CN210910487U - Inflatable pineapple-shaped rubber rod anchor bolt hole accurate positioning and pouring forming die - Google Patents

Inflatable pineapple-shaped rubber rod anchor bolt hole accurate positioning and pouring forming die Download PDF

Info

Publication number
CN210910487U
CN210910487U CN201921324862.4U CN201921324862U CN210910487U CN 210910487 U CN210910487 U CN 210910487U CN 201921324862 U CN201921324862 U CN 201921324862U CN 210910487 U CN210910487 U CN 210910487U
Authority
CN
China
Prior art keywords
pineapple
anchor bolt
inflatable
support
bolt hole
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201921324862.4U
Other languages
Chinese (zh)
Inventor
高福才
弓新亮
李军
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway 12th Bureau Group Co Ltd
Third Engineering Co Ltd of China Railway 12th Bureau Group Co Ltd
Original Assignee
China Railway 12th Bureau Group Co Ltd
Third Engineering Co Ltd of China Railway 12th Bureau Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway 12th Bureau Group Co Ltd, Third Engineering Co Ltd of China Railway 12th Bureau Group Co Ltd filed Critical China Railway 12th Bureau Group Co Ltd
Priority to CN201921324862.4U priority Critical patent/CN210910487U/en
Application granted granted Critical
Publication of CN210910487U publication Critical patent/CN210910487U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)

Abstract

The utility model belongs to building bridge engineering base stone anchor bolt hole construction accuracy control field specifically is an aerify type pineapple line rubber stick anchor bolt hole accurate positioning and pour forming die. Including the base stone steel form, be fixed with at least one support on the base stone steel form, the support including the symmetry set up the support main beam in both sides, be connected with two upper and lower vertical guide beams between the main beam, be provided with girder end uide bushing on the vertical guide beam, connect horizontal guide beam between the longeron end uide bushing of two upper and lower vertical guide beams, set up guide beam scale sign on the horizontal guide beam, the cover has the uide bushing on the crossbeam on the horizontal guide beam, the uide bushing middle part is opened at the crossbeam has the scale window, uide bushing side fixed mounting has the arc wall support on the crossbeam, install the arc wall on the arc wall support, the arc wall both ends are connected through the arc wall buckle between respectively and the arc wall support, install inflatable pineapple line rubber stick between arc wall and the arc wall buckle, inflatable pineapple line rubber stick can wind arc wall pivot rotation.

Description

Inflatable pineapple-shaped rubber rod anchor bolt hole accurate positioning and pouring forming die
Technical Field
The utility model belongs to building bridge engineering base stone anchor bolt hole construction accuracy control field specifically is an aerify type pineapple line rubber stick anchor bolt hole accurate positioning and pour forming die.
Background
For years, in the construction process of anchor bolt holes of highway, railway and municipal bridge cushion stones in national building engineering, the positioning precision of the anchor bolt holes is poor, so that the diameters of the anchor bolt holes are enlarged by 4-6 cm compared with the design in site, PVC plastic pipes are sleeved in the anchor bolt holes to serve as temporary molds of the cushion stone reserved anchor bolt holes, the PVC pipes in the holes are chiseled before beam erecting, and then the hole walls are further chiseled. The positions of some anchor bolt holes are subjected to drilling again at the designed positions due to the fact that curve pre-deviation values are not considered or construction positioning errors are too large. Due to various factors, the pore volume of the anchor bolt is larger and generally exceeds 30-50% of the designed volume, and the excessive consumption of grouting material is very large.
The main reasons for large diameter and inaccurate position of the anchor bolt hole are that the cushion stone template is made of a bamboo plywood, so that the positioning precision is low, the rigidity of the template is poor, and the anchor bolt hole PVC pipe cannot be positioned by using the positioned cushion stone template. In addition, the reinforcing steel bars at the position of the anchor bolt hole are cut off again after the reinforcing steel bars of the cushion are bound, the randomness of the cutting-off position of the reinforcing steel bars is too strong, the cutting-off shape is not round, and the cutting-off range is large. Because the control precision of the reserved position of the anchor bolt hole is low, the reserved hole can surround the designed position of the anchor bolt hole only by arranging a large-diameter PVC pipe. Some reserved anchor bolt hole sites have great difference from the design, the plane position and the verticality do not meet the requirements, and finally secondary drilling is carried out.
The in-process construction cost increases including three aspect, firstly chisels the expense of removing downthehole PVC pipe and pore wall chisel hair, and present labour cost is higher, and this process has the problem that operating space is little, the chisel is removed the degree of difficulty and is big, the efficiency is low. Secondly, the cost of re-drilling with large position deviation and unqualified verticality comprises labor cost and the matching cost of a crane, and the cost of processing one pier exceeds 2000 yuan. Thirdly, the cost of the over-consumption grouting material is high, the density of the grouting material is 2.2, and the price of the grouting material per ton is 2000-3000 yuan. If the project management is not strict, the excess of the grouting material can reach about 50%, and the increased construction cost can reach 100-200 ten thousand yuan. Therefore, if the construction control of a project mainly based on a bridge is not good in the aspect of anchor bolt holes, the loss of construction benefits can reach millions of yuan.
Disclosure of Invention
The utility model discloses a solve above-mentioned problem, provide an aerify type pineapple line rubber stick anchor bolt hole accurate positioning and pour forming die.
The utility model adopts the following technical proposal: an inflatable pineapple grain rubber rod anchor bolt hole accurate positioning and pouring forming die comprises a cushion steel template, at least one bracket is fixed on the cushion steel template, the support include that the symmetry sets up the support main beam in both sides, be connected with two piece upper and lower vertical guide beams between the main beam, be provided with longeron end uide bushing on the vertical guide beam, connect horizontal guide beam between the longeron end uide bushing of two piece upper and lower vertical guide beams, set up the guide beam scale sign on the horizontal guide beam, the cover has the uide bushing on the crossbeam on the horizontal guide beam, open at the uide bushing middle part on the crossbeam has the scale window, uide bushing side fixed mounting has the arc wall support on the crossbeam, install the arc wall on the arc wall support, the arc wall both ends are connected through the arc wall buckle respectively with between the arc wall support, install inflatable pineapple line rubber stick between arc wall and the arc wall buckle, inflatable line rubber stick can wind arc wall pivot rotation.
Furthermore, the combined end of the inflatable pineapple-shaped rubber rod and the arc-shaped groove is a fixed end which is of an unexpanded structure, and an air valve is arranged on the fixed end.
Furthermore, support stand columns are supported at the lower parts of the two ends of the main cross beam, a support secondary cross beam is connected between every two adjacent support stand columns in the transverse direction, and a support secondary longitudinal beam is connected between every two adjacent support stand columns in the longitudinal direction.
Further, 2 groups of supports are installed on the steel template of the cushion stone.
Furthermore, 2 groups of guide sleeves on the cross beam are arranged on the cross guide beam.
Compared with the prior art, the utility model discloses following beneficial effect has:
