer side of the winding shaft 8 is quickly paid off, the side plate 2 is rotated to the upper surface of the base 1, the side plate 2 is fixed through the abutting block 3, then the rear end of the winding shaft 8 is moved to the inner part of the special-shaped block 5, as shown in fig. 2, the winding wire 12 is further paid off through the rotation of the rotating block 6, so that the accurate pay-off is facilitated, the operation can be performed through the motor and the rotation of the rotating block 6, so that the pay-off operation is simple, the use is convenient, as shown in fig. 1 and 3, in the pay-off process, the cylinder 10 abuts against the winding wire 12 under the action of the spring 11, the fixing rod 13 is positioned at the upper end of the winding wire 12, and also, avoid knotting the condition that causes the waste to environmental protection more, like figure 4, after the unwrapping wire was accomplished, through the threaded connection of fixed block 7 with connecting block 14, fix connecting block 14 on balancing weight 15 to be equivalent to fixing winding line 12, just accomplish a series of operations of this prepositioning pay-off for construction above, the content that does not make detailed description in this specification belongs to the prior art that skilled person publicly knows.
The utility model discloses the standard part that uses all can purchase from the market, and dysmorphism piece all can be customized according to the description with the record of drawing of description, and the concrete connected mode of each part all adopts conventional means such as ripe bolt, rivet, welding among the prior art, and machinery, part and equipment all adopt among the prior art, and conventional model, including the conventional connected mode among the circuit connection adoption prior art, and the details are not repeated here, and the content that does not make detailed description in this description belongs to the prior art that skilled person in the art knows.
Although the present invention has been described in detail with reference to the foregoing embodiments, it will be apparent to those skilled in the art that modifications may be made to the embodiments or portions thereof without departing from the spirit and scope of the invention.

Claims (6)

1. The utility model provides a construction is with predetermined position pay-off, includes base (1) and dead lever (13), its characterized in that: the upper surface of the rear end of the base (1) is provided with a side plate (2), the middle of the rear surface of the left end of the base (1) is connected with a resisting block (3), the left side of the base (1) is provided with a pulling plate (4), the rear end of the side plate (2) is connected with a special-shaped block (5), the rear end of the special-shaped block (5) is internally provided with a rotating block (6), the front side of the rotating block (6) is provided with a winding shaft (8), the outer side of the front end of the winding shaft (8) is provided with a clamping block (9), the outer side of the winding shaft (8) is wound with a winding wire (12), the left side of the winding wire (12) is provided with a cylinder (10), the front end and the rear end of the left side of the cylinder (10) are both connected with springs (11), the fixing rod (13) is positioned at the upper end of the winding wire (12), the right end of the winding wire (, and the front end and the rear end of the inner part of the balancing weight (15) are both connected with connecting rods (16), and the upper ends of the connecting rods (16) are connected with fixing blocks (7).
2. The pre-positioning pay-off device for building construction as claimed in claim 1, wherein: the base (1) is connected with the side plate (2) in a hinge mode, the base (1) and the abutting stop block (3) form a rotating structure, and the side plate (2) and the abutting stop block (3) are attached to each other.
3. The pre-positioning pay-off device for building construction as claimed in claim 1, wherein: the base (1) and the pulling plate (4) form a rotating structure, and the pulling plate (4) is of a hollow structure.
4. The pre-positioning pay-off device for building construction as claimed in claim 1, wherein: dysmorphism piece (5) constitute the block structure in curb plate (2), and dysmorphism piece (5) are connected through the welded mode with turning block (6) to dysmorphism piece (5) and fixture block (9) all are connected with winding axle (8) block.
5. The pre-positioning pay-off device for building construction as claimed in claim 1, wherein: fixed block (7) and connecting rod (16) threaded connection, and the lower extreme and balancing weight (15) of connecting rod (16) are connected through articulated mode, and connecting block (14) and balancing weight (15) all are connected with connecting rod (16) block.
6. The pre-positioning pay-off device for building construction as claimed in claim 1, wherein: cylinder (10) and base (1) constitute extending structure, and the length dimension of cylinder (10) equals with the length dimension between dysmorphism piece (5) and fixture block (9) to cylinder (10) and dead lever (13) all set up with winding line (12) laminating.
CN201921347567.0U 2019-08-20 2019-08-20 Pre-positioning pay-off device for building construction Active CN210918293U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201921347567.0U CN210918293U (en) 2019-08-20 2019-08-20 Pre-positioning pay-off device for building construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201921347567.0U CN210918293U (en) 2019-08-20 2019-08-20 Pre-positioning pay-off device for building construction

Publications (1)

Publication Number Publication Date
CN210918293U true CN210918293U (en) 2020-07-03

Family

ID=71365715

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201921347567.0U Active CN210918293U (en) 2019-08-20 2019-08-20 Pre-positioning pay-off device for building construction

Country Status (1)

Country Link
CN (1) CN210918293U (en)

Similar Documents

Publication Publication Date Title
CN111421682A (en) Construction wall body fluting buried line repair equipment
CN210918293U (en) Pre-positioning pay-off device for building construction
CN102110958A (en) Rotatable operation platform for removing and tightening wire of 35 KV circuit
CN203071496U (en) Multifunctional grounding resistance test auxiliary device
CN203660423U (en) Lifting device for overhead ground wire of power transmission line
CN212425226U (en) Clamp type pipeline vertical hoisting equipment
CN210907826U (en) Steel bar shearing and bending device
CN108145032B (en) Automatic bending machine for power line tower stay wire elbow
CN103030072A (en) Small-size crane for building construction
CN103233471A (en) Multi-functional hole cleaning machine for buildings
CN103247981B (en) A kind of cable end method for supporting
CN210312847U (en) Movable wire inlet device
CN214046942U (en) Portable tree inversion control tool
CN203547215U (en) Telegraph pole straightener
CN110508717B (en) Building stair lays reinforcing bar bender
CN210710107U (en) A intraductal electric wire tractive device for building intelligent installation engineering
CN220165441U (en) Wiring device for building construction
CN204109139U (en) Steel wire bounder
CN209835448U (en) Crane motor with counterweight reinforcing component
CN210888101U (en) Push device for assembled concrete member
CN214543341U (en) Device for laying communication pole line suspension wire in long distance
CN220148840U (en) Housing construction unwrapping wire is with receiving and releasing device
CN220725732U (en) Positioning paying-off device for embedded bolts of basket-type cantilever scaffold
CN216335776U (en) Water conservancy and hydropower construction pipe laying pay-off
CN216190580U (en) Tower machine pull rod auxiliary installation device easy to assemble

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant