CN210914934U - Hoist and mount formula both ends are fixed pours material device fast - Google Patents

Hoist and mount formula both ends are fixed pours material device fast Download PDF

Info

Publication number
CN210914934U
CN210914934U CN201921666644.9U CN201921666644U CN210914934U CN 210914934 U CN210914934 U CN 210914934U CN 201921666644 U CN201921666644 U CN 201921666644U CN 210914934 U CN210914934 U CN 210914934U
Authority
CN
China
Prior art keywords
fixed
frame
push rod
electric push
material pouring
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201921666644.9U
Other languages
Chinese (zh)
Inventor
刘志奎
贾旺
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangdong Honganfeng Human Defense Engineering Co ltd
Original Assignee
Guangdong Honganfeng Human Defense Engineering Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guangdong Honganfeng Human Defense Engineering Co ltd filed Critical Guangdong Honganfeng Human Defense Engineering Co ltd
Priority to CN201921666644.9U priority Critical patent/CN210914934U/en
Application granted granted Critical
Publication of CN210914934U publication Critical patent/CN210914934U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Power-Operated Mechanisms For Wings (AREA)

Abstract

The utility model discloses a fixed quick pouring device in hoist and mount formula both ends, the load simulator comprises a case, the installation frame, support frame and pouring frame, the top of support frame is fixed with quick-witted case, one side of machine case is fixed with the installation frame, the inside of machine case is fixed with the motor, the lead screw is installed in the output rotation of motor, the fixed surface of lead screw has the movable block, first electric putter's output is fixed with the mounting panel, the bottom of mounting panel one end is fixed with third electric putter, third electric putter's bottom movable mounting has the pouring frame, the inside one side of pouring frame is fixed with places the recess, the bottom of pouring frame one end is fixed with second electric putter, the intrinsic baffle of output of second electric putter. The utility model discloses a be provided with material pouring frame, second electric putter, baffle, place recess and third electric putter, it is relatively poor to have solved hoist and mount formula material pouring device stability, and the slow problem of material pouring speed.

