CN210912793U - Floating body of floating aeration equipment and floating fixing device thereof - Google Patents

Floating body of floating aeration equipment and floating fixing device thereof Download PDF

Info

Publication number
CN210912793U
CN210912793U CN201921954027.9U CN201921954027U CN210912793U CN 210912793 U CN210912793 U CN 210912793U CN 201921954027 U CN201921954027 U CN 201921954027U CN 210912793 U CN210912793 U CN 210912793U
Authority
CN
China
Prior art keywords
connecting rod
piece
floating
ring piece
outer ring
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201921954027.9U
Other languages
Chinese (zh)
Inventor
刘腾飞
张艳晴
周东
周国宏
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Nowast Environmental Science And Technology (suzhou) Co ltd
Original Assignee
Nowast Environmental Science And Technology (suzhou) Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Nowast Environmental Science And Technology (suzhou) Co ltd filed Critical Nowast Environmental Science And Technology (suzhou) Co ltd
Priority to CN201921954027.9U priority Critical patent/CN210912793U/en
Application granted granted Critical
Publication of CN210912793U publication Critical patent/CN210912793U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02WCLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO WASTEWATER TREATMENT OR WASTE MANAGEMENT
    • Y02W10/00Technologies for wastewater treatment
    • Y02W10/10Biological treatment of water, waste water, or sewage

Abstract

The utility model discloses a floating aeration equipment's body and floating fixing device thereof, the body include fixed connection support and kickboard together and fixing device, this fixing device include with leg joint's fixed subassembly, with the first connecting rod that fixed subassembly is connected, with the skew damping piece that first connecting rod is connected, with the second connecting rod that skew damping piece is connected, with the annular assembly that the second connecting rod is connected, annular assembly movable sleeve establishes on the spud pile, the spud pile is vertical to be inserted and to be established on the riverbed. The utility model discloses a body is used for bearing aeration equipment, and the body can go up and down along with the lift of water level, and skew damping piece and annular assembly have elasticity, can alleviate the impact of rivers, avoid aeration equipment flooding to and, avoid aeration equipment because of receiving to strike too big impaired.