1. the whole set of die is customized, and the template steel of the cushion stone has large rigidity, small deformation and high turnover rate. At present most base stone template adopt be bamboo plywood or wooden multiply wood, the turnover number of times 1~3 times to bamboo plywood class template rigidity is little, warp big, still needs back lining square timber to consolidate, and the bulk rigidity is less than the steel form, dares not fully to vibrate when pouring, and the template warp greatly, easily runs the mould, and finished product base stone surface quality also is not as effectual as the steel form. The steel template has the advantages of high turnover utilization rate and low comprehensive cost, and saves natural resources such as wood.
2. The support is fixed with the template, and the overall stability and rigidity of the die are improved. 4 anchor bolt hole inflation type pineapple grain rubber sticks are fixed on a double portal frame, the support is fixed with the template after the position is determined, the integral rigidity and stability of the support and the steel template are improved, so that the 4 rubber sticks fixed on the support cannot be pushed to incline or walk in the concrete pouring process, and the stability and hole position precision of the anchor bolt hole rubber sticks are greatly improved.
3. The anchor bolt hole inflatable pineapple-shaped rubber rod is fixed on the support, and scale marks are arranged on the longitudinal and transverse guide beams, so that bidirectional adjustment and accurate positioning can be realized. 4 anchor bolt hole rubber rods of a support are fixed on a set of support, sizes of the anchor bolt holes are different due to different support types, and the 4 anchor bolt holes in the portal frame are adjustable in bidirectional distance and provided with fixing screws, so that accurate positioning is achieved.
4. The inflatable pineapple-shaped rubber rod expands uniformly, and the anchor bolt holes are formed beautifully. Every 4 rubber sticks can set up the valve respectively and also can set up one set of one in four aerifys the linker, aerifys and adopts the aerating device who takes the manometer, aerifys according to design pressure, ensures that atmospheric pressure is unanimous, the inflation is even, reaches ideal pore-forming effect.
5. The pineapple grain inflatable rubber rod is adopted, PVC pipe chiseling and roughening procedures of a conventional anchor bolt hole are reduced, the anchor bolt hole can be controlled according to the designed minimum diameter, grouting materials are saved, and construction cost is reduced. The anchor bolt holes are reserved in the pineapple grain inflatable rubber rods, the rubber rods are inflated and expanded before the stone concrete is poured, the concave-convex height difference of the pineapple grains is about 2mm, air is discharged after the poured concrete is initially set, concave-convex grains are naturally formed in the hole walls, and the process problem that PVC pipes are chiseled off and chiseling is difficult to dry is well solved. And the most important is that the hole diameter of the anchor bolt is not amplified due to accurate positioning, so that the excess consumption of the grouting material is less, the production cost can be obviously saved, and the benefit loss is reduced.
Drawings
FIG. 1 is a plan view of the present invention;
FIG. 2 is an enlarged detail view of the support inverted beam and the guide sleeve on the beam;
FIG. 3 is a cross-sectional view along the bridge direction of the present invention;
FIG. 4 is a cross-sectional view of the present invention;
in the figure, 1-a steel template of a cushion stone, 2-a longitudinal guide beam, 3-a guide sleeve at the end of a longitudinal beam, 4-a main cross beam, 5-a guide sleeve on a cross beam, 6-a transverse guide beam, 7-a guide beam scale mark, 8-a scale window, 9-a guide sleeve fixing screw, 10-a template support, 11-an inflatable pineapple-grain rubber rod, 12-an air valve, 13-an arc groove rotating shaft, 14-an arc groove buckle, 15-an arc groove support, 16-an arc groove, 17-a support secondary longitudinal beam, 18-a support secondary cross beam and 19-a support upright post.
Detailed Description
As shown in figures 1-4, an inflatable pineapple grain rubber rod anchor bolt hole accurate positioning and pouring forming die comprises a base steel template 1, wherein the base steel template 1 is of a rectangular frame structure, a template support 10 is arranged between two long edges, at least one bracket is fixed on the base steel template 1, the bracket comprises bracket main beams 4 symmetrically arranged at two sides, an upper longitudinal guide beam 2 and a lower longitudinal guide beam 2 are connected between the main beams 4, a longitudinal beam end guide sleeve 3 is arranged on the longitudinal guide beam 2, a transverse guide beam 6 is connected between the longitudinal beam end guide sleeves 3 of the upper longitudinal guide beam 2 and the lower longitudinal guide beam 2, a guide beam scale mark 7 is arranged on the transverse guide beam 6, an upper transverse guide sleeve 5 is sleeved on the transverse guide beam 6, a scale window 8 is arranged in the middle of the upper transverse guide sleeve 5, an arc-shaped groove support 15 is fixedly arranged on the side surface of the upper transverse guide sleeve 5, an arc-shaped groove 16 is arranged on the arc-shaped groove support 15, and two ends of the arc-shaped groove 16 are respectively connected with, an inflatable pineapple-grain rubber rod 11 is arranged between the arc-shaped groove 16 and the arc-shaped groove buckle 14, and the inflatable pineapple-grain rubber rod 11 can rotate around the arc-shaped groove rotating shaft 13.
The combined end of the inflatable pineapple-shaped rubber rod 11 and the arc-shaped groove 16 is a fixed end which is of an unexpanded structure, and the fixed end is provided with an air valve 12.