Description

Hoist and mount formula both ends are fixed pours material device fast
Technical Field
The utility model relates to a door frame equipment technical field specifically is a fixed quick pouring device in hoist and mount formula both ends.
Background
The door frame is surrounding the doorway both sides and the frame and the threshold on top, inlays on the wall, is supporting the door leaf usually, the frame of exposed door, and the door frame is one of the most common interval, and the door frame can be used hoist and mount formula pouring device usually when the equipment, and hoist and mount formula pouring device still exists not enoughly at present, and hoist and mount formula pouring device stability is relatively poor, and the speed of pouring is slow, therefore it is necessary to improve prior art to solve above-mentioned problem.
SUMMERY OF THE UTILITY MODEL
Technical problem to be solved
An object of the utility model is to provide a fixed quick pouring device in hoist and mount formula both ends to solve the problem that proposes in the above-mentioned background art.
(II) technical scheme
In order to achieve the above object, the utility model provides a following technical scheme: a hoisting type rapid material pouring device with two fixed ends comprises a case, an installation frame, a support frame and a material pouring frame, wherein the case is fixed at the top of the support frame, the installation frame is fixed at one side of the case, a motor is fixed in the case, a lead screw is rotatably installed at the output end of the motor and extends to one end of the installation frame, a movable block is fixed on the surface of the lead screw, a first electric push rod is fixed at the bottom of the movable block, an installation plate is fixed at the output end of the first electric push rod, a third electric push rod is fixed at the bottom of one end of the installation plate, a material pouring frame is movably installed at the bottom of the third electric push rod, a placement groove is fixed at one side of the interior of the material pouring frame, a second electric push rod is fixed at the bottom of one end of the material pouring frame, and a baffle is fixed at the output, the both sides of baffle extend to the inside of falling the material frame, the opening has been seted up to one side that falls the material frame and be located second electric putter.
Preferably, a bearing is fixed at one end of the inner part of the mounting frame, and the screw rod is rotatably connected with the bearing.
Preferably, the top of installation frame is fixed and has been seted up first slide rail, the top of movable block is fixed with the first slider that uses mutually supporting with first slide rail.
Preferably, the bottom of the mounting plate is fixed with a connecting rod, and the connecting rod is movably connected with the material pouring frame through a shaft rod.
Preferably, the material pouring frame is located the inside of second electric putter one side and all is fixed with the second slide rail, the both sides of baffle all are fixed with the second slider that uses with the second slide rail is mutually supported.
Preferably, the input ends of the motor, the first electric push rod, the second electric push rod and the third electric push rod are electrically connected with the output end of an external controller.
(III) advantageous effects
Compared with the prior art, the beneficial effects of the utility model are that:
(1) the utility model discloses a set up material pouring frame, second electric putter, baffle and place the recess, place the recess and place the door frame layering, then the door frame is placed the material pouring frame from the opening and is gone up the back, utilizes second electric putter to drive the baffle and rises, makes the baffle block the door frame fixed to avoid the instability that the hoist and mount formula caused, solved the relatively poor problem of hoist and mount formula material pouring device stability.
(2) The utility model discloses a set up second electric putter, baffle, fall material frame and third electric putter, the external force is applyed to the frame of falling the material to third electric putter, under the effect of axostylus axostyle, the slope appears in the frame of falling the material, the inside door frame of the frame of falling the material also can appear inclining and slide to one side, then utilize second electric putter to drive the baffle and descend, can make the door frame fall from the opening part is automatic layer upon layer, the speed of falling the material has been promoted, the slow problem of hoist and mount formula pouring device pouring speed has been solved.
Drawings
Fig. 1 is a schematic view of the internal structure of the present invention;
fig. 2 is a front view of the present invention;
FIG. 3 is a schematic view of the material pouring frame structure of the present invention;
fig. 4 is a schematic view of the groove structure of the present invention.
The reference numbers in the figures are: 1. a chassis; 2. a motor; 3. a mounting frame; 4. a first slide rail; 5. a first slider; 6. a movable block; 7. a screw rod; 8. a bearing; 9. a support frame; 10. a first electric push rod; 11. a shaft lever; 12. pouring the material frame; 13. a second electric push rod; 14. a baffle plate; 15. a third electric push rod; 16. mounting a plate; 17. placing a groove; 18. a connecting rod; 19. a second slider; 20. a second slide rail; 21. and (4) opening.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