Description

Floating body of floating aeration equipment and floating fixing device thereof
Technical Field
The utility model relates to an environmental protection technology field.
Background
Floating aeration equipment, according to the prior art, is generally fixed by adopting an anchor or a fixed pile. When the water is in flood season, if the cable is not timely lengthened, the aeration device is easily submerged by water; if the cable is lengthened, the surplus of the cable is too long, the cable is very easy to be impacted under the condition of too high water flow speed, and a solar panel or an aeration device of the aeration equipment is easy to be damaged.
SUMMERY OF THE UTILITY MODEL
The utility model solves the technical problem that: the floating aeration equipment can lift along with the lifting of the water level, and the impact of water flow can be relieved.
In order to solve the technical problem, the utility model provides a following technical scheme: the utility model provides a floating body of floating aeration equipment, includes support and the kickboard that fixed connection is in the same place, installs floating fixing device on the support, floating fixing device include with the fixed subassembly of leg joint, with the first connecting rod of fixed subassembly connection, the skew damping piece of being connected with first connecting rod, with the second connecting rod of skew damping piece connection, the annular assembly of being connected with the second connecting rod, annular assembly movable sleeve establishes on the spud pile, the spud pile is vertical to be inserted and is established on the riverbed.
According to the technical scheme, the water level of the river channel rises, the floating plate and the support rise, and the support drives the floating type fixing device to rise, wherein the annular component of the floating type fixing device rises along the fixing pile; the river course water level is long-pending down, and kickboard and support descend, and the support drives floating fixing device and descends, and wherein, floating fixing device's annular assembly descends along the spud pile.
River course rivers strike the kickboard, and the partial displacement volume of kickboard on the surface of water can by skew damping piece absorbs, and elastic deformation takes place for the skew damping piece, plays the effect of alleviating to the impact that the kickboard received.
The body be used for bearing aeration equipment, the body can go up and down along with the lift of water level, and can alleviate the impact of rivers, so, can avoid aeration equipment flooding, can avoid aeration equipment because of receiving to strike too big impaired.
Drawings
The invention will be further explained with reference to the drawings:
FIG. 1 is a schematic view of a float of a floating aeration apparatus;
FIG. 2 is a top view of FIG. 1;
FIG. 3 is a schematic view of the floating fixture 30;
fig. 4 is an exploded view of fig. 3.
The symbols in the drawings illustrate that:
10. a support;
20. a floating plate;
30. a floating fixture; 31. a fixing assembly; 311. an upper half ring member; 312. a lower half ring member; 313. a threaded connector mounting hole; 32. a first link; 33. an offset damping member; 331. a first pin hole; 332. a third pin hole; 34. a second link; 341. a limiting ring; 35. an annular assembly; 351. an inner ring member; 352. an outer ring member; 353. a first threaded hole; 354. a first connection hole; 355. a third connection hole; 356. an inner groove of the outer ring member; 361. an elastic ball; 362. a rope;
40. fixing the pile;
50. a riverbed.
Detailed Description
Referring to fig. 1 and 2, the floating body of the floating aeration device comprises a support 10 and a floating plate 20 which are fixedly connected together, wherein a floating fixing device 30 is installed on the support, the floating fixing device comprises a fixing component 31 connected with the support, a first connecting rod 32 connected with the fixing component, an offset damping part 33 connected with the first connecting rod, a second connecting rod 34 connected with the offset damping part, and an annular component 35 connected with the second connecting rod, the annular component is movably sleeved on a fixing pile 40, and the fixing pile is vertically inserted on a river bed.
Alternatively, the floating plate 20 is a plastic floating plate, which is mounted on the bracket 10 by a screw connection. Wherein, the bracket is formed by welding a plurality of rod pieces.
River course water level goes up and down, drives floating plate and support lift, because fixed subassembly 31 and support 10 fixed connection, consequently, the support drives floating fixing device 30 and goes up and down, and wherein, floating fixing device's annular assembly 35 goes up and down along spud pile 40.
River course rivers strike kickboard 20, and the partial displacement volume of kickboard on the surface of water can by skew damping piece 33 absorbs, and elastic deformation takes place for the skew damping piece, plays the effect of alleviating to the impact that the kickboard received.
Referring to fig. 3 and 4, the ring assembly 35 includes an inner ring member 351 sleeved on the fixed pile 40, an outer ring member 352 mounted on the inner ring member, and a buffer member disposed between the inner ring member and the outer ring member, and the second connecting rod 34 is connected to the outer ring member; the outer ring member has elasticity. Alternatively, the outer ring piece is made of rubber; the inner ring piece is made of stainless steel or aluminum alloy, and the inner ring piece can conveniently ascend and descend along the fixed pile 40. The outer ring piece and the buffer piece both play a role in buffering the floating plate subjected to impact.
The buffer member includes a plurality of elastic balls 361 and a string 362, wherein the string connects the plurality of elastic balls in series to form a ring, and the plurality of elastic balls connected in series by the string are located between the inner ring member 351 and the outer ring member 352. A plurality of resilient balls, which act as bearings to facilitate rotation of the second link 34 about the spud 40, engage the outer and inner ring members. Besides, the elastic balls 361 of the present invention can also buffer the floating plate that is impacted. Thus, the resilient ball has a dual function. Alternatively, the elastic ball is made of rubber.
The outer ring member 352 surrounds the inner ring member 351 and has an annular inner groove 356 in which a plurality of resilient balls 361 are located.
The upper surface of the inner ring piece 351 is provided with a first threaded hole 353, the lower surface of the inner ring piece is provided with a second threaded hole, the upper surface of the outer ring piece 352 is provided with a first connecting hole 354, and the lower surface of the outer ring piece is provided with a second connecting hole; the upper surface of the inner ring piece is connected with the upper surface of the outer ring piece through first bolts matched in the first threaded holes and the first connecting holes, and the lower surface of the inner ring piece is connected with the lower surface of the outer ring piece through second bolts matched in the second threaded holes and the second connecting holes. In actual installation, the elastic balls 361 are firstly installed in the inner groove 356 of the outer ring member, then the outer ring member is sleeved on the inner ring member by utilizing the elastic deformation of the outer ring member, and then the fixed connection between the inner ring member and the outer ring member is realized by utilizing the first bolts and the second bolts.
The side wall of the outer ring piece 352 is provided with a third connecting hole 355, the second connecting rod 34 is provided with a limit ring 341, the tail end of the second connecting rod passes through the third connecting hole, the tail end of the second connecting rod is in threaded connection with a nut, the nut is pressed against the inner side wall of the outer ring piece, and the limit ring is pressed against the outer side wall of the outer ring piece, so that the connection between the second connecting rod and the outer ring piece is realized. In practice, the second connecting rod and the outer ring member are connected before the plurality of resilient balls 361 are installed in the inner grooves 356 of the outer ring member.
The offset damping part 33 is a rubber sleeve, the tail end of the rubber sleeve is provided with a first pin hole 331, the head end of the second connecting rod 34 is provided with a second pin hole, and the tail end of the rubber sleeve is connected with the head end of the second connecting rod through a first pin inserted into the first pin hole and the second pin hole; the head end of the rubber sleeve is provided with a third pin hole 332, the tail end of the first connecting rod 32 is provided with a fourth pin hole, and the head end of the rubber sleeve is connected with the tail end of the first connecting rod through a second pin inserted into the third pin hole and the fourth pin hole.
The fixing assembly 31 includes an upper half ring 311 and a lower half ring 312, the upper half ring is detachably connected to the lower half ring through a screw connection, and the lower half ring is welded to the head end of the first connecting rod 32. In operation, the lower half-ring is fitted with the bar of the stent, after which the upper half-ring is connected with the lower half-ring by means of a threaded connection, the upper and lower half-rings clamping the bar of the stent.
Alternatively, four spuds 40 are provided, which are fixedly inserted into the mud under the water, i.e. on the river bed. Correspondingly, the number of the floating fixing devices 30 is four, and the four floating fixing devices are respectively positioned at four corners of the bracket 10, and the four floating fixing devices are connected with the four fixing piles in a one-to-one manner.
The utility model discloses a body is used for bearing aeration equipment, aeration equipment can be ordinary aeration equipment, for example, a fan is connected with the aeration dish through the pipeline, and the aeration dish is installed in the bottom of body, is located the aquatic, and the fan is connected with the battery. The aeration equipment can also be solar energy aeration equipment, a solar cell panel is added on the basis of the common aeration equipment, the solar cell panel is connected with a battery capable of storing energy, the battery is connected with a fan, and the solar cell panel is arranged above the floating body. Alternatively, the solar aeration equipment adopts a solar aerator in the patent document with the publication number of CN 206298429U and the name of the combined multifunctional ecological floating island.
The above description is only for the preferred embodiment of the present invention, and for those skilled in the art, there are variations on the detailed description and the application scope according to the idea of the present invention, and the content of the description should not be construed as a limitation to the present invention.

Claims (8)

1. A floating body of a floating type aeration apparatus, comprising a bracket (10) and a floating plate (20) which are fixedly connected together, characterized in that: install floating fixing device (30) on the support, floating fixing device includes fixed subassembly (31) with leg joint, first connecting rod (32) be connected with fixed subassembly, skew damping piece (33) be connected with first connecting rod, second connecting rod (34) be connected with skew damping piece, annular assembly (35) be connected with the second connecting rod, annular assembly movable sleeve establishes on spud pile (40), the spud pile is vertical to be inserted and to be established on the riverbed.
2. The float of claim 1, wherein: the annular assembly (35) comprises an inner annular piece (351) sleeved on the fixed pile (40), an outer annular piece (352) mounted on the inner annular piece, and a buffer piece arranged between the inner annular piece and the outer annular piece, and the second connecting rod (34) is connected with the outer annular piece; the outer ring member has elasticity.
3. The float of claim 2, wherein: the buffer piece comprises a plurality of elastic balls (361) and a rope (362), wherein the elastic balls are connected in series by the rope to form a ring, and the elastic balls connected in series by the rope are positioned between the inner ring piece (351) and the outer ring piece (352).
4. The float of claim 2, wherein: the upper surface of the inner ring piece (351) is provided with a first threaded hole (353), the lower surface of the inner ring piece is provided with a second threaded hole, the upper surface of the outer ring piece (352) is provided with a first connecting hole (354), and the lower surface of the outer ring piece is provided with a second connecting hole; the upper surface of the inner ring piece is connected with the upper surface of the outer ring piece through first bolts matched in the first threaded holes and the first connecting holes, and the lower surface of the inner ring piece is connected with the lower surface of the outer ring piece through second bolts matched in the second threaded holes and the second connecting holes.
5. The float of claim 2, wherein: the side wall of the outer ring piece (352) is provided with a third connecting hole (355), the second connecting rod (34) is provided with a limiting ring (341), the tail end of the second connecting rod penetrates through the third connecting hole, the tail end of the second connecting rod is in threaded connection with a nut, the nut is pressed against the inner side wall of the outer ring piece, and the limiting ring is pressed against the outer side wall of the outer ring piece.
6. The float of claim 2, wherein: the offset damping piece (33) is a rubber sleeve, a first pin hole (331) is formed in the tail end of the rubber sleeve, a second pin hole is formed in the head end of the second connecting rod (34), and the tail end of the rubber sleeve is connected with the head end of the second connecting rod through a first pin inserted into the first pin hole and the second pin hole;
the head end of rubber sleeve is equipped with third pinhole (332), and the tail end of first connecting rod (32) is equipped with the fourth pinhole, and the head end of rubber sleeve is through inserting the second round pin of establishing in third pinhole and fourth pinhole and be connected with the tail end of first connecting rod.
7. The float of claim 1, wherein: the fixing component (31) comprises an upper half ring piece (311) and a lower half ring piece (312), the upper half ring piece is detachably connected with the lower half ring piece through a threaded connecting piece, and the lower half ring piece is welded with the head end of the first connecting rod (32).
8. A floating fixation device for connecting the bracket (10) of claim 1 and the fixation peg (40), characterized in that: the floating type fixing device comprises a fixing component (31) connected with the support, a first connecting rod (32) connected with the fixing component, an offset damping part (33) connected with the first connecting rod, a second connecting rod (34) connected with the offset damping part, and an annular component (35) connected with the second connecting rod, wherein the annular component is movably sleeved on the fixing pile (40).
CN201921954027.9U 2019-11-13 2019-11-13 Floating body of floating aeration equipment and floating fixing device thereof Active CN210912793U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201921954027.9U CN210912793U (en) 2019-11-13 2019-11-13 Floating body of floating aeration equipment and floating fixing device thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201921954027.9U CN210912793U (en) 2019-11-13 2019-11-13 Floating body of floating aeration equipment and floating fixing device thereof

Publications (1)

Publication Number Publication Date
CN210912793U true CN210912793U (en) 2020-07-03

Family

ID=71361070

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201921954027.9U Active CN210912793U (en) 2019-11-13 2019-11-13 Floating body of floating aeration equipment and floating fixing device thereof

Country Status (1)

Country Link
CN (1) CN210912793U (en)

Similar Documents

Publication Publication Date Title
JP4629050B2 (en) Support device for at least one turbine driven by water
AU2007206762B2 (en) Gravity foundations for tidal stream turbines
JP2007515588A5 (en)
CN110667788A (en) Floating body of floating aeration equipment and floating fixing device thereof
CN210912793U (en) Floating body of floating aeration equipment and floating fixing device thereof
CN116198671A (en) Ocean floating body, ocean floating body array with wave wall and wind prevention method thereof
CN213442965U (en) Acid and alkali resistant navigation mark
CN113415384B (en) Navigation mark based on Beidou positioning for navigation
CN204713361U (en) Biologic float bed anchor fitting under high wind the wave is high range of water level condition
CN210946744U (en) Water trash device
CN210942161U (en) Basic mounting platform floating on water
CN220786087U (en) A water work platform for constructing bored pile
CN211869632U (en) Fixed connection device of installation base on water operation platform
CN209739292U (en) surface of water photovoltaic power generation board support floating platform
CN217000277U (en) Anti-corrosion structure of coastal structure foundation
CN213141555U (en) Ecological floating bed capable of enhancing stability
CN218156384U (en) Water level detection early warning device
CN213913820U (en) Efficient direction trapezoidal float valve tower tray
CN218577973U (en) Prevent heavy stone device of buoy drift
CN211523083U (en) Soil and water conservation net that hydraulic engineering used
CN211853221U (en) Just, tear formula fixed knot open structure of dredge pump
CN220032170U (en) Floating type unit pontoon
CN214629133U (en) Universal foundation for deep sea cultivation
CN220884735U (en) Rectangular net cage fixed ballast
CN219586726U (en) Ocean bottom-sitting type mounting platform

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
PE01 Entry into force of the registration of the contract for pledge of patent right

Denomination of utility model: A floating body of floating aeration equipment and its floating fixed device

Effective date of registration: 20220530

Granted publication date: 20200703

Pledgee: Bank of Suzhou Co.,Ltd. Shishan road sub branch

Pledgor: NOWAST ENVIRONMENTAL SCIENCE AND TECHNOLOGY (SUZHOU) Co.,Ltd.

Registration number: Y2022320010168

PE01 Entry into force of the registration of the contract for pledge of patent right