CN210908781U - Water and electricity installation steel pipe welding quick butt joint ware - Google Patents
Water and electricity installation steel pipe welding quick butt joint ware Download PDFInfo
- Publication number
- CN210908781U CN210908781U CN201921833154.3U CN201921833154U CN210908781U CN 210908781 U CN210908781 U CN 210908781U CN 201921833154 U CN201921833154 U CN 201921833154U CN 210908781 U CN210908781 U CN 210908781U
- Authority
- CN
- China
- Prior art keywords
- steel pipe
- butt joint
- installation steel
- clamping
- articulated
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 229910000831 Steel Inorganic materials 0.000 title claims abstract description 41
- 239000010959 steel Substances 0.000 title claims abstract description 41
- 238000003466 welding Methods 0.000 title claims abstract description 28
- 238000009434 installation Methods 0.000 title claims abstract description 22
- 210000001503 joint Anatomy 0.000 title claims abstract description 21
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 title claims abstract description 14
- 230000005611 electricity Effects 0.000 title claims abstract description 13
- 238000010276 construction Methods 0.000 abstract description 10
- 230000008878 coupling Effects 0.000 abstract description 6
- 238000010168 coupling process Methods 0.000 abstract description 6
- 238000005859 coupling reaction Methods 0.000 abstract description 6
- 238000000034 method Methods 0.000 abstract description 3
- 238000010923 batch production Methods 0.000 abstract description 2
- 230000008569 process Effects 0.000 abstract description 2
- 230000000694 effects Effects 0.000 description 4
- 230000008859 change Effects 0.000 description 3
- 230000004048 modification Effects 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000007704 transition Effects 0.000 description 1
- 239000002699 waste material Substances 0.000 description 1
Images
Landscapes
- Arc Welding In General (AREA)
Abstract
The utility model provides a water and electricity installation steel pipe welding quick butt joint ware, including two semi-circular arc splint, the tip of two semi-circular arc splint between articulated connection, be equipped with the interval on the semi-circular arc splint, semi-circular arc splint and double-layered frame are connected, can dismantle the connection through coupling assembling between two double-layered frames. The utility model has the advantages that: the problems that the difference of pipe orifice welding quality is large in the welding connection of water and electricity installation steel pipes, and time and labor are wasted in butt joint are solved; the diameter of the steel pipe can be designed according to drawings, customized and processed, or different semicircular arc steel pipes can be replaced in a detachable mode; the problem of treatment water and electricity installation steel pipe welded connection construction quality that can be fine, if can make into regularization instrument through the deepening design, batch production sells, makes construction process more standardized to can have enough to meet the need the use repeatedly.
Description
Technical Field
The utility model relates to a construction auxiliary assembly especially indicates a quick butt joint ware of water and electricity installation steel pipe welding.
Background
In the field of construction, when a construction work is performed according to drawings, a large number of pipelines, such as pipes for water supply and drainage, electric pipes, pipes for pipelines, and the like, exist in installation works. The design pipes are more steel pipes, and the conventional connection modes of the steel pipes comprise welding, buckling connection, flange connection and the like. Before two pipes are welded during construction of the welded connection steel pipe, the butt joint mode and the butt joint method are greatly influenced by manual operation, so that the welding quality of the connection steel pipe has great difference, such as the problems of overlarge welding seam, dislocation of the welding seam and the like, and the phenomena of time and labor waste and the like exist.
SUMMERY OF THE UTILITY MODEL
The utility model provides a water and electricity installation steel pipe welding quick butt joint ware has solved among the prior art problem that the steel pipe welding quality difference is big, the construction is troublesome hard.
The technical scheme of the utility model is realized like this: the utility model provides a water and electricity installation steel pipe welding quick butt joint ware, includes two semicircle splint, the tip of two semicircle splint between articulated connection, be equipped with the interval on the semicircle splint, semicircle splint are connected with the double-layered frame, can dismantle the connection through coupling assembling between two double-layered frames.
The semicircular arc splint comprises at least two sub-blocks, and a gap is formed between the two sub-blocks.
Articulated connection include articulated shaft and articulated pipe, a semicircle splint are connected with the articulated shaft, articulated shaft movable sleeve is established at the articulated pipe intraductally, another semicircle splint are connected with articulated pipe.
The semicircular arc clamping plate is connected with the stiffening plate, and the stiffening plate is connected with the clamping frame.
The semicircular arc clamping plate is connected with the fixed seat, and the fixed seat is detachably connected with the clamping frame through a screw.
The clamping frame is tangent to the middle part of the semi-arc clamping plate.
The clamping frame is a square tube.
One clamping frame is provided with a fixed shaft, the fixed shaft is provided with a rotating pipe, the rotating pipe is connected with a clamping plate, the other clamping frame is provided with a clamping pipe, and the clamping plate is clamped and matched with the clamping pipe.
The clamping frame is provided with two opposite pull pipes, and an opposite pull screw rod is arranged between the two opposite pull pipes.
The utility model has the advantages that: the problems that the difference of pipe orifice welding quality is large in the welding connection of water and electricity installation steel pipes, and time and labor are wasted in butt joint are solved; the diameter of the steel pipe can be designed according to drawings, customized and processed, or different semicircular arc steel pipes can be replaced in a detachable mode; the problem of treatment water and electricity installation steel pipe welded connection construction quality that can be fine, if can make into regularization instrument through the deepening design, batch production sells, makes construction process more standardized to can have enough to meet the need the use repeatedly.
Drawings
In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings used in the description of the embodiments or the prior art will be briefly described below, it is obvious that the drawings in the following description are only some embodiments of the present invention, and for those skilled in the art, other drawings can be obtained according to these drawings without creative efforts.
FIG. 1 is an expanded view of embodiment 1.
FIG. 2 is a close-up view of example 1.
FIG. 3 is a structural view of embodiment 1.
FIG. 4 is an expanded view of embodiment 2.
FIG. 5 is a close-up view of example 2.
FIG. 6 is a structural view of embodiment 2.
In the figure: 1-semi-circular arc splint I, 3-splint frame, 5-articulated shaft, 6-articulated pipe, 7-stiffening plate, 8-square pipe, 9-fixed shaft, 10-rotating pipe, 11-splint, 12-clamping pipe, 13-fixed seat, 14-screw, 15-counter pulling pipe and 16-counter pulling screw rod.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without any creative effort belong to the protection scope of the present invention.
Example 1
As shown in figures 1 to 3, a water and electricity installation steel pipe welding fast butt joint ware, including two semicircle splint 1, articulated connection between the tip of two semicircle splint 1, one of them semicircle splint 1 includes two piecemeals, forms the interval between two piecemeals, and semicircle splint 1 is connected with clamp frame 3, can dismantle the connection through coupling assembling between two clamp frames 3.
During the use, divide into two steel pipes and put into the semicircle splint from both sides to aim at the interval with welded port, two semicircle splint are closed, then utilize coupling assembling to press the steel pipe between two semicircle splint, because the effect is established to the pressure of two semicircle splint, two accurate stable counterpoints of steel pipe weld labour saving and time saving to the steel pipe in the interval department.
Specifically, semicircle splint 1 includes two piecemeals, forms the interval between two piecemeals, and two piecemeals can be pressed two steel pipes respectively and be established, and it is more nimble convenient to operate.
Specifically, articulated connection includes articulated shaft 5 and articulated pipe 6, and a semicircle splint 1 welds with articulated shaft 5, and articulated shaft 5 movable sleeve establishes in articulated pipe 6, and another semicircle splint 1 welds with articulated pipe 6 to realize the articulated activity of two semicircle splint.
Specifically, semicircle splint 1 welds with stiffening plate 7, and stiffening plate 7 welds with double-layered frame 3, realizes the transition of semicircle splint to double-layered frame, makes double-layered frame 3 tangent with the middle part of semicircle splint 1 simultaneously, makes things convenient for the connector card to establish between two double-layered frames.