And support upright posts 19 are supported at the lower parts of two ends of the main cross beam 4, a support secondary cross beam 18 is connected between two adjacent support upright posts 19 in the transverse direction, and a support secondary longitudinal beam 17 is connected between two adjacent support upright posts 19 in the longitudinal direction.
2 groups of brackets are arranged on the steel template 1 of the bed stone. The transverse guide beam 6 is provided with 2 groups of transverse beam upper guide sleeves 5.
The utility model discloses an aerify type pineapple line rubber rod support mould accurate positioning anchor bolt hole, this mould complete set fine processing preparation shaping is applicable to bridge base stone support crab-bolt hole site accuracy and reserves the construction. The utility model discloses accord with objective reality, the problem that construction exists is reserved to the present anchor bolt hole of solution that can be fine, and the earlier location installation of bed stone steel form is fixed firm back, and the support depends on the bed stone steel form and fixes, makes support, template overall stability and rigidity improve. The longitudinal and transverse guide beams arranged on the bracket are utilized to realize the adjustable space between the anchor bolt holes through the guide sleeve so as to be suitable for different types of supports. The distance between the anchor bolt holes in the forward bridge direction and the transverse bridge direction can be accurately taken through the scales arranged on the longitudinal guide beam and the transverse guide beam. The side surface of the guide sleeve on the transverse guide beam is provided with an arc groove support and fixes a semi-arc groove, the radian is matched with the fixed end of the rubber rod, the other half of the arc groove is provided with a rotating shaft which can rotate 180 degrees, and the rubber rod can be vertically adjusted and fastened by a buckle. The fixed end of the rubber rod is provided with an air valve or each group of anchor bolt hole rubber rods is provided with an inflation communicating device with four in one, the inflation communicating device is controlled by a small air pump with a pressure gauge, the air is inflated and does not leak before the cushion stone concrete is poured, the air is deflated, the buckle is loosened and the rubber rod is slightly rotated after the concrete is poured from initial setting to final setting, so that the purpose of forming the anchor bolt holes is achieved, and the anchor bolt hole forming device has good practicability. The invention provides a feasible patent scheme by combining the problems existing in the construction of reserved anchor bolt holes of bridge padstones in recent years, field investigation research and abundant working experience, relates to all other embodiments which are the same as or similar to the patent and are obtained by technical personnel in related fields on the premise of not making creative labor, and belongs to the protection scope of the patent of the invention.
As shown in figure 1, the invention takes the railway bridge pier cushion as an example, and other highway and municipal bridge cushions are communicated. Every mound top unilateral base stone of railway contains two sets and rides the anchor bolt hole rubber stick locating support in base stone template both sides, and every set of support is formed by connecting double-portal crossbeam, vertical guide beam, the utility model discloses consider in the lump in the first bridge form manufacturing process on the upper ground, the complete set steel mould of in-process processing realizes having enough to meet the need many times, improves the construction precision. The precision machining mould realizes the position precision and the perpendicularity of the reserved anchor bolt hole plane before and after the stone-filled concrete is poured, so that the hole diameter of the reserved anchor bolt hole does not need to be enlarged, grouting materials are saved, and the processes of chiseling PVC pipes and roughening hole walls are avoided.
In the practical application process, one set of the base stone template is provided with two sets of anchor bolt holes, the lofting of base stone angular points and anchor bolt hole positions is firstly made, base stone reinforcing steel bars are bound, and the base stone steel template is firmly installed and fixed. Two sets of support upright posts are arranged on two sides of the base stone template in a riding mode, and the supports and the template are fixed into a whole after the positions of the support upright posts are roughly adjusted. And finely adjusting the guide sleeve at the end of the transverse guide beam on the longitudinal guide beam to ensure that the central connecting line of the arc-shaped groove on each transverse guide beam is aligned with the lofting point position of the anchor bolt hole, controlling the precision within 5mm and fixing, and then adjusting the guide sleeve on the cross beam to ensure that the center of each arc-shaped groove is aligned with the lofting point position of the anchor bolt hole. The inflatable pineapple-shaped rubber rod is installed, the rubber rod is fixed by fastening the arc-shaped groove buckle after the length of the inflatable pineapple-shaped rubber rod extending into the cushion is determined, the installation accuracy of the rubber rod is rechecked again, fine adjustment is carried out, and the guide sleeve fixing screw is screwed down. Before the cushion concrete is poured, the air pump is utilized to inflate the air valve of the rubber rod to the designed air pressure and check the air tightness, after the cushion concrete is poured, the air is released in the process from initial setting to final setting of the concrete, the rubber rod is slightly rotated until the rubber rod is separated from the cushion concrete, and the air valve is removed and properly kept and moved to the next cushion construction position when the formwork is removed.