Referring to fig. 1-4, the present invention provides an embodiment: a hoisting type rapid material pouring device with two fixed ends comprises a case 1, an installation frame 3, a support frame 9 and a material pouring frame 12, wherein the case 1 is fixed at the top of the support frame 9, the installation frame 3 is fixed at one side of the case 1, a motor 2 is fixed in the case 1, the model of the motor 2 can be Y90S-2, the device belongs to the prior art and can provide power for the rotation of a screw rod 7, the output end of the motor 2 is rotatably provided with the screw rod 7, the screw rod 7 extends to one end of the installation frame 3, a movable block 6 is fixed on the surface of the screw rod 7, the movable block 6 can be driven by the rotation of the screw rod 7 to move in the horizontal direction so as to drive the material pouring frame 12 to adjust in the horizontal direction, a first electric push rod 10 is fixed at the bottom of the movable block 6, the model of the first electric push rod 10 can be PXTL, the device belongs to the prior art, and the first electric push rod 10, the output end of the first electric push rod 10 is fixed with a mounting plate 16, the bottom of one end of the mounting plate 16 is fixed with a third electric push rod 15, the model PXTL of the third electric push rod 15 belongs to the prior art, the lifting of the third electric push rod 15 can adjust the angle of the material pouring frame 12, the bottom of the third electric push rod 15 is movably mounted with the material pouring frame 12, one side inside the material pouring frame 12 is fixed with a placing groove 17, the placing groove 17 can fix the door frame to prevent the door frame from being unstable during material pouring, the bottom of one end of the material pouring frame 12 is fixed with a second electric push rod 13, the model of the second electric push rod 13 can be PXTL, the prior art can drive the baffle plate 14 to lift, the baffle plate 14 is inherent at the output end of the second electric push rod 13, the baffle plate 14 can block the opening 21, and can fix the door frame during material pouring of the door frame at the same time, the stability when guaranteeing to fall the material, the both sides of baffle 14 extend to the inside of falling material frame 12, and the opening 21 has been seted up to one side that falls material frame 12 and be located second electric putter 13.
Further, the inside one end of installation frame 3 is fixed with bearing 8, rotates between lead screw 7 and the bearing 8 and is connected, makes lead screw 7 can be better rotate through bearing 8.
Further, the fixed first slide rail 4 of having seted up in top of installation frame 3, the top of movable block 6 is fixed with the first slider 5 of mutually supporting the use with first slide rail 4, and when movable block 6 slided on lead screw 7, first slider 5 can slide in first slide rail 4, has guaranteed the gliding stability of movable block 6, avoids movable block 6 the condition that the upset appears.
Furthermore, a connecting rod 18 is fixed at the bottom of the mounting plate 16, the connecting rod 18 is movably connected with the material pouring frame 12 through a shaft rod 11, and when the third electric push rod 15 pulls the material pouring frame 12, the material pouring frame 12 can rotate in an angle under the action of the shaft rod 11.
Further, the material pouring frame 12 is fixed with a second slide rail 20 inside the second electric push rod 13, and the two sides of the baffle 14 are fixed with second sliders 19 used in cooperation with the second slide rail 20, so that when the baffle 14 is lifted, the second sliders 19 slide inside the second slide rail 20, thereby ensuring the lifting stability of the baffle 14.
Further, the input ends of the motor 2, the first electric push rod 10, the second electric push rod 13 and the third electric push rod 15 are electrically connected with the output end of an external controller.
The working principle is as follows: when the material pouring device is used, a worker opens the first electric push rod 10 through an external controller, the first electric push rod 10 drives the material pouring frame 12 to descend, then the worker opens the second electric push rod 13 through the external controller, the second electric push rod 13 lowers the baffle plate 14, meanwhile, the second slide blocks 19 on two sides of the baffle plate 14 slide in the second slide rails 20 in the material pouring frame 12, then the worker can place a door frame to be poured into the material pouring frame 12, the placing groove 17 fixes the door frame, then the third electric push rod 15 drives the baffle plate 14 to ascend, so that the door frame is fixed, then the material pouring frame 12 ascends through the first electric push rod 10, then the motor 2 drives the screw rod 7 to rotate, the screw rod 7 drives the movable block 6 to move in the horizontal direction, meanwhile, the first slide block 5 on the movable block 6 slides in the first slide rails 4, after adjusting the frame 12 of falling material to suitable horizontal position, adjust the height of the frame 12 of falling material through first electric putter 10 again, then recycle external controller and open third electric putter 15, third electric putter 15 drives the one end of the frame 12 of falling material and rises, makes the frame 12 of falling material slope under axostylus axostyle 11's effect, then utilize second electric putter 13 will under the baffle 14, the inside door frame of the frame 12 of falling material can follow opening 21 and pour layer upon layer.
It is noted that, herein, relational terms such as first and second, and the like may be used solely to distinguish one entity or action from another entity or action without necessarily requiring or implying any actual such relationship or order between such entities or actions. Also, the terms "comprises," "comprising," or any other variation thereof, are intended to cover a non-exclusive inclusion, such that a process, method, article, or apparatus that comprises a list of elements does not include only those elements but may include other elements not expressly listed or inherent to such process, method, article, or apparatus.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the invention, the scope of which is defined in the appended claims and their equivalents.

Claims (6)

1. The utility model provides a fixed quick pouring device in hoist and mount formula both ends, includes quick-witted case (1), installation frame (3), support frame (9) and material pouring frame (12), its characterized in that: the top of the supporting frame (9) is fixed with a case (1), one side of the case (1) is fixed with an installation frame (3), the inside of the case (1) is fixed with a motor (2), the output end of the motor (2) is rotated to install a lead screw (7), the lead screw (7) extends to one end of the installation frame (3), the surface of the lead screw (7) is fixed with a movable block (6), the bottom of the movable block (6) is fixed with a first electric push rod (10), the output end of the first electric push rod (10) is fixed with an installation plate (16), the bottom of one end of the installation plate (16) is fixed with a third electric push rod (15), the bottom of the third electric push rod (15) is movably installed with a material pouring frame (12), one side of the inside of the material pouring frame (12) is fixed with a placement groove (17), the bottom of one end of the material pouring frame (12) is fixed with a second electric push rod (13, the intrinsic baffle (14) of output end of second electric putter (13), the both sides of baffle (14) extend to the inside of falling material frame (12), fall material frame (12) and be located one side of second electric putter (13) and seted up opening (21).
2. The hoisting type rapid material pouring device with two fixed ends as claimed in claim 1, is characterized in that: the mounting frame (3) is fixed with bearing (8) in inside one end, rotate between lead screw (7) and bearing (8) and be connected.
3. The hoisting type rapid material pouring device with two fixed ends as claimed in claim 1, is characterized in that: the top of installation frame (3) is fixed has seted up first slide rail (4), the top of movable block (6) is fixed with first slider (5) of mutually supporting the use with first slide rail (4).
4. The hoisting type rapid material pouring device with two fixed ends as claimed in claim 1, is characterized in that: the bottom of the mounting plate (16) is fixed with a connecting rod (18), and the connecting rod (18) is movably connected with the material pouring frame (12) through a shaft rod (11).
5. The hoisting type rapid material pouring device with two fixed ends as claimed in claim 1, is characterized in that: the material pouring frame (12) is located inside one side of the second electric push rod (13) and is fixedly provided with a second sliding rail (20), and the two sides of the baffle (14) are fixedly provided with second sliding blocks (19) which are matched with the second sliding rail (20) for use.
6. The hoisting type rapid material pouring device with two fixed ends as claimed in claim 1, is characterized in that: the input ends of the motor (2), the first electric push rod (10), the second electric push rod (13) and the third electric push rod (15) are electrically connected with the output end of an external controller.
CN201921666644.9U 2019-09-29 2019-09-29 Hoist and mount formula both ends are fixed pours material device fast Expired - Fee Related CN210914934U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201921666644.9U CN210914934U (en) 2019-09-29 2019-09-29 Hoist and mount formula both ends are fixed pours material device fast

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201921666644.9U CN210914934U (en) 2019-09-29 2019-09-29 Hoist and mount formula both ends are fixed pours material device fast

Publications (1)

Publication Number Publication Date
CN210914934U true CN210914934U (en) 2020-07-03

Family

ID=71360427

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201921666644.9U Expired - Fee Related CN210914934U (en) 2019-09-29 2019-09-29 Hoist and mount formula both ends are fixed pours material device fast

Country Status (1)

Country Link
CN (1) CN210914934U (en)

Similar Documents

Publication Publication Date Title
CN210914934U (en) Hoist and mount formula both ends are fixed pours material device fast
CN205419023U (en) Self -propelled temporary storage machine
CN210696512U (en) Experiment table with adjustable height
CN216758785U (en) Be used for accurate welding set of al-alloy door & window
CN215946635U (en) Liftable shield constructs quick-witted auxiliary device bracket
CN215415543U (en) Electromechanical device detection device
CN215364501U (en) Adjustable crane hook
CN212050409U (en) Cable trench cover opening device
CN111137059B (en) Automatic mounting equipment for indoor decorative picture
CN210816368U (en) Foundry goods belt cleaning device
CN220596899U (en) Building engineering material lifting machine
CN221116833U (en) Low-displacement movable lifter
CN110734002A (en) rotary elevator
CN220723498U (en) Petrochemical industry distribution console mode live working platform
CN215945215U (en) Steel tray with adjustable intervals
CN212704350U (en) Liftable formula anchor clamps place platform
CN218434584U (en) Assembled building wallboard hoisting machine
CN221024174U (en) Small landing gear drop test stand
CN218293304U (en) Vertical silence pulley structure that compresses tightly of sash outside lift window
CN112392227B (en) Indoor ground construction equipment for house decoration
CN218434509U (en) Aluminum alloy door and window stone tongs
CN221447904U (en) Supporting device for electric power installation
CN218665318U (en) Novel elevating platform is used in electrical equipment installation
CN221680692U (en) Be used for big standard side hydrogen energy alkaline electrolysis trough assembly electric lift platform
CN217692232U (en) Low-voltage power distribution cabinet convenient to overhaul

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20200703

CF01 Termination of patent right due to non-payment of annual fee