Specifically, the double-layered frame 3 is square pipe 8, and the welding is equipped with fixed axle 9 on the square pipe 8 of a double-layered frame 3, and the cover is equipped with change pipe 10 on the fixed axle 9, change pipe 10 and 11 welded connection of cardboard, is equipped with card pipe 12 on the square pipe 8 of another double-layered frame 3, and the cooperation is established with card pipe 12 card to cardboard 11 to realize the connection of dismantling between two double-layered frames, convenient closure and expansion.
Example 2
As shown in figures 4 to 6, a water and electricity installation steel pipe welding fast butt joint ware, including two semicircle splint 1, articulated connection between the tip of two semicircle splint 1, one of them semicircle splint 1 includes two piecemeals, forms the interval between two piecemeals, and semicircle splint 1 is connected with clamp frame 3, can dismantle the connection through coupling assembling between two clamp frames 3.
During the use, divide into two steel pipes and put into the semicircle splint from both sides to aim at the interval with welded port, two semicircle splint are closed, then utilize coupling assembling to press the steel pipe between two semicircle splint, because the effect is established to the pressure of two semicircle splint, two accurate stable counterpoints of steel pipe weld labour saving and time saving to the steel pipe in the interval department.
Specifically, semicircle splint 1 includes two piecemeals, forms the interval between two piecemeals, and two piecemeals can be pressed two steel pipes respectively and be established, and it is more nimble convenient to operate.
Specifically, articulated connection includes articulated shaft 5 and articulated pipe 6, and a semicircle splint 1 welds with articulated shaft 5, and articulated shaft 5 movable sleeve establishes in articulated pipe 6, and another semicircle splint 1 welds with articulated pipe 6 to realize the articulated activity of two semicircle splint.
Specifically, semicircle splint 1 and fixing base 13 welded connection, fixing base 13 can dismantle with double-layered frame 3 through screw 14 and be connected, through the connection of dismantling of fixing base, conveniently change different semicircle splint to use on the steel pipe welding of different diameters. Meanwhile, the clamping frames 3 are tangent to the middle parts of the semi-arc clamping plates 1, so that the two clamping frames can be conveniently connected and clamped.
Specifically, the clamping frame 3 is a square pipe 8, the opposite pulling pipes 15 are welded on the clamping frame 3, the opposite pulling screw rods 16 are arranged between the two opposite pulling pipes 15, and the two clamping frames can be fixed through the structure of the opposite pulling screw rods. Compared with the embodiment 1, the screw rod is simpler and more universal, does not need to be structurally improved, is used more in a construction site, and is slightly inconvenient to operate.
The above description is only a preferred embodiment of the present invention, and should not be taken as limiting the invention, and any modifications, equivalent replacements, improvements, etc. made within the spirit and principle of the present invention should be included in the protection scope of the present invention.
Claims (9)
1. The utility model provides a water and electricity installation steel pipe welding quick butt joint ware, includes two semicircle splint (1), its characterized in that: the end parts of the two semicircular arc clamping plates (1) are connected in an articulated mode, a space is arranged on one semicircular arc clamping plate (1), the semicircular arc clamping plates (1) are connected with the clamping frames (3), and the two clamping frames (3) are detachably connected through the connecting component.
2. The hydro-electric installation steel pipe welding rapid butt joint device according to claim 1, characterized in that: the semicircular arc splint (1) comprises at least two blocks, and a gap is formed between the two blocks.
3. A hydroelectric installation steel pipe welding quick butt joint ware of claim 1 or 2, characterized in that: articulated connection include articulated shaft (5) and articulated pipe (6), a semicircle splint (1) is connected with articulated shaft (5), articulated shaft (5) movable sleeve is established in articulated pipe (6), another semicircle splint (1) is connected with articulated pipe (6).
4. The hydro-electric installation steel pipe welding rapid butt joint device according to claim 1, characterized in that: the semicircular arc clamping plate (1) is connected with the stiffening plate (7), and the stiffening plate (7) is connected with the clamping frame (3).
5. The hydro-electric installation steel pipe welding rapid butt joint device according to claim 1, characterized in that: the semicircular arc clamping plate (1) is connected with the fixed seat (13), and the fixed seat (13) is detachably connected with the clamping frame (3) through a screw (14).
6. A hydroelectric installation steel pipe welding quick butt joint ware of claim 1, 4 or 5, characterized in that: the clamping frame (3) is tangent to the middle part of the semi-arc clamping plate (1).
7. The hydro-electric installation steel pipe welding rapid butt joint device according to claim 1, characterized in that: the clamping frame (3) is a square tube (8).
8. A hydroelectric installation steel pipe welding quick butt joint ware of claim 1 or 7, characterized in that: a fixed shaft (9) is arranged on one clamping frame (3), a rotating pipe (10) is arranged on the fixed shaft (9), the rotating pipe (10) is connected with a clamping plate (11), a clamping pipe (12) is arranged on the other clamping frame (3), and the clamping plate (11) is clamped and matched with the clamping pipe (12).
9. A hydroelectric installation steel pipe welding quick butt joint ware of claim 1 or 7, characterized in that: the clamp frame (3) is provided with two opposite pulling pipes (15), and an opposite pulling screw rod (16) is arranged between the two opposite pulling pipes (15).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201921833154.3U CN210908781U (en) | 2019-10-29 | 2019-10-29 | Water and electricity installation steel pipe welding quick butt joint ware |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201921833154.3U CN210908781U (en) | 2019-10-29 | 2019-10-29 | Water and electricity installation steel pipe welding quick butt joint ware |
Publications (1)
Publication Number | Publication Date |
---|---|
CN210908781U true CN210908781U (en) | 2020-07-03 |
Family
ID=71362741
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201921833154.3U Expired - Fee Related CN210908781U (en) | 2019-10-29 | 2019-10-29 | Water and electricity installation steel pipe welding quick butt joint ware |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN210908781U (en) |
-
2019
- 2019-10-29 CN CN201921833154.3U patent/CN210908781U/en not_active Expired - Fee Related
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN210908781U (en) | Water and electricity installation steel pipe welding quick butt joint ware | |
CN203356945U (en) | Threaded steel tube high-pressure weld joint butt joint device | |
CN212616978U (en) | Novel 90-degree hydraulic switching | |
CN203343689U (en) | Special clamp and welding system applied to pipeline assembly welding | |
CN210510676U (en) | Novel double-clamping type carbon steel three-way pipe fitting | |
CN210070680U (en) | Central tube structure of spiral plate heat exchanger | |
CN110497142B (en) | Automatic centering butt joint structure for steel pipes | |
CN216590411U (en) | Spiral pipe for water conservancy construction drainage | |
CN110303290A (en) | A kind of special fixture welded for BOSS | |
CN201121755Y (en) | Tap | |
CN207347597U (en) | A kind of converter oxygen gun specialized barrel | |
CN208067606U (en) | Boiler's tube-plate anti-deformation tool | |
CN210318991U (en) | Novel double-clamping-pressing type four-way pipe fitting for carbon steel | |
CN218363131U (en) | Large-diameter thick-wall pipe opening aligning device in power station boiler | |
CN204159779U (en) | A kind of Hydraulic expansion-jointing frock | |
CN213105385U (en) | Welding seam adjusting device for producing large-diameter steel pipe | |
CN207548631U (en) | A kind of bell-type windshield special tool for examination and repair | |
CN207695952U (en) | A kind of face-flange-steel-pipe welding centralizer | |
CN214037128U (en) | Pipeline fixing and supporting device for hydraulic engineering construction | |
CN201208687Y (en) | Pairing fixture for producing pipeline | |
CN216867866U (en) | Carbon steel elbow | |
CN218267333U (en) | Detachable welded ball valve | |
CN214417905U (en) | Assembled stainless steel pipe based on submerged arc welding technology | |
CN217045261U (en) | Centering and clamping device for circular tube welding | |
CN201982828U (en) | Ring pressure spigot-and-socket type welding pipe fitting |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20200703 |