Claims (5)

1. The utility model provides an aerify type pineapple line rubber stick anchor bolt hole accurate positioning and pour forming die which characterized in that: comprises a steel template (1) of the base stone, at least one bracket is fixed on the steel template (1) of the base stone, the bracket comprises main beams (4) of the bracket which are symmetrically arranged on two sides, an upper longitudinal guide beam (2) and a lower longitudinal guide beam (2) are connected between the main beams (4), a longitudinal beam end guide sleeve (3) is arranged on the longitudinal guide beam (2), a transverse guide beam (6) is connected between the longitudinal beam end guide sleeves (3) of the upper longitudinal guide beam (2) and the lower longitudinal guide beam (6), a guide beam scale mark (7) is arranged on the transverse guide beam (6), an upper transverse beam guide sleeve (5) is sleeved on the transverse guide beam (6), a scale window (8) is arranged in the middle of the upper transverse beam guide sleeve (5), an arc-shaped groove support seat (15) is fixedly arranged on the side surface of the upper transverse beam guide sleeve (5), an arc-shaped groove (16) is arranged on the arc-shaped groove support seat (15), two ends of the, an inflatable pineapple-grain rubber rod (11) is arranged between the arc-shaped groove (16) and the arc-shaped groove buckle (14), and the inflatable pineapple-grain rubber rod (11) can rotate around the arc-shaped groove rotating shaft (13).
2. The inflatable pineapple rubber stick anchor bolt hole accurate positioning and pouring forming die as claimed in claim 1, wherein: the combined end of the inflatable pineapple-shaped rubber rod (11) and the arc-shaped groove (16) is a fixed end which is of an unexpanded structure, and the fixed end is provided with an air valve (12).
3. The inflatable pineapple rubber rod anchor bolt hole accurate positioning and pouring forming mold as claimed in claim 2, wherein: support upright posts (19) are supported at the lower parts of the two ends of the main cross beam (4), a support secondary cross beam (18) is connected between every two adjacent support upright posts (19) in the transverse direction, and a support secondary longitudinal beam (17) is connected between every two adjacent support upright posts (19) in the longitudinal direction.
4. The inflatable pineapple rubber stick anchor bolt hole accurate positioning and pouring forming mold as claimed in claim 3, wherein: 2 groups of brackets are arranged on the bed stone steel formwork (1).
5. The inflatable pineapple rubber stick anchor bolt hole accurate positioning and pouring forming mold as claimed in claim 4, wherein: and 2 groups of upper beam guide sleeves (5) are arranged on the transverse guide beam (6).
CN201921324862.4U 2019-08-15 2019-08-15 Inflatable pineapple-shaped rubber rod anchor bolt hole accurate positioning and pouring forming die Active CN210910487U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201921324862.4U CN210910487U (en) 2019-08-15 2019-08-15 Inflatable pineapple-shaped rubber rod anchor bolt hole accurate positioning and pouring forming die

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201921324862.4U CN210910487U (en) 2019-08-15 2019-08-15 Inflatable pineapple-shaped rubber rod anchor bolt hole accurate positioning and pouring forming die

Publications (1)

Publication Number Publication Date
CN210910487U true CN210910487U (en) 2020-07-03

Family

ID=71351432

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201921324862.4U Active CN210910487U (en) 2019-08-15 2019-08-15 Inflatable pineapple-shaped rubber rod anchor bolt hole accurate positioning and pouring forming die

Country Status (1)

Country Link
CN (1) CN210910487U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110480806A (en) * 2019-08-15 2019-11-22 中铁十二局集团有限公司 A kind of Puffer-type pineapple line rubber bar anchor hole is accurately positioned and pouring molding mold

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110480806A (en) * 2019-08-15 2019-11-22 中铁十二局集团有限公司 A kind of Puffer-type pineapple line rubber bar anchor hole is accurately positioned and pouring molding mold

Similar Documents

Publication Publication Date Title
NZ532259A (en) Method for establishing a foundation in particular for a tower of a wind energy plant
CN108930404B (en) Unit type adjustable special-shaped curved surface formwork supporting system and pouring forming method
CN210910487U (en) Inflatable pineapple-shaped rubber rod anchor bolt hole accurate positioning and pouring forming die
CN103993750B (en) A kind of reinforcement means of engineering hollow unit
CN105133487A (en) Combined type bridge temporary support and construction method for rapidly building continuous beams by virtue of same
CN201386392Y (en) Concrete hollow supporting body used for wall body construction technique
CN103737718A (en) Prefabricated reinforced concrete hollow column template and making method thereof
CN204343319U (en) Cableway pipe patten pre-embedded anchoring bolts jig
CN209818080U (en) Segmental assembled pipe shed pouring construction structure
CN204780635U (en) Super wide nonprismatic continuous beam 0# piece concreties and relieves construction structures
CN110480806A (en) A kind of Puffer-type pineapple line rubber bar anchor hole is accurately positioned and pouring molding mold
CN208473874U (en) Tunnel portal pipe shed support structure
CN110453916A (en) By the arc beam construction method of adjustable arc beams regularization formwork erecting structure
CN203876035U (en) Precast reinforced concrete hollow column template
CN201610510U (en) Stepless fine-tuning template of plate-type ballastless track base concrete
CN205969435U (en) Piping lane mould is assembled in horizontal many storehouses
CN205976477U (en) Formula of sinking bathroom hangs mould device
CN208917660U (en) Cast-in-place landscape arch bridge
CN110409800B (en) High-precision formwork construction method for cast-in-situ bare concrete wind tunnel
CN200942556Y (en) Prefabricated steel reinforced concrete culvert doorframe-shape component mould
CN207240452U (en) A kind of mould for foam concrete partition plate verticle mould shaping
CN206016259U (en) A kind of adjustable beam die plate reinforcing jacking device
CN206690285U (en) And of Varying Depth PC track girder adjustable forms
CN220133504U (en) Post-cast strip position beam section concrete interception structure
CN206553833U (en) Sleeper for non-fragment orbit linking new and old concrete is constructed

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant