CN210908472U - Welding bracket for welding BH profile steel of building in large batch - Google Patents

Welding bracket for welding BH profile steel of building in large batch Download PDF

Info

Publication number
CN210908472U
CN210908472U CN201922000618.9U CN201922000618U CN210908472U CN 210908472 U CN210908472 U CN 210908472U CN 201922000618 U CN201922000618 U CN 201922000618U CN 210908472 U CN210908472 U CN 210908472U
Authority
CN
China
Prior art keywords
welding
right angle
operation platform
sloping
vertical
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201922000618.9U
Other languages
Chinese (zh)
Inventor
完海涛
周晓辉
王引
孟建雄
杓斌
郑兵兵
梁园
曾国洪
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhongshui Fourth Bureau Fuqing Energy Equipment Co ltd
Original Assignee
China Fourth Bureau Of Hydropower Fuqing Equipment Engineering Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Fourth Bureau Of Hydropower Fuqing Equipment Engineering Co ltd filed Critical China Fourth Bureau Of Hydropower Fuqing Equipment Engineering Co ltd
Priority to CN201922000618.9U priority Critical patent/CN210908472U/en
Application granted granted Critical
Publication of CN210908472U publication Critical patent/CN210908472U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Butt Welding And Welding Of Specific Article (AREA)
  • Arc Welding In General (AREA)

Abstract

The utility model provides a welding stent for welding in batches building BH shaped steel, including the operation platform that is located the straight shape of middle growth and the right angle support that is located operation platform both sides and relative operation platform symmetrical arrangement, right angle support include a plurality of along operation platform is linear, interval arrangement's right angle support, right angle support is the slope and arranges to right angle support all is connected, every with longitudinal arrangement's first longeron and second longeron outer sloping that is located the outside and the interior sloping that is located the inboard are supported to the right angle outer sloping and interior sloping all incline in ground and arrange, and are right angle connection between the two to the length of outer sloping is greater than the length of interior sloping. The utility model provides a welding stent, BH shaped steel can be along right angle support longitudinal arrangement, and the submerged arc welding machine of erectting on operation platform can advance and weld BH shaped steel on the right angle support of both sides simultaneously along operation platform in-process that advances.

Description

Welding bracket for welding BH profile steel of building in large batch
Technical Field
The utility model relates to a building steel construction technical field, specific theory relates to a welding stent that is used for big welding building BH shaped steel of batch.
Background
The BH section steel for construction is the most common structural form in construction steel structure plants, bridges and the like, and the BH section steel has different sizes according to different use environments, so that the BH section steel produced by various large steel manufacturers has low efficiency and cannot meet the requirements.
SUMMERY OF THE UTILITY MODEL
The embodiment of the utility model provides a welding stent for welding building BH shaped steel in batches solves the technical problem of shaped steel high-efficient production.
The utility model provides a welding stent for big welding building BH shaped steel, is including the operation platform that is located the straight shape of growth in middle and the right angle support that is located operation platform both sides and relative operation platform symmetrical arrangement, the right angle support includes that a plurality of follows operation platform is linear, interval arrangement's right angle and supports, the right angle is supported and is the slope and arranges to the right angle supports all to be connected with longitudinal arrangement's first longeron and second longeron, first longeron, second longeron all are parallel with operation platform's extending direction, every the right angle supports including the outer sloping that is located the outside and being located inboard interior sloping, and outer sloping and interior sloping all are inclined to ground and arrange, and are the right angle between the two and connect to the length of outer sloping is greater than the length of interior sloping.
The top end of the outer oblique beam is vertically connected to the bottom beam through a vertical first vertical support, the connecting part of the outer oblique beam and the inner oblique beam is supported on the bottom beam, and the top end of the inner oblique beam is vertically connected to the bottom beam through a vertical second vertical support.
The middle part of the outer oblique beam is vertically connected to the bottom beam through a vertical third vertical support.
The first vertical supports are connected to the first longitudinal beam.
And the second vertical supports are connected to the second longitudinal beam.
The operating platform is provided with a track arranged in the extending direction of the operating platform, and the track is used for running of rollers at the bottom of the submerged arc welding machine.
The utility model provides a welding stent for welding building BH shaped steel in batches, BH shaped steel can be along right angle support longitudinal arrangement, and the submerged arc welding machine of erectting on operation platform can advance and weld BH shaped steel on the right angle support of both sides simultaneously along operation platform in-process that advances.
Drawings
The invention may be better understood from the following description of particular embodiments thereof taken in conjunction with the accompanying drawings, in which:
other features, objects and advantages of the invention will become more apparent from the following detailed description of non-limiting embodiments thereof, when read in conjunction with the accompanying drawings, in which like or similar reference characters identify the same or similar features.
FIG. 1 is the utility model discloses a welding stent's for big batch welding building BH shaped steel structural schematic.
Detailed Description
Features and exemplary embodiments of various aspects of the present invention will be described in detail below. In the following detailed description, numerous specific details are set forth in order to provide a thorough understanding of the present invention. It will be apparent, however, to one skilled in the art that the present invention may be practiced without some of these specific details. The following description of the embodiments is merely intended to provide a better understanding of the invention by illustrating examples of the invention. The present invention is in no way limited to any specific configuration and algorithm set forth below, but covers any modification, replacement or improvement of elements, components and algorithms without departing from the spirit of the present invention. In the following description, well-known structures and techniques are not shown in order to avoid unnecessarily obscuring the present invention.
Example embodiments will now be described with reference to the accompanying drawings, which may be embodied in various forms and should not be construed as limited to the embodiments set forth herein; rather, these embodiments are provided so that this disclosure will be thorough and complete, and will fully convey the concept of example embodiments to those skilled in the art.
Furthermore, the described features, structures, or characteristics may be combined in any suitable manner in one or more embodiments. In the following description, numerous specific details are provided to provide a thorough understanding of embodiments of the invention. One skilled in the relevant art will recognize, however, that the invention may be practiced without one or more of the specific details, or with other methods, components, materials, and so forth. In other instances, well-known structures, materials, or operations are not shown or described in detail to avoid obscuring aspects of the invention.
As shown in FIG. 1, the utility model provides a welding stent for welding BH-shaped steel of a building in large quantities, which comprises an operating platform 10 in a straight long shape in the middle and right-angle stents 20 which are arranged at both sides of the operating platform 10 and are symmetrically arranged relative to the operating platform, the right-angle bracket comprises a plurality of right-angle supports which are linearly arranged along the operating platform at intervals, the right-angle supports are obliquely arranged, and the right-angle supports are connected with a first longitudinal beam (not shown in the figure) and a second longitudinal beam (not shown in the figure) which are longitudinally arranged, the first longitudinal beam and the second longitudinal beam are parallel to the extending direction of the operating platform, each right-angle support comprises an outer oblique beam 211 positioned on the outer side and an inner oblique beam 212 positioned on the inner side, the outer oblique beam and the inner oblique beam are obliquely arranged on the ground and are connected at a right angle, and the length of the outer oblique beam is greater than that of the inner oblique beam.
The work platform 10 is used to position a welding machine, such as a submerged arc welding machine 40, so that the welding machine can be rolled along the work platform. The length of the outer stringer is generally much greater than the length of the inner stringer to facilitate the erection of the long end of the BH steel 30 on the outer stringer.
The top end of the outer oblique beam 211 is vertically connected to the bottom beam through a vertical first vertical support 213, the connecting part of the outer oblique beam 211 and the inner oblique beam 212 is supported on the bottom beam 215, and the top end of the inner oblique beam 212 is vertically connected to the bottom beam 215 through a vertical second vertical support 214. Typically the operation platform 10 may be erected on the bottom beam 215, that is the bottom beam 215 extends through the bottom of the operation platform, with the two right angle supports sharing the bottom beam 215.
The middle of the outer sloping beam 211 is connected upright to the bottom beam 215 by a vertical third vertical support 216. The third vertical supports 216 can further improve the supporting strength of the outer oblique beams 211.
The first vertical supports 213 are each connected to a first longitudinal beam.
The second vertical supports 214 are each connected to a second longitudinal beam.
And the operating platform 10 is provided with a track 11 arranged in the extending direction of the operating platform, and the track is used for running of rollers at the bottom of the submerged arc welding machine 40.
The utility model provides a welding stent for welding building BH shaped steel in batches, BH shaped steel can be along right angle support longitudinal arrangement, and the submerged arc welding machine of erectting on operation platform can advance and weld BH shaped steel on the right angle support of both sides simultaneously along operation platform in-process that advances.
It will be appreciated by persons skilled in the art that the above embodiments are illustrative and not restrictive. Different features which are present in different embodiments may be combined to advantage. Other variations to the disclosed embodiments can be understood and effected by those skilled in the art upon studying the specification and the claims. In the claims, the term "comprising" does not exclude other means or steps; the indefinite article "a" does not exclude a plurality; the terms "first" and "second" are used to denote a name and not to denote any particular order.

Claims (6)

1. The utility model provides a welding stent for big welding building BH shaped steel, its characterized in that, is including the operation platform that is located the straight shape of growth in middle and the right angle support that is located operation platform both sides and relative operation platform symmetrical arrangement, the right angle support includes that a plurality of follows operation platform is linear, interval arrangement's right angle and supports, the right angle is supported and is the slope and arrange to the right angle supports all to be connected with the first longeron and the second longeron of longitudinal arrangement, first longeron, second longeron all are parallel with operation platform's extending direction, every the right angle supports including the outer sloping that is located the outside and the interior sloping that is located the inboard, and outer sloping and interior sloping all arrange in ground, and be the right angle between the two and connect to the length of outer sloping is greater than the length of interior sloping.
2. The welding stent for mass welding of construction BH section steel of claim 1,
the top end of the outer oblique beam is vertically connected to the bottom beam through a vertical first vertical support, the connecting part of the outer oblique beam and the inner oblique beam is supported on the bottom beam, and the top end of the inner oblique beam is vertically connected to the bottom beam through a vertical second vertical support.
3. The welding stent for mass welding of construction BH section steel of claim 1,
the middle part of the outer oblique beam is vertically connected to the bottom beam through a vertical third vertical support.
4. The welding stent for mass welding of construction BH section steel of claim 2,
the first vertical supports are connected to the first longitudinal beam.
5. The welding stent for mass welding of construction BH section steel of claim 2,
and the second vertical supports are connected to the second longitudinal beam.
6. The welding stent for mass welding of construction BH section steel of claim 1,
the operating platform is provided with a track arranged in the extending direction of the operating platform, and the track is used for running of rollers at the bottom of the submerged arc welding machine.
CN201922000618.9U 2019-11-19 2019-11-19 Welding bracket for welding BH profile steel of building in large batch Active CN210908472U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201922000618.9U CN210908472U (en) 2019-11-19 2019-11-19 Welding bracket for welding BH profile steel of building in large batch

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201922000618.9U CN210908472U (en) 2019-11-19 2019-11-19 Welding bracket for welding BH profile steel of building in large batch

Publications (1)

Publication Number Publication Date
CN210908472U true CN210908472U (en) 2020-07-03

Family

ID=71361174

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201922000618.9U Active CN210908472U (en) 2019-11-19 2019-11-19 Welding bracket for welding BH profile steel of building in large batch

Country Status (1)

Country Link
CN (1) CN210908472U (en)

Similar Documents

Publication Publication Date Title
CN203199888U (en) Crane
JP2010242316A (en) Method for erecting half-through arch bridge
CN210908472U (en) Welding bracket for welding BH profile steel of building in large batch
CN114194357A (en) Transportation method for container ship chimney segment
CN105113638B (en) A kind of new box corner of arch and preparation method thereof
CN205950596U (en) Triangle -shaped circle pipe truss preparation frock bed -jig
CN208934441U (en) A kind of English truss assembly tooling
CN209778099U (en) Lifting and mounting integrated device for steel truss between sections of arc-shaped roof
CN208151832U (en) A kind of top steel box-girder of introversion formula steel case arch rib Integral lifting system
CN211053657U (en) Material storage table for temporarily storing semi-finished reinforcing steel bars
CN206186088U (en) T roof beam reinforcement bed -jig
CN110485412B (en) Bracket device for pile foundation multi-section reinforcement cage connection construction and use method thereof
CN207434892U (en) For the gantry crane of distillation still
CN210635281U (en) Y-shaped strut for belt conveyor truss
CN209256164U (en) A kind of moulding bed device built for flare tower
CN207465203U (en) A kind of wallboard storage rack
CN207277893U (en) A kind of section steel platform formwork erecting structure for high-altitude overhanging
CN103862203A (en) Assembly, welding and circulation hoist of truss purlins
CN217556952U (en) Support structure for maintaining stable stress of lattice column
CN215015312U (en) Adjustable goods shelf bearing panel
CN210001078U (en) T type belt conveyor truss support
CN215034835U (en) Be applied to detachable steel case roof beam of mountain area topography and assemble bed-jig
CN202963817U (en) Truss purlin tailor-welded rotating crane
CN215319527U (en) Prefabricated box girder reinforcement pedestal locator
CN201292000Y (en) Base station special for suspension rudder arm

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CP03 Change of name, title or address

Address after: Fujian Three Gorges Offshore Wind Power Industrial Park, No.1 Sanxia Road, Jiangyin Port City Economic Zone, Fuqing City, Fuzhou City, Fujian Province

Patentee after: Zhongshui Fourth Bureau (Fuqing) Energy Equipment Co.,Ltd.

Country or region after: China

Address before: Fujian Three Gorges Offshore Wind Power Industrial Park, No.1 Sanxia Road, Jiangyin Port City Economic Zone, Fuqing City, Fuzhou City, Fujian Province

Patentee before: China Fourth Bureau of Hydropower (Fuqing) Equipment Engineering Co.,Ltd.

Country or region before: China

CP03 Change of name, title or address